Gabbar Jijal Road Malidara to Alamabad Jijal Road Khar Jijal Road KKH to Pallas Bridge Old Road Janchal Road Kandow Bankhad

Total Page:16

File Type:pdf, Size:1020Kb

Gabbar Jijal Road Malidara to Alamabad Jijal Road Khar Jijal Road KKH to Pallas Bridge Old Road Janchal Road Kandow Bankhad GOVERNMENT OF KHYBER PAKHTUNICHVVA COMMUNICATION &WORKS DEPARTMENT No.SOR/V-39/C&W/2019 To Dated Peshawar, the 07/05/2021 The Chief Engineer (East), Communication & Works, Abbottabad. SUBJECT: REVISED ADMINISTRATIVE APPROVAL FOR "AOM&R / SPECIAL REPAIR ROADS IN KOHISTAN FOR THE YEAR 2020-21". In exercise of the powers delegated vide Part-I Serial No.5 Second Schedule of the Delegation of Powers under the Financial Rules and Powers of Re-appropriation Rules, 2018, the Khyber Pakhtunkhwa Provincial Government is pleased to accord the Revised Administrative Approval for the implementation of the scheme under AOM&R during (2020-21) Kohistan for the year 2020-21" "AOM&R / Special Repair Roads in for current financial year (2020-21) at a total cost of Rs.90.00 million (Rupees Ninety million only) as per detail given below:- a.no. Name of Work Amount A Upper Kohistan (Rs. In Million) 1. Jachoi Bridge 2. Kanoi Bridge 5.446 3. Zambeel Bridge 4.247 4. Shaha Bridge 8.200 5. Baja Bridge 6.049 6. Bela Bridge 1.907 7. Tial Road 1.881 8. Dong Nallah Road 0.066 9. Seo Razika Road 0.088 10. Doga Road 0.132 11. Harban Road 0.132 12. Sommar Nallah Road 0.132 13. Zed Khar Road 0.044 14. Jalkot Goshali Road 0.132 15. Kandia Valley Road 1.224 16. AC Colony Road 0.659 17. DC Colony Road 0.044 18. Chartoo Road 0.044 19. Sazeen Road 0.418 20. Emergency Work 0.616 21. Emergent Nature Work (Already Tendered) 0.344 D/D 7.5 % Tax 0.629 -2.433 B Kohistan Lower Total (A) 30.00 1. Kandow Bankhad Road 2. Dubair Road 1.580 3. Ranolia Road 6.710 4. Shungyal Road 3.150 5. Gabbar Jijal Road 1.190 1.130 6. Malidara to Alamabad Jijal Road 7. Khar Jijal Road 0.170 0.500 8. KKH to Pallas Bridge Old Road 9. Janchal Road 4.000 10. Galgan Road 1.060 0.600 11. Helipad Chowk to AC Office Road 12. Chawa Darra Road 1.900 13. Datra Dart-a Road 1.640 14. Kaya Valley Road 1.110 15. Semo Darra Road 2.230 16. Sanga Hajder Road 1.630 17. Harigah Kayal Road 0.630 18. Emergency Work 0.100 D/D 7.5% Tax 3.104 -2 4'11 .
Recommended publications
  • Floods in Pakistan Pakistan Health Cluster Bulletin No 13 21 August 2010
    Floods in Pakistan Pakistan Health Cluster Bulletin No 13 21 August 2010 Vaccination campaign at an IDP camp at Government Girls High School in Taluka Sehwan, Jamshoro district, Sindh province. • Number of reporting disease cases is increasing. Until 18 August, 204 040 of acute diarrhoea, 263 356 cases of skin diseases and 204 647 of acute respiratory have been reported in flood-affected provinces. More than 1.5 million patient consultations have been conducted in flood-affected provinces since 29 July. • Daily number of reported acute diarrhoea cases, monitored since 31 July is rising, particularly in Charsadda, Nowshera and Peshawar. • From 16-18 August, 6 new suspected acute diarrhoea alerts reported from Khyber Pakhtunkhwa (KPK). • WHO establishing diarrhoeal treatment centres in flood-affected districts with government and partner support. • Health Cluster to have access to UNHAS flights for delivery of medical items. • Health Cluster coordination active in 5 hubs - Islamabad, Peshawar, Multan, Sukkur, Quetta. • WHO delivers large shipment of medicines to Sukkur coordination hub on 20 August. • In first 3 days of emergency vaccination campaign launched in Peshawar and Charsadda on 16 August, 104 640 children under 5 years were vaccinated against polio. All aged over 6 months (92 269 children) also vaccinated against measles and received vitamin A capsules. • As of 21 August, 39% of the US$56.2 million requested to support the health response has been funded. • According to the National Disaster Management Authority (NDMA), more than 20 million people have been affected by the floods. Almost 1500 people have been reported killed and more than 2000 injured, while around 1 million are left homeless.
    [Show full text]
  • Dasu Hydropower Project
    Public Disclosure Authorized PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY (WAPDA) Public Disclosure Authorized Dasu Hydropower Project ENVIRONMENTAL AND SOCIAL ASSESSMENT Public Disclosure Authorized EXECUTIVE SUMMARY Report by Independent Environment and Social Consultants Public Disclosure Authorized April 2014 Contents List of Acronyms .................................................................................................................iv 1. Introduction ...................................................................................................................1 1.1. Background ............................................................................................................. 1 1.2. The Proposed Project ............................................................................................... 1 1.3. The Environmental and Social Assessment ............................................................... 3 1.4. Composition of Study Team..................................................................................... 3 2. Policy, Legal and Administrative Framework ...............................................................4 2.1. Applicable Legislation and Policies in Pakistan ........................................................ 4 2.2. Environmental Procedures ....................................................................................... 5 2.3. World Bank Safeguard Policies................................................................................ 6 2.4. Compliance Status with
    [Show full text]
  • Languages of Kohistan. Sociolinguistic Survey of Northern
    SOCIOLINGUISTIC SURVEY OF NORTHERN PAKISTAN VOLUME 1 LANGUAGES OF KOHISTAN Sociolinguistic Survey of Northern Pakistan Volume 1 Languages of Kohistan Volume 2 Languages of Northern Areas Volume 3 Hindko and Gujari Volume 4 Pashto, Waneci, Ormuri Volume 5 Languages of Chitral Series Editor Clare F. O’Leary, Ph.D. Sociolinguistic Survey of Northern Pakistan Volume 1 Languages of Kohistan Calvin R. Rensch Sandra J. Decker Daniel G. Hallberg National Institute of Summer Institute Pakistani Studies of Quaid-i-Azam University Linguistics Copyright © 1992 NIPS and SIL Published by National Institute of Pakistan Studies, Quaid-i-Azam University, Islamabad, Pakistan and Summer Institute of Linguistics, West Eurasia Office Horsleys Green, High Wycombe, BUCKS HP14 3XL United Kingdom First published 1992 Reprinted 2002 ISBN 969-8023-11-9 Price, this volume: Rs.300/- Price, 5-volume set: Rs.1500/- To obtain copies of these volumes within Pakistan, contact: National Institute of Pakistan Studies Quaid-i-Azam University, Islamabad, Pakistan Phone: 92-51-2230791 Fax: 92-51-2230960 To obtain copies of these volumes outside of Pakistan, contact: International Academic Bookstore 7500 West Camp Wisdom Road Dallas, TX 75236, USA Phone: 1-972-708-7404 Fax: 1-972-708-7433 Internet: http://www.sil.org Email: [email protected] REFORMATTING FOR REPRINT BY R. CANDLIN. CONTENTS Preface............................................................................................................viii Maps.................................................................................................................
    [Show full text]
  • Project Compilation Report on Two Weeks Campaig to Celebrate 16 Days of Acti
    PROJECT COMPLETION REPORT DISABILITY UNIT DISTRICT KOHISTAN SALIK DEVELOPMENT FOUNDATION (SDF) KOHISTAN (Khyber Pukhtoonkhwa) 2 Table of Contents Topic Page Number 1. Table of Contents ………………………………………………….………………… 2-3 2. List of Acronyms ………………………………………………………….………….. 4 3. Project Identification Information............................................. 5 4. Training Objectives ……………………………………………………………. 6 5. Area Background ……………………………………………………………….. 6 6. Map of District Kohistan …………………………………………………….. 7 7. Union Council Wise Population of Kohistan ………………………….. 7 8. Rationale of the Project …………………………………………………… 8 9. Pre-Training Activities ………………………………………………………. 8 10. Dialogue between the SDF and Master Trainers (Tailoring) ….. 8 11. Signing of MOU ……………………………………………………………….. 9 12. Identification of Trainees …………………………………………………. 9 13. Training formally takes start (May 24, 2011) …………………….. 9 14. Tailoring Course ……………………………………………………………… 10 ______________________________________________________________________________ Salik Development Foundation Disability Program Kohistan 3 15. Opening Ceremony (May 24, 2011) ………………………………….. 11 16. Certificates Awarding Ceremony (June 22, 2011) ………………….. 13 17. Requisition for provision of Training Kits (Sewing Machine)……… 18 18. Distribution ceremony of Tailoring Kits ………………………………..…19 19. Graph of distribution of Tailoring Kits and Assistive Devices ……….20 20. Picture Gallary ………………………………………………………………………. 24 21. Community awareness regarding PWD……………………………………… 25 ______________________________________________________________________________
    [Show full text]
  • Hydel Power Potential of Pakistan 15
    Foreword God has blessed Pakistan with a tremendous hydel potential of more than 40,000 MW. However, only 15% of the hydroelectric potential has been harnessed so far. The remaining untapped potential, if properly exploited, can effectively meet Pakistan’s ever-increasing demand for electricity in a cost-effective way. To exploit Pakistan’s hydel resource productively, huge investments are necessary, which our economy cannot afford except at the expense of social sector spending. Considering the limitations and financial constraints of the public sector, the Government of Pakistan announced its “Policy for Power Generation Projects 2002” package for attracting overseas investment, and to facilitate tapping the domestic capital market to raise local financing for power projects. The main characteristics of this package are internationally competitive terms, an attractive framework for domestic investors, simplification of procedures, and steps to create and encourage a domestic corporate debt securities market. In order to facilitate prospective investors, the Private Power & Infrastructure Board has prepared a report titled “Pakistan Hydel Power Potential”, which provides comprehensive information on hydel projects in Pakistan. The report covers projects merely identified, projects with feasibility studies completed or in progress, projects under implementation by the public sector or the private sector, and projects in operation. Today, Pakistan offers a secure, politically stable investment environment which is moving towards deregulation
    [Show full text]
  • Roads &Bridges
    “BUILD BACK BETTER” RECONSTRUCTION AND REHABILITATION STARTEGY TRANSPORT (ROADS &BRIDGES) SECTOR Government of Pakistan Earthquake Reconstruction and Rehabilitation Authority Prime Minister’s Secretariat (Public) 1 Abbreviations ADB Asian Development Bank AJK Azad Jammu and Kashmir DFID Department for International Development, UK DRU District Reconstruction Unit DRAC District Advisory Committee ERRA Earthquake Rehabilitation and Reconstruction Authority EIRR Economic Internal Rate of Return EIA Environmental Impact Assessment Est Estimated FHA Frontier Highway Authority IEE Initial Environmental Examination JBIC Japan Bank for International Cooperation JICA Japan International Cooperation Agency Km Kilometer LG&RD Local Government and Rural Development Department NGO Non-governmental Organization NHA National Highway Authority NWFP North West Frontier Province O & M Operation and Maintenance PERRA Provincial Reconstruction and Rehabilitation Authority PIU Project Implementation Unit PWD Public Works Department SERRA State Reconstruction and Rehabilitation Authority TMA Tehsil Municipal Administration W&S Works and Services Department 2 TABLE OF CONTENTS SR. NO CONTENTS PAGE EXECUTIVE SUMMARY 6 1. INTRODUCTION 9 1.1 Background 9 1.2 Summary of Damages and Needs 10 2. THE STRATEGY 12 2.1 Vision 12 2.2 Objectives 12 2.3 Scope 12 2.4 Guiding Principles 12 2.5 Errors or Omissions 14 2.6 Methodology 14 2.6.1 Reconstruction Approach 14 2.6.1.1 Improved disaster preparedness and service 14 delivery 2.6.1.2 Inter- sectoral Approach 15 2.6.1.3 Community Participation 15 2.6.1.4 Capacity Building: 15 2.6.1.5 Linkages & Partnership 15 2.6.1.6 Coordination 16 2.6.1.7 Management 16 2.6.1.8 Quality assurance 16 3.
    [Show full text]
  • Kohistan Dist Map Number
    323000mE 24 25 26 27 28 29 330 31 32 33 34 35 36 37 38 39 340 41 42 43 44 45 46 47 48 49 350 51 52 53 54 55 56 57 58 359000mE N N 000m PATTAN TEHS KUS Sharakot 000m 91 Leo Malik Abad GOSHALI 91 38 Rustam Abad Kai 38 KAYAL Gaber 3890 Paro 3890 Kharat/Akrat Kunsher Kota Aephulai SKH Dachi 89 Ganna Maror 89 Bar Paro Shatyal Qadoori Tangal Khaliyar 88 Jamro 88 Shagal Khun Super Gai Bahara LOHI 87 DASSU TEHS 87 Musi BARIYAR 86 86 Dana Gidder KUZ PARO Machh 85 Major Kai 85 MAS SHALAKEN ABAD GOH Bagh Kareen 84 Bara Yar 84 Abra Yar 83 83 SHE Doz Khun 82 Kaur Ghar Khar 82 Kalo Khel Gar Thour Dair Moghal Abad MUG 81 Kuz Sharyal 81 Jan Pary Karo Seer Bur Palash SHARA KOT Koz Sharyal Pokhi Paro Karreen Bada Kot Gidar KZP Kuz Paro KRS Para SRG Sargadar Gadar Mak Chaki 3880 Gaha Koai 3880 Bando Mula Bela Jahod KO BAP SH2 HISTAN DIST Bakroo Kuz Dhero KLR Shara Kot Dhero 79 Karas Mabreen 79 KYL Sharid Sham Bela Khaliar Lamro KZR Kundal Shaman Landai Shoki Seer Kuz Seer Kuz Naow 78 Kharzai Kaba Kot Pmock Chaki 78 Khhin Bar Maydan Bar Seer Bar Naow BGH Didoi KND Aujeh PALAS TEHS Nrla SH1 Kandolabad 77 SHU 77 Mari Purni Shirial SHARID Ganja MDL 76 Magri Ruchi Mera 76 PLA Toor Banda Maroi Shah Kalle Seen Bar Saryal Najam Abad Urni 75 Yar Dan Abad Choth Khel Baik 75 NOW Dock Bela Hukim Abad Bun Banda Salch Khel Hissar Shin Khwar Sertay 74 74 Pecch Bela PEC BLR DOM PHB Pul Bela Ladai 73 Dum Bala 73 BAR SHARYAL BEACH BELA 72 72 71 71 Mangrar 3870 Palas Andrak 3870 69 Arang Lundai 69 Gaiano Maidan Kabakot Kandao PASHTO Lundai 68 68 ALLAI TEHS Ghozano Kandaw Lari N RASHANG N Gadar 000m BATEELA 000m 67 67 38 01234Date Created: July 1, 2006 Coord.
    [Show full text]
  • KPK PRISONS DEPARTMENT (KPK-PDHQ) (219)Result for the Post of Male Warder (BPS - 05) Zone 3 PAKISTAN TESTING SERVICE
    KPK PRISONS DEPARTMENT (KPK-PDHQ) (219)Result for the post of Male Warder (BPS - 05) Zone 3 PAKISTAN TESTING SERVICE MERIT LIST FOR MALE(ZONE-3) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Higher Total Obtained Marks of Matric Higher Matric Experience Interview Grand Sr # Name Father Name Contact # District Address DOB Height Chest Runnning Qualification Screening Screening Column Division Qualification Marks Marks Marks Total Marks Marks Marks 13+14+17 Ghundo Bala Gul Dherai Po Sakhakot Tehsil 1 Muhammad Asad Khan Yaqoob Khan 03458868881 Malakand April 4, 1993 5x9 37-.39.5 Pass 1st Division Masters and Above 70 12 100 66 148 5 153 Dargai Distt Malaknad 2 Hamid Ullah Aziz Ullah 03458002321 Lower Dir Village Maina Battan Distt Dir Lower Apr 25 1992 5x7 35-36.5 Pass 1st Division Graduation 70 8 100 69 147 4 151 mishta agra p.o totakan teh batkhela distt 3 Azmat hanif seraj ud din 03418441386 Malakand April 8, 1994 5x10 35-38 Pass 1st Division Masters and Above 70 12 100 62 144 4 148 malakand kpk Akram Muran Kalay P.O Koper Tehsil Dengai 4 Muhammad Ismail Juma Din 03438985082 Malakand Mar 14 1989 5x10.5 34-35.5 Pass 1st Division Masters and Above 70 12 100 60 142 4 146 Malakand Village Nari Shah Munda Tehsil Munda Distt 5 Bakhtawar Khan Khair Ur Rahman 03018945393 Lower Dir Apr 8 1992 5x7.5 35.5-37 Pass 1st Division Masters and Above 70 12 100 59 141 5 146 Lower Dir 6 Abdullah Gul Muhammad Khan 03052258845 Lower Dir P O And Vill Ouch Tahsil Adenzai Dist Dir Lower May 8 1994 5x7.5 35.5-36.5 Pass 1st Division Masters and Above 70 12
    [Show full text]
  • Population and Household Detail from Block to District Level
    POPULATION AND HOUSEHOLD DETAIL FROM BLOCK TO DISTRICT LEVEL KHYBER PAKHTUNKHWA (KOHISTAN DISTRICT) ADMIN UNIT POPULATION NO OF HH KOHISTAN DISTRICT 784,711 101,921 DASSU SUB-DIVISION 222,282 28,880 DASSU TEHSIL 222,282 28880 BARIYAR U.C 36,744 5333 AKRO BAK 130 18 014050406 130 18 ASHOI BACK 1,860 253 014050101 588 85 014050102 598 84 014050103 674 84 ASLAN 512 82 014050905 512 82 ATHLOK 513 73 014050603 513 73 BAIK 138 19 014050805 138 19 BAJA 602 83 014050706 602 83 BANDLO BELA 1,609 222 014050207 582 83 014050208 587 79 014050209 440 60 BAR MUSLIM KOT 1,375 217 014050401 382 65 014050402 432 62 014050403 308 54 014050404 253 36 BARI YAR 1,681 288 014050201 745 132 014050202 466 71 014050203 470 85 BARKAR 138 18 014050801 138 18 BARKHAIL BAK 529 71 014050407 529 71 BASH 574 79 014050701 574 79 CHONDO 63 11 014050305 63 11 DAD 1,268 194 014050109 227 37 014050110 1,041 157 Page 1 of 84 POPULATION AND HOUSEHOLD DETAIL FROM BLOCK TO DISTRICT LEVEL KHYBER PAKHTUNKHWA (KOHISTAN DISTRICT) ADMIN UNIT POPULATION NO OF HH DADAIR SAIDAN 608 81 014050903 608 81 DADBOON 1,729 229 014050512 656 85 014050513 536 70 014050514 537 74 DAKI DO 1,044 163 014050204 536 74 014050205 508 89 DAR 601 74 014051002 601 74 DOKRO 674 125 014050507 466 77 014050508 208 48 DOOLI 609 83 014050904 609 83 GAIDER KEEHRO 395 56 014050901 395 56 JAKH 55 12 014050306 55 12 JARTOSER 1,560 242 014050501 504 76 014050502 453 82 014050503 603 84 JHAMRA 1,765 233 014050408 630 82 014050409 523 69 014050410 612 82 JOKE 584 79 014050705 584 79 JONO 290 48 014051003 290 48 KANDAIR
    [Show full text]
  • S# ID No Institution Name Tehsil Class Beds Locality Status 1 323011 BHU JALKOT DASSU 1 0 Rural Functional 2 323013 BHU GOSHALI
    DISTRICT KOHISTAN BASIC HEALTH UNIT S# ID No Institution Name Tehsil Class Beds Locality Status 1 323011 BHU JALKOT DASSU 1 0 Rural Functional 2 323013 BHU GOSHALI DASSU 1 0 Rural Functional 3 323030 BHU BAJA DASSU 1 0 Rural Functional 4 323022 BHU BERYAR DASSU 1 0 Rural Functional 5 323019 BHU SEO DASSU 1 0 Rural Functional 6 323032 BHU DOGA DASSU 1 0 Rural Functional 7 323034 BHU RAZIKA DASSU 1 0 Rural Functional 8 323026 BHU HARBAN DASSU 1 0 Rural Functional 9 BHU THOTI DASSU 1 0 Rural Functional 10 323003 BHU KARANG DASSU 1 0 Rural Functional 11 323010 BHU GABRAL DASSU 1 0 Rural Functional 12 323007 BHU SOYAL DARA DASSU 1 0 Rural Functional 13 323002 BHU JASHOI DASSU 1 0 Rural Functional 14 323035 BHU SERGARI DASSU 1 0 Rural Functional 15 323033 BHU MANDRAZA PATTAN 1 0 Rural Functional 16 323014 BHU KAYAL PATTAN 1 0 Rural Functional 17 323021 BHU BANKED PATTAN 1 0 Rural Functional 18 323031 BHU MAJGALI PATTAN 1 0 Rural Functional 19 323028 BHU JOG PATTAN 1 0 Rural Functional 20 323008 BHU MK BELA PATTAN 1 0 Rural Functional 21 323006 BHU BANIL PATTAN 1 0 Rural Functional 22 323012 BHU JIJAL PATTAN 1 0 Rural Functional 23 323024 BHU D. BALA PATTAN 1 0 Rural Functional 24 323004 BHU SHARAKOT PALAS 1 0 Rural Functional 25 323016 BHU MAHREEN PALAS 1 0 Rural Functional 26 323023 BHU DM KHAIL PALAS 1 0 Rural Functional 27 323015 BHU KUZ PARO PALAS 1 0 Rural Functional 28 323038 BHU SHARRED PALAS 1 0 Rural Functional 29 323017 BHU PEACH BELA PALAS 1 0 Rural Functional 30 323036 BHU SHERYAL PALAS 1 0 Rural Functional 31 323009 BHU BATTERA
    [Show full text]
  • Hydro Power Resources of Pakistan (I) Private Power and Infrastructure Board
    Private Power and Infrastructure Board Foreword Pakistan is endowed with plenty of natural resources, including water resources. Besides water supply and irrigation, water resources are also utilized to produce electricity. National water resources have rich potential for hydropower generation, estimated as 60000 MW which could be economically harnessed. Out of this vast hydropower potential only 11% has been developed so far. Hydropower is the best available option in the recent scenario of meeting challenges of projected future energy demands of our country as it is sustainable, reliable, renewable, clean, low cost and indigenous thus can be the principal source of energy. It is therefore imperative to put all-out efforts towards development of the untapped hydropower potential without further delay. Accordingly, there is a transition in policy priority i.e. shifting from development of gas/oil based thermal power plants with merits of comparatively shorter construction time and lower capital investment to hydropower generation. The Private Power and Infrastructure Board (PPIB) has already been successful in attracting significant investment in developing hydropower projects, which are currently at different stages of implementation. The world-over, hydropower projects are characterized with a variety of technical and economic constraints and bottlenecks, Pakistan being no exception. These include hydrological risks, resettlement and environmental issues, regulatory matters, market dynamics and financing problems. In the past no attention was ever paid to address these impediments in development of hydropower projects. The government has now taken a number of initiatives to remove all the factors hampering Independent Power Producers (IPPs) in developing hydropower projects. Focus is on creating synergy among various stakeholders including regulatory bodies.
    [Show full text]
  • Mch/Cmam Project Completion Report
    MCH/CMAM PROJECT COMPLETION REPORT 15th Nov 2010 to 30th June 2011 Funded By: World Food Program Under supervision: Salik Development Foundation (SDF) Head Office: H # 82, St# 02, Sector –C, Shiekhmaltoon Town Mardan Khyber Pakhtoon Khwa (KPK). Phone# 0937-868099, Website: www.salikfoundation.org CMAM Completion Report District Kohistan, Salik Development Foundation (SDF), SDF Introduction: Salik Development Foundation (SDF) is a nonprofit organization, established in 1989. Working area of SDF is NWFP and Azad Jamu & Kashmir, while SDF has offices in Takht Bhai, (Mardan), Ghari Habibullah, district Mansehra, Saidu Sharif Mingora Swat,Dassu district Kohistan,Timer gara dist lower dir. The main cause of its establishment is to ensure a peace full, prosperous and developed society. For the purpose, SDF has started the process of community social mobilization and launched several developmental projects i.e Water supply, Sanitation, Environmental Protection, Health, Education, Agriculture development projects, Advocacy, Women in Development projects, Relief Programs, Flood protection, and especially Community Physical Infrastructure Program (CPI) with the financial & technical assistance of PPAF. PPAF and its whole management executive team facilitated Salik Foundation very well, due to which Salik Foundation has found many valuable pearls in the shape of thousands of volunteers from different communities of Khyber Pakhtoon Khwa (KPK), especially District Peshawar, Distt Mardan and Swabi In the whole process of community development and social mobilization. Registration: 1. Social welfare Department Govt of NWFP (R.No. DSW/845/NWFP) 2. Federal Ministry of Youth Affairs Islamabad. Affiliation 1. Pakistan Poverty Alleviation Fund (PPAF) 2. Trust For Voluntary Organization (TVO) Goal Efforts for the Establishment of a Peaceful, Prosperous & Developed.
    [Show full text]