Download Systematic List

Total Page:16

File Type:pdf, Size:1020Kb

Download Systematic List SyStematic LiSt Bird report for 2000–2001 observers Please see the list of contributors at the end of this report to whom we extend our thanks. abbreviations and place names The normal abbreviations are shown below in the table. For place names difficulties arise where there are several names for the same sites including where, for example, a gravel pit complex is named but not the individual pit. A map and guide to the main sites is included towards the end of the report to assist with identification. age/Sex pLaceS/ LocaLitieS ad adult com Common f/s First summer cp Country Park f/w First winter (plumage) fm Farm imm Immature gc Golf course Juv Juvenile gp Gravel Pit(s) m Male res Reservoir pr pair r. River f or fem Female Sf Sewage Farm r/h Redhead StW Sewage Treatment Works r/t Ringtail S/p Summer plumage e Berks East Berkshire S/s Second summer m.Berks Mid Berkshire S/w Second winter W Berks West Berkshire W/p Winter plumage dorney W Dorney Wetlands W Winter K&a Kennet and Avon 3/s Third summer Qmr Queen Mother Reservoir 3/w Third winter In an attempt to show the national status of our breeding birds, any species that is protected under Schedule One of the Wildlife and Countryside Act and any species that may be red or amber listed in the most recent list of Birds of conservation concern for the UK will have the species status placed in brackets after the county status which precedes the species account. 25 red-tHROATED diVer Gavia stellata Scarce winter visitor. 2001 One long staying winter-plumaged bird was found at QMR on Nov 19th remaining until Dec 6th (JAS). The 19th record since 1900. GREAT NORTHerN diVer Gavia immer Scarce winter visitor and passage migrant. 2001 A 1st winter bird arrived on Dec 23rd (BTB) at Twyford GP. This much-admired bird, the 24th county record since 1900, stayed into 2002. LittLe greBe Tachybaptus ruficollis A widespread resident, breeding in all river valleys and suitable lakes and ponds. 2000 Records were received from 51 locations, 17 in W Berks, 13 in M Berks and 21 in E Berks. Monthly maxima from the main sites were: Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Burghfield GPs – – 11 6 2 1 4 5 13 20 18 14 Eversley GPs 5 7 10 6 5 6 9 22 23 9 5 6 Field Fm GP 13 – 12 – 1 1 – 25 30 23 32 21 Lower Fm GP – – 12 9 12 13 28 29 23 17 3 4 Old Slade NR 2 2 – – – – – 4 13 6 5 4 Padworth Lane GP 4 5 12 6 – 2 – 8 14 14 6 20 Dorney W / Slough SF 2 2 – – – – – 6 6 10 – 3 Twyford GPs (inc Whistley Green GP) 1 1 1 5 4 4 4 15 14 9 – – Wraysbury / Horton GPs 12 4 6 3 2 1 2 7 2 4 4 – The high count of 32 at Field Fm GP occurred on Nov 10th (RCr). Elsewhere there were only 2 counts that exceeded 6 birds, 7 at Rapley Lake on Apr 29th (DJB) and 8 at Lane End Fm Shinfield on Sep 2nd (MBu). Breeding: Evidence of breeding was received from 11 locations. The highest concentration of breeding pairs occurred at Lower Fm GP where 2 young were seen on Jun 4th (IW; JL), increasing to 5 broods of 1,2,3,3 and 4 young plus a sitting adult on Jul 29th (DJB) and a count of 13 ads and 16 juvs on Aug 25th (DJB). Elsewhere an adult was feeding a juv at Crookham Com on Jun 22nd (JPM), a pair with 4 chicks at Oval Pond Padworth on Jun 28th (GEW), a pair with 3 young at Thatcham Marsh on Jul 9th and 15th (IW; JL), a pair with 2 chicks at Aldermaston GP on Aug 2nd (JPM), 2 broods of 3 and 5 at Whistley Green GP Twyford on Aug 7th (DJB) increasing to 3 broods of 3, 3 and 2 on Aug 24th (TGB), 4 ads and 4 juvs at Datchet Com GP on Aug 26th (BDC), 4 ads and 3 juvs at Horton GPs on Aug 26th (BDC), an adult on a nest at Hungerford Marsh on Sep 19th (RF), 14 young were reared at Eversley GPs (IHB) and a pair bred in the Pang valley between Bucklebury and Marlston (PDM). A prolonged and successful breeding season. 2001 Occasional records involving 6 or more birds came from Frogmill, Hurley with 6 on Mar 6th (FMF; SJF), Old Slade NR, 6 on Jan 16th (BDC), Oct 5th and Nov 18th (DR), 10 at Dorney W on Oct 28th with 9 there on Dec 12th (DJB) and 9 at Orlitts South Lake on Dec 8th (DR). Breeding: Successful breeding was reported at Aldermaston GP (JPM), Avington near Kintbury (DR), R Pang Bucklebury to Marlston (PDM), Hamstead 26 Marshall (LS; GS), Windsor Great Park (WAS), Lower Fm GP (IW; JL; RF), Old Slade GP (DR), Twyford GP (BTB; BDC) and Woolhampton GP (JPM). Highest breeding count involved 3prs all with young at Hamstead Lock on Jul 4th (IW; JL). Monthly maxima at regular sites were: Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Aldermaston GP – – 1 4 1 – 2 3 3 4 2 – Eversley GPs 9 5 3 5 4 7 6 9 2 8 6 – Field Fm GP 10 7 8 – – 10 – 17 28 30 15 12 Lower Fm GP 3 5 14 18 16 11 23 28 31 12 5 4 Padworth Lane GP 9 20 14 10 – 3 5 11 10 9 7 6 Twyford GPs – – 1 – – 5 13 9 7 – – – GREAT creSted greBe Podiceps cristatus A breeding resident and winter visitor of our larger waters and along the R Thames. 2000 Records were received from 36 locations, 7 in W Berks, 13 in M.Berks and 16 in E Berks. The monthly maxima at the main sites were: Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Bray GPs 15 – – 13 – – – – – 22 17 14 Burghfield / Searles Lane GP 10 – – 7 3 – – – – – 15 10 Eversley GPs 19 14 14 14 10 23 27 22 14 18 13 15 Hosehill Lake – – – – 5 5 15 5 4 10 – – Moatlands GPs – – 25 8 15 10 46 20 30 30 15 15 Muddy Lane GP Thatcham 4 3 3 7 – 8 5 – 6 10 20 17 QMR 36 24 23 – – – – – – – – – Theale Main GP 25 5 6 5 5 5 10 10 20 20 – 20 Twyford / Whistley Green GP 10 10 8 5 2 – – 3 3 – – – Wraysbury GPs 41 60 57 31 47 14 22 19 26 24 49 56 Old Slade NR – – 10 – – Br* – – – 11 6 8 * BR – Breeding confirmed The high count of 60 at Wraysbury GPs occurred on Feb 13th (VAC). Elsewhere the only count to exceed 20 birds was 25 including 4 juvs at Horton GPs on Aug 26th (BDC). Breeding: Evidence of breeding was first received from Searle`s Lane GP Burghfield, where an adult was seen on a nest on Mar 13th (JA). Records were received from a further 15 locations involving at least 30 pairs, with the most favoured breeding locations being lakes or GPs. Only 1 record involved pairs on a river, 3 pairs rearing 4 young on the Thames between Old Windsor and Datchet (WAS). 2001 Counts of 20 or more came from Wraysbury GP with a peak of 67 on Jan 14th and 58 in Feb (VAC), Muddy Lane GP with 24 on Jan 20th (GJS; IW; JL), Woolhampton GP with 20 on Jul 30th (JPM), Moatlands GP with 27 on Aug 26th (SG) and Theale Main GP with 31 on Dec 15th (BMA). Breeding: Breeding was reported from Bottom Lane Theale (MBu), Frogmill near Hurley (FMF; SJF), Hosehill Lake (MBu), Lower Fm GP (SG), Midgham GP (NDOC), Old Slade GP (DR), Romney Lock Windsor (WAS), Thatcham Marsh Lakes (NDOC), Theale Main GP (SG), Woolhampton GPs (SG) and Wraysbury GP (JOB). The first chicks reported were at Aldermaston GP on Mar 19th (JPM) and the latest reported at Muddy Lane GP on Sep 4th (GJS). Monthly maxima at regular sites were as follows: 27 Site Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Eversley GPs 7 7 – – 3 7 2 – 9 9 9 6 Lower Fm GP 1 4 2 3 2 2 5 4 3 2 1 2 Muddy Lane GP 24 7 – 4 3 12 21 19 13 9 10 13 Woolhampton – – – 4 – 8 20 19 12 9 9 9 Wraysbury GPs 67 58 14 15 – – – – – – – – SLaVoNiaN greBe Podiceps auritus Scarce passage migrant and winter visitor. 2001 The recent run of poor years continued in 2001 with only one sighting. The bird, in winter plumage, was at Theale Main GP on Dec 3rd (MJH; CDRH). BLACK-NecKed greBe Podiceps nigricollis Scarce but regular passage migrant and winter visitor. 2000 Eight records involving at least 8 birds make 2000 a fairly average year. After no first winter reports a pair in s/p was located at Hosehill Lake on May 16th (BU). These birds or another pair were then located at Lower Fm GP on May 27th (IW; JL; JPM; MES) to May 29th (MO). autumn: Passage commenced with a juv at QMR on Aug 22nd (JAS) and was followed by 1 at Moatlands GP on Aug 27th (RCr), 1 juv QMR on Sep 7th and Sep 23rd (JAS). Second winter: There were 2 records in December, 1 at Field Fm GP on Dec 4th (J Simmons) and 1 at Wraysbury GPs on Dec 26th (PNe).
Recommended publications
  • Thames Valley Papists from Reformation to Emancipation 1534 - 1829
    Thames Valley Papists From Reformation to Emancipation 1534 - 1829 Tony Hadland Copyright © 1992 & 2004 by Tony Hadland All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means – electronic, mechanical, photocopying, recording or otherwise – without prior permission in writing from the publisher and author. The moral right of Tony Hadland to be identified as author of this work has been asserted in accordance with the Copyright, Designs and Patents Act, 1988. British Library Cataloguing-in-Publication Data A catalogue for this book is available from the British Library. ISBN 0 9547547 0 0 First edition published as a hardback by Tony Hadland in 1992. This new edition published in soft cover in April 2004 by The Mapledurham 1997 Trust, Mapledurham HOUSE, Reading, RG4 7TR. Pre-press and design by Tony Hadland E-mail: [email protected] Printed by Antony Rowe Limited, 2 Whittle Drive, Highfield Industrial Estate, Eastbourne, East Sussex, BN23 6QT. E-mail: [email protected] While every effort has been made to ensure accuracy, neither the author nor the publisher can be held responsible for any loss or inconvenience arising from errors contained in this work. Feedback from readers on points of accuracy will be welcomed and should be e-mailed to [email protected] or mailed to the author via the publisher. Front cover: Mapledurham House, front elevation. Back cover: Mapledurham House, as seen from the Thames. A high gable end, clad in reflective oyster shells, indicated a safe house for Catholics.
    [Show full text]
  • River Kennet – Craven Fishery
    River Kennet – Craven Fishery An Advisory Visit by the Wild Trout Trust November 2014 1 1. Introduction This report is the output of a site meeting and walk-over survey of the Craven Fishery on the River Kennet at Hampstead Marshall in Berkshire. The request for the visit came from the owner of the fishery, Mr. Richard White. Mr. White is keen to explore opportunities to enhance and improve the fishery. The quality of the fishery, and in particular water quantity and quality have been in steady decline over the last 25 years and is thought to be linked to a combination of factors, including the restoration and re-opening of the Kennet and Avon Canal, increased abstraction pressures at Axford and the arrival of non-native signal crayfish Pacifastacus leniusculus Comments in this report are based on observations on the day of the site visit and discussions with Mr. White and the river keeper Mr. Geoff Trotman Throughout the report, normal convention is followed with respect to bank identification, i.e. banks are designated Left Bank (LB) or Right Bank (RB) whilst looking downstream. Map 1 Craven Fishery 2 The Craven fishery lies just downstream from a short section of combined river and navigation channel. The river and canal converge below Copse Lock and separate at the head of the Craven Fishery at NGR SU 421679. Through the Craven Fishery, the river channel runs parallel with the Kennet and Avon Canal before the two channels re-join near the bottom boundary of the fishery at SU 431667. The fishery itself consists of a section of main-river and a shorter section of milling channel.
    [Show full text]
  • Sustainability Appraisal Report
    Bracknell Forest Borough Council Final Sustainability Appraisal Report Technical Document D Site Specific Appraisal: Full appraisal tables October 2006 Site specific sustainability appraisal The tables in the following document provide the full sustainability appraisal for each site proposed within the Site Allocations DPD and the policies within the document. Full details of how this appraisal was carried out, how the scores were calculated, and a summary of the results, can be found in Section 3 of the Final Sustainability Appraisal Report (November 2006). Scoring of Options Score + + The site or policy will have a very positive impact on the sustainability objective + The site or policy will have a slightly positive impact on the sustainability objective The site or policy will have a negligible or neutral impact on the sustainable objective. A recorded 0 neutral effect does not necessarily mean there will be no effect at the project level, but shows that at this strategic level there are no identifiable effects. - The site or policy will have a slightly negative impact on the sustainability objective - - The site or policy will have a very negative impact on the sustainability objective The outcome of implementing the site or policy could be dependant upon implementation or more i detail is required to make an assessment ? The impact of an issue cannot be predicted at this stage Sustainability Objectives Ref. number SA Objective Meet local housing needs by ensuring that everyone has the opportunity to live in a decent, 1 sustainably constructed house. 2 Reduce the risk of flooding and harm to people, property and the environment 3 Protect and enhance human wealth and wellbeing 4 Reduce poverty and social exclusion.
    [Show full text]
  • Budget 2018/19
    Budget 2018/19 ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD BUDGET 2018/19 CONTENTS Page FOREWORD BY THE MANAGING DIRECTOR……………………………………………………... 5 GENERAL STATISTICS………………………………………………………………………………… 7 SUMMARIES AND STATEMENTS …………………………………………………………………... 13 Council Tax for all Bands of Property………………………………………………………………… 15 Parish Precepts………………………………………………………………………………………… 17 Subjective Analysis …………………………………………………………………………………… 18 Collection Fund………………………………………………………………………………………… 19 Revenue Budget Movement Statement……………………………………………………………… 21 Medium Term Financial Plan………………………………………………………………………….. 22 General Fund Cost Direct Cost Budget Summary & Working Balances………………………… 24 GENERAL FUND REVENUE ACCOUNT - DIRECT COST Managing Director - Direct Cost Summary & Details………………………………………..…… 27 Communities Directorate - Direct Cost Summary & Details…………………………………….. 57 Place Directorate - Direct Cost Summary & Details……………………………………………… 81 GENERAL FUND REVENUE ACCOUNT - FULL COST Full Cost Budget Summaries………………………………………………………………………….. 95 FEES & CHARGES ……………………….…………………………………………………………….. 105 Managing Director……………………………………………………………………………………. 107 Place Directorate……………………………………………………………………………. 115 Communities Directorate…………………………………………………………………………….. 118 CAPITAL PROGRAMME ………………..……………………………………………………………. 145 Summary Capital Programme………………………………………………………………………… 147 Managing Director ………………………………………………………………………………….. 148 Communities Directorate ….…………………………………….…………………………………. 151 Place Directorate …………………………………………………..……………………………….. 158 GLOSSARY OF TERMS…………………………………………………………………………………
    [Show full text]
  • Sandford Farm Ecological Appraisal
    Sandford Farm Ecological Appraisal January 2018 20 Soames Place Wokingham Berkshire RG40 5AT Registered in England and Wales Company No: 08152615 Sandford Farm Ecological Appraisal COMMISSIONED BY Colony Architects Ltd. 250 South Oak Way, Green Park, Reading, Berkshire, RG2 6UG Sandford Farm Ecological Appraisal January 2018 Report Ref: DFA18003 Derek Finnie Associates Ltd 20 Soames Place Wokingham Berkshire RG40 5AT [email protected] © Derek Finnie Associates 2018 1 Sandford Farm Ecological Appraisal CONTENTS 1 INTRODUCTION ......................................................................................................................... 3 1.1 Background ............................................................................................................................... 3 2 METHODOLOGY ......................................................................................................................... 4 2.1 Desk Study ................................................................................................................................ 4 2.2 Habitat survey ........................................................................................................................... 4 2.3 Fauna ........................................................................................................................................ 4 2.4 Reptile Survey ........................................................................................................................... 5 2.5 Survey Constraints ...................................................................................................................
    [Show full text]
  • (Public Pack)Agenda Document for Housing, Neighbourhoods And
    Peter Sloman CHIEF EXECUTIVE Civic Offices, Bridge Street, Reading RG1 2LU 0118 937 3787 To: Councillor Davies (Chair) Direct: 0118 937 2368 Councillors Lovelock, Carnell, Ennis, e-mail: Gittings, Grashoff, Hacker, Hoskin, James, [email protected] Leng, Manghnani, McGonigle, O'Connell, 3 March 2020 Rowland, R Singh and R Williams Your contact is: Julie Quarmby - Committee Services NOTICE OF MEETING - HOUSING, NEIGHBOURHOODS AND LEISURE COMMITTEE 11 MARCH 2020 A meeting of the Housing, Neighbourhoods and Leisure Committee will be held on Wednesday, 11 March 2020 at 6.30 pm in the Council Chamber, Civic Offices, Bridge Street, Reading. The Agenda for the meeting is set out below. WARDS Page No AFFECTED 1. DECLARATIONS OF INTEREST Councillors to declare any disclosable pecuniary interests they may have in relation to the items for consideration. 2. MINUTES OF THE HOUSING, NEIGHBOURHOODS & LEISURE 5 - 8 COMMITTEE HELD ON 6 NOVEMBER 2019 3. MINUTES OF OTHER BODIES 9 - 18 Community Safety Partnership – 19 September 2019 and 6 February 2020. 4. PETITIONS Petitions submitted pursuant to Standing Order 36 in relation to matters falling within the Committee’s Powers & Duties which have been received by Head of Legal & Democratic Services no later than four clear working days before the meeting. CIVIC OFFICES EMERGENCY EVACUATION: If an alarm sounds, leave by the nearest fire exit quickly and calmly and assemble on the corner of Bridge Street and Fobney Street. You will be advised when it is safe to re-enter the building. www.reading.gov.uk | facebook.com/ReadingCouncil | twitter.com/ReadingCouncil DX 40124 Reading (Castle Street) 5.
    [Show full text]
  • Borough Local Plan: Submission Version (2017) 1 Foreword
    Borough Local Plan 2013 - 2033 Submission version Borough Local Plan: Submission Version (2017) 1 Foreword Foreword by Leader of the Council and the Lead Member for Planning We are delighted to present the Borough Local Plan for the Royal Borough of Windsor and Maidenhead. The Borough Local Plan promotes a sustainable pattern of development for the Borough until 2033. The new development that is proposed in this plan aims to provide for new housing and affordable housing to fulfil the needs of all of our residents, whilst at the same time protecting our valued natural and built historic environment and assets. The plan aims to protect and enhance those elements that make our Borough special in the eyes of not only our residents but all those who choose to visit, work and invest in the Royal Borough of Windsor and Maidenhead. We are privileged to be home to one of the most recognisable and valued historic assets in the country, Windsor Castle and the Windsor Great Park which the Borough Local Plan seeks to protect not only for our own benefit but also for future generations. The Borough Local Plan is based on a substantial and robust evidence base and on the results of the consultation exercises we have carried out in the past, as guided by national policy and legislation. We have worked with partners including our neighbouring local authorities, statutory bodies and local communities and agencies, as well as considering the many emerging and adopted Neighbourhood Development Plans being prepared by parishes and neighbourhood forums. Planning often presents difficult choices and requires a balance of national policy and local wishes.
    [Show full text]
  • Theale Station I Onward Travel Information Buses Local Area Map
    Theale Station i Onward Travel Information Buses Local area map IK Key C A Bus Stop B Rail replacement Bus Stop A Station Entrance/Exit 1 0 m in ut H es w a CF lk in g d LS is ta PO n BP c e TG L Theale Station Key BP Arlington Business Park C Calcot Sainsbury CF Cricket & Football Grounds IK Ikea Theale Station L Library LS Local Shops FG Football Ground PO Post Office SC Sailing Club TG Theale Green School H Village Hall SC Cycle routes Walking routes km 0 0.5 Rail replacement buses/coaches depart from the station car park. 0 Miles 0.25 Contains Ordnance Survey data © Crown copyright and database right 2018 & also map data © OpenStreetMap contributors, CC BY-SA Main destinations by bus (Data correct at September 2019) DESTINATION BUS ROUTES BUS STOP DESTINATION BUS ROUTES BUS STOP DESTINATION BUS ROUTES BUS STOP Aldermaston (The Street) 44 A Colthrop 1 A Thatcham ^ 1, 41, 44 A Aldermaston Wharf (for Crookham Park 44 A Upper Bucklebury 41 A 1, 44 A Kennet & Avon Canal) ^ Englefield (for Englefield West Berkshire Community 41, 44 A 1 A Arlington Business Park 1 B House & Gardens) Hospital Baughurst (Heath End Lower Padworth (Bath A 44 A 1 A Woolhampton [ 1 Road) Road) Beenham 44 A Midgham (Bath Road) 1 A Bradfield (& Bradfield Newbury ^ 1 A 41, 44 A College) Reading ^ 1 B Notes Brimpton 44 A Bus route 1 (Jet Black) operates a frequent daily service. Southend Bradfield 41, 44 A Bus route 41 operates one journey a day Mondays to Fridays from Calcot 1 B Theale.
    [Show full text]
  • 1 Bus Time Schedule & Line Route
    1 bus time schedule & line map 1 Newbury - Reading via Thatcham, Woolhampton, View In Website Mode Theale The 1 bus line (Newbury - Reading via Thatcham, Woolhampton, Theale) has 3 routes. For regular weekdays, their operation hours are: (1) Newbury: 5:05 AM - 8:30 PM (2) Reading Town Centre: 5:00 AM - 11:02 PM (3) Theale: 9:30 PM - 10:30 PM Use the Moovit App to ƒnd the closest 1 bus station near you and ƒnd out when is the next 1 bus arriving. Direction: Newbury 1 bus Time Schedule 74 stops Newbury Route Timetable: VIEW LINE SCHEDULE Sunday 7:20 AM - 6:45 PM Monday 5:05 AM - 8:30 PM Blagrave Street, Reading Town Centre Blagrave Street, Reading Tuesday 5:05 AM - 8:30 PM Friar Street, Reading Town Centre Wednesday 5:05 AM - 8:30 PM St Marys Butts, Reading Town Centre Thursday 5:05 AM - 8:30 PM St Mary's Butts, Reading Friday 5:05 AM - 8:30 PM Castle Street, Reading Town Centre Saturday 6:20 AM - 8:25 PM Castle Street, Reading Russell Street, Castle Hill - Bath Road Janson Court, Reading 1 bus Info Downshire Square, Castle Hill - Bath Road Direction: Newbury Bath Road, Reading Stops: 74 Trip Duration: 78 min Berkeley Avenue, Southcote Line Summary: Blagrave Street, Reading Town Centre, Friar Street, Reading Town Centre, St Marys Southcote Road, Southcote Butts, Reading Town Centre, Castle Street, Reading Bath Road, Reading Town Centre, Russell Street, Castle Hill - Bath Road, Downshire Square, Castle Hill - Bath Road, Berkeley Parkside Road, Prospect Park Avenue, Southcote, Southcote Road, Southcote, Parkside Road, Prospect Park, Liebenrood
    [Show full text]
  • Chaddleworth Housing Needs Survey Report
    REPORT on the HOUSING NEEDS SURVEY HUNGERFORD February 2007 Arlene Kersley Rural Housing Enabler for Berkshire Contents Report Summary 1 Background 2 Housing Need Survey - Method 6 Survey Findings 7 Conclusions and Recommendations 17 Appendices 1. Comments 19 2. West Berkshire Council Policy HSG.11 29 Provision for Affordable Housing on Rural Exception Sites 3. Housing Need Questionnaire 31 Report Summary Housing Need in Hungerford This survey was conducted at the request of the Town Council in response to concerns raised during the Hungerford 2010 consultation about the need for affordable housing for local people in Hungerford. The survey was commissioned in order to identify whether there is any actual need for affordable housing in Hungerford. A brief summary of the findings follows. Survey forms were distributed to all households in Hungerford and there was a 28.7% return This represents an excellent rate of return for such a large community. From the responses the following can be determined: • There is a high level of support for developing a scheme of affordable housing to meet local need (over 70% of responses). • 107 respondents completed Part 2 of the Survey indicating some level of housing need • Of these 65 represent affordable housing need (8.7% of response). • The need is mostly for smaller 1 bedroom properties, but there is a significant need for 2 and 3 bedroom properties as well. Flexibility in design to accommodate growing families is essential. • A large number of potential sites for development have been identified. Some of these would not be acceptable in planning terms. • Any potential development must take into consideration the Hungerford 2010+ Town Plan recommendations.
    [Show full text]
  • 15 Road Drainage and the Water Environment
    HIGHWAYS AGENCY – M4 JUNCTIONS 3 TO 12 SMART MOTORWAY 15 ROAD DRAINAGE AND THE WATER ENVIRONMENT 15.1 Introduction 15.1.1 This chapter assesses the impacts of the Scheme on road drainage and the water environment during construction and operation, focussing on the effects of highway drainage on the quality and hydrology of receiving waters. In view of the long design-life of the Scheme (30 years for new gantries, 40 years for new carriageway construction, and 120 years for new bridges), the decommissioning phase of the Scheme has not been considered in this chapter because its effects are not predicted to be worse than the effects assessed during the construction and operational phases. The chapter assesses four principal impacts: a) effects of routine runoff on surface water bodies; b) effects of routine runoff on groundwater; c) pollution impacts from spillages; and d) flood impacts. 15.1.2 Although Interim Advice Note (”IAN”) 161/13 ‘Managed Motorways, All lane running’ (Ref 15-1) has scoped out the assessment of ‘Road Drainage and the Water Environment’ for smart motorway schemes, the assessment is required to ensure the protection of the water environment, to prevent its degradation, and ensure adequate mitigation measures are in place to prevent any adverse impacts. 15.1.3 The road drainage and water environment assessment for the Scheme has been undertaken in accordance with standard industry practice and statutory guidance. 15.1.4 This chapter details the methodology followed for the assessment, and summarises the regulatory and policy framework relating to road drainage and the water environment.
    [Show full text]
  • Wokingham Borough Council Year Book
    WOKINGHAM BOROUGH COUNCIL YEAR BOOK 2018 / 2019 WOKINGHAM BOROUGH COUNCIL COAT OF ARMS Interpretation of the Arms The shield combines the principal topographical and historical features of the Borough. The main surface of the shield indicates the former, while the latter are represented in the top portion or "chief". Three white waves and two green ones, each resembling an initial W, suggest the undulating farmlands and rich woodlands enclosed by the Thames, Loddon and Blackwater rivers. The royal stag's head, similar to that in the arms of Windsor and that of the complete stag in the arms of Berkshire and Wokingham, refers to the situation of large parts of the Borough in the ancient Royal Forest of Windsor. In the chief, the pastoral staves refer to the Sees of Winchester and Salisbury, the former held the whole of the Hundred of Wargrave and the Bishop of Salisbury had a Palace at Sonning. The mitre refers to the mitred Abbey of Abingdon which has links with the Borough over a thousand years old, and to the ancient Saxon bishopric said to have existed at Sonning. The background is red, as is the upper part of the arms of Reading University, whose site is within the area at Earley. Above the shield is the closed helm proper to civic arms, with its decorative mantling or tournament cloak in the basic colour of the shield, green and white. Upon the helm stands the crest, the base of which is the special type designed for Rural Borough Councils and consisting of wheatears and acorns alternately, representing agriculture and natural beauty.
    [Show full text]