E-Tender Notice No-35/2020-2021 E-Tender Is Invited in the National E-GP System Portal (Http;// for the Procurement of Following Works

Total Page:16

File Type:pdf, Size:1020Kb

E-Tender Notice No-35/2020-2021 E-Tender Is Invited in the National E-GP System Portal (Http;// for the Procurement of Following Works Government of the People’s Republic of Bangladesh Local Government Engineering Department Office of the Executive Engineer Ò†kL nvwmbvi g~jbxwZ District: Feni. MÖvg kn‡ii DbœwZÓ www.lged.gov.bd Memo No-46.02.3000.000.07.001.20- 948 Date: 09/05/2021 e-Tender Notice No-35/2020-2021 e-Tender is invited in the National e-GP System Portal (http;//www.eprocure.gov.bd) for the procurement of following works. Details are given below: Sl Package No Tender ID Description of Works Tender Tender No No. Security Last Closing & Submission Opening (Date/Time) (Date/ Time) 01 IRIDP-3/FNI/ 576939 Improvement of Olamabazar-Guchagram Road 20-May- 20-May- DW-04 LTM at Ch. 3700-4800m [ID No. 430944020) under 2021 2021 1.00 PM 3.00 PM Sonagazi Upazila, Feni. (2nd Call) 02 IRIDP-3/FNI/ 576940 (a) Improvement of Chalaiya Gopat Road 20-May- 20-May- DW-08 LTM (Bastala- Ahmadpur- Safarpur at Alamar Dokan) 2021 2021 1.00 PM 3.00 PM Road at Ch. 00-800m [ID no. 430945085] (b) Construction of 04 No 0.600mx1.125m culvert at Ch. 280m, 360m, 400m & 800m on the same road under Sonagazi Upazila, Feni.(Salvage Cost Tk. 881809.00) (2nd Call) 03 IRIDP-3/FNI/ 576941 (a) Improvement of Uttar Dharmapur (RHD 20-May- 20-May- DW-09 LTM Road) to Shanir Hat Road at Ch. 00-1280m [ID 2021 2021 1.00 PM 3.00 PM no. 430954083] (b) Construction of 01 No 2.00mx2.00m culvert at Ch. 1088m on the same road under Fulgazi Upazila, Feni.(Salvage Cost Tk. 119858.00) (2nd Call) 04 e-Tender/ 578185 Emergency Maintenance of Dharmapur Shelter 25-May- 25-May- LGED/Feni/ LTM Road (Lemua) (ID No. 430295303)from Ch. 2021 2021 1.00 PM 3.00 PM GOBM/20- 467m- 600m [FENI-S] under Feni District. 21/W-99 This is an online Tender, Where only e-Tender will be accepted in the National e-GP portal and no off-line/hard copies will be accepted. To submit e-Tender, registration in the National e-GP System portal (http//www.eprocure.gov.bd) is required. The fees for downloading the e-Tender Documents from the National e-GP System portal have to be deposited online through any registered Bank’s branches date up to 20/05/2021 at 12.00 Noon from above Sl no. 01 to 03 & date up to 25/05/2021 at 12.00 Noon from above Sl No. 04. Further information and guidelines are available in the National e-GP System portal and from e-GP held desk ([email protected]). (Md. Hasan Ali) Executive Engineer e-mail: [email protected] Memo No-46.02.3000.000.07.001.20-948/1(12) Date: 09/05/2021 Copy forwarded for kind information and necessary action please to: 01. The Chief Engineer, LGED, Agargaon,Sher-e-Bangla Nagar, Dhaka-1207. 02. The Superintending Engineer (Maintenance), LGED, Agargaon, Dhaka-1207. 03. The Project Director, IRIDP-3, LGED, Agargoan, Sher-e-Bangla Nagar, Dhaka-1207. 04. The Editor, The Daily Inquilab/The Daily Sun, Dhaka/ The Daily Naya Poigam, Feni with a request to publish the above Tender Notice limiting it within 3x7” in your widely circulated National Daily on or before 11/05/2021 for once only. 05. The Upazila Engineer, LGED, Upazila: ------------------------------------------------------, District: Feni. 06. Notice Board. (Md. Hasan Ali) Executive Engineer e-mail: [email protected] .
Recommended publications
  • BANGABANDHU SHEIKH MUJIB SHILPANAGAR Mirsarai-Sitakundu-Sonagazi Chattogram-Feni
    BANGABANDHU SHEIKH MUJIB SHILPANAGAR Mirsarai-Sitakundu-Sonagazi Chattogram-Feni Bangladesh Economic Zones Authority (BEZA) BANGABANDHU SHEIKH MUJIB SHILPANAGAR EDITORIAL BOARD Paban Chowdhury, Executive Chairman, BEZA Md. Harunur Rashid, Executive Member, BEZA Mohammad Hasan Arif, General Manager, BEZA Shenjuti Barua, Deputy Manager, BEZA Md. Abdul Quader Khan, Social Consultant, BEZA PUBLISHED IN May 2020 PUBLISHER Bangladesh Economic Zones Authority (BEZA) Prime Minister’s Office DESIGN AND PRINTING Nymphea Publication © Bangladesh Economic Zones Authority (BEZA) All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying recording or otherwise without prior permission of the publisher. The book is sold subject to the condition that it shall not, by way of trade or otherwise, be lent, re-sold, or otherwise circulated without the publisher's prior consent in any form of binding or cover, other than that in which it is published. 4 Bangabandhu Sheikh Mujib Shilpanagar gyw³i msMªv‡gi †P‡qI †`k Movi msMÖvg KwVb, ZvB †`k Movi Kv‡R Avgv‡`i me©kw³ wb‡qvM Ki‡Z n‡e - e½eÜz †kL gywReyi ingvb PRIME MINISTER Government of the People’s Republic of Bangladesh 10 Falgun 1426 MESSAGE 23 February 2020 I am happy to know that Bangladesh Economic Zones Authority (BEZA) is the establishment of Bangabandhu Sheikh Mujib Shilpanagar (BSMSN) publishing a book on the development scenario of Bangabandhu Shekih comprising Mirsarai, Feni and Sitakunda Economic Zones, on 30,000 Mujib Shilpanagar (BSMSN) covering some excellent accomplishments acres of land has created a hilarious prospect among the local and experienced so far.
    [Show full text]
  • POPULATION & HOUSING CENSUS 2011 -..:: Bangladesh Bureau of Statistics
    POPULATION & HOUSING CENSUS 2011 ZILA REPORT : FENI Bangladesh Bureau of Statistics Statistics and Informatics Division Ministry of Planning BANGLADESH POPULATION AND HOUSING CENSUS 2011 Zila Report: FENI July 2015 BANGLADESH BUREAU OF STATISTICS (BBS) STATISTICS AND INFORMATICS DIVISION (SID) MINISTRY OF PLANNING GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH ISBN-978-984-33-8618-2 COMPLIMENTARY Published by Bangladesh Bureau of Statistics (BBS) Statistics and Informatics Division (SID) Ministry of Planning Website: www.bbs.gov.bd This book or any portion thereof cannot be copied, microfilmed or reproduced for any commercial purpose. Data therein can, however, be used and published with acknowledgement of their sources. Contents Page Message of Honorable Minister, Ministry of Planning …………………………………………….. vii Message of Honorable State Minister, Ministry of Finance and Ministry of Planning …………. ix Foreword ……………………………………………………………………………………………….. xi Preface …………………………………………………………………………………………………. xiii Zila at a Glance ………………………………………………………………………………………... xv Physical Features ……………………………………………………………………………………... xix Zila Map ………………………………………………………………………………………………… xx Geo-code ………………………………………………………………………………………………. xxi Chapter-1: Introductory Notes on Census ………………………………………………………….. 1 1.1 Introduction ………………………………………………………………………………… 1 1.2 Census and its periodicity ………………………………………………………………... 1 1.3 Objectives ………………………………………………………………………………….. 1 1.4 Census Phases …………………………………………………………………………… 2 1.5 Census Planning ………………………………………………………………………….
    [Show full text]
  • REPORT on SONAGAZI 50 MW SOLAR POWER PLANT DESIGN REVIEW of DYKE, Sluice GATE ETC
    REPORT ON SONAGAZI 50 MW SOLAR POWER PLANT DESIGN REVIEW OF DYKE, SlUICE GATE ETC. BACKGROUND 1. Electricity Generation Company of Bangladesh (EGCB) has taken up program to build one 50 MW Photo Voltaic Solar Power Plant at Sonagazi Upazila, Feni District, adjacent (eastern side) of the newly built BWDB Musapur Closure (1.08 km length) over little Feni River. The EGCB has acquired a large area of around1000 acres of land on the eastern side of the closure to build Solar Power Plants in phases. In the first phase, the Company has planned to build 50 MW Plant in part of the area measuring around 165 acres to feed the under construction BEZA area on the southern side. This Plant site needs to be protected from tidal flooding and cyclonic surge event for safe operation. A feasibility report has been prepared earlier by Feasibility Report prepared by Wind Force Management Services Pvt. Ltd. India, and Sun trace GmbH - Germany and EQMS Consulting Ltd. – Bangladesh and the report gave an outline of the height of the flood protection dyke and design of the internal drainage system. In order to review the design of the proposed dyke, and other civil infrastructure such drainage network, internal roads etc., the World Bank advised EGCB to hire a short term Disaster Risk / Civil Engineer. 2. Following the recommendation of the Bank, EGCB hired Engr. GM Akram Hossain Peng, a Senior Civil Engineer, who worked (in the immediate past) as Team Leader, Design & Supervision Consultants of the IDA funded Emergency 2007 Cyclone Recovery & Restoration Project (ECRRP), BWDB Part.
    [Show full text]
  • INSIDE MD & CEO Talks to Prothom Alo Travelogue Poetry
    JANUARY ISSUE, 2020 | A HALF-YEARLY PUBLICATION INSIDE MD & CEO Talks to Prothom Alo Travelogue Poetry Financial Inclusion for Sustainable Development | JAN-2020 1 EDITORIAL ADVISOR A Year of Exuberance Quazi Osman Ali For Social Islami Bank Limited the year-2019 ended with the sumptuous celebration of 24 Managing Director & CEO years of glory and pride and thus we stepped into the landmark year of silver jubilee. Like the previous years, anniversary celebration created quite a buzz among the employees, clients and well-wishers. Media presence was conspicuous. Visionary and prudent EDITORIAL prescription of the MD & CEO would pave the way to a healthy growth of SIBL. ADVISOR One of the key components of sustainable development is to make available the develop- ment tools every nook and cranny of the country. Aiming at contributing to the sustaina- Kazi Towhidul Alam ble development the nancial services of the Bank are being made available for all even to Additional Managing Director the ultra-poor. Agent banking can play a vital role in this regard. This window has made nancial services accessible to all at a cheaper and easier means. SIBL has 122 Agent Outlets across the country to provide services among the previously unbanked people. EDITORIAL The most optimistic thing is that 150 Cr. deposit has been procured so far signifying that marginal people have been developing saving tendency. This change will surely bring TEAM change to their lot. To promote agent banking, we arranged agent conference. In the conference the agents expressed the challenges and prospects of this kind of banking.
    [Show full text]
  • Bounced Back List.Xlsx
    SL Cycle Name Beneficiary Name Bank Name Branch Name Upazila District Division Reason for Bounce Back 1 Jan/21-Jan/21 REHENA BEGUM SONALI BANK LTD. NA Bagerhat Sadar Upazila Bagerhat Khulna 23-FEB-21-R03-No Account/Unable to Locate Account 2 Jan/21-Jan/21 ABDUR RAHAMAN SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number SHEIKH 3 Jan/21-Jan/21 KAZI MOKTADIR HOSEN SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number 4 Jan/21-Jan/21 BADSHA MIA SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number 5 Jan/21-Jan/21 MADHAB CHANDRA SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number SINGHA 6 Jan/21-Jan/21 ABDUL ALI UKIL SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number 7 Jan/21-Jan/21 MRIDULA BISWAS SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number 8 Jan/21-Jan/21 MD NASU SHEIKH SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number 9 Jan/21-Jan/21 OZIHA PARVIN SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number 10 Jan/21-Jan/21 KAZI MOHASHIN SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number 11 Jan/21-Jan/21 FAHAM UDDIN SHEIKH SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number 12 Jan/21-Jan/21 JAFAR SHEIKH SONALI BANK LTD.
    [Show full text]
  • IRRIGATION MANAGEMENT IMPROVEMENT PROJECT (IMIP) This Semi-Annual Environmental Monitoring Report Is a Document of the Borrower
    Semi-annual Environmental Monitoring Report Project No. 45207-002 December 2020 IRRIGATION MANAGEMENT IMPROVEMENT PROJECT (IMIP) This Semi-annual Environmental Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH Ministry of Water Resources Bangladesh Water Development Board ADB Loan: 3135-BAN 10th Semi-annual ENVIRONMENTAL MONITORING REPORT Period: July-December, 2020 Safeguard Cell Project Management Unit, Dhaka IRRIGATION MANAGEMENT IMPROVEMENT PROJECT (IMIP), BWDB 10th Semi-annual EMR, IMIP-MIP, BWDB, Dhaka ACRONYMS AND ABBREVIATIONS ADB - Asian Development Bank BADC - Bangladesh Agriculture Development Corporation BOD - Biological Oxygen Demand BOQ - Bill of Quantity B/P- Burried Pipe (uPVC Pipe) BWDB - Bangladesh Water Development Board CAS - Catch Assessment Survey C-IMO - Construction phase Irrigation Management Operator COD - Chemical Oxygen Demand CW- Construction Works DAE - Department of Agricultural Extension DFR - Draft Final Report DO - Dissolved Oxygen DoC - Department of Cooperatives DOE - Department of Environment DOF - Department of
    [Show full text]
  • Factors Influencing Farmers' Awareness on Environmental Hazards Caused by Rice Monoculture
    J. Bangladesh Agril. Univ. 2(1): 55-62,2004 . ISSN 1810-3030 Factors influencing farmers' awareness on environmental hazards caused by rice monoculture A.H. Chowdhury Lecturer, Department of Agricultural Extension Education, BAU, Mymensingh Abstract This purposive study was undertaken to examine the factors associated with farmers' awareness on environmental hazards caused by rice monoculture and ascertain the factors contribute to their awareness. Char ishardia village of Mymensingh sadar upazila and Tulatuli village of Sonagazi upazila, Feni were purposively selected as traditional and progressive village respectively. Data were collected from the randomly selected sample e.g. 96 farmers 48 form each village using a pre-tested structured interview schedule during March and July 2003. About half (54percent) of the respondents had high awareness on environmental hazards of rice monoculture compared to 30 percent low awareness. Farmers of progressive village had more average level of education, family size, training exposure, knowledge of diversified crop cultivation, cosmopoliteness, extension media contact, and innovativeness than those of traditional village. Out of ten selected characteristics, level of education, knowledge of diversified crop cultivation, cosmopoliteness and innovativeness were positively related with the awareness while family size was negatively related. Three factors namely knowledge of diversified crop cultivation, family size and level of education contributed significantly to the farmers' awareness considering both the villages while innovativeness together _with the former two factors mentioned contributed to the awareness considering progressive village. On the other hand, only two factors such as knowledge of diversified"crop cultivation and level of education contributed in predicting awareness of the farmers of traditional village.
    [Show full text]
  • World Bank Document
    Public Disclosure Authorized SOLAR AND WIND RESOURCE IMPLEMENTATION PLAN April 2017 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized This report was prepared by Suntrace GmbH, under contract to The World Bank. It is one of several outputs from the solar and wind resource mapping components of the activity “Renewable Energy Resource Mapping and Geospatial Planning – Bangladesh” [Project ID: P162805]. This activity is funded and supported by the Energy Sector Management Assistance Program (ESMAP), a multi- donor trust fund administered by The World Bank, under a global initiative on Renewable Energy Resource Mapping. Further details on the initiative can be obtained from the ESMAP website. This document is an interim output from the above-mentioned project, and the content is the sole responsibility of the consultant authors. Users are strongly advised to exercise caution when utilizing the information and data contained, as this may include preliminary data and/or findings, and the document has not been subject to full peer review. Final outputs from this project will be marked as such, and any improved or validated solar resource data will be incorporated into the Global Solar Atlas and the Global Wind Atlas. Copyright © 2018 THE WORLD BANK Washington DC 20433 Telephone: +1-202-473-1000 Internet: www.worldbank.org The World Bank, comprising the International Bank for Reconstruction and Development (IBRD) and the International Development Association (IDA), is the commissioning agent and copyright holder for this publication. However, this work is a product of the consultants listed, and not of World Bank staff. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent.
    [Show full text]
  • Report on AK Taj Group Masrur M. A. Hoque.Pdf (983.4Kb)
    Internship Report on AK TAJ GROUP Prepared for, MD. Tamzidul Islam Assistant Professor BRAC BusinessSchool BRAC University Prepared By, Masrur M. A. Hoque ID # 12164092 Submission Date – 15/12/2015 LETTER OF TRANSMITTAL December 15, 2015 MD. Tamzidul Islam Assistant Professor BRAC BusinessSchool BRAC University Subject: Internship Report. Dear Sir, I would like to thank you for supervising and helping me throughout the semester. With due respect I am submitting a copy of intern report foryourappreciation. I have given my best effort to prepare the report with relevant information that I have collected from an onsite production department which is belongs to a group of company and from other sources during my accomplishthe course. I have the immense pleasure to have the opportunity to study on the marketing practices of AK TAJ Group. There is no doubt that the knowledge I have gathered during the study will help me in real life. For your kind consideration I would like to mention that there might be some errors and mistakes due to limitations of my knowledge. I expect that you will forgive me considering that I am still learner and in the process of learning. Thanking for your time and reviews. Yours faithfully Masrur M. A. Hoque ID-12164092 BRAC Business School BRAC University Acknowledgement The successful completion of this internship might not be possible in time without the help some person whose suggestion and inspiration made it happen. First of all I want to thank my Course Instructor MD. Tamzidul Islam for guiding me during the course. Without his help this report would not have been accomplished.
    [Show full text]
  • 45207-002: Irrigation Management Improvement Project
    Resettlement Plan Project No. 45207-002 December 2020 BANGLADESH: Irrigation Management Improvement Project Prepared by the Ministry of Water Resources for the Asian Development Bank. This Resettlement Plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Resettlement Plan Project Number: 45207-002 December 2020 BAN: Irrigation Management Improvement Project Prepared by the Ministry of Water Resources for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 20 December 2020) Currency unit – taka (Tk) Tk1.00 = $0.012 $1.00 = Tk84.81 ABBREVIATIONS AD Line – Alluvion and Diluvion Line ADB – Asian Development Bank ADC – Additional Deputy Commissioner AP – Affected Persons AH – Affected Household ARIPA – Acquisition and Requisition of Immovable Property Act, 2017 BREB – Bangladesh Rural Electrification Board BWDB Bangladesh Water Development Board EA – Executing Agency GKIP – Ganges-Kobadak Irrigation Project GOB – Government of Bangladesh GRC – Grievance Redress Committee ha – Hectare HHs – Households IOL – Inventory of Losses IMO – Irrigation Management Operator JVT – Joint Verification Team km – Kilometer LAR – Land
    [Show full text]
  • List of Upazilas of Bangladesh
    List Of Upazilas of Bangladesh : Division District Upazila Rajshahi Division Joypurhat District Akkelpur Upazila Rajshahi Division Joypurhat District Joypurhat Sadar Upazila Rajshahi Division Joypurhat District Kalai Upazila Rajshahi Division Joypurhat District Khetlal Upazila Rajshahi Division Joypurhat District Panchbibi Upazila Rajshahi Division Bogra District Adamdighi Upazila Rajshahi Division Bogra District Bogra Sadar Upazila Rajshahi Division Bogra District Dhunat Upazila Rajshahi Division Bogra District Dhupchanchia Upazila Rajshahi Division Bogra District Gabtali Upazila Rajshahi Division Bogra District Kahaloo Upazila Rajshahi Division Bogra District Nandigram Upazila Rajshahi Division Bogra District Sariakandi Upazila Rajshahi Division Bogra District Shajahanpur Upazila Rajshahi Division Bogra District Sherpur Upazila Rajshahi Division Bogra District Shibganj Upazila Rajshahi Division Bogra District Sonatola Upazila Rajshahi Division Naogaon District Atrai Upazila Rajshahi Division Naogaon District Badalgachhi Upazila Rajshahi Division Naogaon District Manda Upazila Rajshahi Division Naogaon District Dhamoirhat Upazila Rajshahi Division Naogaon District Mohadevpur Upazila Rajshahi Division Naogaon District Naogaon Sadar Upazila Rajshahi Division Naogaon District Niamatpur Upazila Rajshahi Division Naogaon District Patnitala Upazila Rajshahi Division Naogaon District Porsha Upazila Rajshahi Division Naogaon District Raninagar Upazila Rajshahi Division Naogaon District Sapahar Upazila Rajshahi Division Natore District Bagatipara
    [Show full text]
  • Disaster Incidences in Bangladesh in August, 2015
    Disaster Incidences in Bangladesh in August, 2015 Overview of Disaster Incidences in August, 2015 Natural hazards that occurred in August include flash floods, tidal floods, riverbank erosion, lightening, land slide and rainfall induced flood. Flash flood occurred on August 2, 22 and 23. Tidal flood affected 2 districts on 2nd August. The rate of riverbank erosion has been accelerated in August and it occurred at several places in 22 districts. One incident of lightening has been reported to be occurred on August 16. Landslides occurred in Bandarban district. Rain fall induced floods, started from 22 August became one of the major disasters of the month at the end. Apart from these hazards, embankment collapse, fire incidents, building collapse, boat capsize and road accident occurred in August. 1 Hazard/ August 2015 Disaster 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Flash Flood (FF) F F F F F F Tidal Flood T (TM) M River bank R R R R R R R R R R R R erosion (RE) E E E E E E E E E E E E Lightening (L) L Fire (F) F F F Embankment E E E E E E collapse(EC) C C C C C C Building B Collapse (BC) C Boat capsize(B) B Land slide (L) L S Rainfall R R R R R R R R R R Induced Flood F F F F F F F F F F (RF) Source: Adapted from different disaster situation reports of NDRCC and Dailies in August, 2015 Description of the Events in August Flash flood In this month flash food continued to hit in several places of 6 districts namely, Jessore, Lalmonirhat, Cox’s bazar, Rangamati, Sherpur and Kurigram.
    [Show full text]