February2018 53D01a94-04Ff-458A

Total Page:16

File Type:pdf, Size:1020Kb

February2018 53D01a94-04Ff-458A 2017 Year in review Cape Hatteras National Seashore Fort Raleigh National Historic Site Wright Brothers National Memorial STAFF • 79 staff year-round • 100 seasonal staff VISITATION each summer • Total: 3.2 M visits • 352 volunteers • 22,600 hours STAFF • 79 staff year-round • 100 seasonal staff VISITATION each summer • Total: 3.2 M visits • 352 volunteers • 22,600 hours BUDGET • $14.6 M • $9.6 M Base Funding • $2.7 M Off-Road Vehicle Permits • $2.3 M Camping and Lighthouse Fees • $250 K in Other Fees and Donations STAFF • 79 staff year-round • 100 seasonal staff VISITATION each summer • Total: 3.2 M visits • 352 volunteers • 22,600 hours INTERESTING FACTS • 5 visitor centers • 65,000 overnight camping BUDGET stays in 4 campgrounds • $14.6 M • 39,000 off road vehicle • $9.6 M Base Funding permits • $2.7 M Off-Road Vehicle • Over 200 public toilets Permits • 2 water treatment plants • $2.3 M Camping and • 60 septic systems Lighthouse Fees • 84 parking lots • $250 K in Other Fees and • 230 buildings Donations • 3 airstrips STAFF • 79 staff year-round • 100 seasonal staff VISITATION each summer • Total: 3.2 M visits • 352 volunteers • 22,600 hours INTERESTING FACTS • 5 visitor centers • 65,000 overnight camping BUDGET stays in 4 campgrounds • $14.6 M • 39,000 off road vehicle • $9.6 M Base Funding permits • $2.7 M Off-Road Vehicle • Over 200 public toilets Permits • 2 water treatment plants • $2.3 M Camping and • 60 septic systems Lighthouse Fees • 84 parking lots • $250 K in Other Fees and • 230 buildings Donations • 3 airstrips Visits 150,000 200,000 250,000 300,000 350,000 400,000 1998 Fort Raleigh: Fort 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 - 6% 2010 2011 2012 2013 2014 2015 2016 2017 Visits 200,000 300,000 400,000 500,000 600,000 700,000 800,000 Wright Brothers: Brothers: Wright 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 - 2011 10% 2012 2013 2014 2015 2016 2017 Cape Hatteras: 1% 2,900,000 2,700,000 2,500,000 2,300,000 2,100,000 Visits 1,900,000 1,700,000 1,500,000 November Visits 100,000 110,000 120,000 130,000 140,000 150,000 160,000 80,000 90,000 November 2017: highest 2017: November visitation since 1998 visitation 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Hatteras to Ocracoke Data from: the North Carolina Department of Transportation Ferry Division Hatteras to Ocracoke 550000 500000 450000 400000 350000 Passengers 300000 250000 Data from: the North Carolina Department of Transportation Ferry Division Cape Hatteras Lighthouse Parking Lot Cape Hatteras Lighthouse Parking Lot 1,200 1,000 800 600 Vehicles 400 2016 2017 200 0 2017: Warm, average rain Billy Mitchell Airport – departure from 1981-2010 average 2017 1988 2008 1997 1988 Shoreline and Inlet Seashore Zoning - 67 miles - ORV routes: 29 miles - Seasonal ORV routes: 14.5 Miles - Vehicle free areas: 23.5 miles Closures occur for: - sea turtle nesting - shorebird nesting 10 sound ramps 19 beach ramps ORV Permits Sales ONLINE SALES 2015: 14% 2016: 28% 2017: 32% 2017: Most ORV permits sold 40,000 39,181 38,000 36,868 36,000 34,596 34,000 32,000 30,95530,453 30,000 28,000 27,154 permits soldpermits 26,000 24,000 22,000 20,000 2012 2013 2014 2015 2016 2017 94% of ORV routes were open during summer 2017 94% of ORV routes were open during summer 2017 • May through September • 2013: 17.7 miles • 2014: 19.8 miles • 2015: 22.2 miles • 2016: 25.6 miles • 2017: 27.2 miles Visitor Engagement Park Programs Visitors at Junior the Programs Rangers Hatteras 973 18,959 1488 Fort 696 8,481 1388 Raleigh Wright 1,289 57,445 3608 Brothers Total 2,958 84,885 6484 Thank you .
Recommended publications
  • TROPICAL STORM BONNIE (AL022016) 27 May – 4 June 2016
    NATIONAL HURRICANE CENTER TROPICAL CYCLONE REPORT TROPICAL STORM BONNIE (AL022016) 27 May – 4 June 2016 Michael J. Brennan National Hurricane Center 14 October 2016 GOES-13 VISIBLE IMAGE OF BONNIE AT PEAK INTENSITY (1900 UTC 28 MAY 2016). IMAGE COURTESY OF THE U.S. NAVAL RESEARCH LABORATORY TC WEBPAGE. Bonnie was a tropical storm that formed from non-tropical origins northeast of the Bahamas. It made landfall near Charleston, South Carolina, as a tropical depression and brought heavy rainfall to coastal sections of the Carolinas. Tropical Storm Bonnie 2 Tropical Storm Bonnie 27 MAY – 4 JUNE 2016 SYNOPTIC HISTORY Bonnie originated from a mid- to upper-level low that cut off from the mid-latitude westerlies over the Bahamas on 25 May. An inverted surface trough formed about 350 n mi north- northeast of the southeastern Bahamas that day and began to move slowly westward to west- northwestward. Although southwesterly vertical wind shear displaced the convective activity to the north and east of the trough, by 0600 UTC 27 May a well-defined area of low pressure formed about 270 n mi east-northeast of the island of Eleuthera in the central Bahamas. The convective organization gradually increased that day, and a tropical depression formed around 1800 UTC, centered about 180 n mi miles northeast of Great Abaco in the Bahamas. The “best track” chart of the tropical cyclone’s path is given in Fig. 1, with the wind and pressure histories shown in Figs. 2 and 3, respectively. The best track positions and intensities are listed in Table 11.
    [Show full text]
  • North Carolina Airports System Plan (NCASP)
    Albert J. Ellis Airport Ellis J. Albert INDIVIDUAL AIRPORT SUMMARY: AIRPORT INDIVIDUAL 2015 OAJ AIRPORTS SYSTEM PLAN SYSTEM AIRPORTS NORTH CAROLINA NORTH Airport Grouping/Role In 2004, DOA developed and adopted the Airport Groupings Model that used demographic and economic data to identify key community parameters that could be used to determine what type of airport an area could support. Data for the model was updated and groupings were revised as a part of this NCASP. More detail on the model and the methodology are available in the NCASP technical report. The following represent general runway length objectives by Airport Grouping: Yellow Airport: + 6,500' RUNWAY Blue Airport: + 5,000' RUNWAY As part of the NCASP, Albert J. Ellis Airport was classified as Red Airport: + 6,000' RUNWAY Green Airport: + 4,200' RUNWAY a Yellow Airport. 20-Year Costs for NCASP Recommended Projects SELECT PROJECT TYPES/TOTALS Based on the recommendations in the NCASP, it is estimated that at least $1.2 billion is needed in order to meet the target goals for the plan’s Pavement Condition $210M performance measures and ADP objectives. These costs represent planning- Runway Length/Width $178M level estimates to increase the performance and respond to future needs. RPZ $128M ESTIMATED COSTS BY $172M RSA $108M AIRPORT GROUPING $378M 14% 32% $214M Yellow Airports 18% Parallel Taxiway $84M Red Airports $422M GA Terminal $46M Blue Airports 36% Approach Lighting $39M Green Airports 0 5 10 15 20 NCASP ESTIMATED COSTS = $1.2 BILLION PERCENT (%) OF NCASP TOTAL ESTIMATED COSTS There are additional reports and analyses that were undertaken as part of the NCASP.
    [Show full text]
  • Airportguide.Pdf
    Division of Aviation North Carolina 2015 - 16 Airport Guide Table of Contents Message from the Governor....................................................................................3 Flight Service Station /ATC Telephone Numbers ....................................................................................4 Automated Weather Station Frequencies & Numbers....................................................................................5 Airport Guide Legend....................................................................................7 Airport Index By City....................................................................................8 Contacting NCDOT Division of Aviation....................................................................................11 N.C. Airports Information and Diagrams....................................................................................12 Airport Index by Airport Name....................................................................................121 Private Airports Listing....................................................................................124 Important Information Every effort has been made to ensure that the information contained in this guide is accurate and up to date. However, airport situations are constantly changing. As always, you should carefully check current charts, the FAA's Airport Facilities Directory and NOTAMS prior to any flight. This Guide is for planning purposes only. 10,000 copies of this public document printed at a cost of $23,065.52
    [Show full text]
  • Milebymile.Com Personal Road Trip Guide North Carolina Byway Highway # "Outer Banks Scenic Byway"
    MileByMile.com Personal Road Trip Guide North Carolina Byway Highway # "Outer Banks Scenic Byway" Miles ITEM SUMMARY 0.0 Start of Outer Banks Scenic At the Junction of United States Highway #70 with State Highway Byway #101, at Beaufort, North Carolina, in the Inner Banks area of North Carolina, starts Outer Banks Scenic Byway. This Byway visits the barrier islands. Historic towns, scenic ferries, and well-known lighthouses. Seafood cuisine, oceanside hotels, and dozens of attractions, beaches, wildlife preserves, and lighthouses along the scenice byway. 4.4 Junction Merrimon Road / State Route #1300, 5.2 A Bridge A Bridge across North River in Beaufort, North Carolina 6.5 Bettie, North Carolina Old River Road, Community of Bettie, North Carolina in Carteret County, lie on the eastern shore of North River 7.5 Arrington Road Arrington Road that circles around and connects to Old River Road 8.8 Otway, North Carolina State Route #1325 / State Route #1331, Community of Otway, North Carolina 9.4 Straits, North Carolina Harkers Island Road, Straits, North Carolina, Harkers Island, an Island in North Carolina 10.9 Smyrna, North Carolina Marshallberg Road, State Route #1347, Community of Smyrna, North Carolina, Marshallberg, North Carolina, located in Carteret county, North Carolina 13.4 Willston, North Carolina Willston Creek Road, Willston, North Carolina 17.0 Davis, North Carolina Davis Community Road, Davis, North Carolina, 18.6 A Bridge A bridge over Oyster Creek, 20.6 Stacy Loop Road Stacy Loop Road to Brett Bay 21.6 Stacy, North Carolina Community of Stacy, North Carolina, located in Carteret County, North Carolina, on United States Highway #70.
    [Show full text]
  • PEA ISLAND a IONAL 1 RFUUE Narrative Report Fbr the Period
    PEA ISLAND A IONAL 1 RFUUE Narrative Report fbr the Period January 1 trough April 30 I. G N ;PAL A. Weather Conditions B . Habitat Conditions II . WILDLIFE A, Migratory Birds B. Upland Game Birds C . Fur Animals, Rodents, and Other Marls D . Hawks and Eagles E . Fish F . Diseases III . REFUGE DEVELOPMENT AND MAINTEN C A. Maintenance B. Plantings C . Collections and Receipts D . Control ofVegetation E, Planned Burning F . Fires IV . RESOURCES MANAGE €NT 6 V . FIELD INVte3TIGATION 6 VI . PUBLIC RELATIONS A. Recreational Uses B. Refuge Visitors C . Refuge Participation D . Violations VII . OT . FR ITEMS A . Oregon Inlet Ferries 8 B . Photographs 8, 9, 10 and 11 PEA ISLAND I T' REFUGE NAIL TI . REP((BT January 1 throe pra l 30, 1961 Charles F. Noble, Refuge Manager Houston C . Phillips, Wildlife Aid l . JINEERAL A. Weather Conditions Winter lingered on this year t f April. mild, truly spring-like weathe* cue t three w last of February and first of ?larch . Unseasonably cool wea prevailed throughout April with a frost occurring on April 1.9 in the Manteo me&, January prodAced very cold weather with freezes recorded on 16 dates in that m4Dith on the beach frog continued freezing weather is uncommon x xt to the ocean a1 coast line . From the 20th of Janu o the 4th of February, 6 days, minimum temperatures were Wing the longest extended period of cold usage Strong winds at companied much of the cold wsea* t peratut were 17 degrees on January 26 aider88. do The Hatteras weather station reported a 70 mile hour west wind on Sunday mewing, February 26,E before daybreak, is wind pushed water from Pamlico Sound over u ch of the refuge d across the tate highway passing through the refuge Precipitation was 5.24 inches dove normal this f period .
    [Show full text]
  • Measurement, Modeling and Simulation of Ground-Level Tropical Cyclone Winds
    MEASUREMENT, MODELING AND SIMULATION OF GROUND-LEVEL TROPICAL CYCLONE WINDS By FORREST JAMES MASTERS A DISSERTATION PRESENTED TO THE GRADUATE SCHOOL OF THE UNIVERSITY OF FLORIDA IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF DOCTOR OF PHILOSOPHY UNIVERSITY OF FLORIDA 2004 Copyright 2004 by Forrest James Masters ACKNOWLEDGMENTS Kurtis Gurley, Luis Aponte, Gary Consolazio, Jennifer Jacobs, Perry Green, Lou Cattafesta, Tim Reinhold, Scott Robinette, Jon Lamb, Cos Gardener, Greg Kopp, Mark Powell, Eric Ho and Peter Vickery deeply deserve my gratitude. Only with their gracious support did this document make its way into your hands. iii TABLE OF CONTENTS Page ACKNOWLEDGMENTS ................................................................................................. iii LIST OF TABLES............................................................................................................ vii LIST OF FIGURES ......................................................................................................... viii ABSTRACT..................................................................................................................... xiii CHAPTER 1 INTRODUCTION ........................................................................................................1 The Hurricane Wind to Damage Chain ........................................................................1 Research Underway......................................................................................................2 Florida Coastal Monitoring
    [Show full text]
  • NCGS 106-741 Record Notice of Proximity to Farmlands
    N.C.G.S. 106-741 Record Notice of Proximity to Farmlands PARCEL ID OWNER 1 OWNER 2 DEED BK DEED PG 107B00D00660009 103 ADMIRALTY CT TRUST 1454 603 042A00000040000 103 EQUESTRIAN DRIVE TRUST 1450 845 015B00000130000 104 CURRITUCK COMMERCIAL LLC 1409 41 123E00000270000 1085 COLINGTON ROAD LLC 1120 373 0132000019G0000 1120 LLC 1390 816 107B00B00170009 115 EDGEWATER DR TRUST 1416 908 0110000081B0000 123 PROPERTY SERVICES LLC 1444 193 015A00003800000 123 PROPERTY SERVICES LLC 1208 885 015A00003810000 123 PROPERTY SERVICES LLC 1208 885 015A00003820000 123 PROPERTY SERVICES LLC 1208 885 015A00003840000 123 PROPERTY SERVICES LLC 1208 885 015A00003850000 123 PROPERTY SERVICES LLC 1208 885 014J00000690000 123 PROPERTY SERVICES LLC 1183 336 014J00000120000 123 PROPERTY SERVICES LLC 1148 242 014J00000130000 123 PROPERTY SERVICES LLC 1148 244 014J00000760000 123 PROPERTY SERVICES LLC 1148 246 014J00000140000 123 PROPERTY SERVICES LLC 1148 248 004900000140000 134 BAXTER GROVE LLC 990 76 107B00B00190003 136 HOLLY CRESCENT TRUST 1462 892 013200001280000 143 POINT OF VIEW LLC 1318 525 013200001280000 143 POINT OF VIEW LLC 1318 525 013200001290000 143 POINT OF VIEW LLC 1318 525 013200001290000 143 POINT OF VIEW LLC 1318 525 013200001620000 143 POINT OF VIEW LLC 1318 529 013200001620000 143 POINT OF VIEW LLC 1318 529 0060000057D0000 158 INC 408 887 0060000057E0000 158 INC 397 38 040B00C00120002 1900 CAPITAL FUND R PROPERTIES LLC 1460 630 009400000250000 200 BARNARD ROAD LLC 1179 225 124E00000050000 3 WALKER BOYS LLC 1399 630 0110000093A0000 7578 CARATOKE
    [Show full text]
  • KODY LOTNISK ICAO Niniejsze Zestawienie Zawiera 8372 Kody Lotnisk
    KODY LOTNISK ICAO Niniejsze zestawienie zawiera 8372 kody lotnisk. Zestawienie uszeregowano: Kod ICAO = Nazwa portu lotniczego = Lokalizacja portu lotniczego AGAF=Afutara Airport=Afutara AGAR=Ulawa Airport=Arona, Ulawa Island AGAT=Uru Harbour=Atoifi, Malaita AGBA=Barakoma Airport=Barakoma AGBT=Batuna Airport=Batuna AGEV=Geva Airport=Geva AGGA=Auki Airport=Auki AGGB=Bellona/Anua Airport=Bellona/Anua AGGC=Choiseul Bay Airport=Choiseul Bay, Taro Island AGGD=Mbambanakira Airport=Mbambanakira AGGE=Balalae Airport=Shortland Island AGGF=Fera/Maringe Airport=Fera Island, Santa Isabel Island AGGG=Honiara FIR=Honiara, Guadalcanal AGGH=Honiara International Airport=Honiara, Guadalcanal AGGI=Babanakira Airport=Babanakira AGGJ=Avu Avu Airport=Avu Avu AGGK=Kirakira Airport=Kirakira AGGL=Santa Cruz/Graciosa Bay/Luova Airport=Santa Cruz/Graciosa Bay/Luova, Santa Cruz Island AGGM=Munda Airport=Munda, New Georgia Island AGGN=Nusatupe Airport=Gizo Island AGGO=Mono Airport=Mono Island AGGP=Marau Sound Airport=Marau Sound AGGQ=Ontong Java Airport=Ontong Java AGGR=Rennell/Tingoa Airport=Rennell/Tingoa, Rennell Island AGGS=Seghe Airport=Seghe AGGT=Santa Anna Airport=Santa Anna AGGU=Marau Airport=Marau AGGV=Suavanao Airport=Suavanao AGGY=Yandina Airport=Yandina AGIN=Isuna Heliport=Isuna AGKG=Kaghau Airport=Kaghau AGKU=Kukudu Airport=Kukudu AGOK=Gatokae Aerodrome=Gatokae AGRC=Ringi Cove Airport=Ringi Cove AGRM=Ramata Airport=Ramata ANYN=Nauru International Airport=Yaren (ICAO code formerly ANAU) AYBK=Buka Airport=Buka AYCH=Chimbu Airport=Kundiawa AYDU=Daru Airport=Daru
    [Show full text]
  • Airport Master Plan Update
    DARE COUNTY REGIONAL AIRPORT Airport Master Plan Update SECTION 2 – AIRPORT INVENTORY 2.0 INTRODUCTION The inventory is a systematic data collection that provides an understanding of past and present aviation factors and community trends. A comprehensive inventory forms the basis for airport recommendations throughout the Dare County Regional Airport Master Plan Update (AMP). An on-site inspection was conducted by the consultant in January 2005 to note the physical condition of key airport facilities, equipment and services, confirm on-and off-airport land uses, interview key County/Airport constituents, and review Airport activity logs and records. 2.1 MQI AIRPORT LOCATION Exhibit 2-1 depicts the Airport’s location and vicinity. Dare County is located in northeastern North Carolina, on the outer banks of the Atlantic coastline. EXHIBIT 2-1 AIRPORT VICINITY & LOCATION MAP SECTION 2 INVENTORY J:\2301 (Dare)\0402 AMP Update\Report\2301-0402 AMP Section 2 - Inventory (Final).doc Page 2-1 DARE COUNTY REGIONAL AIRPORT Airport Master Plan Update The Airport is situated in the northeastern portion of the County on Roanoke Island. The Town of Manteo is the Airport’s associated city, located 1 mile southeast of the Airport. 2.2 MQI AIRPORT ROLE The Dare County Regional Airport is identified by the FAA National Plan of Integrated Airspace Systems (NPIAS) as a General Aviation (GA) facility designated 16894A. The North Carolina Department of Transportation (NCDOT) 2004 North Carolina Airport Development Plan (NCADP) lists the Airport as a “red-code” facility. The current Airport Layout Plan (ALP) drawing notes the Airport has an FAA Airport Reference Code (ARC) of B-II.
    [Show full text]
  • Ethnohistorical Description of Eight Villages Adjoining Cape Hatteras
    National Park Service U.S. Department of the Interior Cape Hatteras National Seashore Manteo, North Carolina Final Technical Report - Volume One: Ethnohistorical Description of the Eight Villages Adjoining Cape Hatteras National Seashore and Interpretive Themes of History and Heritage Cultural Resources Southeast Region Final Technical Report – Volume One: Ethnohistorical Description of the Eight Villages adjoining Cape Hatteras National Seashore and Interpretive Themes of History and Heritage November 2005 prepared for prepared by Cape Hatteras National Seashore Impact Assessment, Inc. 1401 National Park Drive 2166 Avenida de la Playa, Suite F Manteo, NC 27954 La Jolla, California 92037 in fulfillment of NPS Contract C-5038010616 About the cover: New Year’s Eve 2003 was exceptionally warm and sunny over the Mid-Atlantic states. This image from the Moderate Resolution Imaging Spectroradiometer (MODIS) instrument on the Aqua satellite shows the Atlantic coast stretching from the Chesapeake Bay of Virginia to Winyah Bay of South Carolina. Albemarle and Pamlico sounds separate the long, thin islands of the Outer Banks from mainland North Carolina. Image courtesy of NASA’s Visible Earth, a catalog of NASA images and animations of our home planet found on the internet at http://visiblearth.nasa.gov. 1. Acknowledgements We thank the staff at the Cape Hatteras National Seashore headquarters in Manteo for their helpful suggestions and support of this project, most notably Doug Stover, Steve Harrison, Toni Dufficy, Steve Ryan, and Mary Doll. The following staff of the North Carolina Division of Marine Fisheries shared maps, statistics, and illustrations: Scott Chappell, Rodney Guajardo, Trish Murphy, Don Hesselman, Dee Lupton, Alan Bianchi, and Richard Davis.
    [Show full text]
  • 2020 20-01-01 Resolution Approving Lease Agreement
    RESOLUTIONS – 2020 20-01-01 Resolution Approving Lease Agreement Between Dare County and Matt Respass (Jan. 6, 2020) 20-01-02 Resolution Approving Lease Agreement Between Dare County and Monarch Beach Club of Dare (Jan. 6, 2020) 20-02-03 Resolution in Support of Alligator River Bridge Improvements (Feb 4, 2020) 20-02-04 Resolution in Support of The Constitution of the United States (Feb 4, 2020) – 2nd Amendment emphasis 20-02-05 Resolution in Support of Southern Dare County Channel Maintenance Project (Feb 4, 2020) 20-02-06 Resolution in Support of Central Dare County Channel Maintenance Project (Feb 4, 2020) 20-03-07 Resolution Census Week (Mar 16, 2020) 20-05-08 Resolution Requesting Payroll Protection Program Modification (May 5, 2020) 20-05-09 Resolution Enacting & Adopting a Supplement to the Dare County Code of Ordinances (May 5, 2020) 20-05-10 Resolution Adopting Outer Banks Regional Hazard Mitigation Plan (May 18, 2020) 20-06-11 Resolution Adopting OPEB and LEOSSA Master Trust Agreement (June 15, 2020) 20-07-12 Resolution Opposing Herbert C. Bonner Bridge Debris Disposal Permit Modification (July 6, 2020) 20-07-13 Resolution Supporting 20/21 Hatteras Inlet Maintenance (July 20, 2020) 20-07-14 Resolution 20/21 Oregon Inlet Permit Modifications (July 20, 2020) 20-07-15 Resolution Requesting that the U.S. Army Corps of Engineers Amend the Existing Federal Authorization to Meet the Original Intent of the Authorization of Safe Navigation from Hatteras to the Hatteras Inlet (July 20, 2020) 20-07-16 Resolution Reimbursement Fiscal Year 20-21 Vehicle and Equipment Financing Project (July 20, 2020) 20-07-17 Resolution North Carolina Governor’s Safety Program (July 20, 2020) 20-07-18 Resolution Adopting the 2020 Update of the Dare County Program for Public Information (July 20, 2020) 20-08-19 Resolution Celebrating the 100th Anniversary of the Ratification of the 19th Amendment (August 17, 2020) 20-09-20 Resolution Authorizing the Dare County Board of Commissioners to Declare Real Property as Surplus Pursuant to G.S.
    [Show full text]
  • Resolutions – 2020
    RESOLUTIONS – 2020 Following the List of 2020 Resolutions in Chronological Order, Each Resolution Can Be Viewed in its Entirety 20-01-01 Resolution Approving Lease Agreement Between Dare County and Matt Respass (Jan. 6, 2020) 20-01-02 Resolution Approving Lease Agreement Between Dare County and Monarch Beach Club of Dare (Jan. 6, 2020) 20-02-03 Resolution in Support of Alligator River Bridge Improvements (Feb 4, 2020) 20-02-04 Resolution in Support of The Constitution of the United States (Feb 4, 2020) – 2nd Amendment emphasis 20-02-05 Resolution in Support of Southern Dare County Channel Maintenance Project (Feb 4, 2020) 20-02-06 Resolution in Support of Central Dare County Channel Maintenance Project (Feb 4, 2020) 20-03-07 Resolution Census Week (Mar 16, 2020) 20-05-08 Resolution Requesting Payroll Protection Program Modification (May 5, 2020) 20-05-09 Resolution Enacting & Adopting a Supplement to the Dare County Code of Ordinances (May 5, 2020) 20-05-10 Resolution Adopting Outer Banks Regional Hazard Mitigation Plan (May 18, 2020) 20-06-11 Resolution Adopting the OPEB and LEOSSA Master Trust Agreement (June 15, 2020) 20-07-12 Resolution Opposing Herbert C. Bonner Bridge Debris Disposal Permit Modification (July 6, 2020) 20-07-13 Resolution Supporting 20/21 Hatteras Inlet Maintenance (July 20, 2020) 20-07-14 Resolution 20/21 Oregon Inlet Permit Modifications (July 20, 2020) 20-07-15 Resolution Requesting that the U.S. Army Corps of Engineers Amend the Existing Federal Authorization to Meet the Original Intent of the Authorization of
    [Show full text]