Draft Strategic Environmental Assessment

Total Page:16

File Type:pdf, Size:1020Kb

Draft Strategic Environmental Assessment ClimatEvolution: Vision and Action Programme Strategic Environmental Assessment Environment Report Supplementary Planning Guidance to the East Lothian Local Development Plan 2018 Published: 31/May/2020 6 Draft Environment Report: ClimatEvolution Copyright notices Mapping © Crown copyright and database rights 2020 OS licence number 100023381. You are granted a non-exclusive, royalty free, revocable licence solely to view the Licensed Data for non-commercial purposes for the period during which East Lothian Council makes it available. You are not permitted to copy, sub-license, distribute, sell or otherwise make available the Licensed Data to third parties in any form. Third party rights to enforce the terms of this licence shall be reserved to OS I-tree data Data produced using the I-Tree Suite developed by the I-Tree Cooperative has been included. The I-Tree Cooperative consist of the USDA Forest Service, Davey Tree Expert Co., National Arbor Day Foundation, Society of Municipal Arborists, International Society of Arboriculture and Casey Trees. KEY FACTS: Climate Change Resilience Zone Strategy and Action Plan The key facts relating to this PPS are set out below: Name of Responsible Authority: East Lothian Council. Title of PPS: Climate Change Resilience Zone Strategy and Action Plan (ClimatEvolution). What prompted the PPS: desire of the Council to balance the built development (housing and employment use) coming forward in the area with an attractive landscape setting, active travel and recreational offer; the desirability of addressing existing access and drainage constraints in the area and of making use of the renewable heat resource in the area. The ELC Green Network Strategy identifies action in this area as a priority. The ClimatEvolution should accord with the ELLDP and ELC Green Network Strategy, as it would be an extension of policy set out there. Area covered by PPS: The area is focussed between and around Prestonpans/Cockenzie Port Seton/Tranent/ Blindwells and Longniddry as shown below, however boundaries are flexible to allow for opportunities to be taken as they arise. : Figure 1: Indicative ClimatEvolution area Subject: Town and Country Planning. Period covered by PPS: At this stage, the Council is envisages that the PPS will continue to have relevance until project level proposals are approved and are being implemented, unless the development plan context changes such that the guidance ought to be revoked or reviewed. i Draft Environment Report: ClimatEvolution Frequency of updates: At this stage, the Council does not consider an update will be necessary, but this may change once East Lothian Local Development Plan 2 is adopted. Purpose of PPS: To set out a deliverable vision and action programme for the broad area shown, providing based on an in-depth analysis and identify opportunities to make best use of existing built, cultural and natural heritage assets alongside proposals that will introduce new elements and sensitively integrate new development and deliver shared multi- functional infrastructure. The Vision will contain a clear concept for the future of the area and identifies potential hard/soft/green/blue infrastructure projects which could come forward. ClimatEvolution will inform and coordinate the future detailed design and delivery of individual projects. Contact point: J Squires (Planner) S Cheyne (Landscape Officer) East Lothian Council John Muir House Brewery Park Haddington EH41 3HA Tel: 01620 827370 Email: [email protected] Cc to [email protected] ii Draft Environment Report: ClimatEvolution ABBREVIATIONS CAT Countryside Around Town COSLA Convention Of Scottish Local Authorities CGSN Central Scotland Green Network ELBAP East Lothian Biodiversity Action Plan ELC East Lothian Council ELLDP East Lothian Local Development Plan 2018 HRA Habitat Regulation Appraisal INNS Invasive Non-Native Species IPBES Intergovernmental Science-Policy Platform on Biodiversity and Ecosystem Services IPCC Intergovernmental Panel on Climate Change JNCC Joint Nature Conservancy Council LBS Local Biodiversity Site NPF National Planning Framework SEA Strategic Environmental Assessment SEPA Scottish Environment Protection Agency SESPLAN South East Scotland Plan, Strategic Development Plan 1 SIMD Scottish Index of Multiple Deprivation SNH Scottish Natural Heritage SPA Special Protection Area SPG Supplementary Planning Guidance SPP Scottish Planning Policy SSSI Site of Special Scientific Interest SUDS Sustainable Urban Drainage iii Draft Environment Report: ClimatEvolution CONTENTS KEY FACTS: Climate Change Resilience Zone Strategy and Action Plan ....................................................................... i ABBREVIATIONS ....................................................................................................................................................... iii 1 INTRODUCTION ........................................................................................................................................... 7 2 OUTLINE OF CONTENTS AND MAIN OBJECTIVES OF THE PLAN .................................................................. 13 3 RELATIONSHIP BETWEEN CLIMATEVOLUTION & OTHER RELEVANT LOCAL LEVEL PLANS, PROJECTS AND STRATEGIES ............................................................................................................................................................. 20 4 BIODIVERSITY, FLORA AND FAUNA ............................................................................................................ 22 5 POPULATION ............................................................................................................................................. 41 6 HUMAN HEALTH ....................................................................................................................................... 52 7 SOIL .......................................................................................................................................................... 68 8 WATER ...................................................................................................................................................... 76 8 AIR ............................................................................................................................................................ 89 9 CLIMATIC FACTORS ................................................................................................................................. 100 10 MATERIAL ASSETS ................................................................................................................................... 123 11 CULTURAL HERITAGE .............................................................................................................................. 134 12 LANDSCAPE ............................................................................................................................................. 150 13 SECONDARY, CUMULATIVE AND SYNERGISTIC EFFECTS .......................................................................... 171 14 ENVIRONMENTAL PROTECTION OBJECTIVES OF RELEVANT HIGHER TIER PPSS ....................................... 176 15 LIMITATION AND DIFFICULTIES IN THE ASSESSMENT .............................................................................. 178 16 MEASURES ENVISAGED TO PREVENT, REDUCE AND OFFSET ANY SIGNIFICANT EFFECTS ON THE ENVIRONMENT OF IMPLEMENTING THE PLAN ...................................................................................................... 179 17 MONITORING .......................................................................................................................................... 180 18 NEXT STEPS ............................................................................................................................................. 181 APPENDIX ONE ...................................................................................................................................................... 183 APPENDIX TWO ..................................................................................................................................................... 189 APPENDIX THREE................................................................................................................................................... 228 6 Draft Environment Report: ClimatEvolution 1 INTRODUCTION 1.1 This document comprises the draft Environment Report of ClimatEvolution: A Climate Resilient Zone Strategy and Action Plan, a vision for a place-based transition to climate resilience in an area of development pressure in East Lothian. This draft Environment Report sets out the significant environmental impacts of the proposed strategy. The area covered by the strategy is in the western part of East Lothian, on the coast of the Forth, broadly between Musselburgh and Longniddry. It lies on part of the Lothian coalfield, with a proud history of traditional industry. Coal mining and salt panning here went back hundreds of years, almost a millennium; brick making not far behind. Now, the area is under development pressure due to its attractive location close to countryside and coast, and proximity to Edinburgh. The former Cockenzie coal fired power station site sits lies within the area. Bearing in mind this legacy it is particularly appropriate that this area should now be at the forefront of efforts to mitigate climate change. 1.2 OPEN consultants, appointed following a tender process, have produced
Recommended publications
  • Identification of Pressures and Impacts Arising Frm Strategic Development
    Report for Scottish Environment Protection Agency/ Neil Deasley Planning and European Affairs Manager Scottish Natural Heritage Scottish Environment Protection Agency Erskine Court The Castle Business Park Identification of Pressures and Impacts Stirling FK9 4TR Arising From Strategic Development Proposed in National Planning Policy Main Contributors and Development Plans Andrew Smith John Pomfret Geoff Bodley Neil Thurston Final Report Anna Cohen Paul Salmon March 2004 Kate Grimsditch Entec UK Limited Issued by ……………………………………………… Andrew Smith Approved by ……………………………………………… John Pomfret Entec UK Limited 6/7 Newton Terrace Glasgow G3 7PJ Scotland Tel: +44 (0) 141 222 1200 Fax: +44 (0) 141 222 1210 Certificate No. FS 13881 Certificate No. EMS 69090 09330 h:\common\environmental current projects\09330 - sepa strategic planning study\c000\final report.doc In accordance with an environmentally responsible approach, this document is printed on recycled paper produced from 100% post-consumer waste or TCF (totally chlorine free) paper COMMISSIONED REPORT Summary Report No: Contractor : Entec UK Ltd BACKGROUND The work was commissioned jointly by SEPA and SNH. The project sought to identify potential pressures and impacts on Scottish Water bodies as a consequence of land use proposals within the current suite of Scottish development Plans and other published strategy documents. The report forms part of the background information being collected by SEPA for the River Basin Characterisation Report in relation to the Water Framework Directive. The project will assist SNH’s environmental audit work by providing an overview of trends in strategic development across Scotland. MAIN FINDINGS Development plans post 1998 were reviewed to ensure up-to-date and relevant information.
    [Show full text]
  • Prince's Gate
    Prince’s Gate Blindwells, Prestonpans A collection of 3, 4 and 5 bedroom homes ‘ A reputation built on solid foundations Bellway has been building exceptional quality new homes throughout the UK for over 70 years, creating outstanding properties in desirable locations. During this time, Bellway has earned a strong Our high standards are reflected in our dedication to reputation for high standards of design, build customer service and we believe that the process of quality and customer service. From the location of buying and owning a Bellway home is a pleasurable the site, to the design of the home, to the materials and straightforward one. Having the knowledge, selected, we ensure that our impeccable attention support and advice from a committed Bellway team to detail is at the forefront of our build process. member will ensure your home-buying experience is seamless and rewarding, at every step of the way. We create developments which foster strong communities and integrate seamlessly with Bellway abides by The the local area. Each year, Bellway commits Consumer Code, which is to supporting education initiatives, providing an independent industry transport and highways improvements, code developed to make healthcare facilities and preserving - as well as the home buying process creating - open spaces for everyone to enjoy. fairer and more transparent for purchasers. Computer generated image. This collection of 3, 4 and 5 bedroom opportunity to be part of an exclusive A perfect homes in Blindwells, East Lothian and self-contained new town. forms part of an innovative new residential community in a sought- These beautiful homes, built to place to after rural setting, just a short drive the highest Bellway standards, offer from Edinburgh.
    [Show full text]
  • Sesplan JOINT COMMITTEE 29Th June 2012
    SESplan JOINT COMMITTEE 29th June 2012 ITEM 8: Proposed Strategic Development Plan – Submission to Scottish Ministers BACKGROUND PAPER: Summary of Unresolved Issues – i. All Schedules 4s ii. Housing Land Schedule 4 Supporting Paper1 1 See separate paper 1 CONTENTS ISSUE 1 VISION AND AIMS ISSUE 2 SPATIAL STRATEGY ISSUE 3 REGIONAL CORE – WEST EDINBURGH ISSUE 4 REGIONAL CORE – OTHER ISSUES ISSUE 5 EAST COAST ISSUE 6 FIFE FORTH ISSUE 7 MIDLOTHIAN/BORDERS ISSUE 8 WEST LOTHIAN ISSUE 9 EMPLOYMENT LAND - STRATEGIC EMPLOYMENT SITES ISSUE 10 EMPLOYMENT LAND - SUPPLY ISSUE 11 TOURISM DEVELOPMENTS ISSUE 12 MIXED USE DEVELOPMENTS ISSUE 13 TOWN CENTRE AND RETAIL ISSUE 14 MINERALS ISSUE 15 HOUSING LAND – HOUSING LAND REQUIREMENT ISSUE 16 HOUSING LAND – COMPONENTS OF HOUSING LAND CALCULATION ISSUE 17 HOUSING LAND – PHASING AND DISTRIBUTION ISSUE 18 HOUSING LAND – PROVIDING FLEXIBILITY ISSUE 19 HOUSING LAND – MISCELLANEOUS 2 ISSUE 20 AFFORDABLE HOUSING ISSUE 21 WASTE ISSUE 22 ENERGY ISSUE 23 FLOODING ISSUE 24 TRANSPORT ISSUE 25 INFRASTRUCTURE ISSUE 26 GREEN NETWORK ISSUE 27 GREEN BELT – REVIEW, RELEASE AND BOUNDARIES ISSUE 28 GREEN BELT – COALESCENCE ISSUE 29 MISCELLANEOUS/OTHER 3 Issue 1 Vision & Aims The Vision: Paragraphs 8-9 Reporter: SESplan – Profiled of the Region: Development plan Paragraphs 10-16 reference: SESplan – The Aims of the SDP: Paragraph 17 Body or person(s) submitting a representation raising the issue (including reference number): General Support PP/0142/0001 GVA Grimley for Henderson Global Investors PP/0042/0001 & PP/0042/0002 Scottish
    [Show full text]
  • MINUTE of MEETING of the Sesplan JOINT COMMITTEE Held on 27Th September, 2010 at 2.00 P.M
    SESPLAN JOINT COMMITTEE 6 DECEMBER 2010 ITEM 4 MINUTE of MEETING of the SESplan JOINT COMMITTEE held on 27th September, 2010 at 2.00 p.m. ------------------ Present: - Councillor J. Beare (Convener), Fife Council Councillor A Martin, Fife Council Councillor J. Lowrie, City of Edinburgh Council Councillor J. Mowat, City of Edinburgh Council Councillor P. McLennan, East Lothian Council Councillor R. Imrie, Midlothian Council Councillor C. Riddell-Carre, Scottish Borders Council Councillor V. Davidson, Scottish Borders Council Councillor R. de Bold, West Lothian Council Councillor M. Day, West Lothian Council Apologies:- Councillor B. Turner, East Lothian Council Councillor D. Milligan, Midlothian Council In Attendance:- Mr. J. Bury, City of Edinburgh Council Mr. J. Inman, City of Edinburgh Council Mr. P. Collins, East Lothian Council Mr. I. Glen, East Lothian Council Mr. K. Winter, Fife Council Mr. A. Ferguson, Fife Council Mrs E. Mair, Fife Council Mr. I Johnson, Midlothian Council Ms. J. Long, Midlothian Council Councillor N. Watson, Scottish Borders Council Mr. I. Lindley, Scottish Borders Council Mr. M. Wanless, Scottish Borders Council Mr. S. Field, West Lothian Council Mr. C. McCorriston, West Lothian Council Mr. I. Angus, SESplan Mrs A. Miles, SESplan Mr. L. Harrison, SEStran 1. WELCOME The Chair welcomed Ian Angus to his first meeting of the Committee following his recent appointment to the post of Strategic Development Plan Manager. Ian gave a brief outline of his previous experience. 2./ CFP/MISC MINS & WRKNG GRPS/Min SESplan Joint Com 270910 CD 1 - 2 - 2. MINUTE The Minute of Meeting of 26th March, 2010 had been circulated. Decision The Committee approved the Minute.
    [Show full text]
  • Lie Forrit Tranent the Blooming Belters Beautiful
    LIE FORRIT TRANENT THE BLOOMING BELTERS BEAUTIFUL SCOTLAND 2019 0 Introduction The town name is thought to be Brythonic Tre and Nant, meaning town over the stream Travernant. There is a long history of settlement dating back to prehistory. There are still several historic buildings in and around the town, including the ruins of the old parish church from the 11th century. Coal was first worked here in the thirteenth century by monks who mined the 7ft thick Great Seam. Soon many wealthy families came to the parish in the rush to mine coal. At first heughs (surface mines) were cut – the name of a local walkway today- and for the next 750 years the industry prospered. The history of coal mining in Scotland is mirrored in the history of the coal heughs, mines and pits of Tranent. Other industries grew and Tranent became the second largest town in East Lothian. The Tranent to Cockenzie Waggonway, possibly the 1 first in Scotland, opened in 1722. It was 2 ⁄2 miles long and connected coal pits at Tranent with the salt pans at Cockenzie and harbour at Port Seton. The track was wooden and wagons were horse drawn. It was converted to use iron rails in 1815 and a section was still in railway use until 1968. There are now plans to recreate a small section. The Battle of Prestonpans in the Jacobite Rising of 1745 was formerly known as the Battle of Tranent and an information board explains the battle. The Massacre of Tranent took place in 1797, when12 local people were killed by soldiers after protesting against conscription into the British Army.
    [Show full text]
  • HRA Regulations Appraisal Record
    FALKIRK Local Development Plan2 Habitats Regulations Appraisal Record Mains Kersie South South Kersie DunmoreAlloa Elphinstone The Pineapple Tower Westeld Airth Linkeld Pow Burn Letham Moss Higgins’ Neuk Titlandhill Airth Castle M9 Waterslap Letham Brackenlees Hollings Langdyke M876 Orchardhead Torwood Blairs Firth Carron Glen Wellseld Doghillock Drum of Kinnaird Wallacebank Wood North Inches Dales Wood Kersebrock Kinnaird House Bellsdyke of M9 Broadside Rullie River Carron Hill of Kinnaird Benseld M80 Hardilands The Docks Langhill Rosebank Torwood Castle Bowtrees Topps Braes Stenhousemuir Howkerse Carron Hookney Drumelzier Dunipace M876 North Broomage Mains of Powfoulis Forth Barnego Forth Valley Carronshore Skinats Denovan Chapel Burn Antonshill Bridge Fankerton Broch Tappoch Royal Hospital South Broomage Carron River Carron The Kelpies The Zetland Darroch Hill Garvald Crummock Stoneywood DennyHeadswood Larbert House LarbertLochlands Langlees Myot Hill Blaefaulds Mydub River Carron GlensburghPark Oil Renery Faughlin Coneypark Mungal Chaceeld Wood M876 Bainsford Wester Stadium Doups Muir Denny Castlerankine Grahamston Bankside Grangemouth Bo’ness Middleeld Kinneil Kerse Bonnyeld Bonny Water Carmuirs M9 Jupiter Newtown Inchyra Park Champany Drumbowie Bogton Antonine Wall AntonineBirkhill Wall Muirhouses Head of Muir Head West Mains Blackness Castle Roughcastle Camelon Kinneil House Stacks Bonnybridge Parkfoot Kinglass Dennyloanhead Falkirk Beancross Kinneil Arnothill Bog Road Wholeats Rashiehill Wester Thomaston Seabegs Wood Forth & Clyde
    [Show full text]
  • The RAGES Rag SPRING 2020, Issue 74
    The RAGES Rag SPRING 2020, Issue 74 The newsletter of the Rail Action Group, East of Scotland, bringing members up-to-date with progress on improvements to local rail services. left: First train to stop at Dunbar’s Platform 2 was the 10.04 to Edinburgh (ex- Newcastle) on Sunday 15/12/2019, formed of an LNER East Coast Trains Azuma. (Photograph: T. Dickson) Follow us on: Website www.rages.org.uk Twitter @RailActionGrpES www.facebook.com/RailActionGroup DUNBAR PLATFORM 2 OPENING CEREMONY DUNBAR STATION – NEW Upon Tweed at a later stage. span footbridge and lift access DOWN PLATFORM The introduction of this new from each platform. northbound second platform for The official opening ceremony Dunbar railway station platform 2 Dunbar will provide increased involved a ribbon cutting and was officially opened on Tuesday capacity and improved plaque unveiling, the ribbon 17/12/2019. operational flexibility for local cutting was performed by Jacquie The opening of platform 2 is an and cross border services on the Bell from Dunbar Community RAGES enabler of one of strategic East Coast Main Line. Council. In attendance were aims of an improved rail service The £13 million investment by between Edinburgh and Dunbar Transport Scotland has delivered (continued on P2) with services extended to Berwick a new 271m platform with a 30m INSIDE THIS ISSUE 1. DUNBAR PLATFORM 2 OPENING CEREMONY 2. TRANSPENNINE EXPRESS (TPE) BEGINS NEW SERVICE TO DUNBAR 3. LNER STAKEHOLDER MEETING 4. INTERCITY 125 HST’S FAREWELL 5. EAST LINTON & RESTON STATIONS UPDATE 6. PETER BRETT STUDY 7. ORR REPORT 8.
    [Show full text]
  • Planning Statement Proposed Residential Development, With
    Planning Statement Proposed Residential Development, with Associated Infrastructure and Access Blindwells Plot 11, East Lothian April 2021 Contents 1. Introduction 1 2. Planning Context 2 3. Proposed Development 7 4. Development Plan Assessment 10 5. Summary and Conclusions 25 Appendix 1: Site Location Plan 26 Kate Donald [email protected] Client Hargreaves Services (Blindwells) Limited Our reference HARE3046 April 2021 1. Introduction 1.1 This Planning Statement has been prepared on behalf of Hargreaves Services (Blindwells) Limited (‘the applicant’) in support of an application to East Lothian Council (‘the Council’) for planning permission for residential development, with associated infrastructure and access, on land referred to as ‘Plot 11’ at Blindwells, East Lothian. A site location plan identifying the land is provided at Appendix 1. 1.2 The purpose of this statement is to provide background details on the proposed development and set out key factors which should be taken into account in the determination of the application. The statement reviews the planning policy context and assesses the proposed development against the development plan. 1.3 This Planning Statement should be read in conjunction with the full suite of submitted drawings and documents which include: • Architectural Drawings, prepared by EMA Architects; • Landscape Drawings, prepared by OOBE; • Drainage and Road Infrastructure Drawings, prepared by Waterman; • Design and Access Statement, prepared by EMA Architects; • Landscape Design and Access Statement and Outline Specification, prepared by Oobe; • Landscape and Habitat Management Plan, prepared by Oobe; • Pre-Application Consultation Report, prepared by Turley; • Geo-Environmental Assessment, prepared by Waterman; • Drainage Strategy and Flood Risk Assessment, prepared by Waterman; and • Transport Statement, prepared by Tetra Tech.
    [Show full text]
  • Climatevolution: Vision and Action Programme
    ClimatEvolution: Vision and Action Programme Strategic Environmental Assessment Environment Report Supplementary Planning Guidance to the East Lothian Local Development Plan 2018 Published: 27/May/2020 6 Draft Environment Report: ClimatEvolution Copyright notices Mapping © Crown copyright and database rights 2020 OS licence number 100023381. You are granted a non-exclusive, royalty free, revocable licence solely to view the Licensed Data for non-commercial purposes for the period during which East Lothian Council makes it available. You are not permitted to copy, sub-license, distribute, sell or otherwise make available the Licensed Data to third parties in any form. Third party rights to enforce the terms of this licence shall be reserved to OS I-tree data Data produced using the I-Tree Suite developed by the I-Tree Cooperative has been included. The I-Tree Cooperative consist of the USDA Forest Service, Davey Tree Expert Co., National Arbor Day Foundation, Society of Municipal Arborists, International Society of Arboriculture and Casey Trees. KEY FACTS: Climate Change Resilience Zone Strategy and Action Plan The key facts relating to this PPS are set out below: Name of Responsible Authority: East Lothian Council. Title of PPS: Climate Change Resilience Zone Strategy and Action Plan (ClimatEvolution). What prompted the PPS: desire of the Council to balance the built development (housing and employment use) coming forward in the area with an attractive landscape setting, active travel and recreational offer; the desirability of addressing existing access and drainage constraints in the area and of making use of the renewable heat resource in the area. The ELC Green Network Strategy identifies action in this area as a priority.
    [Show full text]
  • Planning Permission in Principle for Remediation of Site
    REPORT TO: Planning Committee MEETING DATE: Wednesday 29 March 2017 BY: Depute Chief Executive (Partnerships and Community Services) SUBJECT: Application for Planning Permission for Consideration Application No. 14/00768/PPM Proposal Planning permission in principle for remediation of site and creation of new settlement comprising residential, employment, education and commercial uses with park and ride and rail halt facilities and associated works Location Blindwells Tranent East Lothian Applicant Hargreaves Surface Mining Ltd c/o Agent Per Turley RECOMMENDATION Consent Granted PLANNING ASSESSMENT As the area of the application site is greater than 2 hectares and the principle of development is for more than 49 houses, the development proposed in this application is, under the provisions of The Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009, defined as a major development and thus it cannot be decided through the Council's Scheme of Delegation. The application is therefore brought before the Planning Committee for a decision. As a statutory requirement for major development proposals this development proposal was the subject of a Proposal of Application Notice (Ref: 15/00007/PAN) and thus of community consultation prior to this application for planning permission in principle being made to the Council. As an outcome of that and as a statutory requirement for dealing with major development type applications a pre-application consultation report is submitted with this application. The report informs that the five pre-application public exhibitions were held at Port Seton Library, Longniddry Community Centre, Prestonpans Community Centre, the Town House, Haddington, and the Loch Centre, Tranent. Attendees made a number of queries and comments regarding the proposals.
    [Show full text]
  • Application for Planning Permission for Consideration
    REPORT TO: Planning Committee MEETING DATE: Tuesday 19 May 2020 BY: Head of Development SUBJECT: Application for Planning Permission for Consideration Application No. 19/00900/AMM Proposal Approval of matters specified in conditions of planning permission in principle 14/00768/PPM -Erection of 146 houses and associated works Location Blindwells Tranent East Lothian Applicant Bellway Homes Ltd (East) and Hargreaves (Blindwells) Per EMA Architecture and Design RECOMMENDATION Consent Granted REPORT OF HANDLING PROPOSAL Although this application is for the approval of matters specified in conditions of planning permission in principle 14/00768/PPM it has to be determined as a major development type application because the area of the application site is greater than 2 hectares and the number of dwellings detailed is greater than 49. Accordingly, the application cannot be decided through the Council's Scheme of Delegation. It is therefore brought before the Planning Committee for a decision. A Development Framework for the allocated land of Blindwells was approved by the Council on the 08 June 2010. It sets out the role of the new settlement in the settlement hierarchy and its characteristics in terms of service provision, the consequent scale and range of development/ land uses expected, and how the Council requires it to be developed in terms of infrastructure and design requirements. Planning permission in principle 14/00768/PPM was granted in May 2018 for the creation of a new settlement that could comprise residential, employment, education and commercial uses with park and ride and rail halt facilities and associated works, all on a site of 128 hectares on land at Blindwells which is located in close proximity to the settlements of Prestonpans, Tranent, Cockenzie and Port Seton.
    [Show full text]
  • Blindwells - Phase Two Indicative Hargreaves Surface Mining Ltd
    , , Phase 2 ema 1 INDICATIVE DEVELOPMENT PROPOSAL BLINDWELLS - PHASE TWO HARGREAVES SURFACE MINING LTD JANUARY 2015 3 2 CONTENTS 1.0 INTRODUCTION 1.1 PURPOSE OF MASTERPLAN 1.2 CORE OBJECTIVES 2.0 CONTEXTUAL ANALYSIS 2.1 THE SITE 2.2 NEIGHBOURHOOD CONTEXT 2.3 IMMEDIATE CONTEXT 2.4 VIEWS 2.5 CHARACTER AND IDENTITY 2.6 CONSTRAINTS & OPPORTUNITIES 2.7 EXISTING MOVEMENT & CONNECTIONS 2.8 CORE PATH NETWORK 2.9 POTENTIAL MOVEMENT & CONNECTIONS 2.10 PUBLIC TRANSPORT NETWORK 2.11 ACCESS TO LOCAL AMENITIES 2.12 SURROUNDING HERITAGE 3.0 LDP CONTEXT 3.1 PHASE ONE DESIGN CONCEPT 3.2 PHASE TWO DESIGN CONCEPT 3.3 GREATER BLINDWELLS CONCEPT 3.4 PHASE TWO MASTERPLAN 4.0 ARCHITECTURE / MATERIALS / ARCHITECTS + MASTERPLANNERS 5.0 CONCLUSION ema 5 4 1.0 : INTRODUCTION 1.0 : INTRODUCTION This document has been prepared in support of our representation for this site and its inclusion within the emerging Local Development Plan. The approach has been to outline the characteristics of the site including development constraints and opportunities. We have used this information to develop a deliverable outline proposal for the new settlement at Blindwells. Author ARCHITECTS + MASTERPLANNERS EMA Architects + Masterplanners ema 7 6 1.1: PURPOSE OF THE MASTERPLAN The purpose of the masterplan for Blindwells, East Lothian is to develop a well informed, integrated and creative solution for residential development on the site which has been identified within the East Lothian Local Plan for housing. The masterplan accords with the measures set out within the Development Framework for the site and Phase One of the masterplan has already been submitted for Planning Permission in Principle.
    [Show full text]