<<

15890 Federal Register / Vol. 65, No. 58 / Friday, March 24, 2000 / Notices

[FR Doc. 00–7277 Filed 3–23–00; 8:45 am] Committee is comprised of 16 members DEPARTMENT OF AGRICULTURE BILLING CODE 3410±05±P appointed by the Secretary. Members represent the following groups: (1) FSA; Forest Service (2) State beginning farmer programs; (3) DEPARTMENT OF AGRICULTURE commercial lenders; (4) private East Fork of the Jemez Wild and nonprofit organizations with active Scenic River, Santa Fe National Forest, Farm Service Agency beginning farmer programs; (5) the Sandoval County, ; Boundary Establishment Public Meetings of Advisory Cooperative State Research, Education, Committee on Beginning Farmers and and Extension Service; (6) educational AGENCY: Forest Service, USDA. Ranchers institutions with demonstrated experience in training beginning farmers ACTION: Notice of Availability. AGENCY: Farm Service Agency, USDA. or ranchers; (7) other entities providing SUMMARY: In accordance with 16 U.S.C. ACTION: Notice of public meetings. lending or technical assistance to 1274, the USDA Forest Service has qualified beginning farmers or ranchers; SUMMARY: The Farm Service Agency transmitted the final boundary of the and (8) farmers and ranchers. The East Fork of the Jemez Wild and Scenic (FSA) is issuing this notice to advise the Committee meets at least once a year public that meetings of the Advisory River to the Senate and House of and all meetings are open to the public. Representatives. Committee on Beginning Farmers and The duration of the Committee is Ranchers (Committee) will be held to indefinite. FOR FURTHER INFORMATION CONTACT: discuss ways to increase new farming The initial meetings of the Committee, Information may be obtained by and ranching opportunities for these contacting Diane Tafoya, Recreation producers, including the review of held August 31–September 2, 1999, provided an opportunity for members to Staff Officer, Jemez Ranger District, P.O. proposals and recommendations drafted Box 98, Jemez Springs, NM 87025, 505– at previous meetings. exchange ideas on ways to increase opportunities for beginning farmers and 829–3535. DATES: The public meetings will be held ranchers through Federal-State SUPPLEMENTARY INFORMATION: The April 11–12, 2000, from 8:30 a.m. to 5 partnerships and to encourage more detailed legal description and map of p.m. at the Westin Crown Center Hotel, State participation. Members discussed the East Fork of the Jemez Wild and 1 Pershing Road, Kansas City, Missouri various issues and drafted numerous Scenic River boundary are available for (telephone (816) 474–4400). All times recommendations, six of which the public inspection in the following noted are Central Standard Time (CST). Committee determined were priorities Forest Service offices: USDA Forest ADDRESSES: Mark Falcone, Designated and were submitted to the Secretary in Service Auditors Building, 201 14th St. Federal Official for the Advisory writing. During the April meetings, SW at Independence Ave. SW, Committee on Beginning Farmers and members will discuss the Secretary’s Washington, DC; USDA–FS Ranchers, Farm Service Agency, U.S. response to the six recommendations Southwestern Regional Office, 517 Gold Department of Agriculture, 1400 and review other draft proposals. Guest Ave SW, Albuquerque, NM; USDA–FS Independence Avenue, SW., Room speakers from the Iowa State Santa Fe National Forest, 1474 Rodeo 5438-S, STOP 0522, Washington, DC University’s Beginning Farmer Center Rd., Santa Fe, NM; USDA–FS Jemez 20250–0522; telephone (202) 720–1632; and the National Council of State Ranger Station, Jemez Springs, NM. FAX (202) 690–1117; e-mail l Agricultural Finance Programs will The Wild and Scenic Rivers Act, mark [email protected]. address relevant issues. Public Law 90–542, as amended by FOR FURTHER INFORMATION CONTACT: Attendance is open to all interested Public Law 101–306 on June 6, 1990 Mark Falcone at (202) 720–1632. persons but limited to space available. designated the 11-mile segment of the SUPPLEMENTARY INFORMATION: Section 5 Anyone wishing to make an oral East Fork of the , from the of the Agricultural Credit Improvement statement should submit their request in Santa Fe National Forest boundary to its Act of 1992 (Pub. L. 102–554) required writing (letter, fax, or e-mail) to Mark confluence with the Rio San Antonio, to the Secretary of Agriculture to establish Falcone at the above address. be administered by the Secretary of the Committee for the purpose of Statements should be received no later Agriculture in the following advising the Secretary on the following: than April 6, 2000. Requests should classifications: (a) The 2-mile segment (1) The development of a program of include the name and affiliation of the for the Santa Fe National Forest coordinated financial assistance to individual who will make the boundary to the second crossing of State qualified beginning farmers and presentation and an outline of the issues Highway 4, near Las Conchas trailhead, ranchers required by section 309 (i) of to be addressed. The floor will be open as a recreational river; and (b) the 4-mile the Consolidated Farm and Rural to oral presentations beginning at 1:00 segment from the second crossing of Development Act (Federal and State p.m. CST on April 11, 2000. Comments State Highway 4, near Las Conchas beginning farmer programs provide joint will be limited to 5 minutes, and trailhead, to the third crossing of State financing to beginning farmers and presenters will be approved on a first- Highway 4 approximately one and one- ranchers); (2) methods of maximizing come, first-served basis. quarter miles upstream from Jemez the number of new farming and Persons with disabilities who require Falls, as a wild river; and (c) the 5-mile ranching opportunities created through special accommodations to attend or segment from the third crossing of State the program; (3) methods of encouraging participate in the meetings should Highway 4, approximately one and one- States to participate in the program; (4) contact Mark Falcone by April 6, 2000. quarter miles upstream from Jemez the administration of the program; and Falls, to its confluence with the Rio San (5) other methods of creating new Signed in Washington, DC, on March 17, Antonio, as a scenic river. The final 2000. farming or ranching opportunities. boundary for the designated segments Departmental Regulation 1042–119 Keith Kelly, approximately follows the original dated November 25, 1998, formally Administrator, Farm Service Agency. corridor boundary of 1⁄4-mile of the established the Committee and [FR Doc. 00–7278 Filed 3–23–00; 8:45 am] ordinary high water mark on each side designated FSA to provide support. The BILLING CODE 3410±05±P of the river, with adjustments made in

VerDate 202000 16:57 Mar 23, 2000 Jkt 190000 PO 00000 Frm 00003 Fmt 4703 Sfmt 4703 E:\FR\FM\24MRN1.SGM pfrm02 PsN: 24MRN1 Federal Register / Vol. 65, No. 58 / Friday, March 24, 2000 / Notices 15891 order to follow legal and locatable Dated: March 10, 2000. other potential contaminants collected landlines. James T. Gladen, since 1982. Based on the supplemental Dated: March 10, 2000. Deputy Regional Forester. environmental analysis, the BLM and FS would make decisions regarding the James T. Gladen, [FR Doc. 00–7279 Filed 3–23–00; 8:45 am] BILLING CODE 3410±11±M Panel B and C Mine and Reclamation Deputy Regional Forester. Plan and additional land use [FR Doc. 00–7281 Filed 3–23–00; 8:45 am] authorizations for the proposed mining BILLING CODE 3410±11±M DEPARTMENT OF THE INTERIOR activities, potentially including: lease modifications by the BLM and a Special Bureau of Land Management Use Permit by the FS. In addition, a DEPARTMENT OF AGRICULTURE Section 404, Clean Water Act permit DEPARTMENT OF AGRICULTURE may be required by the U.S. Army Corps Forest Service Forest Service of Engineers (Corps) for the proposed Pecos Wild and Scenic River, Santa Fe operations. National Forest, San Miguel and Mora Smoky Canyon Mine, Panels B and C, Agency Decisions Counties, New Mexico; Boundary BLM Pocatello Field Office and Establishment Caribou-Targhee National Forest, The BLM Pocatello Field Office Caribou County, ID Manager, who is the responsible official AGENCY: Forest Service, USDA. for the SEIS and on-lease lands, and the AGENCY: Bureau of Land Management, Caribou-Targhee National Forest ACTION: Notice of availability. USDI and Forest Service, USDA. Supervisor, who is the responsible ACTION: Notice of Intent to Prepare a official for Caribou-Targhee National SUMMARY: In accordance with 16 USC Supplemental Environmental Impact Forest lands not on-lease will make 1274, the USDA Forest Service is Statement separate decisions related to appropriate transmitting the final boundary of the SUMMARY: Notice is hereby given that land use authorizations regarding this Pecos Wild and Scenic River to the the Bureau of Land Management (BLM), proposal considering: scoping Senate and House of Representatives. Pocatello Field Office and the comments and responses, anticipated FOR FURTHER INFORMATION CONTACT: Department of Agriculture, Forest environmental consequences discussed Information may be obtained by Service (FS), Caribou-Targhee National in the SEIS, and applicable laws, contacting Dan Crittenden, District Forest, will jointly prepare a regulations, and policies. These Ranger, Pecos/Las Vegas Ranger District, Supplemental Environmental Impact decisions may include approval of a site P.O. Drawer 429, Pecos, NM 87552– Statement (SEIS) to document the specific Mine and Reclamation Plan; 0429, 505–757–6121. analysis and disclose the environmental issuance of phosphate lease and human effects of a proposed mine modifications by the BLM; and special SUPPLEMENTARY INFORMATION: The plan for future operations at the existing use permits by the FS. A Section 404, detailed legal description and map of J.R. Simplot Smoky Canyon Phosphate Clean Water Act Permit may also be the Pecos Wild and Scenic River Mine, Caribou County, Idaho, located required by the Corps. They would boundary are available for public approximately 20 miles west of Afton, render a decision related to that permit inspection in the following Forest Wyoming. The proposed mining and how to mitigate the impacts to Service offices: USDA Forest Service operations would utilize land affected wetlands and Waters of the Auditors Building, 201 14th St. SW at administered by the FS, BLM and land United States. Independence Ave. SW, Washington, that is privately owned. Mining would DATES: Written comments concerning DC; USDA–FS Southwestern Regional take place on Federal Phosphate Leases the scope of the analysis described in Office, 517 Gold Ave SW, Albuquerque, I–012890, I–026843, and I–027801, this Notice should be received on or NM; USDA–FS Santa Fe National within the Caribou-Targhee National before April 24, 2000. Forest, 1474 Rodeo Rd., Santa Fe, NM; Forest. USDA–FS Pecos Ranger Station, Pecos, J. R. Simplot Company must obtain Scoping Procedure NM. federal permits prior to mining under The scoping procedure to be used for The Wild and Scenic Rivers Act, the proposed mine plan. The existing this SEIS will involve the following: a Public Law 90–542, as amended by mining and milling operations were broad mailing asking for comments, Public Law 101–306 on June 6, 1990 authorized by a Record of Decision that issues and concerns to interested and designated the 20.5 mile segment of the was issued in 1982 upon completion of potentially affected individuals, groups, , from its headwaters to the the original Smoky Canyon Phosphate Federal, State and local government; townsite of Tererro, to be administered Mine EIS. The conditional permits news releases or legal notices; and by the Secretary of Agriculture in the granted by the BLM and FS at the public scoping meetings. following classifications: (a) The 13.5 beginning of the Smoky Canyon mining mile segment from its headwaters to the operations required that subsequent ADDRESSES: Send written comments to boundary, as a wild site-specific mine plans for the Linda Matthews, JBR Environmental river; and (b) the 7-mile segment from individual mine panels be submitted to Consultants, Inc., 8160 South Highland the Pecos Wilderness boundary to the the agencies for their review and that Drive, Suite A–4, Sandy, Utah 84093, townsite of Tererro, as a recreational appropriate mitigation measures be ([email protected]). river. The final boundary for the developed using further environmental FOR FURTHER INFORMATION CONTACT: Jeff designated segments approximately analysis. The environmental effects Cundick, Bureau of Land Management, follows the original corridor boundary from the proposed B and C Panels were Pocatello Field Office, 1111 N. 8th Ave., of 1⁄4-mile of the ordinary high water assessed in the 1982 EIS, however this Pocatello, Idaho 83201, phone (208) ´ mark on each side of the river, with SEIS will further evaluate the effects of 478–6354; or Philippe de Hanaut, adjustments made in order to follow the proposed mine plan in light of Caribou-Targhee National Forest, Soda legal and locatable landlines. additional information on selenium and Springs Ranger District, 421 W. Second

VerDate 202000 16:57 Mar 23, 2000 Jkt 190000 PO 00000 Frm 00004 Fmt 4703 Sfmt 4703 E:\FR\FM\24MRN1.SGM pfrm02 PsN: 24MRN1