BLM Handbook H-3809-1 Surface Management Handbook

Total Page:16

File Type:pdf, Size:1020Kb

BLM Handbook H-3809-1 Surface Management Handbook Form 1221-2 (June 1969) UNITED STATES Release DEPARTMENT OF THE INTERIOR 3-336 BUREAU OF LAND MANAGEMENT Date MANUAL TRANSMITTAL SHEET 09/17/2012 Subject H – 3809-1 – Surface Management 1. Explanation of Materials Transmitted: This release transmits an entirely new Handbook Section, H-3809-1 - Surface Management. The Handbook incorporates changes in policies resulting from the revision of regulations in 43 CFR 3809. 2. Reports Required: None 3. Materials Canceled: None 4. Filing Instructions: File as directed below REMOVE INSERT N/A H – 3809 -1 (339 pages) /s/ Michael D. Nedd Michael D. Nedd Assistant Director, Minerals and Realty Management This Page Left Blank Surface Management Handbook BLM Handbook H-3809-1 This Page Left Blank BLM HANDBOOK Rel. 3-336 09/17/2012 H-3809-1 – SURFACE MANAGEMENT HANDBOOK – (Public) i Table of Contents Chapter 1 Introduction ................................................................................................................. 1-1 1.1 Purpose ............................................................................................................................... 1-1 1.2 Objective ............................................................................................................................ 1-1 1.3 Authorities.......................................................................................................................... 1-1 1.3.1 Statutes ........................................................................................................................ 1-1 1.3.2 Regulations ................................................................................................................. 1-1 1.4 Roles and Responsibilities ................................................................................................. 1-2 1.4.1 BLM Director.............................................................................................................. 1-2 1.4.2 BLM State Director..................................................................................................... 1-2 1.4.3 District, Field, and Monument Managers ................................................................... 1-2 1.4.4 Program Specialist ...................................................................................................... 1-3 1.4.5 Delegation of Authority .............................................................................................. 1-4 Chapter 2 Casual Use Activity ..................................................................................................... 2-1 2.1 Negligible Disturbance ...................................................................................................... 2-1 2.2 Not Casual Use .................................................................................................................. 2-1 2.2.1 Cumulative Effects...................................................................................................... 2-2 2.2.2 Occupancy................................................................................................................... 2-2 2.2.3 Operator Notification .................................................................................................. 2-2 Chapter 3 Operations Conducted Under Notices ......................................................................... 3-1 3.1 Pre-January 20, 2001 Notice-Level Operations ................................................................. 3-1 3.1.1 Continued Pre-2001 Operations .................................................................................. 3-1 3.1.2 Extended Pre-2001 Notice .......................................................................................... 3-1 3.1.3 Change of Operator on Pre-2001 Notice .................................................................... 3-2 3.1.4 Modified Pre-2001 Notice .......................................................................................... 3-2 3.1.5 Additional Acreage on Pre-2001 Notice ..................................................................... 3-2 3.1.6 Expired Pre-2001 Notice............................................................................................. 3-3 3.2 Filing a Notice.................................................................................................................... 3-3 3.2.1 Required Filing ........................................................................................................... 3-3 3.2.2 Reviewing the Filing ................................................................................................... 3-7 3.2.3 Operator Notification ................................................................................................ 3-10 3.2.4 Authorization ............................................................................................................ 3-12 3.2.5 Commencing Operations .......................................................................................... 3-13 3.3 Notice Modification ......................................................................................................... 3-13 3.3.1 Modifying a Notice ................................................................................................... 3-13 3.3.2 BLM Required Modification .................................................................................... 3-13 3.3.3 Modification Review ................................................................................................ 3-14 3.3.4 Commencing Operations .......................................................................................... 3-14 3.3.5 Continued Operations ............................................................................................... 3-14 3.3.6 Change of Operator ................................................................................................... 3-14 3.4 Notice Term ..................................................................................................................... 3-14 3.4.1 Initial Term ............................................................................................................... 3-14 3.4.2 Notice Extension ....................................................................................................... 3-15 3.5 Expired Notice ................................................................................................................. 3-17 3.5.1 Inspection .................................................................................................................. 3-17 BLM HANDBOOK Rel. 3-336 09/17/2012 H-3809-1 – SURFACE MANAGEMENT HANDBOOK – (Public) ii 3.5.2 Closing the Case File ................................................................................................ 3-17 Chapter 4 Plan of Operations – Content and Processing ............................................................. 4-1 4.1 Requirement to File a Plan of Operations .......................................................................... 4-1 4.1.1 Existing Plans of Operations ....................................................................................... 4-2 4.2 Plans of Operations - Overview of Processes .................................................................... 4-2 4.2.1 Plan Review Timeline ................................................................................................. 4-3 4.2.2 Plan Review Level of Detail and Effort ...................................................................... 4-3 4.3 Plan of Operations – Filing and Content............................................................................ 4-4 4.3.1 Pre-Plan Coordination ................................................................................................. 4-4 4.3.2 Completeness Requirement ...................................................................................... 4-13 4.3.3 Proposed Operations and Operator Identification..................................................... 4-13 4.3.4 Additional Information Requirements ...................................................................... 4-29 4.3.5 Reclamation Cost Estimate Information Requirement ............................................. 4-31 4.4 Processing the Plan of Operations ................................................................................... 4-32 4.4.1 Completeness Review ............................................................................................... 4-32 4.4.2 NEPA Analysis ......................................................................................................... 4-39 4.4.3 Issuing a Decision ..................................................................................................... 4-44 4.5 Beginning Operations ...................................................................................................... 4-48 4.5.1 State and Federal Permit Requirements .................................................................... 4-48 4.5.2 Phased Approvals or Development ........................................................................... 4-48 4.6 Modifications to Plans of Operations .............................................................................. 4-49 4.6.1 Operator Requested Modifications ........................................................................... 4-49 4.6.2 Required Modifications ............................................................................................ 4-49 4.6.3 BLM Review of Plan Modifications ........................................................................
Recommended publications
  • From Base Metals and Back – Isamills and Their Advantages in African Base Metal Operations
    The Southern African Institute of Mining and Metallurgy Base Metals Conference 2013 H. de Waal, K. Barns, and J. Monama From base metals and back – IsaMills and their advantages in African base metal operations H. de Waal, K. Barns, and J. Monama Xstrata IsaMill™ technology was developed from Netzsch Feinmahltechnik GmbH stirred milling technology in the early 1990s to bring about a step change in grinding efficiency that was required to make Xstrata’s fine-grained lead/zinc orebodies economic to process. From small-scale machines suited to ultrafine grinding, the IsaMill™ has developed into technology that is able to treat much larger tonnages, in coarser applications, while still achieving high energy efficiency, suited for coarser more standard regrind and mainstream grinding applications. The unique design of the IsaMillTM, combining high power intensity and effective internal classification, achieves high energy efficiency and tight product distribution which can be effectively scaled from laboratory scale to full-sized models. The use of fine ceramic media also leads to significant benefits in downstream flotation and leaching operations. These benefits are key drivers for the adoption of the technology into processing a diverse range of minerals worldwide, and offer major opportunities for power reduction and improved metallurgy for the African base metal operations. Keywords: IsaMill, regrind, energy efficiency, inert grinding. Introduction The development of the IsaMillTM, by MIM (now GlencoreXstrata) and Netzsch Feinmahltechnik GmbH, was initiated to enable the development of the fine-grained ore deposits at Mt Isa and McArthur River in Northern Australia. To liberate the valuable minerals and so produce a saleable concentrate this ultrafine-grained ore needed to be ground to a P80 of 7 μm.
    [Show full text]
  • Some Problems and Potentials of the Study of Cupellation
    Some problems and potentials of the study of cupellation remains: the case of post-medieval Montbéliard, France Marcos Martinon-Torres, Nicolas Thomas, Thilo Rehren, Aude Mongiatti To cite this version: Marcos Martinon-Torres, Nicolas Thomas, Thilo Rehren, Aude Mongiatti. Some problems and po- tentials of the study of cupellation remains: the case of post-medieval Montbéliard, France. Archeo- sciences, revue d’Archéométrie, G.M.P.C.A./Presses universitaires de Rennes, 2008, pp.59-70. halshs- 00599974 HAL Id: halshs-00599974 https://halshs.archives-ouvertes.fr/halshs-00599974 Submitted on 19 Jun 2011 HAL is a multi-disciplinary open access L’archive ouverte pluridisciplinaire HAL, est archive for the deposit and dissemination of sci- destinée au dépôt et à la diffusion de documents entific research documents, whether they are pub- scientifiques de niveau recherche, publiés ou non, lished or not. The documents may come from émanant des établissements d’enseignement et de teaching and research institutions in France or recherche français ou étrangers, des laboratoires abroad, or from public or private research centers. publics ou privés. Some problems and potentials of the study of cupellation remains: the case of early modern Montbéliard, France Problèmes et perspectives à partir de l’étude des vestiges archéologiques issus de la coupellation : l’exemple du site de Montbéliard (France) Marcos Martinón-Torres*, Nicolas Thomas**, Thilo Rehren*, and Aude Mongiatti* Abstract: Bone-ash cupels are increasingly identified in medieval and later archaeological contexts related to the refining of noble metals in alchemy, assaying, jewellery or coin minting. These small finds may provide information on metal refining activities, the technical knowledge of different craftspeople, and the versatility of laboratory practices, which often differed from the standard protocols recorded in metallurgical treatises.
    [Show full text]
  • Fine Tuning Your GOLD BUDDY Drywasher. Drywashers Are an Excellent Tool to Recover Gold from Dry Material
    Drywasher Components Hopper: This is where you place the raw material. A classifier screen separates the material by size allow- ing the smaller material to enter the hopper and discarding the material that is too large to pass through the machine. Angle Adjustment: Changes the angle of the Recovery Box by adjusting the chain length. Flow Gate: This is a slide gate that controls the size of Recovery Box: This is the the opening at the bottom of lower box that is pressurized the hopper which regulates by the blower and collects how fast the material in the values in the riffle system. hopper enters the recovery box. Rear Leg: Frame: This is the steel structure that holds the components in place. For illustration purposes we are calling the leg where the fine material exits the drywasher the “Front Leg” and the leg where the larger material falls off the drywasher Front Leg: the “Rear Leg”. Setting up the Hopper / Frame Step 1: Your drywasher may have slightly different frame components than the illustration but the easiest way to as- semble a drywasher is usually to place the Hopper on the ground upside down. The upper part of the front and rear legs are at- tached to the hopper and need to be lifted so that the point where they intersect can be bolted together making the frame rigid. Step 2: Attach the bottom portions of the legs and secure them with the hardware provided. The bottom portions are differ- ent widths so you cannot get them mixed up. Step 3: Flip the assembled unit right side up and it should look like this.
    [Show full text]
  • S Ndlovu (PDF)
    Extraction of Gold Then, Now and the Future Prof Sehliselo Ndlovu DST/NRF SARChI: Hydrometallurgy and Sustainable Development University of the Witwatersrand, Johannesburg Building a Robust Minerals Industry 3 – 4 July 2017, Cresta Lodge, Harare University of the Witwatersrand Johannesburg Founded Oct. 1896: School of Mines Approx. 37 000 Students 5 Faculties, 33 Schools, 3610 Courses >160 000 Degrees Conferred since 1922 55% Female Students 10 National Centres of Excellence Home to the Bidvest Football Club( Current PSL league Champions) Evolution in Gold Processing Past Technologies • Amalgamation • Panning Current Technologies • Cyanide leaching • Processing of Emerging and Future refractory ores Technologies • Bio-oxidation • Ionic liquids • Alternative leaching • Ultrasonic leaching reagents • Corn starch?? Past Technologies Used in Ancient Times History of gold extends back at least 6,000 years. Egypt and Mesopotamia around 4000 BC. Gravity Separation: Gold Panning Gold concentrated by washing lighter river sands with water Leaves dense gold particles Alternative- wash gold-bearing sand and gravel over a woollen fleece Traps heavier gold dust that would sink into the wool fibres. Advantages • Simplicity Disadvantages • Labour intensive Gravity Separation: Sluicing • Water is channelled to flow through a sluice-box. • Sluice-box is essentially a man-made channel with riffles (barriers) at the bottom. • Riffles create dead-zones in the water current which allows gold to drop out of suspension. Sluicing and panning results in the direct recovery of small gold nuggets and flakes. Gold Parting: Salt Cementation Process • Invented to remove Ag from Au-Ag mixtures around 6th century BC. Mix: argentiferous gold foil, common salt, brick dust or burnt clay and urine in a sealed container.
    [Show full text]
  • Mineral Processing
    Mineral Processing Foundations of theory and practice of minerallurgy 1st English edition JAN DRZYMALA, C. Eng., Ph.D., D.Sc. Member of the Polish Mineral Processing Society Wroclaw University of Technology 2007 Translation: J. Drzymala, A. Swatek Reviewer: A. Luszczkiewicz Published as supplied by the author ©Copyright by Jan Drzymala, Wroclaw 2007 Computer typesetting: Danuta Szyszka Cover design: Danuta Szyszka Cover photo: Sebastian Bożek Oficyna Wydawnicza Politechniki Wrocławskiej Wybrzeze Wyspianskiego 27 50-370 Wroclaw Any part of this publication can be used in any form by any means provided that the usage is acknowledged by the citation: Drzymala, J., Mineral Processing, Foundations of theory and practice of minerallurgy, Oficyna Wydawnicza PWr., 2007, www.ig.pwr.wroc.pl/minproc ISBN 978-83-7493-362-9 Contents Introduction ....................................................................................................................9 Part I Introduction to mineral processing .....................................................................13 1. From the Big Bang to mineral processing................................................................14 1.1. The formation of matter ...................................................................................14 1.2. Elementary particles.........................................................................................16 1.3. Molecules .........................................................................................................18 1.4. Solids................................................................................................................19
    [Show full text]
  • Principles of Extractive Metallurgy Lectures Note
    PRINCIPLES OF EXTRACTIVE METALLURGY B.TECH, 3RD SEMESTER LECTURES NOTE BY SAGAR NAYAK DR. KALI CHARAN SABAT DEPARTMENT OF METALLURGICAL AND MATERIALS ENGINEERING PARALA MAHARAJA ENGINEERING COLLEGE, BERHAMPUR DISCLAIMER This document does not claim any originality and cannot be used as a substitute for prescribed textbooks. The information presented here is merely a collection by the author for their respective teaching assignments as an additional tool for the teaching-learning process. Various sources as mentioned at the reference of the document as well as freely available material from internet were consulted for preparing this document. The ownership of the information lies with the respective author or institutions. Further, this document is not intended to be used for commercial purpose and the faculty is not accountable for any issues, legal or otherwise, arising out of use of this document. The committee faculty members make no representations or warranties with respect to the accuracy or completeness of the contents of this document and specifically disclaim any implied warranties of merchantability or fitness for a particular purpose. BPUT SYLLABUS PRINCIPLES OF EXTRACTIVE METALLURGY (3-1-0) MODULE I (14 HOURS) Unit processes in Pyro metallurgy: Calcination and roasting, sintering, smelting, converting, reduction, smelting-reduction, Metallothermic and hydrogen reduction; distillation and other physical and chemical refining methods: Fire refining, Zone refining, Liquation and Cupellation. Small problems related to pyro metallurgy. MODULE II (14 HOURS) Unit processes in Hydrometallurgy: Leaching practice: In situ leaching, Dump and heap leaching, Percolation leaching, Agitation leaching, Purification of leach liquor, Kinetics of Leaching; Bio- leaching: Recovery of metals from Leach liquor by Solvent Extraction, Ion exchange , Precipitation and Cementation process.
    [Show full text]
  • Table of Contents
    Table of Contents Preface ........................................... xi Chapter 1. Physical Extraction Operations .................... 1 1.1. Solid-solid and solid-fluid separation operations .............. 1 1.1.1. Flotation ................................... 1 1.1.2. Settling under gravity ........................... 3 1.1.3. Centrifugation ................................ 3 1.1.4. Filtration ................................... 4 1.2. Separation operations of the components of a fluid phase ........ 5 1.2.1. Condensation ................................ 5 1.2.2. Vacuum distillation ............................. 5 1.2.3. Liquation ................................... 6 1.2.4. Distillation .................................. 8 1.2.5. Extractive distillation ........................... 11 1.3. Bibliography ................................... 12 Chapter 2. Hydrometallurgical Operations .................... 15 2.1. Leaching and precipitation operations .................... 15 2.1.1. Leaching and precipitation reactors ................... 15 2.1.2. Continuous stirred tank reactor (CSTR) ................ 18 2.1.3. Models of leaching and precipitation operations ........... 20 2.1.4. Particle-size distribution (PSD) functions ............... 21 2.2. Reactor models based on particle residence time distribution functions ........................................ 24 2.2.1. Performance equations for a single CSTR ............... 24 2.2.2. Performance equations for multistage CSTRs ............. 28 2.3. Reactor models based on the population balance
    [Show full text]
  • A History of Tailings1
    A HISTORY OF MINERAL CONCENTRATION: A HISTORY OF TAILINGS1 by Timothy c. Richmond2 Abstract: The extraction of mineral values from the earth for beneficial use has been a human activity- since long before recorded history. Methodologies were little changed until the late 19th century. The nearly simultaneous developments of a method to produce steel of a uniform carbon content and the means to generate electrical power gave man the ability to process huge volumes of ores of ever decreasing purity. The tailings or waste products of mineral processing were traditionally discharged into adjacent streams, lakes, the sea or in piles on dry land. Their confinement apparently began in the early 20th century as a means for possible future mineral recovery, for the recycling of water in arid regions and/or in response to growing concerns for water pollution control. Additional Key Words: Mineral Beneficiation " ... for since Nature usually creates metals in an impure state, mixed with earth, stones, and solidified juices, it is necessary to separate most of these impurities from the ores as far as can be, and therefore I will now describe the methods by which the ores are sorted, broken with hammers, burnt, crushed with stamps, ground into powder, sifted, washed ..•. " Agricola, 1550 Introduction identifying mining wastes. It is frequently used mistakenly The term "tailings" is to identify all mineral wastes often misapplied when including the piles of waste rock located at the mouth of 1Presented at the 1.991. National mine shafts and adi ts, over- American. Society for Surface burden materials removed in Mining and Reclamation Meeting surface mining, wastes from in Durango, co, May 1.4-17, 1.991 concentrating activities and sometimes the wastes from 2Timothy c.
    [Show full text]
  • Mineral Beneficiation Contents
    Lecture 10: Mineral Beneficiation Contents: Preamble What constitutes mineral beneficiation Size reduction technology Concentration technologies: Basics Recovery and grade Separation efficiency Illustration on separation efficiency Concentration methods Conclusions References Keywords: mineral beneficiation, Milling, gravity concentration flotation Preamble Mineral beneficiation is the first step in extraction of metal from natural resources. With the depletion of high grade metal ores it is important to increase the metal grade of an ore by physical methods; which are termed mineral beneficiation .The objectives of mineral beneficiation are • To increase the metal grade of ore • To reduce the amount of gangue minerals so that lower volume of slag forms in pyromettallurgical extraction of metals .Slag contains mostly gangue minerals. • To decrease the thermal energy required to separate liquid metal from gangue minerals. • To decrease the aqueous solution requirement in hydrometturgical extraction of metals. In this lecture, mineral beneficiation science and technology are briefly reviewed so that readers can apply materials balance principles. Details about the mineral beneficiation can be studied in the reference given in this lecture. What constitutes mineral beneficiation? Ore is an aggregate of minerals and contains valuable and gangue minerals .The mineral beneficiation involves separations of gangue minerals from ore and is done in the following two stages: 1. Liberation of valuable mineral by size reduction technologies. In most ores the valuable minerals is distributed in the matrix of ore. 2. Concentration technologies to separate the gangue minerals and to achieve increase in the content of the valuable mineral to increase the metal grade. Sizes reduction technologies Size reduction or communication is an important step and may be used 9 To produce particles of required sizes and shapes 9 To liberate valuable mineral so that it can be concentrated.
    [Show full text]
  • Method for Coating Mineral Granules to Improve Bonding to Hydrocarbon-Based Substrate and Coloring of Same
    Michigan Technological University Digital Commons @ Michigan Tech Michigan Tech Patents Vice President for Research Office 10-29-2013 Method for coating mineral granules to improve bonding to hydrocarbon-based substrate and coloring of same Bowen Li [email protected] Ralph Hodek [email protected] Domenic Popko Jiann-Yang Hwang [email protected] Follow this and additional works at: https://digitalcommons.mtu.edu/patents Part of the Mining Engineering Commons Recommended Citation Li, Bowen; Hodek, Ralph; Popko, Domenic; and Hwang, Jiann-Yang, "Method for coating mineral granules to improve bonding to hydrocarbon-based substrate and coloring of same" (2013). Michigan Tech Patents. 125. https://digitalcommons.mtu.edu/patents/125 Follow this and additional works at: https://digitalcommons.mtu.edu/patents Part of the Mining Engineering Commons US008568524B2 (12) United States Patent (io) Patent No.: US 8,568,524 B2 Li et al. (45) Date of Patent: Oct. 29,2013 (54) METHOD FOR COATING MINERAL 106/472, 474, 475, 481, 482, 483, 486, 490, GRANULES TO IMPROVE BONDING TO 106/502, 284.04; 427/186; 588/256 HYDROCARBON-BASED SUBSTRATE AND See application file for complete search history. COLORING OF SAME (56) References Cited (75) Inventors: Bowen Li, Chassell, MI (US); Ralph Hodek, Chassell, MI (US); Domenic U.S. PATENT DOCUMENTS Popko, Lake Linden, MI (US); 2,118,898 A * 5/1938 Price ............. 428/145 Jiann-Yang Hwang, Chassell, MI (US) 3,397,073 A * 8/1968 Fehner .......... 428/405 4,378,403 A 3/1983 Kotcharian (73) Assignee: Michigan Technology University, 5,240,760 A 8/1993 George et al. Houghton, MI (US) 5,380,552 A 1/1995 George et al.
    [Show full text]
  • Isamill™ Technology Used in Efficient Grinding Circuits
    1 IsaMill™ Technology Used in Efficient Grinding Circuits B.D. Burford1 and L.W. Clark2 High intensity stirred milling is now an industry accepted method to efficiently grind fine and coarse particles. In particular, the IsaMill™, which was invented for, and transformed the fine grinding industry, is now being included in many new comminution circuits in coarser applications. While comminution has always been regarded as important from a processing perspective, the pressure being applied by environmental concerns on all large scale power users, now make highly energy efficient processes more important than ever. The advantages that were developed in fine grinding in the early IsaMill™ installations have been carried over into coarse grinding applications. These advantages include a simple grinding circuit that operates in open circuit with a small footprint, the ability to offer sharp product size classification, as well as the use of inert media in a high energy intensive environment. This paper will examine the use of IsaMill™ technology in fine grinding (P80 below 15 micron), and examine the use of the technology in conventional grinding applications (P80 20 - 150 µm). Recent installations will be examined, including fine and coarse grinding applications, as well as the recent test work that was undertaken using an IsaMill™ in a primary grinding circuit, and the resulting circuit proposal for this site. While comminution has been relatively unchanged for the last century, the need to install energy efficient technology will promote further growth in IsaMill™ installations, and result in one of the biggest challenges to traditional comminution design. 1. Senior Process Engineer, Xstrata Technology, L4, 307 Queen Street, Brisbane 4000, Qld, Australia 2.
    [Show full text]
  • Catalog New Prices 2020 Page 1-18.Cdr
    The Original Backpacking Self-Locking Folding Sluice Box Coin and Relic Over 50,000 Sold Nationwide!! And Counting! $139.00 We have several scoops of different lengths and features · .063" Aluminum Body with Flare to accommodate your every need. We have short handle, · 50" Long (includes Flare) X 9” wide #00001 long handle and convertible scoops that convert from short · 8 Zinc Plated 18 ga. Steel Riffles Patent No. 8,322,536 handles to long handles by screwing on a handle extension. · 16 ga. Aluminum Expanded Metal The long handle is for soft dirt or sand or when you simply · Deep V Ribbed Black Rubber do not want to bend over. The short handle is for Matting for easy Gold ID digging into hard dirt. The 37 perforations on the · Nylon Carry Strap for easy Transport bill make it one ounce lighter and easier to use. · All screws secured by nylock nuts The nut, bolt & washers that secure the handle that never fall off. 43” to the basket are made of stainless steel, so they’ll never rust together. · Fits in a 5 gallon bucket · Weight 7.25 Lbs. 13 1/2” Self locking backpacking stream Sluice Box that folds from 50" to 15" for easy transportation & storage. Supplied with, “How to use” 58 minute instructional DVD. Short and Long Handle Scoops (When purchased directly from Royal) 15” Non-perforated Treasure Scoop (above right) #00093 $32.00 20” Super Flar e $20.00 15” Perforated Treasure Scoop (above left) #00094 $37.00 Increase Productivity! #00002 15” Non-perforated Stainless Steel Treasure Scoop #00095 $58.00 Attach this Super flare to your 50”
    [Show full text]