REFERENCE DATA SERIES No. 2 2012 Edition

Nuclear Power Reactors in the World

INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA ISBN 978–92–0–132310–1 ISSN 1011–2642 @ REFERENCE DATA SERIES No. 2

NUCLEAR POWER REACTORS IN THE WORLD

2012 Edition

INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA, 2012 NUCLEAR POWER REACTORS IN THE WORLD IAEA, VIENNA, 2012 IAEA-RDS-2/31 ISBN 978–92–0–132310–1 ISSN 1011–2642

Printed by the IAEA in Austria June 2012 CONTENTS

Introduction ...... 5 Definitions ...... 7

Table 1. Reactors in operation, in long term shutdown and under construction, 31 Dec. 2011. . . 10 Table 2. Type and net electrical power of reactors connected to the grid, 31 Dec. 2011 . . . 12 Table 3. Type and net electrical power of reactors under construction, 31 Dec. 2011 . . . . 13 Table 4. Reactor years of experience, up to 31 Dec. 2011 ...... 14 Table 5. Operating reactors and net electrical power, 1980 to 2011 ...... 16 Table 6. Nuclear electricity production and share, 1980 to 2011 ...... 18 Table 7. Annual construction starts and connections to the grid, 1954 to 2011 . . . . 20 Table 8. Number of new reactors connected to the grid and median construction time in months ...... 21 Table 9. Construction starts during 2011 . . . . . 22 Table 10. Connections to the grid during 2011 . . . 23 Table 11. Scheduled connections to the grid during 2012 ...... 23 Table 12. Reactors planned for construction as known on 31 Dec. 2011 ...... 24 Table 13. Reactors under construction, 31 Dec. 2011 ...... 28 Table 14. Reactors in operation, 31 Dec. 2011 . . . 31 Table 15. Reactors in long term shutdown, 31 Dec. 2011 ...... 47 Table 16. Reactors permanently shut down, 31 Dec. 2011 ...... 48 Table 17. Reactors in decommissioning process or decommissioned, 31 Dec. 2011 . . . . . 53 Table 18. Performance factors by reactor category, 2009 to 2011 ...... 58 Table 19. Full outage statistics during 2011 . . . . 59 Table 20. Direct causes of full outages during 2011 . 60 Table 21. Direct causes of full outages, 2007 to 2011 ...... 61 Table 22. Countries: abbreviations and summary . . 62 Table 23. Reactor types: abbreviations and summary ...... 64 Table 24. Operators: abbreviations and summary . 65 Table 25. NSSS suppliers: abbreviations and summary ...... 71 Figure 1. Number of operational reactors by type and net electrical power (as of 31 Dec. 2011) . 74 Figure 2. Reactors under construction by type and net electrical power (as of 31 Dec. 2011) . 75 Figure 3. Nuclear share of electricity generation (as of 31 Dec. 2011) ...... 76 Figure 4. Worldwide median construction time in months (as of 31 Dec. 2011) ...... 77 Figure 5. Number of reactors in operation by age (as of 31 Dec. 2011) ...... 78 Figure 6. Annual construction starts and connections to the grid, 1954 to 2011 ...... 79 INTRODUCTION

Nuclear Power Reactors in the World is an annual publication that presents the most recent data pertaining to nuclear power reactors in IAEA Member States.

This thirty-second edition of Reference Data Series No. 2 provides a detailed comparison of various statistics through 31 December 2011. The tables and figures contain the following information:

— General statistics on nuclear reactors in IAEA Member States; — Technical data on specific reactors that are either planned, under construction or operational, or that have been shut down or decommissioned. — Performance data on reactors operating in IAEA Member States, as reported to the IAEA.

The data compiled in this publication is a product of the IAEA's Power Reactor Information System (PRIS). The PRIS database is a comprehensive source of data on all nuclear power reactors in the world. It includes specification and performance history data on operational reactors as well as on reactors under construction or in the decommissioning process. The IAEA collects this data through designated national correspondents in Member States.

PRIS outputs are available in the IAEA’s annual publications and on the PRIS web page (http://www.iaea. org/pris). Detailed outputs are accessible to registered users through on-line applications. Enquiries should be addressed to:

Director Division of Nuclear Power International Atomic Energy Agency Vienna International Centre PO Box 100 1400 Vienna, Austria Email: [email protected]

5

Definitions

Performance factors

(REG – PEL – UEL – XEL) EAF (%) = × 100 REG

(REG – PEL – UEL) UCF (%) = × 100 REG

UEL UCL (%) = × 100 REG PEL PCL (%) = × 100 REG EG LF (%) = × 100 REG On-line Hours OF (%) = × 100 Total Hours where

EAF is the energy availability factor, expressed in per cent. UCF is the unit capability factor, expressed in per cent. UCL is the unplanned capability loss factor, expressed in per cent. PCL is the planned capability loss factor, expressed in per cent. LF is the load factor, expressed in per cent. OF is the operating factor, expressed in per cent.

REG reference energy generation: The net electrical energy (MW·h) supplied by a unit continuously operated at the reference unit power during the entire reference period.

7 PEL planned energy loss: The energy (MW·h) that was not supplied during the period because of planned shutdowns or load reductions due to causes under plant management control. Energy losses are considered to be planned if they are scheduled at least four weeks in advance.

UEL unplanned energy loss: The energy (MW·h) that was not supplied during the period because of unplanned shutdowns, outage extensions, or load reductions due to causes under plant man- agement control. Energy losses are considered to be unplanned if they are not scheduled at least four weeks in advance.

XEL external energy loss: The energy (MW·h) that was not supplied due to constraints beyond plant management control that reduced plant availability.

EG the net electrical energy supplied during the ref- erence period as measured at the unit outlet terminals after deducting the electrical energy taken by unit auxiliaries and the losses in trans- formers that are considered to be integral parts of the unit.

Construction Start Date when first major placing of concrete, usually for the base mat of the reactor building, is done.

First Criticality Date when the reactor is made critical for the first time.

Grid Connection Date when the plant is first connected to the electrical grid for the supply of power. After this date, the plant is consid- ered to be in operation.

Commercial Operation Date when the plant is handed over by the contractors to the owner and declared to be officially in commercial operation.

Permanent Shutdown Date when the plant is officially declared to be shut down by the owner and taken out of operation permanently.

8 Long Term Shutdown A unit is considered to be in long term shutdown status if it has been shut down for an extended period (usually several years) without any firm recovery schedule at the beginning, but there is the intention to restart the unit eventually.

Units and Energy Conversion 1 terawatt-hour (TW·h) = 106 megawatt-hours (MW·h).

For an average power plant,

1 TW·h = 0.39 megatonnes of coal equivalent (input) = 0.23 megatonnes of oil equivalent (input).

9 3.6 0.0 3.6 3.8 1.9 3.7 5.0 3.2 5.2 34.6 77.7 33.0 31.6 18.1 15.3 17.6 17.8 39.6 40.9 33.2 54.0 32.6 17.8 43.3 19.0 54.0 41.7 19.5 total % of supplied in 2011 Nuclear electricity h ∙ 9.3 0.1 3.9 3.8 5.9 2.4 5.9 26.7 22.3 88.3 82.6 29.0 62.7 25.7 58.1 45.9 14.8 15.3 14.7 10.8 14.3 12.9 55.1 147.8 423.5 156.2 162.0 102.3 TW(e) 630 692 782 5560 1600 1600 2650 4824 8188 1245 1906 26620 Total MW(e) 5 1 1 2 2 7 1 1 2 2 26 10 Units No. of 246 2726 Total MW(e) 1 4 Units No. of Reactors in long term shutdown Reactors under construction 915 482 725 935 375 688 1300 2736 3766 4391 9953 3263 9326 5927 1884 1906 1889 1300 1816 1830 7567 18751 63130 44215 12604 11816 23643 12068 Total MW(e) 2 1 4 6 1 3 5 2 1 7 2 2 9 4 2 4 1 2 8 21 58 50 18 16 20 33 18 10 Reactors in operation Units No. of A A A Y A A A A A A Country A TABLE 1. REACTORS IN OPERATION, LONG TERM SHUTDOWN AND UNDER CONSTRUCTION, 31 DEC. 2011 GERMAN MEXICO FRANCE NETHERLANDS KOREA, REP. OF CHIN FINLAND CZECH REP. , ISL.REP. SLOVAKI JAPAN PAKISTAN CANADA ARGENTIN ROMANI SWITZERLAND UK ARMENI BELGIUM BRAZIL BULGARI HUNGARY INDI RUSSI SLOVENI SOUTH AFRIC SPAIN SWEDEN

10 NA 47.2 19.3 total y % of supplied in 2011 Nuclear electricit h ∙ 84.9 790.4 2518.0 TW(e) ) e ( 1900 1165 61962 Total MW 2 1 65 Units No. of ) e ( 2972 Total MW 5 Units No. of Reactors in long term shutdown Reactors under construction ) e ( 13107 Total MW 101465 368791 15 104 435 Reactors in operation Units No. of h of nuclear electricity generation, representing 19.02% the total generated there. ∙ Country TABLE 1. REACTORS IN OPERATION, LONG TERM SHUTDOWN AND UNDER CONSTRUCTION, 31 DEC. 2011 — continued USA Total Note: The total includes the following data from Taiwan, China: — 6 units, 5018 MW in operation; 2 2600 under construction; — 40.37 TW(e) UKRAINE

11 ) e ( Total 1 915 1 2 1300 1 482 1 1 375 1 2 1906 4 1889 4 1816 2 935 3 725 3 7 5927 6 3766 4 2736 688 1 2 1884 2 1300 2 1830 9 12068 8 7567 5 3263 50 44215 50 21 18751 20 4391 18 12604 18 58 63130 58 10 9326 18 9953 13107 15 No. MW 104 101465 104 ) e ( FBR 1 11816 16 20 No. MW ) e ( LWGR 15 10219 1 10219 15 23643 33 560 No. MW ) e ( PHWR 4 2785 2 935 1 125 1 2 1300 2 1300 18 4091 18 12604 18 No. MW ) e ( GCR 17 8762 No. MW ) e ( BWR 2 1300 2 300 No. MW ) e ( PWR 1 915 4 1816 2 600 2 1 482 1 375 1 7 2 1906 5927 4 1889 6 3766 1 688 2 1884 2 976 2 1760 2 1830 7 9496 2 2572 7 9496 6 6057 2 1510 6 6057 3 1700 2 1563 3 1700 3 2811 7 6515 3 2811 1 1191 17 15966 24 19284 26 24931 26 19284 24 13 10496 13 12864 17 34097 35 67368 69 58 63130 15 13107 No. MW 270 248364 84 77726 17 8762 47 23140 15 10219 2 580 435 368791 435 2 10219 15 23140 47 17 580 8762 77726 84 248364 270 A Y A Country A A A TABLE 2. TYPE AND NET ELECTRICAL POWER Of REACTORS CONNECTED TO THE GRID, 31 DEC. 2011 A JAPAN NETHERLANDS IRAN, ISL. REP. KOREA, REP. OF MEXICO CHIN SLOVAKIA TOTAL Note: The totals include 6 units, 5018 MW in Taiwan, China. During 2011, 7 reactors, 4004 MW were newly connected to the grid. ARGENTINA ARMENI PAKISTAN BELGIUM CANAD INDIA CZECH REP. SLOVENIA ROMANIA RUSSI BRAZIL FINLAND FRANCE SOUTH AFRICA GERMANY BULGARI SPAIN HUNGAR SWITZERLAND SWEDEN UKRAINE US UK

12 ) e ( Total 1 1600 2 1906 1 1165 1 1600 2 782 1 692 2 2650 2 1900 1 1245 5 5560 2 630 26 26620 No. MW ) e ( FBR 1 470 7 4824 1 470 No. MW ) e ( LWGR 1 915 1 789 10 8188 10 1 789 1 915 No. MW ) e ( PHWR 1 692 4 2520 No. MW ) e ( 2650 BWR 2 No. MW ) e ( 782 630 1600 1600 5560 1900 1245 PWR 1 1 2 2 1906 8 6484 1 1165 2 1834 5 2 1 2 53 51326 4 5250 5 3212 1 915 2 1259 65 61962 65 2 1259 1 915 5 3212 4 5250 51326 53 26 26620 No. MW Country A A A TABLE 3. TYPE AND NET ELECTRICAL POWER Of REACTORS UNDER CONSTRUCTION, 31 DEC. 2011 A TOTAL INDIA FRANCE FINLAND CHIN SLOVAKIA Note: The totals include 2 units ( 2xBWR), 2600 MW in Taiwan, China. During 2011, construction started on 4 reactors, 1890 MW. ARGENTINA JAPAN

UKRAINE BRAZIL KOREA, REP. OF US BULGARI PAKISTAN RUSSI

13 7 8 7 3 3 2 6 4 4 9 2 3 4 4 1 6 8 4 7 3 3 6 10 10 11 11 Months 66 37 41 81 25 43 39 67 52 19 30 54 247 151 618 125 122 131 782 106 357 381 140 285 Experience 1816 1546 1058 Years 52 935 751 915 537 725 688 5937 1884 3538 3766 2736 1889 4391 1423 2370 1300 1300 2725 1830 8188 15808 11816 66919 26369 48798 18751 24429 and Shutdown Total, Operating MW(e) Net capacity 2 2 8 2 6 6 4 4 1 4 1 2 2 2 3 2 7 1 2 25 16 70 36 20 60 21 38 10 No. 10 52 55 376 478 786 909 621 1632 3789 1423 4337 2370 14301 MW(e) Net capacity reactors 1 1 4 3 4 9 1 2 1 5 3 2 12 27 Permanently shutdown No. 246 2726 MW(e) Net capacity shutdown 4 1 Reactors in long term No. 935 375 915 482 725 688 5927 1884 1906 3766 2736 1889 4391 1300 1300 1816 1830 7567 12604 11816 63130 12068 44215 18751 23643 Capacity MW(e) Net to the grid 2 1 7 2 2 6 4 9 4 1 2 1 3 2 4 1 2 8 18 16 58 20 50 21 33 Reactors connected No. Country TABLE 4. REACTOR YEARS Of EXPERIENCE, UP TO 31 DEC. 2011 ARGENTINA ARMENIA BELGIUM BRAZIL CANADA CHINA CZECH REP. FINLAND FRANCE GERMANY HUNGARY INDIA IRAN, ISL. REP. ITALY JAPAN KAZAKHSTAN KOREA, REP. OF LITHUANIA MEXICO NETHERLANDS PAKISTAN ROMANIA RUSSIA SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN

14 6 2 6 3 11 11 Months 392 184 398 Experience 1495 3707 Years 3269 10536 13471 16622 111229 420915 14792 and shutdown Total, operating MW(e) Net capacity 6 13 45 19 132 No. 6 1210 3518 3515 9764 49152 578 MW(e) Net capacity reactors 3 1 4 27 28 Permanently shutdown No. 2972 138 MW(e) Net capacity shutdown 5 Reactors in long term No. 9326 3263 9953 13107 368791 101465 MW(e) Net capacity to the grid 5 10 18 15 Reactors connected 104 435 No. Country TABLE 4. REACTOR YEARS Of EXPERIENCE, UP TO 31 DEC. 2011 — continued SWEDEN SWITZERLAND UK UKRAINE USA Total Notes: 1. The total includes the following data from Taiwan, China: — reactors connected to the grid: 6 units, 5018 MW; experience: 182 years, 1 month. 2. Operating experience is counted from the grid connection excluding any long term shutdown period.

15 935 375 915 482 725 688 5927 1884 1906 3766 2736 1889 4391 1300 1300 1816 1830 7567 9326 12604 11816 63130 12068 44215 18751 23643 MW(e) 2011 2 1 7 2 2 6 4 9 4 1 2 1 3 2 4 1 2 8 18 16 58 20 50 21 33 10 No. 935 375 482 425 666 5926 1884 1906 3678 2716 1889 4189 1300 1300 1816 1800 7514 9303 12604 10065 63130 20490 46821 18698 22693 MW(e) 2010 2 1 7 2 2 6 4 4 2 1 2 2 4 1 2 8 18 13 58 17 19 54 21 32 10 No. 935 376 450 425 655 656 5801 1901 2722 6587 3373 2676 1755 2993 1185 1360 2442 1800 7591 8905 12584 63260 20339 47593 16810 21743 MW(e) 2005 2 1 7 2 4 9 6 4 4 1 2 1 2 1 6 1 2 9 18 59 17 15 55 20 31 10 No. 978 376 449 425 655 676 5712 1976 3760 9998 2188 2611 2656 1729 2508 2370 1290 2440 1840 7468 9412 63080 21283 43245 12990 19848 MW(e) 2000 2 1 7 2 6 3 5 4 4 2 2 1 2 1 6 1 2 9 14 59 19 14 52 16 30 11 No. 50 935 376 626 510 125 620 5631 3538 2188 1782 2310 1729 1746 9115 2370 1256 1632 1840 7097 14902 58573 20972 39625 19848 10043 MW(e) 1995 2 1 7 1 6 3 4 4 4 1 2 2 2 1 4 1 2 9 21 56 19 10 50 11 30 12 No. 935 626 135 640 539 125 620 5501 2585 1632 2310 1710 1324 7220 2760 1632 1840 7099 9826 13993 55808 21250 30867 18898 MW(e) 1990 2 7 1 5 4 4 4 7 1 9 2 1 2 1 4 1 2 9 20 56 21 41 29 12 No. Number of units and net capacity (MW(e)) connected to the grid at 31 Dec. given year 935 816 626 391 825 135 508 137 632 5464 1632 9741 2300 1143 1273 3692 1380 1632 1840 5608 9455 37478 18110 23612 15841 MW(e) 1985 2 2 8 1 4 1 4 2 6 3 1 5 1 2 1 4 1 2 8 16 43 24 33 28 12 No. 335 816 832 135 564 498 125 780 1670 1224 5172 2208 1112 8596 1073 5510 14388 10323 14918 MW(e) 1980 1 2 4 3 4 4 4 1 1 2 1 2 3 8 10 22 19 23 20 No. Country TABLE 5. OPERATING REACTORS AND NET ELECTRICAL POWER,1980 TO 2011 ARGENTINA ARMENIA BELGIUM BRAZIL BULGARIA CANADA CHINA CZECH REP. FINLAND FRANCE GERMANY HUNGARY INDIA IRAN, ISL. REP. ITALY JAPAN KAZAKHSTAN KOREA, REP. OF LITHUANIA MEXICO NETHERLANDS PAKISTAN ROMANIA RUSSIA SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN SWEDEN

16 3263 9953 13107 MW(e) 101465 2011 5 18 15 No. 104 3238 10137 13107 MW(e) 101211 2010 5 19 15 No. 104 3220 11852 13107 98145 MW(e) 2005 5 23 15 No. 103 3170 12490 11195 96297 MW(e) 2000 5 33 13 No. 103 3056 12910 13045 98068 MW(e) 1995 5 35 15 No. 108 2942 11360 13020 96228 MW(e) 1990 5 37 15 No. 108 Number of units and net capacity (MW(e)) connected to the grid at 31 Dec. given year 2881 8324 10077 74401 MW(e) 1985 5 38 10 90 No. 1940 6423 2306 50881 MW(e) 1980 4 3 33 69 No. 245 133037 363 245779 416 318253 434 341402 435 349999 441 368125 441 375280 435 368791 441 375280 441 368125 435 349999 341402 434 416 318253 363 245779 245 133037 Country TABLE 5. OPERATING REACTORS AND NET ELECTRICAL POWER,1980 TO 2011 — continued SWITZERLAND UK WORLD UKRAINE USA Note: The world total includes the following data in Taiwan, China: – 1980: 2 units, 1208 MW; 1985: 6 4890 1990: 4828 1995: 4884 2000: 2005: 6 units, 4884 MW; 2010: 4982 2011: 5018 MW.

17 5.0 3.2 1.9 3.7 0.0 3.6 3.6 3.8 5.2 33.2 54.0 32.6 15.3 33.0 31.6 77.7 17.8 43.3 18.1 34.6 19.0 17.6 54.0 41.7 19.5 39.6 % of total 2011 ·h 5.89 2.36 0.10 9.31 3.92 3.84 5.90 45.94 14.79 15.26 88.32 82.57 26.70 22.27 14.71 28.95 10.81 14.34 12.94 55.12 58.10 423.51 102.31 156.18 147.76 162.02 TW(e) 5.9 3.1 1.8 2.9 3.6 3.4 2.6 5.2 39.4 51.2 33.1 15.1 33.3 28.4 74.1 22.6 42.1 29.2 32.2 19.5 17.1 51.8 37.3 20.1 38.1 % of total 2010 ·h 6.69 2.29 5.59 3.75 2.56 5.38 45.73 13.77 14.24 85.50 70.96 26.44 21.89 14.66 20.48 10.70 13.54 12.90 59.26 55.73 410.09 133.01 280.25 141.89 159.41 TW(e) 6.9 2.5 2.0 2.8 5.0 3.9 2.8 8.6 5.5 42.7 55.6 44.1 14.5 30.5 32.9 78.5 26.6 37.2 29.3 44.7 70.3 15.8 56.1 42.4 19.6 44.9 % of total 2005 ·h 6.37 2.50 9.20 9.54 3.77 2.41 5.11 5.61 45.34 17.38 86.83 50.33 23.25 22.36 13.02 15.73 10.32 16.34 12.24 54.99 69.58 431.18 154.61 280.50 137.59 137.64 TW(e) 7.3 1.9 1.2 3.1 3.9 4.3 1.7 6.6 33.0 56.8 45.0 11.8 18.7 32.2 76.4 30.6 40.6 33.8 40.7 73.9 10.9 15.0 53.4 37.4 27.6 39.0 % of total 2000 ·h 5.74 1.84 5.59 7.42 7.92 3.70 0.90 5.05 4.55 45.81 16.79 69.12 16.02 12.71 21.58 13.35 14.23 15.17 13.00 59.49 51.88 395.39 160.66 306.24 103.54 120.10 TW(e) 1.0 1.2 1.9 0.1 6.0 4.9 0.9 6.5 11.8 55.5 46.4 17.3 20.0 29.9 76.1 29.6 42.3 33.4 36.1 86.1 11.8 44.1 39.5 34.1 46.6 % of total 1995 ·h 6.57 2.33 6.99 0.08 7.53 3.78 0.46 4.57 h) of reactors connected to the grid at 31 Dec. given year ∙ 39.30 16.22 93.98 12.13 12.23 18.13 13.20 60.21 10.64 91.59 11.35 11.29 53.49 67.17 358.71 146.13 275.51 TW(e) NA NA NA NA NA 1.0 2.2 2.6 4.9 1.1 5.6 19.8 60.1 35.7 14.8 35.1 74.5 33.1 51.4 27.1 49.1 35.9 45.9 % of total 1990 ·h 6.72 2.06 5.29 2.78 3.29 0.38 4.39 8.47 40.59 13.51 69.87 11.77 18.13 12.89 50.26 15.70 11.16 51.98 65.27 297.61 139.37 187.19 109.62 Nuclear capacity (TW(e) TW(e) NA NA NA NA NA 1.7 2.2 3.8 6.1 1.0 4.2 11.7 59.8 31.6 12.7 38.2 64.8 31.2 23.6 22.7 23.2 24.0 42.3 % of total 1985 ·h 5.25 3.17 1.99 6.10 3.87 6.46 8.75 3.69 0.26 8.70 3.85 5.39 29.25 12.17 59.47 17.98 12.36 88.26 26.83 55.89 213.28 119.59 145.37 TW(e) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 0.5 % of total 1980 h ∙ 2.18 5.71 6.68 2.77 2.11 3.26 3.97 0.07 4.52 4.98 11.86 38.02 57.31 41.44 79.11 43.78 25.42 TW(e) Country TABLE 6. NUCLEAR ELECTRICITY PRODUCTION AND SHARE, 1980 TO 2011 ARGENTINA ARMENIA BELGIUM BRAZIL BULGARIA CANADA CHINA CZECH REP. FINLAND FRANCE GERMANY HUNGARY INDIA IRAN, ISL. REP. ITALY JAPAN KAZAKHSTAN KOREA, REP. OF LITHUANIA MEXICO NETHERLANDS PAKISTAN ROMANIA RUSSIA SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN SWEDEN

18 40.9 17.8 47.2 19.3 % of total 2011 ·h 25.69 62.66 84.89 790.44 TW(e) 38.0 15.5 48.1 19.6 % of total 2010 ·h 25.34 56.85 83.95 807.08 TW(e) 38.0 20.0 48.5 19.3 % of total 2005 ·h 22.11 75.34 83.40 783.35 TW(e) 38.2 21.9 47.3 19.8 % of total 2000 ·h 25.05 72.99 72.56 755.55 TW(e) 39.9 25.4 37.8 22.5 % of total 1995 ·h ·h) of reactors connected to the grid at 31 Dec. given year ·h) 23.58 70.64 65.78 673.52 TW(e) NA 42.6 19.7 20.6 % of total 1990 ·h 22.40 58.77 71.26 578.08 Nuclear capacity (TW(e) TW(e) NA 39.8 19.6 15.5 % of total 1985 ·h 21.28 53.73 35.81 378.68 TW(e) NA NA NA NA % of total 1980 ·h 6.38 13.63 32.32 635.36 1327.43 1890.35 2190.91 2440.94 2626.34 2629.82 2517.97 249.84 TW(e) ∙ h of nuclear electricity generation, representing 19.3% the total generated there; ∙ h of nuclear electricity generation, representing 19.02% the total generated there. ∙ h of nuclear electricity generation, representing 38.32% the total generated there; ∙ h of nuclear electricity generation, representing 17.93% the total generated there; ∙ h of nuclear electricity generation, representing 28.79% the total generated there; ∙ h of nuclear electricity generation, representing 21.19% the total generated there; Country TABLE 6. NUCLEAR ELECTRICITY PRODUCTION AND SHARE, 1980 TO 2011 — continued WORLD SWITZERLAND UK UKRAINE USA Note: The world total includes the following data from Taiwan, China: 1990: 31.54 TW(e) 1995: 33.8 TW(e) 2000: 37 TW(e) 2005: 38.4 TW(e) 2010: 39.89 TW(e) 2011: 40.37 TW(e)

19 TABLE 7. ANNUAL CONSTRUCTION STARTS AND CONNECTIONS TO THE GRID, 1954 TO 2011 Construction Connections Reactors starts to the grid in operation Year Design Design Updated Number Number Number capacity capacity capacity of units of units of units (MW(e)) (MW(e)) (MW(e)) 1954 1 60 1 5 1 5 1955 8 260 1 5

1956 5 577 1 35 2 65 1957 13 1836 3 119 5 209 1958 6 476 1 35 6 269 1959 7 976 5 176 11 548 1960 11 1010 4 438 15 1087

1961 7 1531 1 15 16 1104 1962 8 1379 9 955 25 2223 1963 5 1722 9 500 33 2677 1964 9 2866 8 1022 40 3686 1965 9 3291 8 1879 48 5910

1966 15 7052 8 1530 55 7539 1967 25 16287 11 2165 64 9595 1968 37 26859 7 1020 69 10648 1969 13 9277 10 3670 78 14121 1970 37 25526 6 3410 84 17656

1971 18 12660 16 7711 99 24320 1972 29 22335 16 8880 113 32797 1973 29 23492 20 12727 132 43761 1974 38 35222 26 17149 154 61021 1975 38 36449 15 10236 169 70414

1976 42 40656 19 14269 186 83992 1977 24 22691 18 13243 200 96385 1978 23 21735 20 15782 219 111923 1979 28 23909 8 6909 225 117814 1980 20 19134 21 15088 245 133037

1981 16 15149 23 20389 267 153832 1982 19 19765 19 15317 284 168317 1983 16 12218 23 19253 306 187756 1984 10 9528 33 31001 336 218452 1985 20 16286 33 31042 363 245779

1986 8 7201 27 27212 389 272074 1987 13 11019 22 22191 407 295812 1988 7 7722 14 13621 416 305212 1989 6 4018 12 10457 420 311942 1990 5 3366 10 10543 416 318253

1991 2 2246 4 3668 415 321924 1992 3 3105 6 4809 418 325261 1993 4 3715 9 9012 427 333914 1994 2 1330 5 4176 429 336934 1995 5 3635 434 341402

1996 1 610 6 7080 438 347296 1997 5 4386 3 3568 434 347895 1998 3 2096 4 3152 430 344915 1999 4 4583 4 2704 432 347368 2000 7 5399 6 3063 435 349999

2001 1 1304 3 2696 438 352730 2002 6 3440 6 4998 439 357296 2003 1 202 2 1700 437 359842 2004 2 1336 5 4785 438 364688 2005 3 2900 4 3923 441 368125

2006 4 3400 2 1435 435 369581 2007 8 6519 3 1785 439 371645 2008 10 10499 438 371495 2009 12 13165 2 1068 437 370705 2010 16 15846 5 3763 441 375280

2011 4 1890 7 3997 435 368791

20 60 64 105 221 107 Months 3 1 1 1 1 2011 No. 68 81 53 51 160 323 Months to 4 4 1 1 1 1 2006 2010 No. 60 64 47 54 191 233 Months to 6 1 1 4 4 2 2001 2005 No. 42 59 83 175 167 124 122 169 118 Months to 1 1 4 4 3 5 1 1 2 1996 2000 No. 97 73 93 46 61 113 120 210 109 Months to 1 2 3 3 3 2 1 1 1991 1995 10 No. 89 93 86 90 49 62 72 96 101 103 152 116 151 Months to 1 5 3 6 2 1 8 4 1 1 4 2 1986 1990 15 No. 80 98 74 68 46 65 80 73 99 80 74 109 132 104 100 112 154 102 112 Months to 1 4 1 1 7 1 7 2 2 4 1 9 2 1 2 5 4 1981 1985 24 10 No. 73 87 69 63 66 68 61 63 74 89 85 152 101 Months to 2 1 4 4 9 1 1 1 6 2 3 1976 1980 13 11 No. Country TABLE 8. NUMBER Of NEW REACTORS CONNECTED TO THE GRID AND MEDIAN CONSTRUCTION TIME IN MONTHS ARGENTINA ARMENIA BELGIUM BRAZIL BULGARIA CANADA CHINA CZECH REP. FINLAND FRANCE GERMANY HUNGARY INDIA IRAN, ISL. REP. ITALY JAPAN KOREA, REP. OF LITHUANIA MEXICO PAKISTAN ROMANIA RUSSIA SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN SWEDEN

21 Months 2011 No. Commercial operation 2016-6 2016-12 2017-10 2016-12 Months to 2006 2010 Grid connection 2016-3 2016-9 2017-7 2016-9 No. 227 Months to Construction start 2011-7 2011-9 2011-12 2011-5 2 2001 2005 No. NSSS supplier NPCIL NPCIL CZEC CZEC 278 Months to 1 1996 2000 Operator NPCIL NPCIL PAEC PAEC No. 630 630 315 315 Net 80 113 221 700 700 340 340 Gross Months to 1 1 1 1991 1995 Capacity (MW) No. 999 999 2177 2177 Thermal 98 57 146 Months Model to 4 6 1986 1990 22 No. Horizontal Pre Horizontal Pre CNP-300 CNP-300 PWR PWR Type PHWR PHWR 64 125 186 126 Months to 1 6 7 1981 1985 25 No. 63 89 106 100 Reactor Months to 1 4 3 1976 1980 86 74 131 99 85 95 29 103 23 123 20 64 12 75 7 105 18 No. Name RAJASTHAN-7 RAJASTHAN-8 CHASNUPP 4 CHASNUPP 3 Code IN -21 IN -22 PK -5 PK -4 Country TABLE 8. NUMBER Of NEW REACTORS CONNECTED TO THE GRID AND MEDIAN CONSTRUCTION TIME IN MONTHS — continued Country TABLE 9. CONSTRUCTION STARTS DURING 2011 SWITZERLAND UK UKRAINE USA TOTAL Note: Construction time is measured from the first pouring of concrete to connection unit grid. The totals include the following data from Taiwan, China: — 1976 to 1980: 2 units, 64 months; — 1981 to 1985: 4 units, 72 months. INDIA PAKISTAN Note: During 2011, construction was started on 4 reactors (1890 MW).

22 Grid connection 2012-7 2012-7 2012-1 2012-1 2012-12 2012-8 Grid connection — 2011-5 2011-11 2011-1 2011-9 2011-3 — First criticality — 2012-6 2011-12 2012-1 2012-12 — First criticality 2010-7 2011-2 2011-11 2010-11 2011-5 2011-2 2011-11 Construction start 1981-7 2002-7 2007-6 2007-11 1987-1 1972-12 Construction start 2000-5 2006-6 2007-1 2002-5 1975-5 2005-12 1986-8 NSSS supplier SIEMENS MAEP DHICKOPC DHICKOPC SKODA WH NSSS supplier IZ DFEC CNNC NPCIL ASE CNNC Operator NASA NPCIL KHNP KHNP EMO TVA 692 917 960 960 391 Operator CIAE LDNPC NPQJVC NPCIL NPPDCO PAEC REA Net 1165 20 610 202 915 300 950 Net 1000 745 440 1000 1000 1000 1218 Gross 25 650 220 325 1080 1000 1000 Gross Capacity (MW) 2160 3000 2825 2825 1375 3425 65 Capacity (MW) 800 999 Thermal 2905 1930 3000 3200 Thermal Model PHWR KWU VVER V-412 OPR-1000 OPR-1000 VVER V-213 W (4-loop) BN-20 CPR-1000 CNP 600 Horizontal Pre VVER V-446 PWR VVER V-320 PWR PWR PWR PWR PWR Type PHWR Type Model FBR PWR PWR PHWR PWR PWR PWR Reactor Reactor Name ATUCHA-2 KUDANKULAM-2 SHIN-KORI-2 SHIN-WOLSONG-1 MOCHOVCE-3 WATTS BAR-2 Name CEFR LINGAO 4 QINSHAN 2-4 KAIGA-4 BUSHEHR 1 CHASNUPP 2 KALININ-4 Code AR -3 IN -26 KR -22 KR -23 SK -10 US -391 Code CN -84 CN -13 CN -15 IN -16 IR -1 PK -3 RU -37 Country Country TABLE 10. CONNECTIONS TO THE GRID DURING 2011 TABLE 11. SCHEDULED CONNECTIONS TO THE GRID DURING 2012 CHINA INDIA IRAN, ISL. REP. PAKISTAN RUSSIA Note: During 2011, 7 reactors (3997 MW) were newly connected to the grid. ARGENTINA INDIA KOREA, REP. OF SLOVAKIA USA Note: During 2012, 6 reactors (5085 MW) are expected to achieve connection grid.

23 Expected construction start — — — — — — — — — — — — — — — — — — — — — — — — — — — — — NSSS supplier DFEC DFEC DFEC WH WH DFEC DFEC DFEC WH/MHI WH/MHI Operator FQNP FQNP FQNP SNPC SNPC HONGYANH LHNPC LHNPC SMNPC SMNPC FSNPC FSNPC HSNPC 0 0 900 610 610 800 800 200 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1250 1250 1250 1250 1000 1000 650 650 860 860 200 1080 1087 1087 1087 1250 1250 1080 1080 1250 1250 Capacity (MW) 500 2905 1930 1930 2905 2905 2905 3750 3750 2905 2905 3750 3750 2100 2100 Thermal Gross Net CPR-1000 CPR-1000 CPR-1000 CPR-1000 AP-1000 AP-1000 CPR-1000 CPR-1000 AP-1000 AP-1000 BN-800 BN-800 HTGR-PM FBR FBR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model HTGR Reactor BAMAOSHAN CHANGJIANG 3 CHANGJIANG 4 FANGCHENGGANG 3 FANGCHENGGANG 4 FANGCHENGGANG 5 FANGCHENGGANG 6 FUQING 4 FUQING 5 FUQING 6 HAIYANG 3 HAIYANG 4 HONGSHIDING 1 HONGSHIDING 2 HONGYANHE 5 HONGYANHE 6 JIYANG 1 JIYANG 2 JIYANG 3 JIYANG 4 PENGZE 1 PENGZE 2 PENGZE 3 PENGZE 4 SANMEN 3 SANMEN 4 SANMING-1 SANMING-2 SHIDAOWAN 1 Code Name CN -42 CN -53 CN -54 CN -57 CN -58 CN -59 CN -60 CN -48 CN -49 CN -50 CN -76 CN -77 CN -26 CN -27 CN -80 CN -81 CN -65 CN -66 CN -67 CN -68 CN -61 CN -62 CN -63 CN -64 CN -78 CN -79 CN -70 CN -71 CN -69 Country TABLE 12. REACTORS PLANNED fOR CONSTRUCTION AS KNOWN ON 31 DEC. 2011 CHINA

24 Expected construction start — — — — — — — — — — — — — 2013-7 2013-7 2015-6 — — — — — — — — — — — NSSS supplier IZ IZ DFEC DFEC DFEC DFEC DFEC DFEC DFEC TBD ASE MHI MHI DHICKOPC Operator JNPC JNPC JNPC JNPC LNPC LNPC YJNPC YJNPC YJNPC NPPDCO NPPDCO NPPDCO CHUBU TEPCO TEPCO TOHOKU CHUGOKU CHUGOKU TOHOKU KYUSHU JAPCO JAPCO KHNP 0 0 0 0 933 933 915 915 330 825 Net 1000 1000 1000 1000 1000 1000 1000 1350 1343 1343 1067 1325 1325 1538 1538 1538 1340 360 1000 1000 1080 1080 1080 1080 1087 1087 1087 1000 1000 1400 1385 1385 1373 1373 1590 1590 1590 1400 Gross Capacity (MW) 3000 3000 2905 2905 2905 2905 2905 2905 2905 3000 3000 1113 3926 3926 3926 3926 3926 4466 4466 4466 3938 Thermal VVER V-428 VVER V-428 CNP-1000 CNP-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 VVER V-446 - IR-360 ABWR ABWR ABWR ABWR ABWR ABWR BWR APWR APWR APWR APR-1400 PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR BWR BWR BWR BWR BWR BWR BWR PWR PWR PWR PWR Type Model Reactor Name TAOHUAJIANG 1 TAOHUAJIANG 2 TIANWAN 3 TIANWAN 4 TIANWAN 5 TIANWAN 6 XIANNING 1 XIANNING 2 XUDABU 1 XUDABU 2 YANGJIANG 4 YANGJIANG 5 YANGJIANG 6 BUSHEHR 2 BUSHEHR 3 DARKHOVAIN HAMAOKA-6 HIGASHI DORI 1 (TEPCO) HIGASHI DORI 2 (TEPCO) HIGASHI DORI 2 (TOHOKU) KAMINOSEKI 1 KAMINOSEKI 2 NAMIE-ODAKA SENDAI-3 TSURUGA-3 TSURUGA-4 SHIN-ULCHIN-1 Code CN -32 CN -33 CN -72 CN -73 CN -74 CN -75 CN -40 CN -41 CN -82 CN -83 CN -44 CN -45 CN -46 IR -2 IR -5 IR -9 JP -76 JP -69 JP -74 JP -72 JP -62 JP -63 JP -73 JP -75 JP -67 JP -68 KR -27 Country TABLE 12. REACTORS PLANNED fOR CONSTRUCTION AS KNOWN ON 31 DEC. 2011 — continued IRAN, ISL. REP. JAPAN KOREA, REP. OF

25 Expected construction start — 2012-2 — — — — — — — — — — — — — — — — — — — — — — — — — — — NSSS supplier DHICKOPC ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM Operator KHNP REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA 32 32 Net 1340 1109 1109 1115 1115 1115 1115 1115 1115 1115 1115 1115 1115 1115 1115 1085 1085 1115 1115 1115 1115 1115 1115 1115 1115 1115 1115 35 35 1400 1194 1194 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1170 1170 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 Gross Capacity (MW) 150 150 3983 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3000 3000 Thermal APR-1400 VVER V-491 VVER V-491 - - - - - VVER V-491 VVER V-491 KLT-40S KLT-40S PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model Reactor Name SHIN-ULCHIN-2 BALTIISK-1 BALTIISK-2 BASHKIR-1 BASHKIR-2 CENTRAL-1 CENTRAL-2 CENTRAL-3 CENTRAL-4 KOLA 2-1 KOLA 2-2 KURSK 2-1 KURSK 2-2 KURSK 2-3 KURSK 2-4 LENINGRAD 2-3 LENINGRAD 2-4 NIZHEGORODSK-1 NIZHEGORODSK-2 PEVEK-1 PEVEK-2 PRIMORSK-1 PRIMORSK-2 SEVERSK-1 SEVERSK-2 SMOLENSK 2-1 SMOLENSK 2-2 SOUTH URALS 1 SOUTH URALS 2 Code KR -28 RU -170 RU -171 RU -202 RU -203 RU -177 RU -178 RU -185 RU -186 RU -175 RU -176 RU -166 RU -189 RU -190 RU -191 RU -165 RU -167 RU -181 RU -182 RU -179 RU -180 RU -196 RU -197 RU -187 RU -188 RU -198 RU -199 RU -204 RU -205 Country TABLE 12. REACTORS PLANNED fOR CONSTRUCTION AS KNOWN ON 31 DEC. 2011 — continued RUSSIA

26 Expected construction start — — — — — — — — — — — — — — — — — — — — — — — — — — — — — NSSS supplier ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM AREVA WH WH ROSATOM ROSATOM Operator REA REA REA REA REA REA REA PROGRESS EVN EVN Net 1115 1115 1115 1115 1115 1115 1115 1600 1600 1700 1700 1520 1117 1117 1500 1117 1117 1350 1350 1117 1117 1117 1117 1117 1117 1117 1117 1000 1000 1200 1200 1200 1200 1200 1200 1200 1720 1720 1600 1250 1250 1250 1250 1400 1400 1250 1250 1250 1250 1250 1250 1250 1250 Gross Capacity (MW) 3000 3200 3200 3200 3200 3200 3200 4300 4300 4500 3750 3750 3750 3750 3926 3926 3750 3750 3750 3750 3750 3750 3750 3750 Thermal EPR US-EPR US-APWR US-APWR ESBWR AP-1000 AP-1000 US-APWR AP-1000 AP-1000 ABWR ABWR AP-1000 AP-1000 AP-1000 AP-1000 AP-1000 AP-1000 AP-1000 AP-1000 PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR BWR PWR PWR PWR PWR PWR BWR BWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model Reactor Name SOUTH URALS 3 TATAR-1 TATAR-2 TVERSK-1 TVERSK-2 TVERSK-3 TVERSK-4 BELL BEND CALVERT CLIFFS-3 COMANCHE PEAK-3 COMANCHE PEAK-4 ENRICO FERMI-3 LEVY COUNTY-1 LEVY COUNTY-2 NORTH ANNA-3 SHEARON HARRIS-2 SHEARON HARRIS-3 SOUTH TEXAS-3 SOUTH TEXAS-4 POINT-6 TURKEY POINT-7 VIRGIL C. SUMMER-2 VIRGIL C. SUMMER-3 VOGTLE-3 VOGTLE-4 WILLIAM STATES LEE III -1 WILLIAM STATES LEE III -2 PHUOC DINH 1 PHUOC DINH 2 Code RU -206 RU -200 RU -201 RU -192 RU -193 RU -194 RU -195 US -5039 US -5016 US -5034 US -5035 US -5033 US -5029 US -5030 US -5017 US -5022 US -5023 US -5012 US -5013 US -5040 US -5041 US -5027 US -5028 US -5025 US -5026 US -5018 US -5019 VN -1 VN -2 Country TABLE 12. REACTORS PLANNED fOR CONSTRUCTION AS KNOWN ON 31 DEC. 2011 — continued USA VIETNAM Note: Status as of 31 December 2011, 114 reactors (117329 MW) were known being planned.

27 Commercial operation — — — 2016-1 — 2015-12 — — — — — — 2015-7 — — — — — — — — — — — — — Grid connection 2012-7 — — — — — — — — — — — — — — — — — — — — — — — — — First criticality — — — — — — — — — — — — — — — — — — — — — — — — — — Construction start 1981-7 1987-1 1987-3 2010-6 2010-4 2010-11 2010-7 2010-12 2008-12 2009-7 2008-11 2009-6 2010-12 2009-9 2010-6 2007-8 2008-3 2009-3 2009-8 2008-2 2008-11 2010-1 2010-9 2009-4 2009-12 2009-10 NSSS supplier SIEMENS ASE ASE KWU DFEC DFEC DFEC DFEC DFEC DFEC DFEC DFEC DFEC WH WH DFEC DFEC DFEC DFEC DFEC DFEC DFEC DFEC WH/MHI WH/MHI AREVA Operator NASA KOZNPP KOZNPP ELETRONU HNPC HNPC GFNPC GFNPC QNPC QNPC FQNP FQNP FQNP SNPC SNPC LHNPC LHNPC LHNPC LHNPC NDNPC NDNPC NDNPC NDNPC SMNPC SMNPC TNPC 692 953 953 610 610 Net 1245 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1700 745 650 650 1000 1000 1350 1087 1087 1087 1087 1087 1087 1087 1250 1250 1080 1080 1080 1080 1087 1080 1080 1080 1250 1250 1750 Gross Capacity (MW) 2160 3000 3000 3765 1930 1930 2905 2905 2905 2905 2905 2905 2905 3750 3750 2905 2905 2905 2905 2905 2905 2905 2905 3750 3750 4500 Thermal PHWR KWU VVER V-466 VVER V-466 PRE KONVOI CNP-600 CNP-600 CPR-1000 CPR-1000 CNP-1000 CNP-1000 CPR-1000 CPR-1000 CPR-1000 AP-1000 AP-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 AP-1000 AP-1000 EPR-1700 PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model PHWR Reactor Name ATUCHA-2 BELENE-1 BELENE-2 ANGRA-3 CHANGJIANG 1 CHANGJIANG 2 FANGCHENGGANG 1 FANGCHENGGANG 2 FANGJIASHAN 1 FANGJIASHAN 2 FUQING 1 FUQING 2 FUQING 3 HAIYANG 1 HAIYANG 2 HONGYANHE 1 HONGYANHE 2 HONGYANHE 3 HONGYANHE 4 NINGDE 1 NINGDE 2 NINGDE 3 NINGDE 4 SANMEN 1 SANMEN 2 TAISHAN 1 Code AR -3 BG -7 BG -8 BR -3 CN -51 CN -52 CN -55 CN -56 CN -28 CN -29 CN -30 CN -31 CN -47 CN -24 CN -25 CN -20 CN -21 CN -22 CN -23 CN -36 CN -37 CN -38 CN -39 CN -16 CN -17 CN -34 Country TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2011 ARGENTINA BULGARIA BRAZIL CHINA

28 Commercial operation — — — — 2013-8 — 2015-6 2015-12 — 2012-8 — 2016-6 2016-12 2014-11 — — 2013-9 2014-9 — — 2016-12 2017-10 2013-12 Grid connection — — — — — 2016-12 2015-3 2015-9 — 2012-7 — 2016-3 2016-9 — — 2012-1 — — 2012-1 — 2016-9 2017-7 — First criticality — — — — — 2016-12 2014-12 2015-6 — 2012-6 — 2015-12 2016-6 — — 2011-12 — — 2012-1 — 2016-8 2017-6 — Construction start 2010-4 2008-12 2009-6 2010-11 2005-8 2007-12 2010-11 2010-11 2002-3 2002-7 2004-10 2011-7 2011-9 2010-5 2007-10 2007-6 2008-10 2009-8 2007-11 2008-9 2011-5 2011-12 2007-4 NSSS supplier AREVA DFEC DFEC DFEC AREVA AREVA NPCIL NPCIL MAEP MAEP NPCIL NPCIL H/G HITACHI DHICKOPC DHICKOPC DHICKOPC DHICKOPC DHICKOPC CZEC CZEC ROSATOM Operator TNPC YJNPC YJNPC YJNPC TVO EDF NPCIL NPCIL NPCIL NPCIL BHAVINI NPCIL NPCIL EPDC CHUGOKU KHNP KHNP KHNP KHNP KHNP PAEC PAEC REA 32 630 630 917 917 470 630 630 960 960 960 315 315 Net 1700 1000 1000 1000 1600 1600 1325 1325 1340 1340 35 700 700 500 700 700 340 340 1750 1087 1087 1087 1720 1650 1000 1000 1383 1373 1000 1400 1400 1000 1000 Gross Capacity (MW) 999 999 150 4500 2905 2905 2905 4300 4300 2166 2166 3000 3000 1253 2177 2177 3926 3926 2825 3983 3938 2825 2825 Thermal EPR-1700 CPR-1000 CPR-1000 CPR-1000 EPR EPR PHWR-700 PHWR-700 VVER V-412 VVER V-412 Horizontal Pre Horizontal Pre ABWR ABWR OPR-1000 APR-1400 APR-1400 OPR-1000 OPR-1000 CNP-300 CNP-300 KLT-40S 'Float FBR PWR PWR PWR PWR PWR PWR PWR PWR BWR BWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model PHWR PHWR PHWR PHWR Reactor Name TAISHAN 2 YANGJIANG 1 YANGJIANG 2 YANGJIANG 3 OLKILUOTO-3 FLAMANVILLE-3 KAKRAPAR-3 KAKRAPAR-4 KUDANKULAM-1 KUDANKULAM-2 PFBR RAJASTHAN-7 RAJASTHAN-8 OHMA SHIMANE-3 SHIN-KORI-2 SHIN-KORI-3 SHIN-KORI-4 SHIN-WOLSONG-1 SHIN-WOLSONG-2 CHASNUPP 3 CHASNUPP 4 1 Code CN -35 CN -18 CN -19 CN -43 FI -5 FR -74 IN -30 IN -31 IN -25 IN -26 IN -29 IN -21 IN -22 JP -66 JP -65 KR -22 KR -25 KR -26 KR -23 KR -24 PK -4 PK -5 RU -151 Country TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2011 — continued FINLAND FRANCE INDIA JAPAN KOREA, REP. OF PAKISTAN RUSSIA

29 Commercial operation 2013-12 — — — — 2013-12 — — — 2013-2 2013-10 — — — — — Grid connection — — — — — — — — — 2012-12 2013-9 2015-1 2016-1 2012-8 — — First criticality — — — — — — — — — 2012-12 2013-8 — — — — — Construction start 2007-4 2006-7 1985-12 2008-10 2010-4 2008-6 2009-7 2009-9 2010-6 1987-1 1987-1 1986-3 1987-2 1972-12 1999-3 1999-8 NSSS supplier ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM SKODA SKODA ASE ASE WH GE GE Operator REA REA REA REA REA REA REA REA REA EMO EMO NNEGC NNEGC TVA TPC TPC 32 789 915 391 391 950 950 Net 1085 1085 1114 1114 1011 1011 1165 1300 1300 35 864 440 440 1000 1170 1170 1200 1200 1070 1070 1000 1000 1218 1350 1350 Gross Capacity (MW) 150 2100 3200 3200 3200 3200 3200 3000 3000 1375 1375 3200 3200 3425 3926 3926 Thermal KLT-40S 'Float BN-800 RBMK-1000 VVER V-491 VVER V-491 VVER V-392M VVER V-392M VVER V-320 VVER V-320 VVER V-213 VVER V-213 VVER V-392B VVER V-392B W (4-loop) (IC ABWR ABWR FBR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR BWR BWR Type Model LWGR Reactor Name AKADEMIK LOMONOSOV 2 BELOYARSKY-4 (BN-800) KURSK-5 LENINGRAD 2-1 LENINGRAD 2-2 NOVOVORONEZH 2-1 NOVOVORONEZH 2-2 ROSTOV-3 ROSTOV-4 MOCHOVCE-3 MOCHOVCE-4 KHMELNITSKI-3 KHMELNITSKI-4 WATTS BAR-2 LUNGMEN 1 LUNGMEN 2 Code RU -152 RU -116 RU -120 RU -163 RU -164 RU -161 RU -162 RU -63 RU -64 SK -10 SK -11 UA -51 UA -52 US -391 TW -7 TW -8 Country TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2011 — continued SLOVAKIA UKRAINE USA Note: Status as of 31 December 2011, 65 reactors (61962 MW) were under construction, including 2 units (2600 in Taiwan, China: TAIWAN, CN TAIWAN, CN

30 ------DH DH Non- applics electrical 87.6 80.2 72.3 84.9 90.7 87.1 86.4 88.1 90.1 88.9 73.1 90.9 86.7 86.7 77.2 87.4 91.0 85.9 90.0 91.9 89.6 90.4 93.4 88.6 2011 2007– UCF % 87.4 80.1 71.2 84.9 90.7 86.8 86.4 87.1 89.8 88.3 73.0 90.3 86.3 86.1 76.6 86.9 90.7 85.8 89.9 91.7 88.5 89.5 92.5 87.8 2011 2007– EAF % Commercial operation 1974-6 1984-1 1980-5 1975-2 1975-12 1982-10 1985-7 1975-10 1983-6 1985-9 1985-1 2001-2 1988-12 1993-12 1978-2 1979-1 1985-3 1984-9 1986-4 1987-5 1992-11 1990-10 1993-2 1993-6 Grid connection 1974-3 1983-4 1980-1 1974-8 1975-8 1982-6 1985-4 1975-3 1982-10 1985-6 1982-4 2000-7 1987-11 1991-8 1977-12 1978-12 1984-12 1984-6 1986-2 1987-3 1990-12 1990-1 1992-12 1993-4 Construction Start 1968-6 1974-4 1975-7 1969-7 1971-9 1975-1 1978-12 1970-6 1976-4 1978-11 1971-5 1976-1 1980-7 1982-4 1972-7 1972-9 1978-6 1978-1 1979-5 1979-8 1982-4 1981-9 1984-9 1985-7 NSSS supplier SIEMENS AECL FAEA ACECOWEN ACECOWEN FRAMACEC ACECOWEN ACLF FRAMACEC ACECOWEN WH KWU AEE AEE OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL Operator NASA NASA ANPPJSC ELECTRAB ELECTRAB ELECTRAB ELECTRAB ELECTRAB ELECTRAB ELECTRAB ELETRONU ELETRONU KOZNPP KOZNPP BRUCEPOW BRUCEPOW BRUCEPOW BRUCEPOW BRUCEPOW BRUCEPOW OPG OPG OPG OPG 335 600 375 433 433 962 609 953 953 730 730 817 817 817 817 878 878 878 878 Net 1006 1039 1008 1046 1275 357 648 408 454 454 640 805 805 872 891 872 845 934 934 934 934 1056 1090 1009 1055 1094 1350 1000 1000 Gross Capacity (MW) 1179 2015 1375 1311 1311 3054 2988 2873 3064 3000 1882 3764 3000 3000 2832 2832 2832 2690 2832 2690 2776 2776 2776 2776 Thermal PHWR KWU CANDU 6 VVER V-270 WE (2 loops) WE (2 loops) WE 3-loops WE 3-loops Framatome 3 lo WE 3-loops WE 3-loops 2-loop WE PRE KONVOI VVER V-320 VVER V-320 CANDU 750A CANDU 750A CANDU 750B CANDU 750B CANDU 750B CANDU 750B CANDU 850 CANDU 850 CANDU 850 CANDU 850 PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR Reactor Name ATUCHA-1 EMBALSE ARMENIA-2 DOEL-1 DOEL-2 DOEL-3 DOEL-4 TIHANGE-1 TIHANGE-2 TIHANGE-3 ANGRA-1 ANGRA-2 KOZLODUY-5 KOZLODUY-6 BRUCE-3 BRUCE-4 BRUCE-5 BRUCE-6 BRUCE-7 BRUCE-8 DARLINGTON-1 DARLINGTON-2 DARLINGTON-3 DARLINGTON-4 Code AR -1 AR -2 AM -19 BE -2 BE -4 BE -5 BE -7 BE -3 BE -6 BE -8 BR -1 BR -2 BG -5 BG -6 CA -10 CA -11 CA -18 CA -19 CA -20 CA -21 CA -22 CA -23 CA -24 CA -25 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 ARGENTINA ARMENIA BELGIUM BRAZIL BULGARIA CANADA Note: The column "Non-electrical applications" indicates the use of facility to provide: DH district heating.

31 ------Non- applics electrical 69.6 65.4 57.1 69.3 80.5 74.5 80.5 22.0 94.2 90.8 90.1 89.7 73.2 99.5 87.3 79.5 87.9 83.1 90.4 92.7 80.1 84.2 87.4 89.3 86.0 85.8 2011 2007– UCF % 66.7 65.2 56.9 68.6 80.2 74.2 79.7 22.0 94.2 90.8 89.9 89.7 73.2 99.5 87.2 79.5 87.8 83.1 90.3 92.5 80.1 84.2 87.2 88.8 85.3 85.2 2011 2007– EAF % Commercial operation 1983-10 1971-7 1973-6 1983-5 1984-2 1985-1 1986-2 1983-2 — 1994-2 1994-5 2002-5 2003-1 2010-9 2011-8 1994-4 2002-4 2004-5 2010-10 2011-12 2002-12 2003-7 2007-5 2007-8 1985-5 1986-3 1986-12 1987-7 Grid connection 1982-12 1971-4 1973-5 1982-12 1983-11 1984-11 1986-1 1982-9 2011-7 1993-8 1994-2 2002-2 2002-12 2010-7 2011-5 1991-12 2002-2 2004-3 2010-8 2011-11 2002-11 2003-6 2006-5 2007-5 1985-2 1986-1 1986-11 1987-6 Construction start 1974-4 1966-6 1968-5 1974-11 1975-10 1976-3 1976-9 1975-5 2000-5 1987-8 1988-4 1997-5 1997-11 2005-12 2006-6 1985-3 1996-6 1997-4 2006-3 2007-1 1998-6 1998-9 1999-10 2000-10 1979-1 1979-1 1979-3 1979-3 NSSS supplier AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL AECL IZ FRAM FRAM FRAM FRAM DFEC DFEC CNNC CNNC CNNC CNNC CNNC AECL AECL IZ IZ SKODA SKODA SKODA SKODA Operator HQ OPG OPG OPG OPG OPG OPG NBEPC CIAE GNPJVC GNPJVC LANPC LANPC LDNPC LDNPC QNPC NPQJVC NPQJVC NPQJVC NPQJVC TQNPC TQNPC JNPC JNPC CEZ CEZ CEZ CEZ 20 635 515 515 516 516 516 516 635 944 944 938 938 298 610 610 610 610 650 650 990 990 471 427 471 471 Net 1007 1007 25 675 542 542 540 540 540 540 680 984 984 990 990 310 650 650 650 650 700 700 498 456 498 498 1080 1080 1060 1060 Gross 65 Capacity (MW) 966 2156 1744 1744 1744 1744 1744 1744 2180 2905 2905 2905 2905 2905 2905 1930 1930 1930 1930 2064 2064 3000 3000 1375 1375 1444 1375 Thermal CANDU 6 CANDU 500A CANDU 500A CANDU 500B CANDU 500B CANDU 500B CANDU 500B CANDU 6 BN-20 M310 M310 M310 M310 CPR-1000 CPR-1000 CNP-300 CNP-600 CNP-600 CNP-600 CNP 600 CANDU 6 CANDU 6 VVER V-428 VVER V-428 VVER V-213 VVER V-213 VVER V-213 VVER V-213 FBR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR Reactor Name GENTILLY-2 PICKERING-1 PICKERING-4 PICKERING-5 PICKERING-6 PICKERING-7 PICKERING-8 POINT LEPREAU CEFR GUANGDONG-1 GUANGDONG-2 LINGAO 1 LINGAO 2 LINGAO 3 LINGAO 4 QINSHAN 1 QINSHAN 2-1 QINSHAN 2-2 QINSHAN 2-3 QINSHAN 2-4 QINSHAN 3-1 QINSHAN 3-2 TIANWAN 1 TIANWAN 2 DUKOVANY-1 DUKOVANY-2 DUKOVANY-3 DUKOVANY-4 Code CA -12 CA -4 CA -7 CA -13 CA -14 CA -15 CA -16 CA -17 CN -84 CN -2 CN -3 CN -6 CN -7 CN -12 CN -13 CN -1 CN -4 CN -5 CN -14 CN -15 CN -8 CN -9 CN -10 CN -11 CZ -4 CZ -5 CZ -8 CZ -9 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued CHINA CZECH REP.

32 ------DH DH Non- applics electrical 68.9 79.2 92.1 93.4 95.1 94.4 71.6 83.3 83.3 82.0 87.3 81.8 76.1 61.5 73.8 77.8 87.4 81.8 78.8 85.8 70.9 77.6 75.2 78.2 78.8 84.1 74.6 87.2 2011 2007– UCF % 68.8 78.7 91.7 92.7 94.6 93.7 70.6 80.5 79.4 79.6 84.3 78.8 73.8 56.3 71.8 73.9 84.9 78.8 77.4 83.7 65.2 75.8 72.7 73.7 77.5 81.4 73.5 84.4 2011 2007– EAF % Commercial operation 2002-6 2003-4 1977-5 1981-1 1979-10 1982-7 1988-6 1989-1 1981-12 1983-2 1983-11 1983-10 1979-3 1979-3 1979-7 1980-1 1987-4 1988-2 1991-2 1992-1 1984-2 1984-8 1987-3 1988-4 2000-5 2000-9 2002-1 2002-4 Grid connection 2000-12 2002-12 1977-2 1980-11 1978-9 1980-2 1987-10 1988-7 1981-6 1982-7 1983-8 1983-5 1978-5 1978-9 1979-3 1979-7 1986-11 1987-9 1990-7 1991-5 1982-11 1983-11 1986-10 1987-11 1996-8 1997-4 1997-12 1999-12 Construction start 1987-2 1987-2 1971-5 1972-8 1974-2 1975-11 1980-5 1980-8 1977-1 1977-1 1978-4 1978-4 1972-11 1973-9 1974-6 1974-7 1979-10 1980-7 1982-6 1983-9 1977-3 1977-3 1980-10 1981-2 1984-1 1985-12 1988-10 1991-4 NSSS supplier SKODA SKODA AEE AEE ASEASTAL ASEASTAL FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM Operator CEZ CEZ FORTUMPH FORTUMPH TVO TVO EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF 963 963 488 488 880 880 910 910 910 910 910 910 880 880 905 905 905 905 Net 1310 1310 1300 1300 1300 1300 1500 1500 1495 1495 510 510 910 910 951 951 951 951 945 945 917 917 954 954 954 954 1013 1013 1363 1363 1362 1362 1362 1362 1560 1560 1561 1561 Gross Capacity (MW) 3000 3000 1500 1500 2500 2500 3817 3817 2785 2785 2785 2785 2785 2785 2785 2785 3817 3817 3817 3817 2785 2785 2785 2785 4270 4270 4270 4270 Thermal VVER V-320 VVER V-320 VVER V-213 VVER V-213 BWR-2500 BWR-2500 P4 REP 1300 P4 REP 1300 CP1 CP1 CP1 CP1 CP0 CP0 CP0 CP0 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 CP2 CP2 CP2 CP2 N4 REP 1450 N4 REP 1450 N4 REP 1450 N4 REP 1450 PWR PWR PWR PWR BWR BWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model Reactor Name TEMELIN-1 TEMELIN-2 LOVIISA-1 LOVIISA-2 OLKILUOTO-1 OLKILUOTO-2 BELLEVILLE-1 BELLEVILLE-2 BLAYAIS-1 BLAYAIS-2 BLAYAIS-3 BLAYAIS-4 BUGEY-2 BUGEY-3 BUGEY-4 BUGEY-5 CATTENOM-1 CATTENOM-2 CATTENOM-3 CATTENOM-4 CHINON-B-1 CHINON-B-2 CHINON-B-3 CHINON-B-4 CHOOZ-B-1 CHOOZ-B-2 CIVAUX-1 CIVAUX-2 Code CZ -23 CZ -24 FI -1 FI -2 FI -3 FI -4 FR -54 FR -55 FR -32 FR -33 FR -34 FR -35 FR -13 FR -14 FR -15 FR -16 FR -50 FR -53 FR -60 FR -65 FR -40 FR -41 FR -56 FR -57 FR -62 FR -70 FR -72 FR -73 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued FINLAND FRANCE Note: The column "Non-electrical applications" indicates the use of facility to provide: DH district heating.

33 ------Non- applics electrical 74.9 72.0 76.4 76.8 81.4 85.5 82.3 82.0 67.8 59.5 73.5 77.2 90.1 87.3 76.8 82.3 76.5 84.6 84.9 80.0 86.5 76.8 84.9 83.4 64.6 79.3 78.4 87.0 66.4 81.4 2011 2007– UCF % 70.7 68.2 74.4 74.3 78.3 83.5 80.4 79.4 66.8 57.3 71.5 74.3 88.5 85.5 75.1 80.7 74.6 83.3 83.3 79.6 83.1 75.6 79.8 81.3 62.5 77.5 77.7 85.1 65.0 79.0 2011 2007– EAF % Commercial operation 1984-4 1985-4 1984-9 1985-2 1980-9 1981-2 1981-5 1981-11 1978-1 1978-4 1986-12 1987-3 1991-2 1994-3 1980-11 1980-12 1981-6 1981-10 1985-1 1985-10 1988-2 1989-5 1985-12 1985-12 1986-2 1986-6 1990-12 1992-11 1986-5 1987-3 Grid connection 1983-4 1984-9 1984-5 1984-10 1980-3 1980-12 1981-1 1981-8 1977-4 1977-10 1985-12 1986-7 1990-6 1993-6 1980-3 1980-8 1980-12 1981-6 1984-8 1985-8 1987-10 1988-12 1984-6 1984-9 1985-9 1986-4 1990-5 1992-2 1985-8 1986-7 Construction start 1978-8 1978-11 1979-4 1979-10 1975-2 1975-4 1975-9 1975-12 1971-9 1972-2 1979-12 1980-5 1982-11 1984-10 1975-2 1975-3 1975-12 1976-4 1979-10 1979-10 1981-5 1982-1 1977-8 1978-1 1979-2 1980-2 1982-9 1984-8 1979-1 1979-7 NSSS supplier FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM Operator EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF 915 915 915 915 890 890 890 890 880 880 910 910 910 910 910 910 Net 1330 1330 1310 1310 1310 1310 1330 1330 1330 1330 1330 1330 1335 1335 956 956 956 956 937 937 937 937 920 920 951 951 951 951 951 951 1382 1382 1363 1363 1363 1363 1382 1382 1382 1382 1382 1382 1381 1381 Gross Capacity (MW) 2785 2785 2785 2785 2785 2785 2785 2785 2660 2660 3817 3817 3817 3817 2785 2785 2785 2785 2785 2785 3817 3817 3817 3817 3817 3817 3817 3817 3817 3817 Thermal CP2 CP2 CP2 CP2 CP1 CP1 CP1 CP1 CP0 CP0 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 CP1 CP1 CP1 CP1 CP1 CP1 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model Reactor Name CRUAS-1 CRUAS-2 CRUAS-3 CRUAS-4 DAMPIERRE-1 DAMPIERRE-2 DAMPIERRE-3 DAMPIERRE-4 FESSENHEIM-1 FESSENHEIM-2 FLAMANVILLE-1 FLAMANVILLE-2 GOLFECH-1 GOLFECH-2 GRAVELINES-1 GRAVELINES-2 GRAVELINES-3 GRAVELINES-4 GRAVELINES-5 GRAVELINES-6 NOGENT-1 NOGENT-2 PALUEL-1 PALUEL-2 PALUEL-3 PALUEL-4 PENLY-1 PENLY-2 ST. ALBAN-1 ST. ALBAN-2 Code FR -42 FR -43 FR -44 FR -45 FR -22 FR -29 FR -30 FR -31 FR -11 FR -12 FR -46 FR -47 FR -61 FR -68 FR -20 FR -21 FR -27 FR -28 FR -51 FR -52 FR -58 FR -59 FR -36 FR -37 FR -38 FR -39 FR -63 FR -64 FR -48 FR -49 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

34 ------DS DS DH DH DH Non- applics electrical 85.1 80.7 80.6 77.0 79.6 84.9 91.2 94.2 84.3 91.4 89.1 88.4 93.9 92.8 91.9 86.7 87.6 88.2 88.3 90.0 92.6 72.9 93.5 45.3 94.3 80.7 91.2 2011 2007– UCF % 81.3 77.6 78.5 74.9 78.3 83.2 91.0 94.1 84.2 90.1 88.9 88.3 93.8 92.5 90.7 86.7 87.6 88.2 88.3 57.6 56.4 45.1 71.7 35.9 62.5 47.5 50.9 2011 2007– EAF % Commercial operation 1983-8 1983-8 1980-12 1980-12 1981-5 1981-11 1986-12 1988-6 1982-6 1985-2 1984-7 1985-1 1988-4 1989-4 1985-4 1983-8 1984-11 1986-12 1987-11 2000-11 2000-3 2007-5 2011-1 1993-5 1995-9 1984-1 1986-3 Grid connection 1981-1 1981-6 1980-5 1980-8 1981-2 1981-6 1986-10 1988-4 1981-12 1984-9 1984-3 1984-11 1988-1 1989-1 1984-12 1982-12 1984-9 1986-9 1987-8 2000-10 1999-12 2007-4 2011-1 1992-11 1995-3 1983-7 1985-9 Construction start 1976-5 1976-7 1974-11 1974-12 1975-4 1975-5 1976-1 1982-8 1975-1 1976-6 1976-7 1976-7 1982-9 1982-11 1977-7 1974-8 1974-8 1979-10 1979-10 1989-9 1989-12 2002-3 2002-5 1984-12 1985-4 1971-1 1972-10 NSSS supplier FRAM FRAM FRAM FRAM FRAM FRAM KWU KWU KWU KWU KWU KWU KWU KWU KWU AEE AEE AEE AEE NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL Operator EDF EDF EDF EDF EDF EDF E.ON KLE E.ON KWG KGG KGG E.ON EnKK EnKK PAKS Zrt PAKS Zrt PAKS Zrt PAKS Zrt NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL 915 915 915 915 915 915 470 473 473 473 202 202 202 202 202 202 205 205 Net 1410 1329 1275 1360 1284 1288 1410 1310 1402 956 956 955 955 955 955 500 500 500 500 220 220 220 220 220 220 220 220 1480 1400 1345 1430 1344 1344 1485 1400 1468 Gross Capacity (MW) 801 801 800 800 801 801 801 801 2785 2785 2785 2785 2785 2785 3900 3850 3765 3900 3840 3840 3950 3850 3950 1485 1485 1485 1485 Thermal CP2 CP2 CP1 CP1 CP1 CP1 PWR Konvoi PWR PWR BWR-72 BWR-72 Konvoi Konvoi PWR VVER V-213 VVER V-213 VVER V-213 VVER V-213 Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR BWR BWR PWR PWR PWR PWR PWR PWR PWR Type Model PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR Reactor Name ST. LAURENT-B-1 ST. LAURENT-B-2 TRICASTIN-1 TRICASTIN-2 TRICASTIN-3 TRICASTIN-4 BROKDORF (KBR) EMSLAND (KKE) GRAFENRHEINFELD (KKG) GROHNDE (KWG) GUNDREMMINGEN-B (GUN-B) GUNDREMMINGEN-C (GUN-C) ISAR-2 (KKI 2) NECKARWESTHEIM-2 (GKN 2) PHILIPPSBURG-2 (KKP 2) PAKS-1 PAKS-2 PAKS-3 PAKS-4 KAIGA-1 KAIGA-2 KAIGA-3 KAIGA-4 KAKRAPAR-1 KAKRAPAR-2 MADRAS-1 MADRAS-2 Code FR -17 FR -23 FR -18 FR -19 FR -25 FR -26 DE -32 DE -33 DE -23 DE -27 DE -26 DE -28 DE -31 DE -44 DE -24 HU -1 HU -2 HU -3 HU -4 IN -13 IN -14 IN -15 IN -16 IN -9 IN -10 IN -5 IN -6 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued GERMANY HUNGARY INDIA Note: The column "Non-electrical applications" indicates the use of facility to provide: DH district heating, DS desalination.

35 ------PH PH PH PH DS DS DS Non- applics electrical 0.0 68.0 34.8 53.4 91.4 89.6 91.7 66.1 86.4 91.9 92.1 84.9 61.6 60.4 70.2 66.6 69.7 63.5 85.0 64.4 67.0 86.6 67.0 81.2 61.0 63.9 76.5 2011 2007– UCF % 0.0 36.8 18.7 50.3 71.5 70.1 90.7 65.3 85.8 91.4 66.3 56.1 61.6 59.0 69.1 65.4 68.5 62.3 85.0 64.4 67.0 86.6 66.7 79.1 49.2 63.9 76.4 2011 2007– EAF % Commercial operation 1991-1 1992-7 1973-12 1981-4 2000-6 2000-12 2010-2 2010-3 1969-10 1969-10 2006-8 2005-9 2012-7 1978-4 1979-10 1982-4 1984-2 1985-6 1987-8 1975-10 1981-3 1994-3 1997-7 1987-8 1993-9 2005-1 2005-12 1977-9 Grid connection 1989-7 1992-1 1972-11 1980-11 2000-3 2000-11 2009-12 2010-3 1969-4 1969-5 2006-6 2005-6 2011-9 1977-9 1979-5 1981-7 1983-6 1984-12 1986-12 1975-2 1980-6 1993-6 1996-11 1987-1 1993-1 2004-4 2005-3 1977-2 Construction start 1976-12 1977-11 1965-8 1968-4 1990-2 1990-10 2002-9 2003-1 1964-10 1964-10 2000-5 2000-3 1975-5 1972-5 1973-10 1976-3 1979-5 1981-3 1981-5 1971-9 1977-2 1988-6 1992-7 1983-4 1989-10 2000-7 2000-11 1973-9 NSSS supplier NPCIL NPCIL AECL AECL/DAE NPCIL NPCIL NPCIL NPCIL GE GE NPCIL NPCIL ASE TOSHIBA GE/T TOSHIBA HITACHI TOSHIBA HITACHI MHI MHI MHI MHI TOSHIBA TOSHIBA TOSHIBA TOSHIBA MHI Operator NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPPDCO TEPCO TEPCO TEPCO TEPCO TEPCO TEPCO KYUSHU KYUSHU KYUSHU KYUSHU CHUBU CHUBU CHUBU TOHOKU SHIKOKU 90 202 202 187 202 202 202 202 150 150 490 490 915 760 529 529 538 Net 1067 1067 1067 1067 1067 1127 1127 1056 1092 1325 1067 220 220 100 200 220 220 220 220 160 160 540 540 784 559 559 566 1000 1100 1100 1100 1100 1100 1180 1180 1100 1137 1380 1100 Gross Capacity (MW) 801 801 346 693 801 801 801 801 530 530 1730 1730 3000 2381 3293 3293 3293 3293 3293 1650 1650 3423 3423 3293 3293 3926 3293 1650 Thermal Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre BWR-1, Mark 2 BWR-1, Mark 2 Horizontal Pre Horizontal Pre VVER V-446 BWR-4 BWR-5 BWR-5 BWR-5 BWR-5 BWR-5 M (2-loop) M (2-loop) M (4-loop) M (4-loop) BWR-5 BWR-5 ABWR BWR-5 M (2-loop) BWR BWR PWR BWR BWR BWR BWR BWR BWR PWR PWR PWR PWR BWR BWR BWR BWR PWR Type Model PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR Reactor Name NARORA-1 NARORA-2 RAJASTHAN-1 RAJASTHAN-2 RAJASTHAN-3 RAJASTHAN-4 RAJASTHAN-5 RAJASTHAN-6 TARAPUR-1 TARAPUR-2 TARAPUR-3 TARAPUR-4 BUSHEHR 1 FUKUSHIMA-DAIICHI-5 FUKUSHIMA-DAIICHI-6 FUKUSHIMA-DAINI-1 FUKUSHIMA-DAINI-2 FUKUSHIMA-DAINI-3 FUKUSHIMA-DAINI-4 GENKAI-1 GENKAI-2 GENKAI-3 GENKAI-4 HAMAOKA-3 HAMAOKA-4 HAMAOKA-5 HIGASHI DORI 1 (TOHOKU) IKATA-1 Code IN -7 IN -8 IN -3 IN -4 IN -11 IN -12 IN -19 IN -20 IN -1 IN -2 IN -23 IN -24 IR -1 JP -17 JP -18 JP -25 JP -26 JP -35 JP -38 JP -12 JP -27 JP -45 JP -46 JP -36 JP -49 JP -60 JP -58 JP -23 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued IRAN, ISL. REP. JAPAN Note: The column "Non-electrical applications" indicates the use of facility to provide: PH process heating, DS desalination.

36 ------DS DS DS DS DS DS Non- applics electrical 4.0 85.2 77.7 35.5 14.3 20.0 31.9 55.4 54.6 53.4 64.4 71.6 63.5 77.0 62.0 75.8 52.3 69.2 62.4 69.0 78.7 35.9 42.7 46.4 70.6 67.4 71.2 76.8 73.2 59.9 2011 2007– UCF % 4.0 85.1 77.7 29.9 10.7 10.8 21.7 47.2 47.9 53.1 64.2 71.6 63.5 77.0 62.0 75.8 42.4 59.8 52.4 69.0 78.7 35.9 42.7 46.4 70.6 67.4 71.2 76.8 73.2 56.1 2011 2007– EAF % Commercial operation 1982-3 1994-12 1985-9 1990-9 1993-8 1994-8 1990-4 1996-11 1997-7 1970-11 1972-7 1976-12 1979-3 1979-12 1991-12 1993-2 1984-6 1995-7 2002-1 1984-7 1985-11 1993-7 2006-3 1974-3 1989-2 1974-11 1975-11 1985-1 1985-6 1978-11 Grid connection 1981-8 1994-3 1985-2 1990-2 1992-12 1993-12 1989-9 1996-1 1996-12 1970-8 1972-4 1976-2 1977-12 1978-10 1991-6 1992-6 1983-11 1994-12 2001-5 1983-9 1985-4 1993-1 2005-7 1973-12 1988-7 1974-3 1975-1 1984-5 1984-11 1978-3 Construction start 1978-8 1990-10 1980-6 1985-11 1989-3 1990-3 1985-6 1992-11 1993-7 1967-2 1968-5 1972-8 1972-10 1972-12 1987-10 1988-6 1980-7 1991-4 1998-1 1979-12 1981-10 1989-7 2001-8 1970-7 1985-2 1970-4 1971-3 1980-12 1981-3 1973-10 NSSS supplier MHI MHI TOSHIBA TOSHIBA TOSHIBA HITACHI HITACHI TOSHIBA HITACHI WH MHI MHI WH WH MHI MHI TOSHIBA TOSHIBA TOSHIBA MHI MHI HITACHI HITACHI HITACHI HITACHI WH/MHI MHI MHI MHI GE Operator SHIKOKU SHIKOKU TEPCO TEPCO TEPCO TEPCO TEPCO TEPCO TEPCO KEPCO KEPCO KEPCO KEPCO KEPCO KEPCO KEPCO TOHOKU TOHOKU TOHOKU KYUSHU KYUSHU HOKURIKU HOKURIKU CHUGOKU CHUGOKU KEPCO KEPCO KEPCO KEPCO JAPCO 538 846 320 470 780 498 796 796 846 846 505 439 789 780 780 830 830 Net 1067 1067 1067 1067 1067 1315 1315 1120 1120 1127 1127 1108 1060 566 890 340 500 826 524 825 825 890 890 540 460 820 826 826 870 870 1100 1100 1100 1100 1100 1356 1356 1175 1175 1180 1180 1206 1100 Gross Capacity (MW) 1650 2660 3293 3293 3293 3293 3293 3926 3926 1031 1456 2440 3423 3423 3423 3423 1593 2436 2436 2660 2660 1593 3926 1380 2436 2440 2440 2660 2660 3293 Thermal M (2-loop) M (3-loop) BWR-5 BWR-5 BWR-5 BWR-5 BWR-5 ABWR ABWR W (2-loop) M (2-loop) M (3-loop) W (4-loop) W (4-loop) M (4-loop) M (4-loop) BWR-4 BWR-5 BWR-5 M (3-loop) M (3-loop) BWR-5 ABWR BWR-3 BWR-5 M (3-loop) M (3-loop) M (3-loop) M (3-loop) BWR-5 PWR PWR BWR BWR BWR BWR BWR BWR BWR PWR PWR PWR PWR PWR PWR PWR BWR BWR BWR PWR PWR BWR BWR BWR BWR PWR PWR PWR PWR BWR Type Model Reactor Name IKATA-2 IKATA-3 KASHIWAZAKI KARIWA-1 KASHIWAZAKI KARIWA-2 KASHIWAZAKI KARIWA-3 KASHIWAZAKI KARIWA-4 KASHIWAZAKI KARIWA-5 KASHIWAZAKI KARIWA-6 KASHIWAZAKI KARIWA-7 MIHAMA-1 MIHAMA-2 MIHAMA-3 OHI-1 OHI-2 OHI-3 OHI-4 ONAGAWA-1 ONAGAWA-2 ONAGAWA-3 SENDAI-1 SENDAI-2 SHIKA-1 SHIKA-2 SHIMANE-1 SHIMANE-2 TAKAHAMA-1 TAKAHAMA-2 TAKAHAMA-3 TAKAHAMA-4 TOKAI-2 Code JP -32 JP -47 JP -33 JP -39 JP -52 JP -53 JP -40 JP -55 JP -56 JP -4 JP -6 JP -14 JP -15 JP -19 JP -50 JP -51 JP -22 JP -54 JP -57 JP -28 JP -37 JP -48 JP -59 JP -7 JP -41 JP -8 JP -13 JP -29 JP -30 JP -21 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued Note: The column "Non-electrical applications" indicates the use of facility to provide: DS desalination.

37 ------Non- applics electrical 71.1 74.6 91.4 43.0 51.7 95.0 91.4 92.9 92.4 93.6 89.6 93.1 88.6 93.7 93.6 50.1 93.7 94.8 93.4 91.9 90.8 92.5 91.8 94.2 92.8 76.1 82.8 100.0 2011 2007– UCF % 71.1 74.6 91.4 42.8 50.9 94.4 91.4 92.9 92.2 99.6 93.4 89.6 93.0 88.5 93.6 93.4 50.1 93.5 94.7 93.3 91.6 90.5 92.3 91.5 94.2 92.5 75.8 82.3 2011 2007– EAF % Commercial operation 1989-6 1991-4 2009-12 1970-3 1987-2 1978-4 1983-7 1985-9 1986-4 2011-2 1988-9 1989-9 1998-8 1999-12 2004-7 2005-4 1983-4 1997-7 1998-7 1999-10 1986-8 1987-6 1995-3 1996-1 2002-5 2002-12 1990-7 1995-4 Grid connection 1988-12 1990-8 2009-3 1969-11 1986-6 1977-6 1983-4 1985-1 1985-11 2010-8 1988-4 1989-4 1998-1 1998-12 2003-12 2005-1 1982-12 1997-4 1998-3 1999-5 1986-3 1986-11 1994-10 1995-7 2001-12 2002-9 1989-4 1994-11 Construction start 1985-4 1985-6 2004-11 1966-11 1982-11 1972-4 1977-12 1979-10 1980-4 2006-6 1983-1 1983-7 1993-7 1993-11 1999-10 2000-9 1977-10 1992-6 1994-3 1994-7 1981-6 1981-12 1989-12 1990-5 1997-6 1997-11 1976-10 1977-6 NSSS supplier MHI MHI MHI GE MHI WH WH WH WH DHICKOPC FRAM FRAM DHICKOPC DHICKOPC DHICKOPC DHICKOPC AECL AECL/DHI AECL/DHI AECL/DHI WH WH DHICKAEC DHICKAEC DHICKOPC DHICKOPC GE GE Operator HEPCO HEPCO HEPCO JAPCO JAPCO KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP CFE CFE 550 550 866 340 576 637 985 945 942 994 998 997 997 660 710 707 708 953 947 997 994 988 996 650 650 Net 1108 1011 1009 579 579 912 357 603 675 985 984 689 740 729 730 985 978 682 682 1160 1042 1042 1038 1047 1045 1048 1048 1039 1039 1046 1050 Gross Capacity (MW) 1650 1650 2660 1070 3411 1729 1882 2912 2912 2825 2785 2775 2825 2825 2815 2825 2061 2061 2061 2061 2787 2787 2825 2825 2825 2825 2027 2027 Thermal M (2-loop) M (2-loop) M (3-loop) BWR-2 M (4-loop) WH △60 WH F WH F WH F OPR-1000 France CPI France CPI OPR-1000 OPR-1000 OPR-1000 OPR-1000 CANDU 6 CANDU 6 CANDU 6 CANDU 6 WH F WH F OPR-1000 OPR-1000 OPR-1000 OPR-1000 BWR-5 BWR-5 PWR PWR PWR BWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR BWR BWR Type Model PHWR PHWR PHWR PHWR Reactor Name TOMARI-1 TOMARI-2 TOMARI-3 TSURUGA-1 TSURUGA-2 KORI-1 KORI-2 KORI-3 KORI-4 SHIN-KORI-1 ULCHIN-1 ULCHIN-2 ULCHIN-3 ULCHIN-4 ULCHIN-5 ULCHIN-6 WOLSONG-1 WOLSONG-2 WOLSONG-3 WOLSONG-4 YONGGWANG-1 YONGGWANG-2 YONGGWANG-3 YONGGWANG-4 YONGGWANG-5 YONGGWANG-6 LAGUNA VERDE-1 LAGUNA VERDE-2 Code JP -43 JP -44 JP -64 JP -3 JP -34 KR -1 KR -2 KR -5 KR -6 KR -21 KR -9 KR -10 KR -13 KR -14 KR -19 KR -20 KR -3 KR -4 KR -15 KR -16 KR -7 KR -8 KR -11 KR -12 KR -17 KR -18 MX -1 MX -2 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued KOREA, REP. OF MEXICO

38 - - - - DS PH DH DH DH DH DH DH Non- DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH applics electrical 93.0 74.1 88.3 45.7 94.1 94.6 87.4 89.2 89.5 88.8 76.6 53.3 84.8 85.7 83.4 84.9 86.2 85.3 85.7 86.0 78.7 84.6 84.8 78.6 71.4 75.6 2011 2007– UCF % 92.7 74.0 88.3 45.7 93.6 93.8 86.9 88.1 88.5 88.0 76.5 44.3 75.5 76.3 74.2 84.7 85.9 85.1 82.4 82.4 72.2 80.9 82.8 78.4 70.7 74.7 2011 2007– EAF % Commercial operation 1973-10 2000-9 2011-5 1972-12 1996-12 2007-10 1986-5 1988-1 1989-4 1993-12 1981-11 1974-4 1975-2 1976-2 1977-1 1985-6 1987-3 2005-11 — 1973-12 1975-2 1982-12 1984-12 1977-10 1979-8 1984-3 1986-2 Grid connection 1973-7 2000-6 2011-3 1971-10 1996-7 2007-8 1985-12 1987-10 1988-12 1993-4 1980-4 1974-1 1974-12 1975-12 1976-12 1984-5 1986-12 2004-12 2011-11 1973-6 1974-12 1981-3 1984-10 1976-12 1979-1 1983-10 1985-12 Construction start 1969-7 1993-8 2005-12 1966-8 1982-7 1983-7 1980-12 1981-8 1982-11 1984-4 1969-1 1970-1 1970-1 1970-1 1970-1 1977-2 1982-2 1985-10 1986-8 1970-5 1970-5 1977-4 1976-8 1972-6 1973-1 1978-4 1981-5 NSSS supplier S/KWU CNNC CNNC CGE AECL AECL ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM Operator EPZ PAEC PAEC PAEC SNN SNN REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA 11 11 11 11 482 300 300 125 650 650 950 950 950 950 560 950 950 950 950 411 411 411 411 925 925 925 925 Net 12 12 12 12 515 325 325 137 706 706 600 440 440 440 440 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 Gross 62 62 62 62 Capacity (MW) 999 999 433 1366 2180 2180 3000 3000 3000 3200 1470 3000 3000 3200 3200 1375 1375 1375 1375 3200 3200 3200 3200 Thermal LWR - PWR CNP-300 PWR CANDU-137 MW CANDU 6 CANDU 6 VVER V-320 VVER V-320 VVER V-320 VVER V-320 BN-600 EGP-6 EGP-6 EGP-6 EGP-6 VVER V-338 VVER V-338 VVER V-320 VVER V-320 VVER V-230 VVER V-230 VVER V-213 VVER V-213 RBMK-1000 RBMK-1000 RBMK-1000 RBMK-1000 FBR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model LWGR LWGR LWGR LWGR LWGR LWGR LWGR LWGR PHWR PHWR PHWR Reactor Name BORSSELE CHASNUPP 1 CHASNUPP 2 KANUPP CERNAVODA-1 CERNAVODA-2 BALAKOVO-1 BALAKOVO-2 BALAKOVO-3 BALAKOVO-4 BELOYARSKY-3 (BN-600) BILIBINO-1 BILIBINO-2 BILIBINO-3 BILIBINO-4 KALININ-1 KALININ-2 KALININ-3 KALININ-4 KOLA-1 KOLA-2 KOLA-3 KOLA-4 KURSK-1 KURSK-2 KURSK-3 KURSK-4 Code NL -2 PK -2 PK -3 PK -1 RO -1 RO -2 RU -96 RU -97 RU -98 RU -99 RU -21 RU -141 RU -142 RU -143 RU -144 RU -30 RU -31 RU -36 RU -37 RU -12 RU -13 RU -32 RU -33 RU -17 RU -22 RU -38 RU -39 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued NETHERLANDS PAKISTAN ROMANIA RUSSIA Note: The column "Non-electrical applications" indicates the use of facility to provide: DS desalination, DH district heating, PH process heating.

39 ------Non- DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH applics electrical 80.2 87.3 72.8 71.7 66.0 81.8 67.8 88.3 90.2 76.3 80.2 79.3 85.8 86.7 89.6 89.8 93.8 81.4 81.8 89.6 88.8 82.0 85.6 83.9 91.5 88.3 2011 2007– UCF % 79.2 86.9 71.3 70.5 65.2 80.6 67.0 88.2 89.4 75.9 79.7 79.1 83.5 84.7 89.2 89.1 93.7 80.9 79.1 88.6 87.8 80.8 83.8 82.4 91.1 87.9 2011 2007– EAF % Commercial operation 1974-11 1976-2 1980-6 1981-8 1972-6 1973-3 1981-2 2001-12 2010-12 1983-9 1985-7 1990-10 1985-2 1985-12 1998-10 2000-4 1983-1 1984-7 1985-11 1983-9 1984-7 1984-12 1986-3 1985-3 1971-5 1988-8 Grid connection 1973-12 1975-7 1979-12 1981-2 1971-12 1972-12 1980-5 2001-3 2010-3 1982-12 1985-5 1990-1 1984-8 1985-8 1998-7 1999-12 1981-10 1984-4 1985-7 1981-5 1983-10 1983-8 1985-10 1984-10 1971-3 1988-5 Construction start 1970-3 1970-6 1973-12 1975-2 1967-7 1967-7 1974-3 1981-9 1983-5 1975-10 1976-6 1984-5 1976-12 1976-12 1983-10 1983-10 1975-3 1976-7 1976-7 1973-7 1973-7 1974-5 1975-3 1975-9 1966-9 1979-8 NSSS supplier ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM SKODA SKODA SKODA SKODA WH FRAM FRAM WH WH WH WH GE GE KWU Operator REA REA REA REA REA REA REA REA REA REA REA REA SE,plc SE,plc SE,plc SE,plc NEK ESKOM ESKOM CNAT CNAT ANAV ANAV ID NUCLENOR CNAT 925 925 925 925 385 385 950 950 950 925 925 925 472 472 436 436 688 930 900 995 997 446 Net 1011 1006 1064 1003 417 417 505 505 470 470 727 970 940 466 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1045 1044 1033 1027 1092 1066 Gross Capacity (MW) 3200 3200 3200 3200 1375 1375 3000 3200 3200 3200 3200 3200 1471 1471 1471 1471 1994 2775 2775 2947 2947 2941 2941 3237 1381 3010 Thermal RBMK-1000 RBMK-1000 RBMK-1000 RBMK-1000 VVER V-179 VVER V-179 VVER V-187 VVER V-320I VVER V-320I RBMK-1000 RBMK-1000 RBMK-1000 VVER V-213 VVER V-213 VVER V-213 VVER V-213 Westinghouse 2 CP1 CP1 WE 3-loops WE 3-loops WE 3-loops WE 3-loops BWR-6 BWR-3 PWR 3 loops PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR BWR BWR PWR Type Model LWGR LWGR LWGR LWGR LWGR LWGR LWGR Reactor Name LENINGRAD-1 LENINGRAD-2 LENINGRAD-3 LENINGRAD-4 NOVOVORONEZH-3 NOVOVORONEZH-4 NOVOVORONEZH-5 ROSTOV-1 ROSTOV-2 SMOLENSK-1 SMOLENSK-2 SMOLENSK-3 BOHUNICE-3 BOHUNICE-4 MOCHOVCE-1 MOCHOVCE-2 KRSKO KOEBERG-1 KOEBERG-2 ALMARAZ-1 ALMARAZ-2 ASCO-1 ASCO-2 COFRENTES SANTA MARIA DE GARONA TRILLO-1 Code RU -15 RU -16 RU -34 RU -35 RU -9 RU -11 RU -20 RU -59 RU -62 RU -23 RU -24 RU -67 SK -13 SK -14 SK -6 SK -7 SI -1 ZA -1 ZA -2 ES -6 ES -7 ES -8 ES -9 ES -10 ES -2 ES -11 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN Note: The column "Non-electrical applications" indicates the use of facility to provide: DH district heating, PH process heating.

40 ------PH DH DH Non- applics electrical 73.2 84.7 72.4 82.1 75.1 82.8 55.6 58.1 62.5 82.1 82.9 93.1 90.0 93.4 91.2 88.0 36.3 45.1 56.6 55.7 52.6 48.6 82.7 70.0 67.9 70.4 67.9 2011 2007– UCF % 72.2 84.1 71.9 81.3 73.8 81.4 54.7 56.9 61.2 80.1 81.1 93.1 90.0 93.2 90.3 87.9 36.3 45.1 56.6 55.7 52.6 48.6 82.4 69.5 67.6 70.4 67.9 2011 2007– EAF % Commercial operation 1988-3 1980-12 1981-7 1985-8 1972-2 1975-1 1985-8 1976-1 1975-5 1981-9 1983-11 1969-9 1971-12 1979-11 1984-12 1972-11 1985-4 1989-4 1989-4 1989-4 1989-4 1989-4 1989-4 1989-4 1978-10 1976-9 1976-2 Grid connection 1987-12 1980-6 1981-1 1985-3 1971-8 1974-10 1985-3 1974-10 1974-8 1980-9 1982-6 1969-7 1971-10 1979-2 1984-5 1971-7 1983-4 1985-12 1983-8 1984-10 1983-7 1984-10 1988-7 1988-11 1976-10 1976-2 1976-2 Construction start 1980-12 1973-6 1975-1 1979-1 1966-8 1969-9 1980-5 1969-2 1970-10 1972-9 1973-11 1965-9 1968-1 1973-12 1974-1 1967-3 1965-10 1965-10 1968-10 1968-10 1970-12 1970-12 1980-8 1980-8 1967-9 1967-9 1967-11 NSSS supplier WH ABBATOM ABBATOM ABBATOM ABBATOM ABBATOM ABBATOM ABBATOM WH WH WH WH WH KWU GETSCO GETSCO APC APC NPC NPC NPC NPC NPC NPC TNPG TNPG TNPG Operator ANAV FKA FKA FKA OKG OKG OKG RAB RAB RAB RAB Axpo AG Axpo AG KKG KKL BKW BE BE BE BE BE BE BE BE BE BE BE 984 996 473 638 854 809 945 365 365 970 373 520 520 595 595 585 575 605 605 435 435 460 Net 1045 1170 1400 1057 1190 492 661 893 917 981 380 380 390 615 615 655 655 625 625 680 680 655 655 644 1087 1022 1034 1212 1450 1102 1035 1245 Gross Capacity (MW) 2941 2928 2928 3300 1375 1800 3900 2540 2660 3135 2775 1130 1130 3002 3600 1097 1500 1500 1500 1500 1500 1500 1550 1550 1494 1494 1496 Thermal WE 3-loops BWR-75 BWR-75 BWR-3000 ABB BWR ABB BWR BWR-75 BWR WE (3 loops) WE (3 loops) WE (3 loops) WH - 2 loops WH - 2 loops PWR 3 Loop BWR-6 BWR-4 AGR AGR AGR AGR AGR AGR AGR AGR AGR AGR AGR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR PWR BWR BWR BWR BWR BWR BWR BWR PWR PWR PWR PWR PWR PWR BWR BWR Type Model Reactor Name VANDELLOS-2 FORSMARK-1 FORSMARK-2 FORSMARK-3 OSKARSHAMN-1 OSKARSHAMN-2 OSKARSHAMN-3 RINGHALS-1 RINGHALS-2 RINGHALS-3 RINGHALS-4 BEZNAU-1 BEZNAU-2 GOESGEN LEIBSTADT MUEHLEBERG DUNGENESS-B1 DUNGENESS-B2 HARTLEPOOL-A1 HARTLEPOOL-A2 HEYSHAM-A1 HEYSHAM-A2 HEYSHAM-B1 HEYSHAM-B2 HINKLEY POINT-B1 HINKLEY POINT-B2 HUNTERSTON-B1 Code ES -16 SE -9 SE -11 SE -14 SE -2 SE -3 SE -12 SE -4 SE -5 SE -7 SE -10 CH -1 CH -3 CH -4 CH -5 CH -2 GB -18A GB -18B GB -19A GB -19B GB -20A GB -20B GB -22A GB -22B GB -16A GB -16B GB -17A Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued SWEDEN SWITZERLAND UK Note: The column Non-Electrical Applications indicates the use of facility to provide: DH district heating, PH process

41 ------DH DH DH DH DH DH DH DH DH DH DH DH DH DH DH Non- applics electrical 70.1 41.1 80.7 76.1 85.8 63.7 59.6 81.4 74.8 58.4 71.4 69.1 72.6 77.7 79.5 71.4 81.4 82.1 85.5 83.6 83.0 82.8 91.4 93.9 94.6 93.0 95.3 95.3 2011 2007– UCF % 70.0 41.1 80.7 75.5 84.8 63.4 59.4 80.7 74.0 58.0 70.7 67.1 70.0 73.1 77.7 65.5 80.4 81.0 82.8 82.1 81.7 82.4 91.4 93.9 94.6 93.0 95.2 95.2 2011 2007– EAF % Commercial operation 1977-3 1967-12 1995-9 1988-5 1989-2 1971-11 1972-1 1988-8 2005-12 1981-9 1982-7 1987-5 2006-4 1983-10 1985-4 1989-12 1985-12 1986-2 1987-3 1988-4 1989-10 1996-9 1974-12 1980-3 1976-10 1987-11 1988-7 1988-10 Grid connection 1977-3 1967-11 1995-2 1988-5 1989-2 1971-1 1971-7 1987-12 2004-8 1980-12 1981-12 1986-12 2004-10 1982-12 1985-1 1989-9 1984-12 1985-7 1986-12 1987-12 1989-8 1995-10 1974-8 1978-12 1976-6 1987-8 1987-7 1988-5 Construction start 1967-11 1962-5 1988-7 1980-8 1980-8 1963-9 1963-9 1981-11 1985-2 1973-8 1973-10 1980-2 1986-8 1977-3 1979-10 1985-2 1980-4 1981-1 1982-4 1983-4 1985-11 1986-6 1968-10 1968-12 1970-6 1974-5 1975-8 1975-8 NSSS supplier TNPG TNPG PPC NNC NNC EE/B&W/T EE/B&W/T PAIP PAIP PAIP PAIP PAIP PAA PAA PAA PAA PAIP PAIP PAIP PAIP PAIP PAIP B&W CE WH WH WH WH Operator BE MEL BE BE BE MEL MEL NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC ENTERGY ENTERGY FENOC FENOC EXELON EXELON 430 217 600 605 490 490 950 950 381 376 950 950 950 950 950 950 950 950 950 950 950 842 993 892 885 Net 1191 1178 1152 644 230 682 682 540 540 420 415 880 923 923 1250 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1040 1240 1213 Gross Capacity (MW) 730 1496 3425 1623 1623 1920 1920 3000 3000 1375 1375 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 2568 3026 2689 2689 3587 3587 Thermal AGR MAGNOX SNUPPS AGR AGR MAGNOX MAGNOX VVER V-320 VVER V-320 VVER V-213 VVER V-213 VVER V-320 VVER V-320 VVER V-302 VVER V-338 VVER V-320 VVER V-320 VVER V-320 VVER V-320 VVER V-320 VVER V-320 VVER V-320 B&W (L-loop) D CE (2-loop) DR W (3-loop) W (3-loop) W (4-loop) W (4-loop) DRY GCR GCR GCR GCR GCR GCR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model Reactor Name HUNTERSTON-B2 OLDBURY-A1 SIZEWELL-B TORNESS 1 TORNESS 2 WYLFA 1 WYLFA 2 KHMELNITSKI-1 KHMELNITSKI-2 ROVNO-1 ROVNO-2 ROVNO-3 ROVNO-4 SOUTH UKRAINE-1 SOUTH UKRAINE-2 SOUTH UKRAINE-3 ZAPOROZHE-1 ZAPOROZHE-2 ZAPOROZHE-3 ZAPOROZHE-4 ZAPOROZHE-5 ZAPOROZHE-6 ARKANSAS ONE-1 ARKANSAS ONE-2 BEAVER VALLEY-1 BEAVER VALLEY-2 BRAIDWOOD-1 BRAIDWOOD-2 Code GB -17B GB -11A GB -24 GB -23A GB -23B GB -13A GB -13B UA -40 UA -41 UA -27 UA -28 UA -29 UA -69 UA -44 UA -45 UA -48 UA -54 UA -56 UA -78 UA -79 UA -126 UA -127 US -313 US -368 US -334 US -412 US -456 US -457 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued UKRAINE USA Note: The column Non-Electrical Applications indicates the use of facility to provide: DH district heating,

42 ------Non- applics electrical 91.7 89.1 90.5 91.6 88.5 94.6 94.1 89.4 96.3 94.6 92.3 92.2 94.8 81.6 92.7 95.9 91.6 50.8 85.7 92.3 90.2 68.5 90.4 95.2 96.4 92.2 89.1 93.0 90.2 96.1 2011 2007– UCF % 90.3 87.6 88.6 91.6 88.5 94.6 94.1 89.4 96.1 94.6 92.3 92.2 94.8 81.4 92.7 95.9 91.6 50.8 85.7 92.3 90.0 68.5 90.4 95.2 96.4 92.2 89.1 93.0 90.2 95.5 2011 2007– EAF % Commercial operation 1974-8 1975-3 1977-3 1977-3 1975-11 1985-9 1987-8 1984-12 1975-5 1977-4 1985-6 1986-8 1987-11 1984-12 1990-8 1993-8 1974-7 1977-3 1978-7 1985-5 1986-3 1975-8 1978-7 1970-6 1971-11 1975-2 1988-1 1977-12 1981-7 1975-7 Grid connection 1973-10 1974-8 1976-9 1976-12 1975-4 1985-3 1987-2 1984-10 1975-1 1976-12 1985-1 1986-5 1987-4 1984-5 1990-4 1993-4 1974-5 1977-1 1977-8 1984-11 1985-10 1975-2 1978-3 1970-4 1971-7 1974-5 1986-9 1977-8 1981-5 1975-2 Construction start 1967-5 1967-5 1968-7 1970-2 1970-2 1975-4 1975-4 1975-9 1968-6 1968-6 1974-5 1974-5 1975-10 1972-8 1974-12 1974-12 1968-6 1968-9 1970-9 1968-4 1970-12 1969-3 1969-3 1966-1 1966-10 1970-6 1972-9 1970-10 1970-10 1968-9 NSSS supplier GE GE GE GE GE WH WH WH CE CE WH WH GE GE WH WH GE B&W B&W WH WH WH WH GE GE GE GE WH WH GE Operator TVA TVA TVA PROGRESS PROGRESS EXELON EXELON AmerenUE CONSTELL CONSTELL DUKEENER DUKEENER EXELON ENERGYNW LUMINANT LUMINANT ENTERGY PROGRESS FENOC PG&E PG&E AEP AEP EXELON EXELON NEXTERA DTEDISON SOUTHERN SOUTHERN ENTERGY 938 920 855 850 774 860 894 867 867 601 874 860 855 Net 1101 1104 1105 1164 1136 1190 1129 1129 1065 1131 1209 1197 1122 1118 1009 1077 1085 990 989 918 911 801 890 925 913 913 614 895 905 882 1152 1155 1400 1225 1196 1236 1188 1188 1098 1200 1259 1250 1136 1164 1077 1133 1154 Gross Capacity (MW) 3458 3458 3458 2923 2923 3587 3587 3565 2700 2700 3411 3411 3473 3486 3612 3458 2381 2568 2772 3338 3411 3304 3468 2527 2527 1912 3430 2775 2775 2536 Thermal BWR-4 (Mark 1 BWR-4 (Mark 1 BWR-4 (Mark 1 BWR-4 (Mark 1 BWR-4 (Mark 1 W (4-loop) (DR W (4-Loop) (DR W (4-loop) DRY CE (2-loop) (D CE (2-loop) (D W (4-loop) (IC W (4-loop) (IC BWR-6 (Mark 3 BWR-5 (Mark 2 W (4-loop) DRY W (4-loop) DRY BWR-4 (Mark 1 B&W (L-loop) B&W (R-loop) W (4-loop) W (4-loop) W (4-loop) ICE W (4-loop) ICE BWR-3 (Mark 1 BWR-3 (Mark 1 BWR-4 (Mark 1 BWR-4 (Mark 1 W (3-loop) W (3-loop) DRY BWR-4 (Mark 1 BWR BWR BWR BWR BWR PWR PWR PWR PWR PWR PWR PWR BWR BWR PWR PWR BWR PWR PWR PWR PWR PWR PWR BWR BWR BWR BWR PWR PWR BWR Type Model Reactor Name BROWNS FERRY-1 BROWNS FERRY-2 BROWNS FERRY-3 BRUNSWICK-1 BRUNSWICK-2 BYRON-1 BYRON-2 CALLAWAY-1 CALVERT CLIFFS-1 CALVERT CLIFFS-2 CATAWBA-1 CATAWBA-2 CLINTON-1 COLUMBIA COMANCHE PEAK-1 COMANCHE PEAK-2 COOPER CRYSTAL RIVER-3 DAVIS BESSE-1 DIABLO CANYON-1 DIABLO CANYON-2 DONALD COOK-1 DONALD COOK-2 DRESDEN-2 DRESDEN-3 DUANE ARNOLD-1 ENRICO FERMI-2 FARLEY-1 FARLEY-2 FITZPATRICK Code US -259 US -260 US -296 US -325 US -324 US -454 US -455 US -483 US -317 US -318 US -413 US -414 US -461 US -397 US -445 US -446 US -298 US -302 US -346 US -275 US -323 US -315 US -316 US -237 US -249 US -331 US -341 US -348 US -364 US -333 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

43 ------Non- applics electrical 78.9 92.9 85.6 93.2 87.3 94.4 94.4 92.8 93.3 96.1 96.1 96.6 94.5 88.5 93.1 91.1 89.6 86.0 94.0 94.7 93.3 89.6 89.3 91.4 93.3 93.4 91.4 86.2 88.8 86.6 2011 2007– UCF % 78.9 92.9 85.6 93.2 87.3 94.4 94.4 92.8 93.3 96.1 96.1 96.6 94.5 88.5 93.1 90.7 89.6 86.0 94.0 94.7 88.8 84.4 89.3 91.4 93.3 93.3 91.4 86.2 88.8 86.6 2011 2007– EAF % Commercial operation 1973-9 1985-7 1971-3 1975-12 1979-9 1986-12 1974-8 1976-8 1974-6 1984-1 1984-10 1986-2 1990-1 1981-12 1984-3 1975-12 1986-4 1971-6 1969-12 1988-3 1978-6 1980-12 1973-7 1974-9 1974-12 1969-12 1971-12 1986-1 1986-9 1988-1 Grid connection 1973-8 1984-10 1970-9 1974-11 1978-9 1986-8 1973-6 1976-4 1974-4 1982-9 1984-4 1985-4 1989-9 1981-9 1983-5 1975-11 1986-2 1971-3 1969-11 1987-8 1978-4 1980-8 1973-5 1973-12 1974-9 1969-9 1971-12 1985-6 1986-5 1987-11 Construction start 1968-6 1974-5 1967-4 1968-9 1972-2 1976-3 1966-10 1968-11 1968-8 1973-9 1973-9 1974-6 1974-6 1971-4 1971-4 1969-11 1974-8 1967-6 1965-4 1975-8 1971-2 1971-2 1967-11 1967-11 1967-11 1964-12 1967-3 1976-5 1976-6 1976-6 NSSS supplier CE GE WH GE GE GE WH WH WH GE GE GE GE WH WH CE WH GE GE GE WH WH B&W B&W B&W GE CE CE CE CE Operator OPPD ENTERGY PROGRESS SOUTHERN SOUTHERN PSEG ENTERGY ENTERGY DOMINION EXELON EXELON EXELON EXELON DUKEENER DUKEENER DOMINION DOMINION NSP CONSTELL CONSTELL DOMINION DOMINION DUKEENER DUKEENER DUKEENER EXELON ENTERGY APS APS APS 482 724 876 883 566 869 572 621 920 943 846 846 846 619 793 Net 1251 1191 1022 1040 1118 1120 1130 1134 1100 1100 1233 1119 1311 1314 1312 512 745 898 921 581 910 600 642 973 994 891 891 891 652 842 1333 1376 1062 1065 1177 1179 1194 1194 1158 1158 1253 1205 1414 1414 1346 Gross Capacity (MW) 1500 3833 2339 2804 2804 3339 3216 3216 1772 3489 3489 3458 3458 3411 3411 2700 3411 1775 1850 3467 2893 2940 2568 2568 2568 1930 2565 3990 3990 3990 Thermal CE (2-loop) BWR-6 (Mark 3 W (3-loop) DRY BWR-4 (Mark 1 BWR-4 (Mark 1 BWR-4 (Mark 1 W (4-loop) DRY W (4-loop) DRY W (2-loop) DRY BWR-5 (Mark 2 BWR-5 (Mark 2 BWR-4 (Mark 2 BWR-4 (Mark 2 W (4-loop) ICE W (4-loop) (IC COMB CE DRY W (4-loop) DRY BWR-3 BWR-2 (Mark 1 BWR-5 (Mark 2 W (3-loop) W (3-loop) B&W (L-loop) B&W (L-loop) B&W (L-loop) BWR-2 (Mark 1 CE (2-loop) DR CE (2-loop) DR COMB CE80 DR COMB CE80 DR PWR BWR PWR BWR BWR BWR PWR PWR PWR BWR BWR BWR BWR PWR PWR PWR PWR BWR BWR BWR PWR PWR PWR PWR PWR BWR PWR PWR PWR PWR Type Model Reactor Name FORT CALHOUN-1 GRAND GULF-1 H.B. ROBINSON-2 HATCH-1 HATCH-2 HOPE CREEK-1 INDIAN POINT-2 INDIAN POINT-3 KEWAUNEE LASALLE-1 LASALLE-2 LIMERICK-1 LIMERICK-2 MCGUIRE-1 MCGUIRE-2 MILLSTONE-2 MILLSTONE-3 MONTICELLO NINE MILE POINT-1 NINE MILE POINT-2 NORTH ANNA-1 NORTH ANNA-2 OCONEE-1 OCONEE-2 OCONEE-3 OYSTER CREEK PALISADES PALO VERDE-1 PALO VERDE-2 PALO VERDE-3 Code US -285 US -416 US -261 US -321 US -366 US -354 US -247 US -286 US -305 US -373 US -374 US -352 US -353 US -369 US -370 US -336 US -423 US -263 US -220 US -410 US -338 US -339 US -269 US -270 US -287 US -219 US -255 US -528 US -529 US -530 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

44 ------Non- applics electrical 96.6 94.5 85.1 93.6 87.9 88.6 90.4 93.9 94.6 95.7 94.5 91.1 92.3 92.0 82.0 85.3 89.7 92.2 93.3 94.3 93.5 89.6 88.0 81.2 93.6 92.3 89.9 90.3 91.4 90.0 2011 2007– UCF % 96.6 94.5 85.1 93.4 87.9 88.6 90.4 93.9 94.6 95.7 94.5 90.0 92.0 92.0 81.9 85.1 89.7 92.2 93.3 94.3 93.5 89.6 88.0 81.2 93.2 92.3 89.9 90.3 91.4 89.6 2011 2007– EAF % Commercial operation 1974-7 1974-12 1987-11 1972-12 1970-12 1972-10 1973-12 1974-12 1973-2 1973-3 1970-7 1986-6 1977-6 1981-10 1983-8 1984-4 1990-8 1981-7 1982-6 1987-5 1988-8 1989-6 1976-12 1983-8 1972-12 1973-5 1983-6 1985-2 1974-9 1972-12 Grid connection 1974-2 1974-9 1986-12 1972-7 1970-11 1972-8 1973-12 1974-12 1972-4 1972-5 1969-12 1985-12 1976-12 1981-6 1982-9 1983-9 1990-5 1980-7 1981-12 1987-1 1988-3 1989-4 1976-5 1983-6 1972-7 1973-3 1982-11 1984-7 1974-6 1972-11 Construction start 1968-1 1968-1 1974-10 1968-8 1967-7 1968-7 1968-6 1969-6 1967-2 1967-2 1966-4 1977-3 1968-9 1968-9 1974-3 1974-3 1976-7 1970-5 1970-5 1978-1 1975-12 1975-12 1970-7 1977-6 1968-6 1968-6 1973-11 1973-11 1968-5 1967-4 NSSS supplier GE GE GE GE WH WH WH WH GE GE WH GE WH WH CE CE WH WH WH WH WH WH CE CE WH WH GE GE B&W WH Operator EXELON EXELON FENOC ENTERGY NEXTERA NEXTERA NSP NSP EXELON EXELON CONSTELL ENTERGY PSEG PSEG SCE SCE NEXTERA TVA TVA PROGRESS STP STP FPL FPL DOMINION DOMINION PPL SUSQ PPL SUSQ EXELON FPL 685 512 586 521 519 882 892 580 967 900 839 839 839 839 805 693 Net 1122 1122 1240 1174 1158 1070 1080 1247 1152 1126 1280 1280 1260 1260 711 543 645 566 640 913 913 608 960 883 883 848 848 837 729 1171 1171 1303 1036 1228 1170 1127 1127 1296 1221 1221 1354 1354 1298 1300 Gross Capacity (MW) 3514 3514 3758 2028 1540 1800 1650 1650 2957 2511 1775 3091 3459 3459 3438 3438 3587 3411 3411 2900 3853 3853 2700 2700 2546 2546 3952 3489 2568 2300 Thermal BWR-4 (Mark 1 BWR-4 (Mark 1 BWR-6 (Mark 3 BWR-3 (Mark 1 W (2-loop) DRY W (2-loop) DRY W (2-loop) DRY W (2-loop) DRY BWR-3 (Mark 1 BWR-3 (Mark 1 W (2-loop) BWR-6 (Mark 3 W (4-loop) DRY W (4-loop) DRY CE (2-loop) DR CE (2-loop) DR W (4-loop) DRY W (4-loop) ICE W (4-loop) (IC W (3-loop) DRY W (4-loop) W (4-loop) DRY COMB CE DRY COMB CE DRY W (3-loop) DRY W (3-loop) DRY BWR-4 (Mark 2 BWR-4 (Mark 2 B&W (L-loop) W (3-loop) DRY BWR BWR BWR BWR PWR PWR PWR PWR BWR BWR PWR BWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR BWR BWR PWR PWR Type Model Reactor Name PEACH BOTTOM-2 PEACH BOTTOM-3 PERRY-1 PILGRIM-1 POINT BEACH-1 POINT BEACH-2 PRAIRIE ISLAND-1 PRAIRIE ISLAND-2 QUAD CITIES-1 QUAD CITIES-2 R.E. GINNA RIVER BEND-1 SALEM-1 SALEM-2 SAN ONOFRE-2 SAN ONOFRE-3 SEABROOK-1 SEQUOYAH-1 SEQUOYAH-2 SHEARON HARRIS-1 SOUTH TEXAS-1 SOUTH TEXAS-2 ST. LUCIE-1 ST. LUCIE-2 SURRY-1 SURRY-2 SUSQUEHANNA-1 SUSQUEHANNA-2 THREE MILE ISLAND-1 TURKEY POINT-3 Code US -277 US -278 US -440 US -293 US -266 US -301 US -282 US -306 US -254 US -265 US -244 US -458 US -272 US -311 US -361 US -362 US -443 US -327 US -328 US -400 US -498 US -499 US -335 US -389 US -280 US -281 US -387 US -388 US -289 US -250 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

45 ------Non- applics electrical 90.0 94.1 90.3 94.0 91.2 92.8 91.3 86.9 87.2 90.9 92.4 90.3 94.4 93.3 2011 2007– UCF % 89.9 94.1 90.3 94.0 91.2 92.3 91.3 86.9 87.0 90.6 91.6 88.8 94.3 93.3 2011 2007– EAF % Commercial operation 1973-9 1972-11 1984-1 1987-6 1989-5 1985-9 1996-5 1985-9 1978-12 1979-7 1981-12 1983-3 1984-7 1985-5 Grid connection 1973-6 1972-9 1982-11 1987-3 1989-4 1985-3 1996-2 1985-6 1977-11 1978-12 1981-5 1982-6 1984-5 1985-2 Construction start 1967-4 1967-12 1973-3 1976-8 1976-8 1974-11 1973-1 1977-5 1972-6 1973-12 1975-11 1976-3 1978-8 1979-2 NSSS supplier WH GE WH WH WH CE WH WH GE GE GE GE WH WH Operator FPL ENTERGY SCE&G SOUTHERN SOUTHERN ENTERGY TVA WCNOC TPC TPC TPC TPC TPC TPC 693 620 966 604 604 985 985 918 922 Net 1150 1152 1168 1123 1195 729 650 636 636 956 958 1003 1203 1202 1200 1202 1213 1019 1020 Gross Capacity (MW) 2300 1912 2900 3565 3565 3716 3459 3565 1804 1804 2943 2943 2822 2822 Thermal W (3-loop) DRY BWR-4 (Mark 1 W (3-loop) DRY W (4-loop) DRY W (4-loop) DRY CE (2-loop) W (4-loop) (IC W (4-loop) BWR-4 BWR-4 BWR-6 BWR-6 WE 312 (3 loop WE 312 (3 loop PWR BWR PWR PWR PWR PWR PWR PWR BWR BWR BWR BWR PWR PWR Type Model Reactor Name TURKEY POINT-4 VERMONT YANKEE VIRGIL C. SUMMER-1 VOGTLE-1 VOGTLE-2 WATERFORD-3 WATTS BAR-1 WOLF CREEK CHIN SHAN-1 CHIN SHAN-2 KUOSHENG-1 KUOSHENG-2 MAANSHAN-1 MAANSHAN-2 Code US -251 US -271 US -395 US -424 US -425 US -382 US -390 US -482 TW -1 TW -2 TW -3 TW -4 TW -5 TW -6 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued Note: Status as of 31 December 2011, 435 reactors (368791 MW) were connected to the grid, including 6 units (5018 in Taiwan, China: TAIWAN, CN TAIWAN, CN TAIWAN, CN TAIWAN, CN TAIWAN, CN TAIWAN, CN

46 Long term shutdown date 1997-10 1995-10 1997-12 1997-12 1995-12 Commercial operation 1977-9 1977-9 1971-12 1972-6 — Grid connection 1977-1 1976-9 1971-10 1972-5 1995-8 Construction start 1971-6 1970-12 1966-9 1967-12 1986-5 NSSS supplier OH/AECL OH/AECL OH/AECL OH/AECL T/H/F/M Operator BRUCEPOW BRUCEPOW OPG OPG JAEA 848 848 515 515 246 824 824 542 542 280 Capacity (MW) 714 2832 2832 1744 1744 Thermal Gross Net CANDU 791 CANDU 791 CANDU 500A CANDU 500A - FBR Type Model PHWR PHWR PHWR PHWR Reactor BRUCE-1 BRUCE-2 PICKERING-2 PICKERING-3 MONJU Code Name CA -8 CA -9 CA -5 CA -6 JP -31 Country TABLE 15. REACTORS IN LONG TERM SHUTDOWN, 31 DEC. 2011 CANADA JAPAN Note: Status as of 31 December 2011, 5 reactors (2972 MW) were in long term shutdown.

47 Shut down 1989-2 1987-6 2002-12 2002-12 2006-12 2006-12 1984-5 1977-6 1987-8 1994-5 1973-4 1985-6 1990-6 1991-10 1985-7 1980-2 1984-6 2010-2 1990-4 1992-5 1998-12 1988-12 2011-8 2011-8 2011-8 1990-2 Commercial operation 1977-10 1962-10 1974-10 1975-11 1981-1 1982-6 1968-9 1972-5 1962-10 1972-7 1964-2 1965-2 1966-8 1967-4 1968-6 1959-4 1960-4 1974-7 1969-6 1971-11 1986-12 1969-5 1975-2 1977-1 1977-2 1974-7 Grid connection 1976-12 1962-10 1974-7 1975-8 1980-12 1982-5 1967-1 1971-4 1962-6 1972-4 1963-6 1965-2 1966-8 1967-4 1967-7 1959-4 1960-4 1973-12 1969-3 1971-8 1986-1 1967-12 1974-8 1976-4 1976-7 1973-12 Construction start 1969-7 1957-11 1970-4 1970-4 1973-10 1973-10 1960-2 1966-9 1958-1 1965-12 1957-2 1959-8 1961-3 1962-1 1962-7 1955-3 1956-3 1968-11 1963-10 1966-1 1976-12 1961-8 1970-1 1972-2 1970-4 1970-3 NSSS supplier FAEA WH AEE AEE AEE AEE AECL AECL CGE FRAM LEVIVIER LEVIVIER GTM A/F/W GAAA SACM SACM CNCLNEY FRAM FRAM ASPALDO BBK KWU KWU KWU AtEE Operator ANPPJSC CEN/SCK KOZNPP KOZNPP KOZNPP KOZNPP OH HQ OH EDF EDF EDF EDF SENA EDF COGEMA COGEMA CEA/EDF EDF EDF EDF AVR RWE RWE KKB EWN 10 22 70 70 39 40 13 376 408 408 408 408 206 250 540 180 360 305 130 390 465 771 408 Net 1200 1167 1240 12 25 80 75 43 43 15 408 440 440 440 440 218 266 555 230 480 320 142 500 530 806 440 1242 1225 1300 Gross Capacity (MW) 41 92 46 704 792 300 800 250 260 260 345 1375 1375 1375 1375 1375 1954 1170 1040 1650 1475 3000 3517 3733 2292 1375 Thermal FBR FBR GCR GCR GCR GCR GCR GCR GCR GCR PWR PWR PWR PWR PWR PWR PWR PWR PWR BWR PWR Type HTGR PHWR PHWR HWLWR HWGCR Reactor Name ARMENIA-1 BR-3 KOZLODUY-1 KOZLODUY-2 KOZLODUY-3 KOZLODUY-4 DOUGLAS POINT GENTILLY-1 ROLPHTON NPD BUGEY-1 CHINON-A1 CHINON-A2 CHINON-A3 CHOOZ-A (ARDENNES) EL-4 (MONTS D'ARREE) G-2 (MARCOULE) G-3 (MARCOULE) PHENIX ST. LAURENT-A1 ST. LAURENT-A2 SUPER-PHENIX AVR JUELICH (AVR) BIBLIS-A (KWB A) BIBLIS-B (KWB B) BRUNSBUETTEL (KKB) GREIFSWALD-1 (KGR 1) Code AM -18 BE -1 BG -1 BG -2 BG -3 BG -4 CA -2 CA -3 CA -1 FR -9 FR -2 FR -3 FR -4 FR -5 FR -6 FR -1B FR -1 FR -10 FR -7 FR -8 FR -24 DE -4 DE -12 DE -18 DE -13 DE -502 Country TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2011 ARMENIA BELGIUM BULGARIA CANADA FRANCE GERMANY

48 Shut down 1990-2 1990-2 1990-7 1989-11 1977-1 1971-4 2011-8 1991-8 2011-8 1979-1 1988-9 1984-5 2011-8 1974-7 2005-5 2011-8 1990-6 2003-11 1988-4 2011-8 1985-11 1994-8 1990-7 1990-7 1982-3 1987-12 2003-3 2011-5 2011-5 2011-5 Commercial operation 1975-4 1978-5 1979-11 1989-11 1967-4 1970-8 1979-3 1979-3 1984-3 1968-10 1987-8 1966-12 1976-12 1973-1 1969-3 1980-3 1966-10 1972-5 1987-6 1979-9 1962-2 1975-11 1981-12 1965-1 1964-6 1964-1 1979-3 1971-3 1974-7 1976-3 Grid connection 1974-12 1977-10 1979-9 1989-4 1966-12 1969-10 1977-12 1978-4 1983-9 1968-7 1986-3 1966-3 1976-6 1973-1 1968-10 1979-5 1966-5 1972-1 1985-11 1978-9 1961-6 1971-12 1978-5 1964-10 1964-1 1963-5 1978-7 1970-11 1973-12 1974-10 Construction start 1970-3 1972-4 1972-4 1976-12 1962-12 1965-1 1972-5 1974-9 1974-4 1964-10 1975-1 1961-12 1972-2 1966-6 1965-3 1970-10 1960-1 1967-12 1971-5 1972-7 1958-7 1968-1 1970-1 1961-7 1959-11 1958-11 1972-5 1967-7 1969-6 1970-12 NSSS supplier AtEE AtEE AtEE AtEE AEG,GE AEG,KWU KWU IA KWU AEG BBR SIEMENS KWU SIEM,KWU SIEM,KWU KWU AtEE KWU HRB KWU GE,AEG AEG,KWU AMN/GETS EL/WEST GE TNPG HITACHI GE/GETSC GE/T TOSHIBA Operator EWN EWN EWN EWN KGB HDR E.ON KBG KKK KWL KGG KBG EnKK KKN EnBW EnKK EWN E.ON HKG E.ON VAK PE SOGIN SOGIN SOGIN SOGIN JAEA TEPCO TEPCO TEPCO 25 17 52 62 15 408 408 408 408 237 878 183 785 100 340 890 640 296 640 860 260 150 153 148 439 760 760 Net 1346 1219 1345 25 21 57 70 16 440 440 440 440 250 912 268 840 106 357 926 672 308 670 882 270 160 160 165 460 784 784 1402 1302 1410 Gross Capacity (MW) 58 60 801 100 520 200 321 265 750 870 506 660 557 1375 1375 1375 1375 2575 3690 3760 2497 1050 2575 1900 3900 1912 2651 1380 2381 2381 Thermal FBR GCR PWR PWR PWR PWR BWR BWR BWR BWR BWR PWR PWR PWR BWR PWR PWR PWR BWR BWR BWR PWR BWR BWR BWR BWR Type HTGR PHWR HWGCR HWLWR Reactor Name GREIFSWALD-2 (KGR 2) GREIFSWALD-3 (KGR 3) GREIFSWALD-4 (KGR 4) GREIFSWALD-5 (KGR 5) GUNDREMMINGEN-A (KRB A) HDR GROSSWELZHEIM ISAR-1 (KKI 1) KNK II KRUEMMEL (KKK) LINGEN (KWL) MUELHEIM-KAERLICH (KMK) MZFR NECKARWESTHEIM-1 (GKN 1) NIEDERAICHBACH (KKN) OBRIGHEIM (KWO) PHILIPPSBURG-1 (KKP 1) RHEINSBERG (KKR) STADE (KKS) THTR-300 UNTERWESER (KKU) VAK KAHL WUERGASSEN (KWW) CAORSO ENRICO FERMI (TRINO) GARIGLIANO LATINA FUGEN ATR FUKUSHIMA-DAIICHI-1 FUKUSHIMA-DAIICHI-2 FUKUSHIMA-DAIICHI-3 Code DE -503 DE -504 DE -505 DE -506 DE -3 DE -7 DE -16 DE -8 DE -20 DE -6 DE -22 DE -2 DE -15 DE -11 DE -5 DE -14 DE -501 DE -10 DE -19 DE -17 DE -1 DE -9 IT -4 IT -3 IT -2 IT -1 JP -20 JP -5 JP -9 JP -10 Country TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2011 — continued GERMANY ITALY JAPAN

49 Shut down 2011-5 2009-1 2009-1 1976-3 1998-3 1999-4 2004-12 2009-12 1997-3 2002-4 1983-1 1990-1 1988-2 1990-8 1977-2 2006-12 2008-12 2006-4 1990-7 1974-6 1999-11 2005-5 1969-1 1989-3 Commercial operation 1978-10 1976-3 1978-11 1965-3 1966-7 1973-7 1984-5 1987-8 1969-3 1954-12 1964-4 1969-12 1964-12 1970-4 1972-12 1980-4 1981-1 1969-8 1972-8 1964-5 1975-7 1977-7 NA 1962-6 Grid connection 1978-2 1974-8 1978-5 1963-10 1965-11 1973-7 1983-12 1987-8 1968-10 1954-6 1964-4 1967-12 1964-9 1969-12 1972-12 1978-12 1980-3 1968-7 1972-5 1964-5 1975-5 1977-3 1968-1 1962-6 Construction start 1973-2 1971-6 1974-6 1960-12 1961-3 1964-10 1977-5 1978-1 1965-5 1951-1 1958-6 1962-1 1957-7 1964-6 1958-8 1972-4 1972-4 1964-6 1968-6 1957-12 1971-2 1973-1 1962-4 1957-1 NSSS supplier HITACHI TOSHIBA TOSHIBA GE GEC MAEC-KAZ MAEP MAEP RDM MSM MSM MSM MSM MSM SKODA AEE AEE WH CEA ABBATOM ASEASTAL ABBATOM NGA TNPG Operator TEPCO CHUBU CHUBU JAEA JAPCO MAEC-KAZ INPP INPP BV GKN REA REA REA REA REA JAVYS JAVYS JAVYS UFG HIFRENSA BKAB BKAB BKAB EOS MEL 5 6 12 52 55 93 10 760 515 806 137 102 146 197 336 408 408 141 480 600 600 138 Net 1185 1185 6 6 13 90 60 12 784 540 840 166 108 160 210 365 143 440 440 150 500 615 615 166 1300 1300 Gross Capacity (MW) 90 30 80 28 587 183 286 530 760 560 510 620 2381 1593 2436 1000 4800 4800 1320 1375 1375 1670 1800 1800 Thermal FBR GCR GCR GCR BWR BWR BWR BWR BWR PWR PWR PWR PWR PWR BWR BWR Type LWGR LWGR LWGR LWGR LWGR PHWR HWGCR HWGCR Reactor Name FUKUSHIMA-DAIICHI-4 HAMAOKA-1 HAMAOKA-2 JPDR TOKAI-1 BN-350 IGNALINA-1 IGNALINA-2 DODEWAARD APS-1 OBNINSK BELOYARSKY-1 BELOYARSKY-2 NOVOVORONEZH-1 NOVOVORONEZH-2 BOHUNICE A1 BOHUNICE-1 BOHUNICE-2 JOSE CABRERA-1 (ZORITA) VANDELLOS-1 AGESTA BARSEBACK-1 BARSEBACK-2 LUCENS BERKELEY 1 Code JP -16 JP -11 JP -24 JP -1 JP -2 KZ -10 LT -46 LT -47 NL -1 RU -1 RU -3 RU -6 RU -4 RU -8 SK -1 SK -2 SK -3 ES -1 ES -3 SE -1 SE -6 SE -8 CH -8 GB -3A Country TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2011 — continued JAPAN KAZAKHSTAN LITHUANIA NETHERLANDS RUSSIA SLOVAKIA SPAIN SWEDEN SWITZERLAND UK

50 Shut down 1988-10 2002-3 2002-3 2003-3 2003-3 2003-3 2003-3 2004-6 2004-6 2004-6 2004-6 1977-3 1994-3 2006-12 2006-12 2000-5 2000-5 1990-3 1989-12 2011-6 2006-12 2006-12 1991-2 1991-2 1981-4 1990-9 1996-11 1991-10 2000-12 1986-4 1997-8 Commercial operation 1962-10 1962-7 1962-11 1956-10 1957-2 1958-5 1959-4 1959-3 1959-8 1959-12 1960-3 1962-10 1976-7 1965-10 1965-12 1965-3 1965-5 1964-2 1964-7 1968-9 1966-3 1966-9 1965-3 1965-3 1963-3 1968-1 1978-5 1979-5 1982-6 1984-3 1963-3 Grid connection 1962-6 1962-7 1962-7 1956-8 1957-2 1958-3 1959-4 1959-2 1959-7 1959-11 1960-1 1962-10 1975-1 1965-9 1965-11 1965-2 1965-3 1964-2 1964-6 1968-4 1966-1 1966-4 1965-1 1965-2 1963-2 1967-12 1977-9 1978-12 1981-12 1983-12 1962-12 Construction start 1957-1 1957-1 1957-1 1953-8 1953-8 1955-8 1955-8 1955-10 1955-10 1955-10 1955-10 1955-3 1966-1 1960-7 1960-7 1957-11 1957-11 1957-10 1957-10 1962-5 1961-4 1961-4 1959-7 1959-7 1958-11 1963-5 1970-3 1973-2 1976-3 1979-4 1960-5 NSSS supplier TNPG TNPG TNPG UKAEA UKAEA UKAEA UKAEA UKAEA UKAEA UKAEA UKAEA UKAEA TNPG TNPG TNPG EE/B&W/T EE/B&W/T GEC GEC TNPG EE/B&W/T EE/B&W/T APC APC UKAEA ICL/FE FAEA FAEA FAEA FAEA GE Operator MEL MEL MEL MEL MEL MEL MEL MEL MEL MEL MEL UKAEA UKAEA MEL MEL MEL MEL MEL MEL MEL MEL MEL MEL MEL UKAEA UKAEA MTE MTE MTE MTE CPC 49 49 49 49 48 48 48 48 11 24 92 67 138 123 123 234 225 225 235 235 150 150 217 210 210 195 195 740 925 925 925 Net 60 60 60 60 60 60 60 60 15 36 71 166 146 146 250 230 230 267 267 173 173 230 245 245 235 235 100 800 1000 1000 1000 Gross Capacity (MW) 60 620 481 481 268 268 268 268 260 260 260 260 600 840 840 900 900 595 595 660 850 850 120 318 240 1010 1010 3200 3200 3200 3200 Thermal FBR FBR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR BWR Type LWGR LWGR LWGR LWGR SGHWR Reactor Name BERKELEY 2 BRADWELL 1 BRADWELL 2 CALDER HALL 1 CALDER HALL 2 CALDER HALL 3 CALDER HALL 4 CHAPELCROSS 1 CHAPELCROSS 2 CHAPELCROSS 3 CHAPELCROSS 4 DOUNREAY DFR DOUNREAY PFR DUNGENESS-A1 DUNGENESS-A2 HINKLEY POINT-A1 HINKLEY POINT-A2 HUNTERSTON-A1 HUNTERSTON-A2 OLDBURY-A2 SIZEWELL-A1 SIZEWELL-A2 TRAWSFYNYDD 1 TRAWSFYNYDD 2 WINDSCALE AGR WINFRITH SGHWR CHERNOBYL-1 CHERNOBYL-2 CHERNOBYL-3 CHERNOBYL-4 BIG ROCK POINT Code GB -3B GB -4A GB -4B GB -1A GB -1B GB -1C GB -1D GB -2A GB -2B GB -2C GB -2D GB -14 GB -15 GB -9A GB -9B GB -7A GB -7B GB -6A GB -6B GB -11B GB -10A GB -10B GB -8A GB -8B GB -5 GB -12 UA -25 UA -26 UA -42 UA -43 US -155 Country TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2011 — continued UK UKRAINE USA

51 Shut down 1968-6 1967-1 1978-10 1968-2 1972-11 1989-8 1963-12 1996-12 1964-9 1976-7 1974-10 1987-4 1997-8 1998-7 1967-10 1974-11 1966-1 1989-6 1992-11 1972-5 1982-10 1989-5 1979-3 1992-11 1991-10 1998-2 1998-2 Commercial operation 1965-9 NA 1960-7 1964-7 NA 1979-7 1957-10 1968-1 1963-11 1963-8 1962-10 1969-11 1972-12 1971-3 NA 1967-6 1963-11 1975-4 1968-1 1967-3 1958-5 NA 1978-12 1976-5 1961-7 1973-12 1974-9 Grid connection 1964-8 1963-12 1960-4 1963-8 1966-8 1976-12 1957-10 1967-8 1963-9 1963-4 1962-9 1968-4 1972-11 1970-11 1966-7 1967-1 1963-7 1974-10 1967-7 1967-3 1957-12 1986-8 1978-4 1975-12 1960-11 1973-6 1973-12 Construction start 1960-1 1960-1 1956-5 1959-1 1956-8 1968-9 1956-1 1964-5 1959-1 1960-11 1956-5 1963-3 1968-10 1966-5 1959-1 1962-2 1960-1 1969-4 1964-5 1960-1 1954-1 1972-11 1969-11 1970-2 1957-11 1968-12 1968-12 NSSS supplier GNEPRWRA WH GE AC UEC GA GE WH GE GE B&W AC CE GE AC GA GE B&W WH GE WH GE B&W WH WH WH WH Operator DOE/PRWR CVPA EXELON RCPA DTEDISON PSCC GE CYAPC AEC/NPPD PG&E ENTERGY DPC MYAPC DOMINION NMC EXELON CofPiqua SMUD SCE SNEC DOE DUQU LIPA GPU PORTGE YAEC EXELON EXELON 3 17 17 22 61 24 75 63 48 59 40 12 60 197 330 560 257 860 641 873 436 820 880 167 Net 1095 1040 1040 3 18 19 24 65 24 84 65 55 63 42 12 68 207 342 603 277 900 684 917 456 849 959 180 1155 1085 1085 Gross Capacity (MW) 50 65 58 50 46 24 700 200 842 256 220 615 165 220 115 236 600 1825 2630 2011 2772 1347 2436 2772 3411 3250 3250 Thermal X X FBR BWR BWR BWR BWR PWR BWR PWR BWR PWR BWR BWR PWR PWR PWR PWR BWR PWR PWR PWR PWR PWR Type HTGR HTGR PHWR Reactor Name BONUS CVTR DRESDEN-1 ELK RIVER ENRICO FERMI-1 FORT ST. VRAIN GE VALLECITOS HADDAM NECK HALLAM HUMBOLDT BAY INDIAN POINT-1 LACROSSE MAINE YANKEE MILLSTONE-1 PATHFINDER PEACH BOTTOM-1 PIQUA RANCHO SECO-1 SAN ONOFRE-1 SAXTON SHIPPINGPORT SHOREHAM THREE MILE ISLAND-2 TROJAN YANKEE NPS ZION-1 ZION-2 Code US -014 US -144 US -10 US -011 US -16 US -267 US -018 US -213 US -077 US -133 US -013 US -409 US -309 US -245 US -130 US -171 US -012 US -312 US -206 US -146 US -001 US -322 US -320 US -344 US -29 US -295 US -304 Country TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2011 — continued USA Note: Status as of 31 December 2011, 138 reactors (49152 MW) have been permanently shut down.

52 2019 2014 2014 2025 2015 2027 2025 2020 Licence terminated K A A Decom. licensee SEN E.ON xxxx E.ON SOGIN 2018 G 01 - EDF EDF EDF EDF EDF EDF EDF KGG ANPPJSC KWL GmbH AECL 777 E-03492 E-03493 E-00174 2036 2036 2036 , , , 7 E-00086 2036 NERS , , 6 6 6 4 CEN/SC 43 G 01 G 01 3 G 01 3 G 01 4 G 01 KKR 7 AECL 7 AECL , , , 3 2 2 phase Current fuel management 6 9 6 9 , , , , 9 73 73 9 9 3 , , , , , , 4 4 4 4 3 3 6 9 9 3 7 7 8 8 8 8 , , , , phase Current decom. Decom. strategy Imdte.dism. 4 Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism.Imdte.dism.Imdte.dism. 3 3 Dd+PD+SE Imdte.dism. 3 Dd+PD+SE Dd+SE Dd+PD+SE 7777 Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. 3 1 , , , , 5 2 2 2 2 2 2 2 8 6 , , , , , , , , , , 6 6 5 6 2 7 1 2 2 2 2 2 , , , , 2 1 6 3 1 1 1 1 1 1 OtherOtherOtherOther Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE 6 6 Other Imdte.dism. 3 , , , , , 3 3 3 3 OtherOther Imdte.dism. Other Imdte.dism. Imdte.dism. 4 Other Other Shutdown reason Shut down 2002-12 2006-12 2006-12 7 7 7 1987-6 2002-12 7 2010-2 1998-12 1991-10 1985-7 2003-11 1977-1 1988-12 1990-6 1990-2 1990-2 1990-2 1990-7 1989-11 1979-1 1994-8 1987-12 7 1990-4 1992-5 1994-5 1989-2 1987-8 1984-5 1985-6 1973-4 1990-6 1977-6 ) ) ) ) ) ) ) ) KRB A ( ) ) ) KGR 1 KGR 2 KGR 3 KGR 4 KGR 5 KWW ( ( ( ( ( ( KKR AVR ( X ( ) ) Reactor ARDENNES ( KWL ( KKS ( X A MONTS D'ARREE ( RMENIA-1 VR JUELICH A A Code Name DE -503 GREIFSWALD-2 DE -6 LINGEN FR -6 EL-4 BG -2 BG -3 BG -4 KOZLODUY-2 KOZLODUY-3 KOZLODUY-4 DE -501 RHEINSBERG IT -1 LATIN DE -504 GREIFSWALD-3 DE -506 GREIFSWALD-5 BE -1 BR-3 AM -18 BG -1 KOZLODUY-1 CA -1 ROLPHTON NPD FR -3 CHINON-A2 FR -2 CHINON-A1 DE -9 WUERGASSEN FR -4 CHINON-A3 FR -7 FR -8 FR -9 ST. LAURENT-A1 ST. LAURENT-A2 BUGEY-1 FR -24 SUPER-PHENI FR -5 CHOOZ-A DE -4 DE -505 GREIFSWALD-4 DE -3 GUNDREMMINGEN-A CA -2 DOUGLAS POINT DE -502 GREIFSWALD-1 CA -3 GENTILLY-1 FR -10 PHENI A A A Country TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2011 CANAD GERMANY DE -10 STADE ARMENI BULGARI ITALY BELGIUM FRANCE

53 2025 2029 2015 2030 2333 2032 2019 2030 2117 2117 2002 2025 2004 Licence terminated A A nox Snox S 2110 nox N 2110 2333 g g g Decom. licensee JAPCO 2018 SOGIN SOGIN 2019 2019 JAVYS UKAE INPP BV GKN 2055 Ma Ma SL SL JAERI Ma BKAB EA EOS ENRES EA EA EA 7 MAEC-KAZ 6 JAVYS , , 5 SOGIN5 2013 JAEA 67 JAVYS UFG , , , , 4 3 4 BKAB 1 INPP 5 DSR 22 CHUBU DL 2037 CHUBU DL 2037 4 BKAB , , phase Current fuel management 9 , 6 6 8 8 , , , , 10 7 93 7 52 7 62 93 92 93 , , , , , , , , , , 5 5 6 6 4 4 3 6 5 , , , , , , , , , 9 6 4 6 3 6 5 4 4 4 3 7 3 5 7 1 8 , , , , , , , , , , 3 3 5 5 , , , , 4 4 1 1 1 , , 2 2 phase Current decom. Decom. strategy Dd+PD+SE 1 Dd+SE Dd+SE Dd+SE Dd+PD+SEDd+PD+SE 3 3 Dd+SE Dd+SE Dd+PD+SE 3 Dd+SE Dd+SE Dd+PD+SE Imdte.dism. 3 Imdte.dism. 3 Dd+PD+SE 3 5 3 8 8 8 8 , , , , , , 2 6 2 6 4 4 7 7 4 Other Imdte.dism. 3 2 2 2 2 2 2 , OtherOther Imdte.dism. Imdte.dism. 3 Other 3 OtherOther Imdte.dism. Imdte.dism. Dd+SE 2 , , , , , 4 Other Other Other Imdte.dism. Other Imdte.dism. 3 OtherOther Dd+PD+SE Dd+PD+SE 2 Other Other Other Imdte.dism. 3 Other Other Other Other Other Other Other Other , 7 7 2 Shutdown reason Shut down 1982-3 3 2005-5 2003-3 2009-1 2009-12 7 1974-6 1999-4 1998-3 2004-12 7 1990-7 1976-3 2009-1 2006-4 1977-3 1994-3 1969-1 1999-11 2006-12 2006-12 1990-9 1990-7 1990-7 1997-3 2006-12 2003-3 1983-1 2003-3 2008-12 1988-2 1990-1 1990-8 1977-2 ) ) ZORITA ( TRINO ( R R Reactor R GESTA A Code Name ES -1 JOSE CABRERA-1 SE -8 BARSEBACK-2 JP -20 FUGEN ATR JP -24 HAMAOKA-2 ES -3 VANDELLOS-1 IT -2 GARIGLIANO IT -3 ENRICO FERMI SK -2 BOHUNICE-1 GB -15 DOUNREAY PF GB -14 DOUNREAY DF LT -47 IGNALINA-2 GB -1B CALDER HALL 2 JP -2 TOKAI-1 LT -46 IGNALINA-1 RU -3 BELOYARSKY-1 JP -11 HAMAOKA-1 SE -6 BARSEBACK-1 GB -10A SIZEWELL-A1 GB -10B GB -12 SIZEWELL-A2 WINFRITH SGHWR GB -1A CALDER HALL 1 IT -4 CAORSO SK -3 BOHUNICE-2 JP -1 JPD SE -1 RU -4 NOVOVORONEZH-1 RU -6 BELOYARSKY-2 RU -8 NOVOVORONEZH-2 A A Country TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2011 — continued SWITZERLAND CH -8 LUCENS NETHERLANDS NL -1 DODEWAARD RUSSI KAZAKHSTAN KZ -10 BN-350 LITHUANI SPAIN UK ITALY JAPAN SWEDEN SLOVAKIA SK -1 BOHUNICE A1

54 2007 1974 2009 2117 2117 2065 2013 Licence terminated ua q A A nox Nnox Nnox Nnox N 2128 nox S 2128 nox S 2128 nox S 2128 nox S 2083 2083 nox N 2104 nox N 2104 nox Snox S 2090 nox N 2090 nox N 2104 nox S 2104 nox S 2098 2098 2111 2111 g g g g g g g g g g g g g g g g Decom. licensee CofPi 1970 Ma Ma RCP CVP GPUNC 2005 SL SL SL PG&E Ma Ma Ma Ma Ma Ma Ma Ma Ma Ma Ma Ma Ma Ma DOE DUQU 1989 ENTERGY GE&PGEC AEC&NPPD 1971 NMC 7 CPC 7 EXELON phase Current fuel management 8 8 6 9 , , , , 6 6 6 6 6 6 6 6 6 6 6 6 6 6 , , , , , , , , , , , , , , 6 6 5 6 8 8 , , , , , , 5 5 5 5 5 5 5 5 5 5 5 5 5 5 11 11 , , , , , , , , , , , , , , 5 5 3 4 3 3 , , , , 3 3 phase Current decom. .. 11 p p Decom. strategy Dd+PD+SEDd+PD+SEDd+PD+SEDd+PD+SE 3 Dd+PD+SE 3 Dd+PD+SE 3 Dd+SE 3 Dd+SE 3 Dd+SE 3 Dd+SE Dd+PD+SEDd+PD+SEDd+PD+SEDd+PD+SE 3 Dd+PD+SE 3 Dd+PD+SE 3 Dd+PD+SE 3 Dd+PD+SE 3 3 3 in situ dis 3 in situ dis Imdte.dism. Dd+PD+SE 3 Dd+PD+SE Dd+SE Dd+SE Dd+SE Dd+SE 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 5 6 , , , , , , , , , , , , , , , , , , , , 3 5 5 1 5 6 5 4 2 2 2 2 2 2 2 2 2 2 2 2 2 5 2 2 2 2 2 Other Imdte.dism. OtherOther Dd+SE Imdte.dism. , , , Other Imdte.dism. Other Dd+PD+SE 2 2 7 1 Shutdown reason Shut down 1997-8 1966-1 1972-5 1990-3 1982-10 2003-3 2003-3 1976-7 1974-10 1963-12 1989-3 1988-10 2002-3 2002-3 1981-4 1989-12 2000-5 2000-5 1991-2 1991-2 2004-6 1968-6 1964-9 2004-6 2004-6 2004-6 2006-12 2006-12 1967-1 1968-2 1978-10 1967-10 Y 3 4 Reactor Code Name US -155 BIG ROCK POINT US -012 PIQUA US -146 SAXTON GB -1D GB -2A CALDER HALL CHAPELCROSS 1 GB -6A HUNTERSTON-A1 US -001 SHIPPINGPORT GB -1C CALDER HALL US -014 BONUS US -013 INDIAN POINT-1 US -077 HALLAM US -018 GE VALLECITOS GB -2B GB -2C CHAPELCROSS 2 GB -2D CHAPELCROSS 3 GB -3A CHAPELCROSS 4 GB -3B BERKELEY 1 GB -4A BERKELEY 2 GB -4B BRADWELL 1 GB -5 BRADWELL 2 GB -6B WINDSCALE AGR GB -7A HUNTERSTON-A2 GB -7B HINKLEY POINT-A1 GB -8A HINKLEY POINT-A2 GB -8B TRAWSFYNYDD 1 GB -9A TRAWSFYNYDD 2 GB -9B DUNGENESS-A1 DUNGENESS-A2 US -144 CVTR US -011 ELK RIVER US -10 US -130 DRESDEN-1 PATHFINDER US -133 HUMBOLDT BA Country TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2011 — continued A UK US

55 2005 1996 1995 2009 2008 Licence terminated Decom. licensee CYAPC YAEC 2007 PSCC LIPA DTEDISON 2025 CommonEd COMMED SMUD EXELON SCE DOMINRES PORTGE 2005 4 GPU 7 MYAPC 2005 7 DPC phase Current fuel management 6 6 , , 11 1 1 9 1 4 4 , 11 9 phase Current decom. Decom. strategy Dd+SE Imdte.dism.Dd+PD+SE Dd+PD+SE Dd+PD+SE 4 Other Dd+SE Imdte.dism. 4 Imdte.dism. Dd+PD+SE Dd+PD+SE Dd+PD+SE 5 7 6 6 6 5 , , , , , , 1 6 6 6 6 2 5 5 4 5 4 5 Other Imdte.dism. Other Imdte.dism. , , Other Dd+PD+SE 7 1 Shutdown reason Shut down 1998-2 1974-11 1996-12 1998-2 1997-8 1979-3 1989-5 1989-8 1998-7 1991-10 1992-11 1972-11 1992-11 1989-6 1987-4 K Reactor Code Name US -320 US -322 THREE MILE ISLAND-2 SHOREHAM US -245 MILLSTONE-1 US -295 ZION-1 US -29 YANKEE NPS US -344 TROJAN US -16 ENRICO FERMI-1 US -206 SAN ONOFRE-1 US -171 PEACH BOTTOM-1 US -213 HADDAM NEC US -312 RANCHO SECO-1 US -304 US -309 ZION-2 MAINE YANKEE US -267 FORT ST. VRAIN US -409 LACROSSE Country TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2011 — continued A US

56 e s ) ctive safe enclosure period A Passive safe enclosure period process Immediate dismantling and removal of all radioactive materials Deferred dismantling, placing all radiological areas into safe enclosure Deferred dismantling, including partial dismantling and placing remanining radiological areas into safe enclosur In situ disposal, involving encapsulation of radioactive materials and subsequent restriction of acces Drawing up the final decommissioning plan Reactor core defuelling Waste conditioning on-site (only for decommissioning waste) Waste shipment off-site (only for decommissioning waste) Safe enclosure preparation Partial dismantling Final dismantling Final survey Licence terminated (legal act at the end of decommissioning Description Other 8 Decommissioning strategy Imdte.dism. Dd+SE Dd+PD+SE in situ disp. undefined Current decommissioning phase1 Description 2 3 4 5 6 7 9 10 11 e s e t s s s e e fter an operating incident The process was no longer profitabl There were changes in licensing requirement A Other economical reason Public acceptance reason Other Underwater storag Dry storag Encapsulation Other technological reason The technology or process being used became obsolet Transfer to a reactor facility Transfer away from reactor facility Storage in an on-site facility Storage in an off-site facility Shipment to a reprocessing plan Description Description TABLE 17. DEFINITIONS FOR REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED Shutdown reason 1 2 3 4 5 6 7 undefd 1 2 3 4 5 6 7 8 Fuel Management

57 80.2 32.1 80.0 82.2 78.9 68.2 72.8 64.9 71.8 82.0 81.8 76.6 72.2 64.6 81.8 (%) Load factor 81.3 64.3 76.8 82.4 80.4 76.0 62.6 76.0 73.7 83.8 83.5 78.9 74.4 68.1 83.6 (%) factor 2.7 0.4 2.7 2.0 3.7 0.7 7.9 5.9 1.3 2.8 3.9 5.7 2.7 14.6 10.7 (%) rate 68.3 79.9 73.0 79.9 83.0 81.2 71.8 77.2 67.4 74.5 83.5 83.8 81.1 75.0 83.8 (%) factor 11.7 16.9 26.7 16.9 14.2 14.0 27.7 15.0 22.9 18.9 15.1 11.9 14.5 18.5 12.2 Reactors reporting to IAEA PRIS (see note) (%) factor 68.1 79.6 73.0 79.6 82.5 79.7 71.8 65.9 64.7 73.0 82.7 83.2 77.1 73.6 82.7 (%) factor Availability Planned cap.loss Capability Forced loss Operating 4 2 18 12 16 21 26 12 94 47 47 82 448 224 271 of units Number Reactor category TABLE 18. PERfORMANCE fACTORS BY REACTOR CATEGORY, 2009 to 2011 FBR GCR LWGR >= 600 MW(e) LWGR < 600 MW(e) LWGR PHWR >= 600 MW(e) PWR >= 600 MW(e) Note: 2011 is the latest year for which operating experience data currently available to IAEA. — Reactors permanently shut down during 2009 to 2011 (17 units) are considered. TOTAL PHWR < 600 MW(e) BWR < 600 MW(e) BWR PWR < 600 Mw(e) PWR PHWR BWR >= 600 MW(e)

58 0.0 6.1 2.5 1.0 0.4 1.8 2.8 2.0 1.9 1.6 53.9 23.9 13.5 11.0 14.1 (%) outages External 0.0 2.3 5.4 9.6 4.1 7.9 5.1 15.6 51.3 19.7 22.6 31.3 17.8 10.0 15.4 (%) outages Unplanned 78.3 47.7 43.8 92.1 90.0 72.0 69.3 78.0 75.6 65.9 80.2 76.5 82.7 93.3 100.0 (%) outages Planned 809 1773 2000 1647 3216 1323 2065 4028 2502 1471 1590 1488 2684 1669 1520 per operating experience year Full outage hours 2 4 17 11 21 15 10 74 47 26 84 47 435 223 270 in the world Number of units Reactor Type TABLE 19. fULL OUTAGE STATISTICS DURING 2011 Note: 2011 is the latest year for which outage information currently available to IAEA. — Reactors shut down during 2011 (13 units) are considered. FBR ALL REACTORS GCR LWGR >= 600 MW(e) PHWR >= 600 MW(e) LWGR LWGR < 600 MW(e) BWR < 600 MW(e) BWR >= 600 MW(e) PHWR PHWR < 600 MW(e) BWR PWR < 600 MW(e) PWR >= 600 MW(e) PWR

59 % Time lost Hours Unplanned full outages % h ∙ 231 0.40 451 0.60 4251 7.40 5496 7.34 4251 7.40 2021 2.70 1042 1.81 Energy lost 51296 89.30 65747 87.77 51296 89.30 GW(e) % Time lost Hours Planned full outages % h ∙ 73 0.01 162 0.02 788 0.14 8760 1.31 788 0.14 41 0.07 208 0.28 1946 0.35 2935 0.44 2935 1.01 578 0.35 1946 1.31 983 9274 1.65 12964 1.95 Energy lost 28049 5.00 33796 5.07 28049 5.00 54034 8.11 33945 6.05 561355 100.00 666262 100.00 57439 100.00 561355 100.00 74906 100.00 361161 64.34 415043 62.29 415043 64.34 361161 126119 22.47 138568 20.80 GW(e) Direct outage cause TABLE 20. DIRECT CAUSES Of fULL OUTAGES DURING 2011 Human factor related Fire TOTAL Note: Only reactors which have achieved full commercial operation in or before 2011 are counted. Plant equipment problem/failure Refuelling without maintenance Major back-fitting, refurbishment or upgrading activities with refuelling Fuel management limitation (including high flux tilt, stretch out or coast-down operation) Inspection, maintenance or repair combined with refuelling Inspection, maintenance or repair without refuelling Testing of plant systems or components Major back-fitting, refurbishment or upgrading activities without refuelling Nuclear regulatory requirements Other

60 % Time lost Hours Unplanned full outages % h ∙ 6780 1.59 8817 1.72 6780 1.59 5277 1.03 3835 0.90 Energy lost 44926 10.54 53351 10.39 44926 10.54 GW(e) 0.00 367271 86.20 440342 85.74 440342 86.20 367271 0.00 % Time lost Hours Planned full outages % h ∙ 382 0.02 1909 0.06 1909 0.02 382 7199 0.29 17806 0.58 1284 0.30 3045 0.59 3045 0.30 1284 0.58 17806 0.29 7199 1579 0.06 17522 0.57 793 0.19 1613 0.31 17522 0.57 793 0.19 1579 0.06 2725 0.11 3354 0.11 1204 0.28 1133 0.22 Energy lost 102376 4.13 117563 3.85 102376 4.13 288958 9.47 172346 6.94 101683 4.10 153387 5.03 323778 13.05 373676 12.25 1769760 71.31 2076012 68.06 1769760 71.31 2481827 100.00 3050189 100.00 426091 100.00 513579 100.00 426091 100.00 3050189 100.00 2481827 100.00 GW(e) Direct Outage Cause TABLE 21. DIRECT CAUSES Of fULL OUTAGES, 2007 TO 2011 Plant equipment problem/failure Refuelling without maintenance Inspection, maintenance or repair combined with refuelling Inspection, maintenance or repair without refuelling Testing of plant systems or components Major back-fitting, refurbishment or upgrading activities with refuelling Major back-fitting, refurbishment or upgrading activities without refuelling Nuclear regulatory requirements Human factor related Fire External restrictions on supply and services Fuel management limitation (including high flux tilt, stretch out or coast-down operation) Other Note: Only reactors which have achieved full commercial operation in or before 2011 are counted. TOTAL

61 3 2 42 10 35 Planned 1 1 4 3 1 2 4 9 1 2 1 5 3 3 27 12 27 Shut down 4 1 LT shut down 1 2 1 1 1 7 2 5 2 2 26 10 Number of reactors, as 31 Dec. 2011 Construction 1 2 7 2 2 5 6 9 8 4 4 1 2 1 3 2 1 4 18 16 58 18 20 50 21 33 10 Operational Full name ARMENIA ARGENTINA BELGIUM BULGARIA BRAZIL CANADA SWITZERLAND CHINA CZECH REPUBLIC GERMANY SPAIN FINLAND FRANCE HUNGARY INDIA IRAN, ISLAMIC REPUBLIC OF ITALY JAPAN KOREA, REPUBLIC OF KAZAKHSTAN LITHUANIA MEXICO NETHERLANDS PAKISTAN ROMANIA RUSSIAN FEDERATION SWEDEN SLOVENIA SLOVAKIA FI IT SI IN IR JP LT KZ NL BE ES PK SE SK CZ FR AR BR CA DE KR BG CH CN GB HU RU AM MX RO TABLE 22. COUNTRIES: ABBREVIATIONS AND SUMMARY Code Country

62 2 20 114 Planned 4 28 138 Shut down 5 LT shut down 2 1 65 Number of reactors, as 31 Dec. 2011 Construction 2 15 435 104 Operational Full name UKRAINE UNITED STATES OF AMERICA VIETNAM SOUTH AFRICA ZA UA US VN TABLE 22. COUNTRIES: ABBREVIATIONS AND SUMMARY — continued Code TOTAL Country Note: The total includes the following data from Taiwan, China: — 6 units in operation; 2 under construction.

63 2 1 10 114 101 Planned 7 4 4 2 9 5 1 2 31 35 38 138 Shut down 5 1 4 LT shut down 4 2 1 5 65 53 Number of reactors, as 31 Dec. 2011 Construction 2 84 17 15 47 435 270 Operational Full name Boiling light water cooled and moderated reactor Fast breeder reactor Gas cooled, graphite moderated reactor High temperature gas cooled, graphite moderated reactor Heavy water moderated, gas cooled reactor Heavy water moderated, boiling light cooled reactor Light water cooled, graphite moderated reactor Pressurized heavy water moderated and cooled reactor Pressurized light water moderated and cooled reactor Steam generating heavy water reactor Other TABLE 23. REACTOR TYPES: ABBREVIATIONS AND SUMMARY code Type BWR FBR GCR HTGR HWGCR HWLWR LWGR PHWR PWR SGHWR X TOTAL

64 1 2 Planned 1 1 1 3 1 1 1 2 1 2 1 1 1 1 1 Shut down 2 LT shut down 1 1 Number of reactors, as 31 Dec. 2011 Construction 2 1 3 1 3 2 1 6 6 2 3 2 1 3 5 15 Operational Full name ATOMIC ENERGY COMMISSION AND NEBRASKA PUBLIC POWER DISTRICT AMERICAN ELECTRIC POWER COMPANY, INC. AMEREN UE, UNION ELECTRIC COMPANY ASOCIACION NUCLEAR ASCO-VANDELLOS A.I.E. (ENDESA/ID) JOINT STOCK COMPANY ARMENIAN NPP ARIZONA PUBLIC SERVICE CO. ARBEITSGEMEINSCHAFT VERSUCHSREAKTOR GMBH KERNKRAFTWERK BEZNAUCH-5312 DÖTTINGEN BRITISH ENERGY BHARATIYA NABHIKIYA VIDYUT NIGAM LIMITED BARSEBÄCK KRAFT AB BKW ENERGIE AG BRUCE POWER BV GEMEENSCHAPPELIJKE KERNENERGIECENTRALE NEDERLAND (BV GKN) COMMISSARIAT À L'ENERGIE ATOMIQUE (80%)ELECTRICITÉ DE FRANCE (20%) CENTRE D'ETUDE DE L'ENERGIE NUCLEAIRE / STUDIECENTRUM VOOR KERNENERGIE CZECH POWER COMPANY, CEZ A.S. COMISION FEDERAL DE ELECTRICIDAD CHUBU ELECTRIC POWER CO., INC. THE CHUGOKU ELECTRIC POWER CO., INC. CHINA INSTITUTE OF ATOMIC ENERGY CENTRALES NUCLEARES ALMARAZ-TRILLO (ID/UFG/ENDESA/HC/NUCLENOR ) CITY OF PIQUA GOVERNMENT COMPAGNIE GENERALE DES MATIERES NUCLEAIRES CONSTELLATION ENERGY NUCLEAR GROUP, LLC CONSUMERS POWER CO. CAROLINAS-VIRGINIA NUCLEAR POWER ASSOC. CONNECTICUT YANKEE ATOMIC POWER CO. DEPARTMENT OF ENERGY AND DUQUESNE LIGHT CO. DOE & PUERTO RICO WATER RESOURCES code TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY Operator AEC/NPPD AEP AmerenUE ANAV ANPPJSC APS AVR Axpo AG BE BHAVINI BKAB BKW BRUCEPOW BV GKN CEA/EDF CEN/SCK CEZ CFE CHUBU CHUGOKU CIAE CNAT CofPiqua COGEMA CONSTELL CPC CVPA CYAPC DOE DUQU DOE/PRWR

65 2 3 2 Planned 1 1 1 3 8 1 2 1 1 6 4 1 1 1 Shut down LT shut down 1 1 2 1 3 2 Number of reactors, as 31 Dec. 2011 Construction 7 1 7 3 7 2 1 2 1 2 4 3 2 4 2 58 12 17 Operational Full Name DOMINION GENERATION DAIRYLAND POWER COOPERATIVE DETROIT EDISON CO. DUKE ENERGY CORP. E.ON KERNKRAFT GMBH ELECTRICITE DE FRANCE ELECTRABEL M. V. NUCLEAIRE PRODUKTIE ELETROBRAS ELETRONUCLEAR S.A. ELECTROSTATION MOCHOVCE ENBW KRAFTWERKE AG ENERGY NORTHWEST ENBW KERNKRAFT GMBH (SITZ IN OBRIGHEIM) ENTERGY NUCLEAR OPERATIONS, INC. ENERGIE DE L'OUEST SUISSE ELECTRIC POWER DEVELOPMENT CO.,LTD. N.V. ELEKTRICITEITS-PRODUKTIEMAATSCHAPPIJ ZUID-NEDERLAND ESKOM VIETNAM ELECTRICITY ENERGIEWERKE NORD GMBH EXELON GENERATION CO., LLC FIRST ENERGY NUCLEAR OPERATING CO. FORSMARK KRAFTGRUPP AB FORTUM POWER AND HEAT OY (FORMER IVO) FLORIDA POWER & LIGHT CO. CNNC FUJIAN FUQING NUCLEAR POWER CO.,LTD FUJIAN SANMING NUCLEAR POWER CO.,LTD. GENERAL ELECTRIC GUANGXI FANGCHENGGANG NUCLEAR POWER COMPANY LTD GUANDONG NUCLEAR POWER JOINT VENTURE COMPANY LIMITED (GNPJVC) GENERAL PUBLIC UTILITIES (OWNED BY FIRSTENERGY CORP.) HEISSDAMPFREAKTOR-BETRIEBSGESELLSCHAFT MBH. code TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY— continued Operator DOMINION DPC DTEDISON DUKEENER E.ON EDF ELECTRAB ELETRONU EMO EnBW ENERGYNW EnKK ENTERGY EOS EPDC EPZ ESKOM EVN EWN EXELON FENOC FKA FORTUMPH FPL FQNP FSNPC GE GFNPC GNPJVC GPU HDR

66 1 1 2 4 2 1 Planned 1 1 1 2 2 1 3 2 1 1 1 1 1 4 1 Shut down 1 LT shut down 2 5 2 Number of reactors, as 31 Dec. 2011 Construction 3 2 1 1 3 2 2 1 1 1 2 1 6 2 2 11 21 Operational Full name HOKKAIDO ELECTRIC POWER CO.,INC. HISPANO-FRANCESA DE ENERGIA NUCLEAR, S.A. HOCHTEMPERATUR-KERNKRAFTWERK GMBH HAINAN NUCLEAR POWER COMPANY HOKURIKU ELECTRIC POWER CO. HONGYANHE NUCLEAR POWER COMPANY HYDRO QUEBEC HUANENG SHANDONG SHIDAOBAY NUCLEAR POWER CO.,LTD. IBERDROLA, S.A. IGNALINA JAPAN ATOMIC ENERGY AGENCY JAPAN ATOMIC POWER CO. JADROVA A VYRADOVACIA SPOLOCNOST/NUCLEAR AND DECOMMISSIONING COMPANY, PLC./ JIANGSU NUCLEAR POWER CORPORATION KERNKRAFTWERK-BETRIEBSGESELLSCHAFT MBH KANSAI ELECTRIC POWER CO. KERNKRAFTWERKE GUNDREMMINGEN BETRIEBSGESELLSCHAFT MBH KERNKRAFTWERK GUNDREMMINGEN GMBH KOREA HYDRO AND NUCLEAR POWER CO. KERNKRAFTWERK BRUNSBÜTTEL GMBH KERNKRAFTWERK GOESGEN-DAENIKEN AG KERNKRAFTWERK KRÜMMEL GMBH & CO. OHG KERNKRAFTWERK LEIBSTADT KERNKRAFTWERK NIEDERAICHBACH GMBH KERNKRAFTWERKE LIPPE-EMS GMBH KOZLODUY NPP-PLC GEMEINSCHAFTSKERNKRAFTWERK GROHNDE GMBH & CO. OHG KERNKRAFTWERK LINGEN GMBH KYUSHU ELECTRIC POWER CO., INC. LINGAO NUCLEAR POWER COMPANY LTD. LINGDONG NUCLEAR POWER COMPANY LTD. code TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY— continued Operator HEPCO HIFRENSA HKG HNPC HOKURIKU HONGYANH HQ HSNPC ID INPP JAEA JAPCO JAVYS JNPC KBG KEPCO KGB KGG KHNP KKB KKG KKK KKL KKN KLE KOZNPP KWG KWL KYUSHU LANPC LDNPC

67 2 2 3 1 Planned 1 1 4 1 1 2 1 1 1 23 Shut down 2 LT shut down 4 1 4 2 6 2 Number of reactors, as 31 Dec. 2011 Construction 2 3 2 1 1 4 1 4 3 1 3 1 3 4 2 2 5 15 20 10 Operational Full Name LIAONING HONGYANHE NUCLEAR POWER CO. LTD. (LHNPC) LONG ISLAND POWER AUTHORITY LIAONIN NUCLEAR POWER COMPANY,LMT. LUMINANT GENERATION COMPANY LLC MANGISHLAK ATOMIC ENERGY COMPLEX-KAZATOMPROM, LIMITED LIABILITY COMPANY MAGNOX ELECTRIC LIMITED MINTOPENERGO OF UKRAINE - MINISTRY FUEL AND ENERGY MAINE YANKEE ATOMIC POWER CO. NUCLEOELECTRICA ARGENTINA S.A. NEW BRUNSWICK ELECTRIC POWER COMMISSION NINGDE NUCLEAR POWER COMPANY LTD. NUKLERANA ELEKTRARNA KRŠKO NEXTERA ENERGY RESOURCES, LLC NUCLEAR MANAGEMENT CO. NATIONAL NUCLEAR ENERGY GENERATING COMPANY NUCLEAR POWER CORPORATION OF INDIA LTD. NUCLEAR POWER PRODUCTION & DEVELOPEMENT CO. OF IRAN NUCLEAR POWER PLANT QINSHAN JOINT VENTURE COMPANY LTD. NORTHERN STATES POWER CO. (SUBSIDIARY OF XCEL ENERGY) NUCLENOR, S.A. ONTARIO HYDRO OKG AKTIEBOLAG ONTARIO POWER GENERATION OMAHA PUBLIC POWER DISTRICT PAKISTAN ATOMIC ENERGY COMMISSION PAKS NUCLEAR POWER PLANT LTD PREUSSENELEKTRA KERNKRAFT GMBH&CO KG PACIFIC GAS AND ELECTRIC COMPANY PORTLAND GENERAL ELECTRIC CO. PPL SUSQUEHANNA, LLC PROGRESS ENERGY code TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY— continued Operator LHNPC LIPA LNPC LUMINANT MAEC-KAZ MEL MTE MYAPC NASA NBEPC NDNPC NEK NEXTERA NMC NNEGC NPCIL NPPDCO NPQJVC NSP NUCLENOR OH OKG OPG OPPD PAEC PAKS Zrt PE PG&E PORTGE PPL SUSQ PROGRESS

68 2 2 2 2 35 Planned 1 1 5 2 1 1 1 1 4 4 1 4 1 Shut down LT Shut Down 2 2 2 2 2 1 1 10 Number of reactors, as 31 Dec. 2011 Construction 3 1 4 2 1 4 3 2 6 2 4 6 2 6 2 33 13 Operational Full Name PUBLIC SERVICE CO. OF COLORADO PSEG NUCLEAR LLC PUBLIC SERVICE ELECTRIC & GAS CO. QINSHAN NUCLEAR POWER COMPANY RINGHALS AB RURAL COOPERATIVE POWER ASSOC. JOINT STOCK COMPANY CONCERN RWE POWER AG SOUTHERN CALIFORNIA EDISON CO. SOUTH CAROLINA ELECTRIC & GAS CO. SLOVENSKÉ ELEKTRÁRNE, A.S. SOCIETE D'ENERGIE NUCLEAIRE FRANCO-BELGE DES ARDENNES SHIKOKU ELECTRIC POWER CO., INC SANMEN NUCLEAR POWER CO., LTD. SACRAMENTO MUNICIPAL UTILITY DISTRICT SAXTON NUCLEAR EXPIRAMENTAL REACTOR CORPORATION SOCIETATEA NATIONALA NUCLEARELECTRICA S.A. SHANDONG NUCLEAR POWER COMPANY LTD SOCIETA GESTIONE IMPANTI NUCLEARI S.P.A. SOUTHERN NUCLEAR OPERATING COMPANY, INC. STP NUCLEAR OPERATING CO. TOKYO ELECTRIC POWER CO.,INC. GUANGDONG TAISHAN NUCLEAR POWER JOINT VENTURE COMPANY LIMITED (TNPC) BETWEEN EDF (30%) AND GUANGDONG NUCLEAR POWER GROUP (CGNPC). TOHOKU ELECTRIC POWER CO.,INC TAI POWER CO. THE THIRD QINSHAN JOINTED VENTURE COMPANY LTDA. TENNESSEE VALLEY AUTHORITY TEOLLISUUDEN VOIMA OY UNION FENOSA GENERATION S.A. UNITED KINGDOM ATOMIC ENERGY AUTHORITY VERSUCHSATOMKRAFTWERK KAHL GMBH code TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY— continued Operator PSCC PSEG QNPC RAB RCPA REA RWE SCE SCE&G SE,plc SENA SHIKOKU SMNPC SMUD SNEC SNN SNPC SOGIN SOUTHERN STP TEPCO TNPC TOHOKU TPC TQNPC TVA TVO UFG UKAEA VAK

69 3 39 114 Planned 1 138 shut down 5 LT shut down 3 65 Number of reactors, as 31 Dec. 2011 Construction 1 435 Operational Full name WOLF CREEK NUCLEAR OPERATION CORP. YANKEE ATOMIC ELECTRIC CO. YANGJIANG NUCLEAR POWER COMPANY code TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY— continued Operator WCNOC YAEC YJNPC not specified TOTAL

70 1 1 13 Planned 1 2 3 2 6 1 1 2 1 2 1 1 6 3 1 1 1 1 1 1 Shut down LT shut down 4 4 2 20 Number of reactors, as 31 Dec. 2011 Construction 7 4 1 9 1 3 8 2 1 2 7 1 7 2 2 14 Operational Full name ASSOCIATION ACEC, FRAMATOME ET WESTINGHOUSE ABBATOM (FORMERLY ASEA-ATOM) ALLIS CHALMERS ACECOWEN (ACEC-COCKERILL-WESTINGHOUSE ) (ACECOWEN - CREUSOT LOIRE FRAMATOME) ATOMIC ENERGY OF CANADA LTD. ATOMIC ENERGY OF CANADA LTDA AND DEPARTMENT (INDIA) ATOMIC ENERGY OF CANADA LTD./DOOSAN HEAVY INDUSTRY & CONSTRUCTION ATOMENERGOEXPORT ALLGEMEINE ELEKTRICITAETS-GESELLSCHAFT ALLGEMEINE ELECTRICITAETS-GESELLSCHAFT, GENERAL ELECTRIC COMPANY (US) ALLGEMEINE ELEKTRICITAETS GESELLSCHAFT, KRAFTWERK UNION AG ANSALDO MECCANICO NUCLEARE SPA/GENERAL ELECTRIC TECHNICAL SERVICES CO ATOMIC POWER CONSTRUCTION LTD. AREVA, 27-29, RUE LE PELETIER, 75433 PARIS CEDEX 09URL: WWW.AREVA.COM ASEA-ATOM/STAL-LAVAL ASPALDO ATOMENERGOEXPORT BABCOCK & WILCOX CO. BROWN BOVERI-KRUPP REAKTORBAU GMBH BROWN BOVERI REAKTOR GMBH COMBUSTION ENGINEERING CO. COMMISSARIAT A L'ENERGIE ATOMIQUE CANADIAN GENERAL ELECTRIC CNIM-CONSTRUCTIONS NAVALES ET INDUSTRIELLES DE MEDITERRANEE CL - CREUSOT LOI CHINA NATIONAL NUCLEAR CORPORATION CHINA ZHONGYUAN ENGINEERING CORPORATION DONGFANG ELECTRIC CORPORATION DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA ATOMIC ENERGY RESEARCH INSTITUTE code TABLE 25. NSSS SUPPLIERS: ABBREVIATIONS AND SUMMARY NSSS supplier A/F/W ABBATOM AC ACECOWEN ACLF AECL AECL/DAE AECL/DHI AEE AEG AEG,GE AEG,KWU AMN/GETS APC AREVA ASE ASEASTAL ASPALDO AtEE B&W BBK BBR CE CEA CGE CNCLNEY CNNC CZEC DFEC DHICKAEC

71 2 2 2 Planned 4 1 5 3 2 1 1 1 1 3 1 1 2 1 1 1 9 2 1 2 5 1 11 Shut down LT shut down 5 2 1 1 1 2 Number of reactors, as 31 Dec. 2011 Construction 7 2 1 2 1 2 9 3 2 6 66 47 12 20 Operational Full name DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPA THE ENGLISH ELECTRIC CO. LTD / BABCOCK & WILCOX TAYLOR WOODROW CONSTRU ELETTRONUCLEARE ITALIANA / WESTINGHOUSE ELECTRIC CORP. FEDERAL ATOMIC ENERGY AGENCY FRAMATOME FRAMACECO ( FRAMATOME-ACEC-COCKERILL ) GENERAL ATOMIC CORP. GROUPEMENT ATOMIQUE ALSACIENNE ATLANTIQUE GENERAL ELECTRIC CO. GENERAL ELECTRIC COMPANY (US), ALLGEMEINE ELEKTRICITAETS- GESELLSCHAFT GENERAL ELECTRIC CO./GENERAL TECHNICAL SERVICES CO. GENERAL ELECTRIC CO./TOSHIBA CORPORATION GENERAL ELECTRIC COMPANY (UK) GENERAL ELECTRIC TECHNICAL SERVICES CO. GENERAL & PUERTO RICO WATER RESOURCES AUTHORITY (US) GRANDS TRAVAUX DE MARSEILLE HITACHI GE NUCLEAR ENERGY, LTD. HITACHI LTD. HOCHTEMPERATUR-REAKTORBAU GMBH INTERATOM INTERNATIONALE ATOMREAKTORBAU GMBH INTERNATIONAL COMBUSTION LTD. / FAIREY ENGINEERING IZHORSKIYE ZAVODY SIEMENS KRAFTWERK UNION AG LEVIVIER MAEC-KAZATOMPROMMANGISHLAK ATOMIC ENERGY COMPLEX-KAZATOMPROM, LIMITED LIABILITY MINATOMENERGOPROM, MINISTRY OF NUCLEAR POWER AND INDUSTRY MITSUBISHI HEAVY INDUSTRIES LTD. MINISTRY OF MEDIUM MACHINE BUILDING THE USSR (MINSREDMASH) NATIONAL GESELLSCHAFT ZUR FÖRDERUNG DER INDUSTRIELLEN ATOMTECHNIK NATIONAL NUCLEAR CORPORATION NUCLEAR POWER CO. LTD. code TABLE 25. NSSS SUPPLIERS: ABBREVIATIONS AND SUMMARY— continued NSSS supplier DHICKOPC EE/B&W/T EL/WEST FAEA FRAM FRAMACEC GA GAAA GE GE,AEG GE/GETSC GE/T GEC GETSCO GNEPRWRA GTM H/G HITACHI HRB IA ICL/FE IZ KWU LEVIVIER MAEC-KAZ MAEP MHI MSM NGA NNC NPC

72 1 4 2 37 49 114 Planned 1 2 2 1 1 9 3 1 10 10 138 Shut down 4 1 5 LT shut down 4 1 2 3 2 1 10 65 Number of reactors, as 31 Dec. 2011 Construction 4 1 1 1 5 1 16 16 11 33 10 14 71 435 Operational Full name NUCLEAR POWER CORPORATION OF INDIA LTD.VIKRAM SARABHAI BHAVAN, ANUSHAKTI NAG ONTARIO HYDRO/ATOMIC ENERGY OF CANADA LTD. PRODUCTION AMALGAMATION 'ATOMMASH', PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA PWR POWER PROJECTS LTD ROTTERDAMSE DROOGDOK MAATSCHAPPIJ (RDM) IN ROTTERDAM (NL) STATE ATOMIC ENERGY CORPORATION ROSATOM SIEMENS/KRAFTWERK UNION AG SOCIETE ALSACIENNE DE CONSTRUCTIONS MECANIQUES SIEMENS AG, KRAFTWERK UNION AG SIEMENS AG, POWER GENERATION -FRG SKODA CONCERN NUCLEAR POWER PLANT WORKS TOSHIBA/HITACHI/FUJI ELECTRIC HOLDINGS/MITSUBISHI HEAVY INDUSTRIES TBD THE NUCLEAR POWER GROUP LTD. TOSHIBA CORPORATION UNITED ENGINEERS AND CONTRACTORS UNITED KINGDOM ATOMIC ENERGY AUTHORITY WESTINGHOUSE ELECTRIC CORPORATION WESTINGHOUSE ELECTRIC CORPORATION/MITSUBISHI HEAVY INDUSTRIES LTD. code TABLE 25. NSSS SUPPLIERS: ABBREVIATIONS AND SUMMARY— continued NSSS supplier NPCIL OH/AECL PAA PAIP PPC RDM ROSATOM S/KWU SACM SIEM,KWU SIEMENS SKODA T/H/F/M TBD TNPG TOSHIBA UEC UKAEA WH WH/MHI not specified TOTAL

73 300 Number of reactors Net electrical power (GW(e)) 270 248.4 250

200

150 Number of reactors/net electrical power (GW(e)) power electrical reactors/net of Number

100 84 77.7

50 47 23.1 17 15 10.2 8.8 2 0.6 0 PWR BWR GCR PHWR LWGR FBR Reactor type

figure 1. Number of operational reactors by type and net electrical power (as of 31 Dec. 2011).

74 60 Number of reactors Net electrical power (GW(e)) 53 51.3

50

40

30 Number of reactors/net electrical power (GW(e))

20

10 5.3 5 4 3.2 2 1.3 1 0.9

0 PWR BWR PHWR LWGR FBR Reactor type figure 2. Reactors under construction by type and net electrical power (as of 31 Dec. 2011).

75 80% 77.7% 60% 54.0% 54.0% 47.2% 43.3% 41.7% 40.9% 39.6% 40% 34.6% 33.2% 33.0% 32.6% 31.6% Nuclear share Nuclear 19.5% 19.3% 19.0% 18.1% 17.8% 17.8% 20% 17.6% 15.3% 5.2% 5.0% 3.8% 3.7% 3.6% 3.5% 3.2% 1.9% 0.0% 0% UK USA INDIA SPAIN CHINA JAPAN BRAZIL RUSSIA MEXICO FRANCE CANADA FINLAND SWEDEN UKRAINE BELGIUM ARMENIA ROMANIA SLOVAKIA PAKISTAN HUNGARY SLOVENIA BULGARIA GERMANY figure 3. Nuclear share of electricity generation (as of 31 Dec. 2011). Dec. 31 of (as generation electricity of share Nuclear 3. figure Note: The nuclear share of electricity supplied in Taiwan, China, was 19.0% the total. ARGENTINA CZECH REP. KOREA, REP. SWITZERLAND IRAN, ISL. REP. SOUTH AFRICA NETHERLANDS

76 140 131 123

120 105 103 99 100 95 86 85

80 75 74 64

60 Number of reactors /construction time (in months)

40 29 23 20 20 12 7

0 2011 1976 – 1980 1981 – 1985 1986 – 1990 1991 – 1995 1996 – 2000 2001 – 2005 2006 – 2010

Number of reactors Construction time figure 4. Worldwide median construction time in months (as of 31 Dec. 2011).

77 1 0 7 4 12 10 13 20 11 13 13 11 6 19 22 18 20 33 32 24 21 14 11 10 4 6 9 Reactor age (in years) (in age Reactor 5 4 6 3 44 6 3 6 2 5 4 2 3 0 2 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 7 figure 5. Number of reactors in operation by age (as 31 Dec. 2011).

5 0

35 30 25 20 15 10 Number of reactors of Number

78

7

2011

4

5

2010

16

2

2009

12

0

2008

10

3

2007

8

2

2006

4

4

2005

3

5

2004

2

2

2003

1

6 2002

6

Grid connections

3

2001

1

6

2000

7

4

1999

4

4

1998

3

3

1997

5

6

1996

1

5

1995

0

5

1994

2

9

1993

4

6

Construction starts 1992

3

4

1991

2

10

1990

5

12

1989

6

14

1988

7

22

1987

13

27

1986

8

33

1985

20

33

1984

10

23

1983

16

19

1982

19

23

1981

16

21

1980

20

8

1979

28

20

1978

23

18

1977

24

19

1976

42

15

1975

38

26

1974

38

20

1973

29

16

1972

29

16

1971

18

6

1970

37

10

1969

13

7

1968

37

11

1967

25

8

1966

15

8

1965

9

8

1964

9

9

1963

5

9

1962

8

1

1961

7

4

1960

11

5

1959

7

1

1958

6

3

1957

13

1

1956

5

0

1955

8

1 1954 1 figure 6. Annual construction starts and connections to the grid, 1954 2011.

0

50 40 30 20 10 Number of reactors of Number

79

@ No. 22 Where to order IAEA publications In the following countries IAEA publications may be purchased from the sources listed below, or from major local booksellers. Payment may be made in local currency or with UNESCO coupons. AUSTRALIA DA Information Services, 648 Whitehorse Road, MITCHAM 3132 Telephone: +61 3 9210 7777 • Fax: +61 3 9210 7788 Email: [email protected] • Web site: http://www.dadirect.com.au BELGIUM Jean de Lannoy, avenue du Roi 202, B-1190 Brussels Telephone: +32 2 538 43 08 • Fax: +32 2 538 08 41 Email: [email protected] • Web site: http://www.jean-de-lannoy.be CANADA Bernan Associates, 4501 Forbes Blvd, Suite 200, Lanham, MD 20706-4346, USA Telephone: 1-800-865-3457 • Fax: 1-800-865-3450 Email: [email protected] • Web site: http://www.bernan.com Renouf Publishing Company Ltd., 1-5369 Canotek Rd., Ottawa, Ontario, K1J 9J3 Telephone: +613 745 2665 • Fax: +613 745 7660 Email: [email protected] • Web site: http://www.renoufbooks.com CHINA IAEA Publications in Chinese: China Nuclear Energy Industry Corporation, Translation Section, P.O. Box 2103, Beijing CZECH REPUBLIC Suweco CZ, S.R.O., Klecakova 347, 180 21 Praha 9 Telephone: +420 26603 5364 • Fax: +420 28482 1646 Email: [email protected] • Web site: http://www.suweco.cz FINLAND Akateeminen Kirjakauppa, PO BOX 128 (Keskuskatu 1), FIN-00101 Helsinki Telephone: +358 9 121 41 • Fax: +358 9 121 4450 Email: [email protected] • Web site: http://www.akateeminen.com FRANCE Form-Edit, 5, rue Janssen, P.O. Box 25, F-75921 Paris Cedex 19 Telephone: +33 1 42 01 49 49 • Fax: +33 1 42 01 90 90 Email: [email protected] • Web site: http://www. formedit.fr Lavoisier SAS, 145 rue de Provigny, 94236 Cachan Cedex Telephone: + 33 1 47 40 67 02 • Fax +33 1 47 40 67 02 Email: [email protected] • Web site: http://www.lavoisier.fr GERMANY UNO-Verlag, Vertriebs- und Verlags GmbH, Am Hofgarten 10, D-53113 Bonn Telephone: + 49 228 94 90 20 • Fax: +49 228 94 90 20 or +49 228 94 90 222 Email: [email protected] • Web site: http://www.uno-verlag.de HUNGARY Librotrade Ltd., Book Import, P.O. Box 126, H-1656 Budapest Telephone: +36 1 257 7777 • Fax: +36 1 257 7472 • Email: [email protected] INDIA Allied Publishers Group, 1st Floor, Dubash House, 15, J. N. Heredia Marg, Ballard Estate, Mumbai 400 001, Telephone: +91 22 22617926/27 • Fax: +91 22 22617928 Email: [email protected] • Web site: http://www.alliedpublishers.com Bookwell, 2/72, Nirankari Colony, Delhi 110009 Telephone: +91 11 23268786, +91 11 23257264 • Fax: +91 11 23281315 Email: [email protected] ITALY Libreria Scientifica Dott. Lucio di Biasio “AEIOU”, Via Coronelli 6, I-20146 Milan Telephone: +39 02 48 95 45 52 or 48 95 45 62 • Fax: +39 02 48 95 45 48 Email: [email protected] • Website: www.libreriaaeiou.eu JAPAN Maruzen Company, Ltd., 13-6 Nihonbashi, 3 chome, Chuo-ku, Tokyo 103-0027 Telephone: +81 3 3275 8582 • Fax: +81 3 3275 9072 Email: [email protected] • Web site: http://www.maruzen.co.jp REPUBLIC OF KOREA KINS Inc., Information Business Dept. Samho Bldg. 2nd Floor, 275-1 Yang Jae-dong SeoCho-G, Seoul 137-130 Telephone: +02 589 1740 • Fax: +02 589 1746 • Web site: http://www.kins.re.kr NETHERLANDS De Lindeboom Internationale Publicaties B.V., M.A. de Ruyterstraat 20A, NL-7482 BZ Haaksbergen Telephone: +31 (0) 53 5740004 • Fax: +31 (0) 53 5729296 Email: [email protected] • Web site: http://www.delindeboom.com Martinus Nijhoff International, Koraalrood 50, P.O. Box 1853, 2700 CZ Zoetermeer Telephone: +31 793 684 400 • Fax: +31 793 615 698 Email: [email protected] • Web site: http://www.nijhoff.nl Swets and Zeitlinger b.v., P.O. Box 830, 2160 SZ Lisse Telephone: +31 252 435 111 • Fax: +31 252 415 888 Email: [email protected] • Web site: http://www.swets.nl NEW ZEALAND DA Information Services, 648 Whitehorse Road, MITCHAM 3132, Australia Telephone: +61 3 9210 7777 • Fax: +61 3 9210 7788 Email: [email protected] • Web site: http://www.dadirect.com.au SLOVENIA Cankarjeva Zalozba d.d., Kopitarjeva 2, SI-1512 Ljubljana Telephone: +386 1 432 31 44 • Fax: +386 1 230 14 35 Email: [email protected] • Web site: http://www.cankarjeva-z.si/uvoz SPAIN Díaz de Santos, S.A., c/ Juan Bravo, 3A, E-28006 Madrid Telephone: +34 91 781 94 80 • Fax: +34 91 575 55 63 Email: [email protected], [email protected], [email protected], [email protected] Web site: http://www.diazdesantos.es UNITED KINGDOM The Stationery Office Ltd, International Sales Agency, PO Box 29, Norwich, NR3 1 GN Telephone (orders): +44 870 600 5552 • (enquiries): +44 207 873 8372 • Fax: +44 207 873 8203 Email (orders): [email protected] • (enquiries): [email protected] • Web site: http:// www.tso.co.uk On-line orders DELTA Int. Book Wholesalers Ltd., 39 Alexandra Road, Addlestone, Surrey, KT15 2PQ Email: [email protected] • Web site: http://www.profbooks.com Books on the Environment Earthprint Ltd., P.O. Box 119, Stevenage SG1 4TP Telephone: +44 1438748111 • Fax: +44 1438748844 Email: [email protected] • Web site: http://www.earthprint.com UNITED NATIONS Dept. I004, Room DC2-0853, First Avenue at 46th Street, New York, N.Y. 10017, USA (UN) Telephone: +800 253-9646 or +212 963-8302 • Fax: +212 963-3489 Email: [email protected] • Web site: http://www.un.org UNITED STATES OF AMERICA Bernan Associates, 4501 Forbes Blvd., Suite 200, Lanham, MD 20706-4346 Telephone: 1-800-865-3457 • Fax: 1-800-865-3450 Email: [email protected] · Web site: http://www.bernan.com Renouf Publishing Company Ltd., 812 Proctor Ave., Ogdensburg, NY, 13669 Telephone: +888 551 7470 (toll-free) • Fax: +888 568 8546 (toll-free) Email: [email protected] • Web site: http://www.renoufbooks.com

Orders and requests for information may also be addressed directly to: Marketing and Sales Unit, International Atomic Energy Agency Vienna International Centre, PO Box 100, 1400 Vienna, Austria Telephone: +43 1 2600 22529 (or 22530) • Fax: +43 1 2600 29302 Email: [email protected] • Web site: http://www.iaea.org/books

12-24221 REFERENCE DATA SERIES No. 2 2012 Edition

Nuclear Power Reactors in the World

INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA ISBN 978–92–0–132310–1 ISSN 1011–2642 @