20150424-5295 FERC PDF (Unofficial) 4/24/2015 3:37:20 PM 625 Liberty Avenue, Suite 1700 | Pittsburgh, PA 15222 844-MVP-TALK |
[email protected] www.mountainvalleypipeline.info April 24, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Mountain Valley Pipeline, LLC Docket No. PF15-3-000 Draft Resource Report Nos. 3 and 4 Dear Ms. Bose: Pursuant to the Commission’s rules and regulations, Mountain Valley Pipeline, LLC (“MVP”) is submitting for filing in the captioned proceeding Draft Resource Report Nos. 3 and 4. A copy of this filing is also being provided to Paul Friedman, OEP and to Lavinia DiSanto, Cardno. Should you have any questions regarding this matter, please contact the undersigned by telephone at (412) 395-5540 or by e-mail at
[email protected]. Respectfully submitted, Mountain Valley Pipeline, LLC Paul W. Diehl Enclosures cc: Paul Friedman (w/enclosures) Lavinia M. DiSanto, Cardno, Inc. (w/enclosures) 20150424-5295 FERC PDF (Unofficial) 4/24/2015 3:37:20 PM Mountain Valley Pipeline Project Docket No. PF15-3 Resource Report 3 – Fisheries, Vegetation and Wildlife Draft April 2015 20150424-5295 FERC PDF (Unofficial) 4/24/2015 3:37:20 PM Mountain Valley Pipeline Project Resource Report 3 – Fisheries, Vegetation and Wildlife Resource Report 3 Filing Requirements Location in Resource Information Report Minimum Filing Requirements 1. Classify the fishery type of each surface waterbody that would be crossed, including fisheries of special concern. (§ 380.12(e)(1)) Section 3.1.3 This includes commercial and sport fisheries as well as coldwater and warmwater Table 3.1-2 fishery designations and associated significant habitat.