Pitcombe WARD: TOWER DESCRIPTION: Use of Land for Siting of a Marquee from 15Th April to 15Th October Annually

Total Page:16

File Type:pdf, Size:1020Kb

Pitcombe WARD: TOWER DESCRIPTION: Use of Land for Siting of a Marquee from 15Th April to 15Th October Annually OFFICER: Andrew Collins 01935 462276 APPL.NO: 07/05484/COU APPLICATION TYPE: Change of Use PARISH: Pitcombe WARD: TOWER DESCRIPTION: Use of land for siting of a marquee from 15th April to 15th October annually. GR (367484/134256) LOCATION: Gants Mill Gants Mill Lane Bruton Somerset BA10 0DB APPLICANT: Mr And Mrs Shingler AGENT: Mr D Carpendale Brimble Lea & Partners Wessex House High Street Gillingham Dorset SP8 4AG DATE ACCEPTED: 30 November 2007 Reason for Referral to Committee The proposal is brought to committee at the request of the Chairman due to amount of public interest and as he feels there is a case both for and against the application. Site Description and Proposal The site is located outside of the development area. The mill is Grade II* listed and the dwelling and other buildings on the site are Grade II listed. A Certificate of Lawfulness for a Proposed Use or Development was granted which considered that the use of wedding ceremonies and receptions for 28 days in any year was lawful. However, a informative was attached to the decision that said that any marquee could only be left on the site for 28 days in any year and would need to be taken down between events. Meeting: AE10A 07:08 20 Date: 13.02.08 It is now proposed to retain the marquee on site between 15th April and 15th October. No elevation details have been submitted but the block plan shows a red line measuring 24 metres by 12 metres. History 03/00047/LBC - The installation of additional turbine and generator within mill building - Application permitted with conditions - 10/11/04 07/04428/COL - Application for a Certificate of Lawfulness for the proposed use of land for not more than 28 days in total in any calendar year for wedding ceremonies and receptions - Application Permitted - 19/11/07. Policy Section 38(6) of the Planning and Compulsory Purchase Act 2004 repeats the duty imposed under S54A of the Town and Country Planning Act 1990 and requires that decision must be made in accordance with relevant Development Plan Documents unless material considerations indicate otherwise, Relevant Development Plan Documents Regional Spatial Strategy: VIS1 VIS2 Somerset and Exmoor National Park Joint Structure Plan STR1 (Sustainable Development) STR6 (Development Outside Towns, Rural Centres and Villages) Policy 5 (Landscape Character) Policy 9 (The Built Historic Environment) Policy 48 (Access and Parking) South Somerset Local Plan (Adopted April 2006) ST3 (Development Areas) ST5 (General Principles of Development) ST6 (The Quality of Development) EC3 (Landscape Character) EH5 (Development Proposals Affecting the Setting of Listed Buildings) EP2 (Pollution and Noise) Consultations Area Engineer - "No comment" Climate Change Officer - "It has been brought to my attention through my involvement with the South Somerset Hydropower Group that one of its members - Gants Mill - is making a planning application to erect a marquee for the purpose of holding wedding receptions each summer. This will provide an income for the site owner's daughter and son in law who have recently moved into the cottage at Gants Mill. Gants Mill is an exemplar sustainable tourist destination and B&B (Green Tourism Award) with electricity generated by hydropower and heating provided by wood. The site owner has held - and continues to hold - the position of secretary within the hydropower Meeting: AE10A 07:08 21 Date: 13.02.08 group and also organises hydropower tours of the installations, which were facilitated by grant funding achieved by SSDC. The mill building has been restored and is a useful example of both the historic and modern use of water power that attracts a steady stream of visitors to the area and is also used by local schools. Permission from the council to run up to 28 events a year has already been granted with a "Certificate of Lawful Use." The planning application is to ensure that the marquee does not need to be taken down between each event but only at the end of the summer weddings season. It would seem that the planning application should be supported because; • The marquee will not impact the views of neighbours (from where it cannot be seen) • It will enable the extended family to continue earning a living from this site thus reducing the need to travel • It supports the growth of rural, family run, sustainable tourism • It helps secure future management of site that is an asset to and closely associated with the district." Landscape Officer - "I view a structure with a 5 month period of permanence as a very different proposition to that of an occasional use to a maximum presence of 28 individual days within the calendar year. Given the close proximity of the listed building, and the historic footprint of built form associated with the mill group within the enclosed scale of the valley, I would view a large marquee static for 5 months as imposing a form whose scale and colouration is at variance with the mill site's intrinsic character, and thus suggest refusal on landscape grounds (policy ST 5 para 4)." Conservation Officer - "I agree with the comments made by Robert Archer, Landscape Officer. The buildings have an important group interest as well as individual value. The erection of a large marquee in a prominent position for 5 months of the year will have an adverse affect on this group of associated buildings and is therefore contrary to Policy EH5 of the Local Plan." Area East Regeneration Officer - "I would like to put in comments from the Regeneration perspective in Area East: The Gants Mill proposal is entirely acceptable from the Regeneration perspective and is put forward by a national prize-winning commercial enterprise seriously interested in preserving Heritage and Environment aspects of the property. The proposal is supported by Tourism and Economic Development Officers and also by many local people. I refer to policy ME5 which favours well conceived proposals for rural diversification schemes for Business purposes, consistent in scale and where no unacceptable harm is caused. The proposal is in a narrow valley just outside Bruton which is enclosed by a railway embankment on one side and a hill on the other, and at each end by trees, so the site is only seen by those who deliberately visit. The Business already has substantial numbers of visitors as a tourism attraction. It also runs many events attended at any one time by over 100 people. The proposals put forward to extend into weddings is quite within their rights and is fully justified for economic viability and sustainability in a family devoted to environment and heritage. The proposals put forward mean that a temporary structure would be in place for several months. To continually erect and take down this structure would mean tripling the Meeting: AE10A 07:08 22 Date: 13.02.08 damage to the local environment which seems to deliver no benefit, so I welcome the sensitive and sensible suggestion put forward by Gants Mill for this structure. I do not believe that Robert Archer's view based on policy ST5 applies. Were a site visit to occur, I believe everyone would see that this is a sensible minor change which will provide extra services to the area and improved economic viability to the business with minimal effect on the property and no damage at all to the landscape or the area." Environmental Protection Unit - "EP have no observations regarding this application." Pitcombe Parish Council - No comments received. County Highways - "I refer to the above planning application received in my Department on 12 December 2007. I also refer to my detailed discussions in respect of the history of this site and application and the fact that I have previously given my views on the question which I was asked by the applicant as to whether weddings would be permitted at the site. My comments to the applicant and to your Authority were such that I was not at all satisfied with the safety of the access from Gants Mill Lane out onto Cole Road; coupled with this is the fact that if wedding receptions are held at the site, there could potentially and effectively be 200 vehicles on the single track of Gants Mill Lane which would lead to traffic chaos in the area. However, I understand that a Certificate has now been issued allowing these uses but for only 28 days per year. I would think it difficult to enforce this issue as to when the marquee is and is not in use and to this end I would suggest that it should be erected and removed at such times as wedding parties are booked for the site. It is a matter for your authority to determine and it is difficult for me to recommend the refusal of a marquee as such and can only object to its use as such - which is not stated in the planning application as a description. In the event of permission being granted, I would recommend that the following condition is imposed: The marquee hereby approved shall only be erected and brought into use on no more than 28 days in any calendar year. Reason: In the interests of highway safety due to the capacity of the approach roads to the site." English Heritage - No comments received to date. Previous comments received in relation to this site: County Archaeologist - "As far as we are aware there are limited or no archaeological implications to this proposal and we therefore have no objections on archaeological grounds." Environment Agency - "We have no comment to make on this application." Natural England - "Based on the information provided Natural England have no comment to make on the proposal." Meeting: AE10A 07:08 23 Date: 13.02.08 Representations 40 letters of representation have been received in support of the application.
Recommended publications
  • Micro Hydro Power
    Water power in the South Pennines How to develop a micro hydro scheme Contents 1. OUR HERITAGE 2. INTRODUCTION TO MODERN HYDRO 3. FEASIBILITY STUDIES 4. CAPACITY 5. EQUIPMENT 6. PERMISSIONS 7. THE FINANCIAL BIT 8. LEGAL STRUCTURES 9. OTHER DEVELOPMENT OPTIONS 10. CASE STUDIES © Power from the landscape 2009 1 1. OUR HERITAGE From the earliest times, water power has provided a pivotal role in the development of the South Pennines; from the early corn and fulling mills to the growth of the early Industrial Revolution of the late 18th and early 19th centuries. In the early 1800s water was powering upwards of 100 mills in the upper Calder Valley alone. From the 1840s onwards, it was used to complement steam power and was still being used in some mills well into the 20th century. The evidence is permanently disappearing as the mills shut down, the mill ponds and goits dry up and the landscape changes back to its natural state. At present there are still small fragmented, tantalising clues to this not so distant past in the landscape itself. Our energy needs now are far greater than in the past and water levels have dropped significantly, but new technology can be used to harness the power that once turned the waterwheels. Power from the Landscape aims to make water power a common feature of the landscape once again It has the potential to provide a useful contribution to the power mix of the area, and it is a clean, readily available, environmentally friendly resource, with great heritage and community value.
    [Show full text]
  • Bruton Circular (Via Hauser & Wirth Somerset) Or from Castle Cary
    Bruton Circular Castle Cary to Bruton 1st walk check 2nd walk check 3rd walk check 1st walk check 2nd walk check 3rd walk check 17th June 2017 17th June 2017 Current status Document last updated Saturday, 11th September 2021 This document and information herein are copyrighted to Saturday Walkers’ Club. If you are interested in printing or displaying any of this material, Saturday Walkers’ Club grants permission to use, copy, and distribute this document delivered from this World Wide Web server with the following conditions: • The document will not be edited or abridged, and the material will be produced exactly as it appears. Modification of the material or use of it for any other purpose is a violation of our copyright and other proprietary rights. • Reproduction of this document is for free distribution and will not be sold. • This permission is granted for a one-time distribution. • All copies, links, or pages of the documents must carry the following copyright notice and this permission notice: Saturday Walkers’ Club, Copyright © 2017-2021, used with permission. All rights reserved. www.walkingclub.org.uk This walk has been checked as noted above, however the publisher cannot accept responsibility for any problems encountered by readers. Bruton Circular (via Hauser & Wirth Somerset) or from Castle Cary Start: Bruton Station Finish: Bruton station Bruton Station, map reference ST 687 347, is 45 km west of Salisbury, 31 km south of Bath and 168 km south west of Charing Cross. It lies 72m above sea level. Castle Cary Station, map reference ST 635 335, is 5 km south west of Bruton and 43m above sea level.
    [Show full text]
  • Sprainting Site Preference of European Otter, 2011
    2011 Research Project Word Count 5000 excluding tables Jo Pearse INVESTIGATION INTO SPRAINTING SITE PREFERENCE OF EUROPEAN OTTER LUTRA LUTRA [Type the abstract of the document here. The abstract is typically a short summary of the contents of the document. Type the abstract of the document here. The abstract is typically a short summary of the contents of the document.] Contents Page Chapter 1 Introduction 1.1 Aim 1.2 Study site 1.3 Hypothesis Chapter 2 Literary Review Chapter 3 Method 3.1 Landscapes 3.2 Otter signs 3.3 Table of methodology Chapter 4 Results 4.1 Habitat 4.1.1 Standard symbols for use in River Corridor Surveys 4.1.2 7km stretch of the Brue centred on Bruton 4.1.3 4.1.3 River Corridor Map 1 and Notes 4.1.4 River Corridor Map 2 and Notes 4.1.5 River Corridor Map 3 and Notes 4.1.6 River Corridor Map 4 and Notes 4.1.7 4km stretch of the Alham at Alhampton 4.1.8 River Corridor Map 5 and Notes 4.1.9 River Corridor Map 6 and Notes 4.1.10 River Corridor Map 7 and Notes 4.1.11 River Corridor Map 8 and Notes 4.2 Otter surveys 4.2.1 Background 4.2.2 Main site surveys 4.3 Water testing 4.4 Environment Agency data 4.5 Biological monitoring 4.6 Otter prey – fish data Chapter 5 Discussion 5.1 Habitat 5.2 Otter surveying Jo Pearse 2 5.3 Water analysis 5.4 Biological monitoring 5.5 Pollution events 5.6 Fish availability Chapter 6 Conclusion 6.1 Hypothesis 6.2 Recommendations for further study Chapter 7 References Chapter 8 Appendix 8.1 Oxygen and temperature data 8.2 Nutrient and chemical analysis 8.3 pH levels data 8.4 Otter spraint surveys 8.5 Macroinvertebrate surveys 8.6 Environment Agency fish data 8.7 Environment Agency chemical and nutrient data 8.8 Environment Agency – various 8.9 DNA study 8.10 Total Brue catchment 8.11 Map from 2 day Somerset Otter Group Survey 8.12 Letter from Agency Agency 8.13Risk Assessment Jo Pearse 3 1.Introduction 1.1 Aim To analyse patterns of otter (lutra lutra) sprainting in relationship to the ecology of the environment by investigating and comparing two sites, one known to be used by otters, the other absent of otter signs.
    [Show full text]
  • Peripheral Landscape Study Bruton
    Peripheral landscape study – Bruton Conservation and Design Unit South Somerset District Council March 2008 Peripheral landscape study - Bruton Page No: Contents – 1. Background to study 3 2. The settlement 4 3. Landscape character 5 4. Landscape sensitivity 8 5. Visual sensitivity 10 6. Values and Constraints 13 7. Landscape capacity 14 8. Proposals 15 9. Appendices 17 (1) - capacity matrix (2) - historic landscape character (3) - photos (1-10) 10. Plans - 1) site context and study area - 2) landscape character sensitivity - 3) visual sensitivity - 4) values and constraints - 5) landscape capacity Page 2 of 18 Peripheral landscape study - Bruton 1) Background to the study: 1.1. The forthcoming South Somerset Local Development Framework (LDF) will be required to allocate new development sites for both housing and employment for the period 2006-2026, with the focus of major growth placed upon Yeovil, thereafter the district’s major towns and rural centres. As part of the process of finding suitable sites for development, a landscape study to assess the capacity of the settlement fringe to accommodate new development in a landscape-sympathetic manner, is commissioned. This will complement other evidence-based work that will contribute to the LDF process. 1.2 PPS 7 commends the approach to the identification of countryside character developed by the Countryside Agency (now Natural England) and suggests that it can assist in accommodating necessary change due to development without sacrifice of local character and distinctiveness. National
    [Show full text]
  • Pitcombe Parish Plan 2015
    Pitcombe Parish Plan 2015 19th March 2015 FOREWORD The IP summarised the mainly relevant points of the SSDC Local Plan, which at that time was in the process of re-drafting to take on board latest Government legislation as referred to above. Much of what was stated in the Local Plan then, at least as it applies at our level, has broadly survived into the final SSDC Local Plan THE STATUS OF CURRENT PARISH PLANNING (Feb 2015). However, for completeness, and as a ready reference important to the understanding of implications at our level, relevant aspects of the SSDC Local Plan Where are we? 2015 have been extracted into Annex A. This is a draft of a new Pitcombe Parish Plan 2015, the aim of which is to provide The intention is that Parish Plan 2015 is to take account of, and analyse, the new an opportunity for residents to study and have input before it is finalised. information and its impact and provide more robust conclusions for determining how Pitcombe parish sees its future, and how it intends to influence decisions. The Initial Plan (IP), launched in 2014, was based on analysis of responses by residents to a Questionnaire covering specific issues. This provided a platform for Why create a new parish plan? the development of wider ranging and longer-term policy, which is the intended focus for Pitcombe Plan 2015. Some of the content of the IP is repeated in The Localism Act offers communities more control in the future over their areas, appropriate sections of this plan to preserve extant analysis and provide linkage.
    [Show full text]
  • Catchment Matters
    Issue 5 October 2004 Catchment Matters The newsletter from the Parrett Catchment Project Inside this issue: Communication matters Lobby group consultations - 2 Welcome to Issue 5 of Catchment Matters from the Parrett Catchment Project (PCP), the quar- where does PCP stand? terly bulletin for members, supporters and everyone who wants to hear about the work under- Parrett sluice news 2 way in the Parrett catchment to reduce flood risk and bring water levels under control. Also, out now is Issue 2 of Catchment Matters: Farming Edition, available from the PCP office or website. 2 PCP welcomes a new partner Flood retention 3 Sharing information between members is a key benefit of partnership working, but it’s something demonstrations update that in practice is not so easily achieved. To assist we are developing the PCP website: www. parrettcatchment.info as an information source, where members can submit and access useful 4 Modelling the catchment information, progress updates, PCP policy responses and technical information. A Presentation Are we communicating ? 4 CD is also available from the PCP office. Updated quarterly this assists partners in explaining the whys and wherefores of the Parrett Catchment Project within your organisations and/or to Flood facts 4 external groups. Rising to our next challenge With the JAF ‘Farming Water’ projects well socio-economic change from the Agri- underway the PCP partnership's attention is environment reforms, it has become clear that now turning towards strategy component no. 4: the restoration of natural wetland ecosystems Creation and enhancement of wetland habitats, is vital for the protection of our environment and with very good reason.
    [Show full text]
  • Local Environment Agency Plan
    local environment agency plan BRUE AND AXE CONSULTATION REPORT JULY 1997 E n v ir o n m e n t Ag e n c y Ninonil Information Centre The Environment Agency Rio House Waterside Drive Aztec West BRISTOL BS1 2 +UD Due for return FOREWORD this Local Environment Agency Plan represents a significant step forward in environmental thinking. It has been clear for many years that the problems of land, air and water, particularly in the realm of pollution control, cannot be adequately addressed individually. They are interdependent, each affecting the others. The Government's answer was to create the Environment Agency with the umbrella responsibility for all three. The role and duties of the Agency are set out in this Consultation Report. This holistic approach is now reflected in this Plan. It is a logical development of the Catchment Management Plans prepared by the former National Rivers Authority, now subsumed into the new Agency. It sets out the environmental problems of the area in a way which has not been done before, and suggests the most important issues which should now be addressed. It is, I believe, vital reading for everyone concerned with the future of North Wessex. The catchment of the Rivers Brue and Axe encompasses a varied and complex environment, which includes a major part of the important Somerset Levels and Moors. The Plan covers all the work of the Environment Agency - water management, waste regulation and the control of heavy industrial processes. We look forward to hearing your views on the many environmental issues discussed here and I hope that with the help of our partners we can work towards a better environment in this area.
    [Show full text]
  • SHTAV NEWS HISTORIC TOWNS and VILLAGES 2005 Issue Number 3 of the UK
    JOURNAL <ii the ASSOCIATION OF SMALL SHTAV NEWS HISTORIC TOWNS AND VILLAGES 2005 Issue Number 3 of the UK SUMMER PARTY IN BRUTON On other pages Chipping Campden Landmark Trust Tribute to Dr H.Lane ASHTAV Local miscellany The Inspector Says.. Protect your ATM Summer Party Hydrology Revisited eritage Link thinks Monkey Bikes Anne's Solar Dream Visit to a Brickworks Can't compute ... ASHTAV Where have All .... Fordingbridge AGM 23 Lanes, Boutique Park 24 ASHTAV AGM SATURDAY 22nd OCTOBER I-OR ") NGBR L)GE DO PLEASE TRY TO ATTEND ORE DETAILS ON TH BACK COVER PARTY PROGRAMME NETWORK LUNCHEON THE BULL BRUTON: THE INSIDE STOIO JOHN BISHTON CANTS MILL HYDROLOGY MILLING GARDEN PARTY TEA ustus more coverage on the centre page merchant in Chaucer's 'Canterbury CHIPPING Talcs': CAMPDEN i OVlt/rc/ii/tit n-a.it/ior m't/i fcrfiut! fjortf, Herbert Lane's ,'jn rnotiU'fcyv /tJtrf/tyi} cji fyeTSB Itv ■Mil-, resting place Coijcji itU iwL'ifa FfauiiiCru.i&li Eovvr {tut, 7Jis£oota cftiApoiTjidre luufjl'tris/y; "1 thank God and ever shall *Jji.i rociis fia sjiufijai<scfomj3tiefy, It is the sheepe hath payed wcuiiujiqe a/way t/uyjicrco c(~/ih uy for all." What were Chipping Campden's qualities that enticed Herbert Lane to live there? His library and his meticulous notes reveal just how much he knew about small towns across Europe and bow passionately he cared for them. He had read G.M.Trevelyn's description of Campden : "the most beautiful village street now left in the island". An inveterate traveller by public transport, he possessed first-hand knowledge of so many places, so what extra dowry did Chipping Campden bring to their marriage? Chipping Campden is remarkable for it has remained the same size tor seven hundred years.
    [Show full text]
  • 5 Understanding Flood Risk In
    5 Understanding flood risk in MDC One of the key purposes of this SFRA is to identify the influential local flood risk issues and to summarise recorded local flood incidents and predicted flood risk to the area. Flood risk can arise from a variety of different sources, as described within this section. Often however, flooding originates from a combination of courses as flood mechanisms are integrated. 5.1 How flood risk is assessed A flood is now formally defined in the Flood and Water Management Act (2010) as “any case where land not normally covered by water becomes covered by water”. The Act also states that a flood, as defined above, can be caused by: • Heavy rainfall • A river overflowing, or its banks being breached • A dam overflowing or being breaches • Tidal waters • Groundwater • Anything else (including a combination of factors) In the context of the FWMA (2010) a flood does not include: • A flood from any part of a sewerage system, unless wholly or partly caused by an increase in the volume of rainwater (including snow and other precipitation) entering or otherwise affecting the system • A flood caused by a burst water main (within the meaning given by section 219 of the Water Industry Act 1991) The FWMA (2010) states that flood risk “means a risk in respect of flood”, where risk is “assessed and expressed (as for insurance and scientific purposes) as combination of the probability of the occurrence with its potential consequences”. Thus, it is possible to define and express flood risk as: Consequences Flood Flood Receptor Receptor = Probability X Hazard X presence X Vulnerability Risk Magnitude 5.2 Historical flooding Mendip District has a history of documented flood events with the main sources being from fluvial flooding, with surface water flooding also significant.
    [Show full text]