World Bank Document
Total Page:16
File Type:pdf, Size:1020Kb
Sample Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan: January 10, 2017 (Original procurement plan). 2. Date of General Procurement Notice: NA 3. Period covered by this procurement plan: 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Comments US$ Public Disclosure Authorized 1. Goods Above US$ 4 million All 2. Works Above US$ 15 million All 3. Non-Consultant Services Above US$ 4 million All 2. Prequalification. NA. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: The Project Implementation Manual (PIM) makes reference to all applicable procurement guidelines and manuals including the Commune/Sangkat Fund PIM for small-scale infrastructure activities carried out by the sub-national levels (Commune/Sangkat), has been developed for this project. Public Disclosure Authorized 4. Any Other Special Procurement Arrangements: 5 packages (goods) would be financed under retroactive financing 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness. 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Community procured by Public Disclosure Authorized 5.48 60 No Post infrastructur Communes/Sa es ngkats individually for the whole life of the project June 12, 2017 Procureme 0.92 8 No Post will be nt of procured vehicles, centrally at the office beginning of equipment, project implementation office (shopping furniture, method) motorcycle s, etc. III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Selection of Consulting firms Above US$ 2 million All 2. Selection of Individual Consultant Above US$ 400,000 All 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: 11 individual consultants would be financed through retroactive financing. 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 6 7 Ref. Description Estimated Pack Review Comments No. Cost ages by Bank US$ million (Prior / Post) Producer Group 0.34 1 Post QCBS method Mobilization for Siem Reap (NGO package) Self-help Group 0.27 1 Post QCBS method Mobilization for SRP (NGO) Human Resources 0.92 2 Post QBS method Development Services Provider (HRDSP) for Siem Reap (NGO/Firm) Consulting firms for 0.175 1 Post CQS method baseline survey, impact survey, and final impact June 12, 2017 survey, and External financial auditing Individual consultants 2.93 126 Post Selection of for supporting the individual national level and sub- consultant. national level project entities (finance, procurement, infrastructure, community development, micro- finance experts, livelihood specialists, etc.) June 12, 2017 PROCUREMENT Cambodia : KH - Livelihood Enhancement and Association of the Poor Project (LEAP) PLAN General Information Country: Cambodia Bank’s Approval Date of the Original Procurement Plan: 2017-06-12 Revised Plan Date(s): (comma delineated, leave blank if none)2020-03-08 Project ID: P153591 GPN Date: Project Name: KH - Livelihood Enhancement and Association of the Poor Project (LEAP) Loan / Credit No: IDA / 59600 Executing Agency(ies):Ministry of Interior WORKS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KH-MOI-99874-CW-RFQ / Pending Component 3: Project Request for Single Stage - One Office Renovation at PCO- IDA / 59600 Post Open - National 30,000.00 0.00 Implementati 2019-03-06 2019-04-17 2019-05-17 Management Quotations Envelope MOI on KH-MOI-99875-CW-CDD / The rehabilitation laterite road (Length 2400m, Width Component 1: Improving Pending Community Driven 4.00m, 0.15m thick) and IDA / 59600 Livelihoods for Rural Poor Post Open - National 28,341.00 0.00 Implementati 2019-04-30 2019-05-07 2019-05-21 2019-05-28 2019-06-11 2019-09-09 Development Single Pipe Culvert Ø 1.0m and Vulnerable Households on (2 units) for Anlong Samnar, Chi Kraeng. KH-MOI-99886-CW-CDD / The rehabilitation laterite road ( Length 1500m, Width Component 1: Improving Pending Community Driven 4.00m, 0.15m Thick) and IDA / 59600 Livelihoods for Rural Poor Post Open - National 29,208.00 0.00 Implementati 2019-03-01 2019-03-08 2019-04-30 2019-05-07 2019-05-21 2019-08-19 Development Construction of Box Culver and Vulnerable Households on heigth 2m with Stop Log (1 unit) for Doun Kaev, Puok. KH-MOI-99878-CW-CDD / The rehabilitation laterite Component 1: Improving Pending Community Driven road (Length 2419m, Width IDA / 59600 Livelihoods for Rural Poor Post Open - National 25,921.00 0.00 Implementati 2019-03-01 2019-03-08 2019-03-22 2019-03-29 2019-04-12 2019-07-11 Development 3.50m, 0.15m thick) for Chi and Vulnerable Households on Kraeng, Chi Kraeng. KH-MOI-99880-CW-CDD / The rehabilitation laterite road (Length 2090m, Width 4.00m, 0.15m thick) and Component 1: Improving Pending Construction of Single Pipe Community Driven IDA / 59600 Livelihoods for Rural Poor Post Open - National 30,721.00 0.00 Implementati 2019-03-01 2019-03-08 2019-03-22 2019-03-29 2019-04-12 2019-07-11 Culvert Ø 0.6m (1 unit), Development and Vulnerable Households on Single Pipe Culvert Ø 0.8m (1 unit) and Single Pipe Culvert Ø 1.0m (1unit) for Dan Run, Soutr Nikom. KH-MOI-99881-CW-CDD / The rehabilitation laterite road (Length 1550m, Width 4.00m, 0.15m thick), Single Component 1: Improving Pending Community Driven Pipe Culvert Ø 1.0m (1unit) IDA / 59600 Livelihoods for Rural Poor Post Open - National 29,965.00 0.00 Implementati 2019-03-01 2019-03-06 2019-04-17 2019-05-17 2019-06-21 2019-09-19 Development and Construction of Double and Vulnerable Households on Pipe Culvert Ø 0.8m (5units), for Ballangk, Prasat Bakong. KH-MOI-99887-CW-CDD / Construction of Box Culvert heigth 2m with stop Log (1unit), Box Culvert heigth Component 1: Improving Pending Community Driven 1.5m with stop Log (1unit) IDA / 59600 Livelihoods for Rural Poor Post Open - National 29,896.00 0.00 Implementati 2019-04-30 2019-05-07 2019-05-21 2019-05-28 2019-06-11 2019-09-09 Development Pipe Culver Ø 0.8m with and Vulnerable Households on Stop Log (1unit) and Single Pipe Culvert Ø 0.8m (4 unit) for Sasar Sdam, Puok. Page 1 KH-MOI-99888-CW-CDD / Construction of Reinforced Component 1: Improving Pending Concrete Road (Lengh 260m, Community Driven IDA / 59600 Livelihoods for Rural Poor Post Open - National 30,417.00 0.00 Implementati 2019-04-30 2019-05-07 2019-05-21 2019-05-28 2019-06-11 2019-09-09 width 5.00m, 0.15m thick) Development and Vulnerable Households on for Kampong Thkov, Kralanh. Total: 0.260 km KH-MOI-99890-CW-CDD / The rehabilitation ponds size (60mx30mx5m), Component 1: Improving Pending Community Driven (30mx25mx5m), IDA / 59600 Livelihoods for Rural Poor Post Open - National 29,949.00 0.00 Implementati 2019-03-01 2019-03-08 2019-03-22 2019-03-29 2019-04-12 2019-07-11 Development (40mx20mx5m), and Vulnerable Households on (50mx50mx5m) for Slaeng Spean, Srei Snam. Total:4 Places KH-MOI-99891-CW-CDD / The rehabilitation laterite Component 1: Improving Pending road (1.450km) and Single Community Driven IDA / 59600 Livelihoods for Rural Poor Post Open - National 32,660.00 0.00 Implementati 2019-04-30 2019-05-07 2019-05-21 2019-05-28 2019-06-11 2019-09-09 Pipe Culvert Ø 1.0m (3 Development and Vulnerable Households on units) for Svay Chek, Angkor Thum. KH-MOI-99892-CW-CDD / The rehabilitation laterite road ( Length 2520m, Width Component 1: Improving Pending Community Driven 4.00m, 0.15 Thick) and IDA / 59600 Livelihoods for Rural Poor Post Open - National 34,064.00 0.00 Implementati 2019-04-30 2019-05-07 2019-05-21 2019-05-28 2019-06-11 2019-09-09 Development Construction of Single Pipe and Vulnerable Households on Culvert Ø 1.0m (2 unit) for Leang Dai, Angkor Thum. KH-MOI-99893-CW-CDD / The rehabilitation laterite road (Length 1080m, Width 4.00m, 0.15m thick) and Component 1: Improving Pending Community Driven Construction of Single Pipe IDA / 59600 Livelihoods for Rural Poor Post Open - National 27,869.20 0.00 Implementati 2019-03-01 2019-03-08 2019-03-22 2019-03-29 2019-05-07 2019-08-05 Development Culvert Ø 0.8m (1 unit) and and Vulnerable Households on Triple Pipe Culvert, Ø 1.0m (3 unit) for Ta Siem, Svay Leu. KH-MOI-99894-CW-CDD / Construction of Reinforced Component 1: Improving Pending Concrete Road (Length Community Driven IDA / 59600 Livelihoods for Rural Poor Post Open - National 48,510.00 0.00 Implementati 2019-04-30 2019-05-07 2019-05-21 2019-05-28 2019-06-11 2019-09-09 445m, Width 3.50m, 0.15m Development and Vulnerable Households on thick) for khnang Phnum, Svay Leu.