SDP SEA Scoping Rpt V0 1 DRAFT for Review-PM
Total Page:16
File Type:pdf, Size:1020Kb
Defence Equipment and Support Submarine Dismantling Project Intermediate-Level Waste Storage Site Selection: Strategic Environmental Assessment Scoping Report February 2014 Jacobs document control sheet BPP 04 F8 version 15; Mar 2013 Project: SDP ILW Storage Client: Ministry of Defence Project No: B4160003 Document title: ILW Storage Site Selection: Strategic Environmental Assessment Scoping Report Ref. No: B4160003-R01 REVISION NAME NAME NAME NAME As Project Manager I confirm that the above INITIALS Approved by document(s) have been subjected to Jacobs’ Check and Review procedure and that I approve them for issue DATE Document status REVISION NAME NAME NAME NAME As Project Manager I confirm that the above INITIALS Approved by document(s) have been subjected to Jacobs’ Check and Review procedure and that I approve them for issue DATE Document status Jacobs U.K. Limited This document has been prepared by a division, subsidiary or affiliate of Jacobs U.K. Limited (“Jacobs”) in its professional capacity as consultants in accordance with the terms and conditions of Jacobs’ contract with the commissioning party (the “Client”). Regard should be had to those terms and conditions when considering and/or placing any reliance on this document. No part of this document may be copied or reproduced by any means without prior written permission from Jacobs. If you have received this document in error, please destroy all copies in your possession or control and notify Jacobs. Any advice, opinions, or recommendations within this document (a) should be read and relied upon only in the context of the document as a whole; (b) do not, in any way, purport to include any manner of legal advice or opinion; (c) are based upon the information made available to Jacobs at the date of this document and on current UK standards, codes, technology and construction practices as at the date of this document. It should be noted and it is expressly stated that no independent verification of any of the documents or information supplied to Jacobs has been made. No liability is accepted by Jacobs for any use of this document, other than for the purposes for which it was originally prepared and provided. Following final delivery of this document to the Client, Jacobs will have no further obligations or duty to advise the Client on any matters, including development affecting the information or advice provided in this document. This document has been prepared for the exclusive use of the Client and unless otherwise agreed in writing by Jacobs, no other party may use, make use of or rely on the contents of this document. Should the Client wish to release this document to a third party, Jacobs may, at its discretion, agree to such release provided that (a) Jacobs’ written agreement is obtained prior to such release; and (b) by release of the document to the third party, that third party does not acquire any rights, contractual or otherwise, whatsoever against Jacobs and Jacobs, accordingly, assume no duties, liabilities or obligations to that third party; and (c) Jacobs accepts no responsibility for any loss or damage incurred by the Client or for any conflict of Jacobs’ interests arising out of the Client's release of this document to the third party. Contents 1 Introduction .................................................................................................................... 1 1.1 Overview ................................................................................................................. 1 1.2 Context ................................................................................................................... 1 1.3 Requirement for SEA .............................................................................................. 2 1.4 Purpose of this Report ............................................................................................ 3 1.5 ILW storage Scoping Report Structure .................................................................... 3 1.6 How to Comment on this Scoping Report and Key Questions ................................. 4 2 The Submarine Dismantling Project ............................................................................... 6 2.1 Background............................................................................................................. 6 2.2 2011 SEA and Public Consultation ......................................................................... 7 2.3 Aim and Scope of the Current Stage of the SDP ..................................................... 7 2.4 Shortlisted Sites for ILW Storage .......................................................................... 10 2.5 Key Aspects of Implementing ILW Storage ........................................................... 12 3 Approach to Scoping the SEA ...................................................................................... 13 3.1 Stages of SEA ...................................................................................................... 13 3.2 Elements of SEA Scoping ..................................................................................... 13 3.3 Information Used to Set the Scope ....................................................................... 14 3.4 Habitats Regulations Assessment ......................................................................... 14 3.5 SEA Categories .................................................................................................... 15 4 Review of Plans, Programmes and Environmental Protection Objectives .................... 17 4.1 Introduction ........................................................................................................... 17 4.2 Updates since the 2011 SEA ................................................................................ 17 5 Baseline Information and Local Context ....................................................................... 19 5.1 Introduction ........................................................................................................... 19 5.2 Baseline Context for All Nuclear-Licensed Sites ................................................... 19 5.3 AWE Aldermaston................................................................................................. 20 5.4 AWE Burghfield .................................................................................................... 32 5.5 Capenhurst (Capenhurst Nuclear Services) .......................................................... 40 5.6 Sellafield (NDA) .................................................................................................... 49 5.7 Chapelcross (NDA) ............................................................................................... 59 5.8 Summary of Key Issues and Opportunities at Each Site ....................................... 67 6 Proposed Scope of the SEA......................................................................................... 69 6.1 Introduction ........................................................................................................... 69 6.2 Technical Scope ................................................................................................... 69 6.3 Assessment Timescales ....................................................................................... 77 6.4 Geographic Scope ................................................................................................ 78 Intermediate-Level Waste Storage Site Selection: Strategic Environmental Assessment Scoping Report 7 Next Steps ................................................................................................................... 79 7.1 SEA Scoping ......................................................................................................... 79 7.2 Purpose and Proposed Structure of the Environmental Report ............................. 79 7.3 Public Consultation on the SDP and Environmental Report .................................. 80 Annex 1: Statutory and Governmental Department Comments on ILW Storage from the Previous SEA.................................................................................................... 81 Annex 2: Maps of Alternative Sites and Key Environmental Features .............................. 82 Annex 3: Key Environmental Protection Objectives .......................................................... 93 Annex 4: Rationale for Amendment of the SEA Objectives and Guiding Questions ........ 103 Annex 5: Rationale for the SEA Technical Scope ........................................................... 112 Annex 6: Guideline Assessment Criteria by SEA Category ............................................ 128 Annex 7: SEA Scoping Quality Assurance Checklist ...................................................... 139 Intermediate-Level Waste Storage Site Selection: Strategic Environmental Assessment Scoping Report 1 Introduction 1.1 Overview The overarching objective of the Submarine Dismantling Project (SDP) is to develop and implement a timely solution for the dismantling and ultimate disposal of the UK’s 27 defueled nuclear submarines at the end of their life. This report presents the proposed scope of the Strategic Environmental Assessment (SEA) for the transportation and interim storage of the submarine Reactor Pressure Vessels (RPVs) as part of the SDP. This SEA builds upon the previous, overarching 2011/12 SEA which considered the end-to-end process of submarine dismantling but was not able to consider any specific