L. N. Malviya Infra Projects Pvt. Ltd. 1

Total Page:16

File Type:pdf, Size:1020Kb

L. N. Malviya Infra Projects Pvt. Ltd. 1 Feasibility Report (Draft), Volume I Main Report Chapter 00- Executive Summary Preparation of Feasibility Report For Two Laning of State Lakheri-Bijoliya Road Highways Package No. 14/SH/PPP/2014-15 Highway –II 1. EXECUTIVE SUMMARY 0.1 BACKGROUND Public Works Department Government of Rajasthan, engaged in the up-gradation & widening of State Highways/ MDR’s & Mining roads across the state, intends to come across the services of technically expert consultancy firms to prepare detailed feasibility report, detailed financial analysis & detailed traffic survey for two laning of roads including project design, planning and project preparation, surveys, devise suitable financing model and contract award structure for making the project viable under Private Sector Participation, bid management and preparation of tender documents, to perform detail engineering for the project including detailed cost estimates and land acquisition plans etc. Public Works Department, Government of Rajasthan intends to develop the roads. So, the above department invites offers from reputed firms to provided services for the above assignments for preparation of Detailed Feasibility Report including detailed financial analysis and detailed traffic survey of the following roads – PACKAGE No. - 14 Length Sr. (as per Road No. Name of Road District No. TOR) km 1 Highway-I Uniara – Indergarh Road (SH-29) Tonk/Bundi 25 Bundi/ 2 Highway-II Lakheri – Bijoliya Road (SH-29) 115 Bhilwara Sawai Madhopur to Palighat up to State Sawai 3 Highway-III 34 Border Road (SH-34) Madhopur Tonk - Nainwa - Keshoraipatan Road 4 Highway-IV Tonk/Bundi 113 (SH-34) 5 Mines Roads of Mandalgarh a.) Berisal to Sukhpura Road (Mining Road) Karangarh to Amadala Road b.) (Mining Road) Highway-V Khakharmala to Aasuna Road Bhilwara 51 c.) (Mining Road) Marewada to Bhanas Via Pandroo Road d.) (Mining Road) e.) Tilaswan to Salwatiya Road (Mining Road) NH-12 - Laxmipura - Dora - Dabi - Ranaji 6 Highway-VI Bundi 50 Ka Guda Road Bundi - Silor - Gararda - Bhopatpura Road 7 Highway-VII Bundi 48 (SH-29) Sawai 8 Highway-VII Malarna Dungar to Chak Biloli Road 15 Madhopur Total 451 Additional Sawai Madhopur Bypass Sawai 9 15 Bypass (Kota Road to Lalsot Road) Madhopur In order to access the financial and technical feasibility, M/s L.N. Malviya Infra Project Pvt. Ltd. has been entrusted by Public Works Department, Government of Rajasthan for the task of carrying out the Detailed Feasibility Report for above said project sections. L. N. Malviya Infra Projects Pvt. Ltd. 1 Feasibility Report (Draft), Volume I Main Report Chapter 00- Executive Summary Preparation of Feasibility Report For Two Laning of State Lakheri-Bijoliya Road Highways Package No. 14/SH/PPP/2014-15 Highway –II 0.2 CONSULTANCY SERVICES The consultancy services are to be provided in stages as brought out below: KD Inception Report 1 KD Supplementary Inception Report 2 KD Report on Alignment (including proposed geometric improvements) and 3 first traffic survey KD Report on Land Plan Schedules and Utility Relocation 4 KD Report on Indicative GAD of structures (bridges, grade separators, 5 ROB/RUBs) KD Report on Environment and Social Impact Assessment 6 KD Draft Feasibility Report and Schedules to the Concession Agreement 7 KD Final Feasibility Report 8 The Feasibility Report for each of the Highways comprising the Project shall include the following: Sets of Drawings Investigation Reports Preliminary designs Preliminary costing Implementation schedule 1.2.1 Objectives The objective of this consultancy is to undertake feasibility studies and prepare separate Feasibility Reports for all Highways comprising the Project for the purpose of firming up the Authority's requirements in respect of development and construction of the Project and Project Facilities and enabling the prospective bidders to assess the Authority's requirements in a clear and predictable manner with a view to ensuring: enhanced safety and level of service for the road users; superior operation and maintenance enabling enhanced operational efficiency of the Project; minimal adverse impact on the local population and road users due to road construction; minimal adverse impact on environment; minimal additional acquisition of land; and phased development of the Project for improving its financial viability consistent with the need to minimize frequent inconvenience to traffic that may be caused if additional works are undertaken within a period of seven years from the commencement of construction of the Project. 1.2.2 Scope of Services The scope of services for each of the Highways of the Project shall comprise: Traffic surveys and demand assessment L. N. Malviya Infra Projects Pvt. Ltd. 2 Feasibility Report (Draft), Volume I Main Report Chapter 00- Executive Summary Preparation of Feasibility Report For Two Laning of State Lakheri-Bijoliya Road Highways Package No. 14/SH/PPP/2014-15 Highway –II Engineering surveys and investigations Location and layout of toll plazas Location and layout of truck lay byes Location and layout of bus bays and bus shelters Wayside amenities Safety Social impact assessment Environment impact assessment Preliminary Designs of road, bridges, structures, etc. Preparation of Land Plan Schedules and Utility Relocation Plans Preparation of indicative BOQ and rough Cost Estimates Preparation of Schedules A, B, C, D and H of the Concession Agreement. 0.3 PROJECT ALIGNMENT DESCRIPTION The Project, Lakheri-Bijoliya Road starts from Y-Junction with SH–1 (Kota-Lalsot Mega Highway) at Lakheri and ends at T-Junction with NH-76 (Kota-Chittorgarh section) at Govindpura near Bijoliya. The project road passes through Bundi and Bhilwara districts of Rajasthan. The Project Road as described in the terms of References is 115 Km. Actual design length is 115.70 Km. The Section from km 63+500 upto 2.408 km length is retained as overlapping with SH-70 & NH-12. There are a number of junctions very important. Y-junction with SH-1 at km 0+000 (Kota-Indergarh Section) at Lakheri, Y-Junction with SH-37A at km 27+750 at Gendoli, Y-Junction with SH-34 at km 41+500, T-Junction with SH-34 at km 44+400, T-Junction with SH-70 at km 65+300, T-Junction with NH- 12 at km 65+300(at the end of retained portion) & T-Junction with NH-76 (Kota-Chittorgarh section) at Govindpura near Bijoliya. The index map depicting the project road is presented in Fig. 0.1. Figure 0.1 Index Map showing Project Road The consultancy services for the same is to include design of best possible alignment and pavement composition, design of bridges, culverts and other structures in addition to analysis of costs, determining project feasibility, preparation of Land Acquisition Plan, if any, and obtaining of all requisite clearances. Figure 0.2:- Project Alignment of Lakheri-Bijoliya Road 0.4 CHAINAGE REFERENCES (EXISTING V/s DESIGN) Table 0.1:- Chainage References (Lakheri-Bijoliya Road) Existing Chainage Sr. No Design Chainage (km) Remarks (km) From To From To 1 0+000 3+200 0+000 3+200 Lakheri 2 3+200 4+250 3+200 4+250 Lakheri L. N. Malviya Infra Projects Pvt. Ltd. 3 Feasibility Report (Draft), Volume I Main Report Chapter 00- Executive Summary Preparation of Feasibility Report For Two Laning of State Lakheri-Bijoliya Road Highways Package No. 14/SH/PPP/2014-15 Highway –II Existing Chainage Sr. No Design Chainage (km) Remarks (km) From To From To 3 4+250 4+850 4+250 4+850 Lakheri 4 4+850 8+800 4+850 8+800 5 8+800 9+200 8+800 9+200 Chamawali 6 9+200 9+400 9+200 9+400 Chamawali 7 9+400 11+800 9+400 11+800 8 11+800 12+100 11+800 12+100 Utrana 9 12+100 23+400 12+100 23+400 10 23+400 24+000 23+400 24+000 Guntha 11 24+000 24+100 24+000 24+100 Guntha 12 24+100 25+000 24+100 25+000 13 25+000 26+000 25+000 26+000 14 26+000 27+650 26+000 27+650 15 27+650 28+000 27+650 28+000 Gendoli 16 28+000 28+300 28+000 28+300 Gendoli 17 28+300 30+000 28+300 30+000 18 30+000 32+800 30+000 32+800 19 32+800 33+100 32+800 33+100 Foulai 20 33+100 35+000 33+100 35+000 21 35+000 37+000 35+000 37+000 22 37+000 42+400 37+000 42+400 23 42+400 42+900 42+400 42+900 Khatkad 24 42+900 44+400 42+900 44+400 Khatkad 25 44+400 45+700 44+400 45+700 26 45+700 45+900 45+700 45+900 Khatiyari 27 45+900 47+000 45+900 47+000 28 47+000 47+500 47+000 47+500 Rajwas 29 47+500 48+000 47+500 48+000 Rajwas 30 48+000 52+000 48+000 52+000 31 52+000 52+500 52+000 52+500 Aked 32 52+500 53+500 52+500 53+500 33 53+500 53+680 53+500 53+680 Haripura 34 53+680 53+900 53+680 53+900 Haripura 35 53+900 63+000 53+900 63+000 36 63+000 63+100 63+000 63+100 37 63+100 64+800 63+100 64+800 Bundi 38 64+800 65+300 64+800 65+300 Bundi 39 65+300 67+150 65+300 67+150 Bundi 40 67+150 69+300 67+150 69+300 41 69+300 69+700 69+300 69+700 Hattipura 42 69+700 74+500 69+700 74+500 43 74+500 74+860 74+500 74+860 Ram nagar 44 74+860 78+300 74+860 78+300 45 78+300 78+360 78+300 78+360 Gudana Thav 46 78+360 78+600 78+360 78+600 Gudana Thav 47 78+600 78+900 78+600 78+900 Gudana Thav 48 78+900 84+700 78+900 84+700 49 84+700 84+800 84+700 84+800 Neem ka Kheda 50 84+800 85+100 84+800 85+100 Neem ka Kheda 51 85+100 89+700 85+100 89+700 52 89+700 90+300 89+700 90+300 Megharawat 53 90+300 103+500 90+300 103+500 54 103+500 103+900 103+500 103+900 Bhpoatpura 55 103+900 109+600 103+900 109+600 56 109+600 110+000 109+600 110+000 Mandol L.
Recommended publications
  • Pre–Feasibility Report
    PRE–FEASIBILITY REPORT Development of 8 lanes (Greenfield Highway) from Itawa (Ch. 284.000) to after Chambal River Banda Hera (Ch. 392.800) Section of NH-148 N (Total length 108.800 Km), Under BHARATMALA PRIYOJANA Lot-4/Pkg-4 in the state of Rajasthan June 2019 DISCLAIMER This report has been prepared by DPR Consultant on behalf of NHAI for the internal purpose and use of the Ministry of Environment, Forest and Climate Change (MOEF&CC), Government of India. This document has been prepared based on public domain sources, secondary and primary research. The purpose of this report is to obtain Term of Reference (ToR) for Environmental Impact Assessment (EIA) study for Environmental Clearance to develop the Economic Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana, Section of Lot 4/Pkg 4: Firozpur Jhirka – Kota section. It is, however, to be noted that this report has been prepared in best faith, with assumptions and estimates considered to be appropriate and reasonable but cannot be guaranteed. There might be inadvertent omissions/errors/aberrations owing to situations and conditions out of the control of NHAI and DPR Consultant. Further, the report has been prepared on a best-effort basis, based on inputs considered appropriate as of the mentioned date of the report. Neither this document nor any of its contents can be used for any purpose other than stated above, without the prior written consent from NHAI. Feasibility Report Table of Contents 1. Executive Summary ................................................................................................................................ 1 2. Introduction to the project ..................................................................................................................... 2 2.1 Project Proponent ................................................................................................................................
    [Show full text]
  • Secretariat of the State Level Expert Appraisal Committee Rajasthan
    Secretariat of the State Level Expert Appraisal Committee Rajasthan, Constituted under the Environmental (Protection) Act, 1986 4, Jhalana, Institutional Area, Jaipur-302004 (Ph.: 0141- 5159661; [email protected]) F.1 (153)/SEAC (4)/ Meeting Notice/Mines/2020/12702-12789 Date:-30.07.2020 M/s --------- As per Annexure -A Subject: Meeting Notice of the 4.47th Meeting of the State Level Expert Appraisal Committee (SEAC), (Raj.), scheduled to be held on 24th ,25th ,26th and 27th ,August 2020. Sir, The 4.47th Meeting of SEAC is scheduled to be held on 24th ,25th ,26th and 27th ,August 2020 at 10:30 AM in the Meeting Hall of the Rajasthan State Pollution Control Board, 4, Institutional Area, Jhalana Doongri, Jaipur as per programme (Annex-A). All the project proponents (PPs) are advised to send an identical set of project documents namely, Form-1, Form-2, Pre-Feasibility Report and / or EIA/EMP Report, supporting documents (as per relevant OMs, circulars, notifications of MoEF & CC updated till date ) and as submitted to the Member Secretary, Secretary, SEAC, Rajasthan, to the Members of SEAC (Annex-B) as per the EIA Notification 2006 and its amendments issued from time to time in a pen drive as soft copy as per Ministry of Environment & Forest Order No. J- 11013/19/2012-IAII (I) dated 20th March, 2012 as updated /amended) by 12.08.2020 along with a hard copy of the computer presentation. Copy of reply to quarries (in hard copy) raised by this office (if any) and point wise reply/information submitted /prepared by P.P is also to be incorporated in tabular / chart form in the documents to be sent to this office and to all the members.
    [Show full text]
  • EPF Contact Nos.Xls Page 1
    EPF Contact Nos.xls Page 1 E.P.F. TELEPHONE NUMBERS Telephone numbers Tel. numbers ZONE/Dist Name of Excise Excise Station Incharge Name of Officer Office with Residenc Office with rict Mobile Stations/s Name with Rank Mobile STD code e STD code ZONE - KOTA Kota Zone Sh. Kalyan Singh EO 0744-2360102 9414000830 - Gumanpura Kota Ashish Bhargav S.I. 0744-2461100 9414000466 Nayapura Kota Ashish Bhargav S.I. - 9414000466 Ramganjmandi Ashish Bhargav S.I. - 9414000466 Kota SH. Gopal Dixit AEO 0744-2364860 9414000741 - Itawa Kota Ashish Bhargav S.I. - 9414000466 Sangod Ashish Bhargav S.I. - 9414000466 Baran Parmanand Patidar E.I. 07453-231184 9414175212 Sh. Khetaram Vishnoi Chabra Ahmed Sultan PO - 9413092621 Baran 07453-231184 9414987077 DY-SP Anta Parmanand Patidar E.I. - 9414175212 - Shabad Parmanand PatidarE.I. - 9414175212 Bundi Mahaveer Kumar PO 0747-2457683 9414000731 Bundi 0747-2457683 Lakheri Mahaveer Kumar PO - 9414000731 Nainwa Mahaveer Kumar PO - 9414000731 Jhalawar Rakesh Verma S.I. 07432-233766 9413344964 Sh. Ashok Kumar Bhawanimandi Tejkaran Masar PO 07433-222299 9413220343 Jhalawar 07432-233765 9414000322 - Kaushik AEO Aklera Rakesh Verma S.I. - 9413344964 Khanpur Rakesh Verma S.I. - 9413344964 S.Madhopur © Vimal Kumar S.I. 07462-223932 9414030034 Sawai Sh. Nabi Sher Kha DY- 07462-223636 9001929286 - S.Madhopur ® Vimal Kumar S.I. - 9414030034 Madhopur SP Gangapur Vimal Kumar S.I. - 9414030034 Karauli Hari Krishan C.I. - 9413182834 Sh. Raghuraj Singh DY- Hindon Mahesh Bhimwall C.I. 07469-233833 9799561459 Karauli 07464-251258 9414147555 - SP Kaila Devi Hari Krishan C.I. - 9413182834 Toda Bhim Mahesh Bhimwall C.I. - 9799561459 ZONE - JAIPUR CITY Jhotwara SH.
    [Show full text]
  • 183 29 DRINKING WATER AVAILABILITY and MANAGEMENT: a CASE STUDY of SAWAI MADHOPUR DISTRICT Prem Sonwal Assistant Professor, Depa
    Journal of Global Resources Volume 6 (01) August 2019-January 2020 Page 183-188 UGC–CARE Listed Journal in Group D ISSN: 2395-3160 (Print), 2455-2445 (Online) 29 DRINKING WATER AVAILABILITY AND MANAGEMENT: A CASE STUDY OF SAWAI MADHOPUR DISTRICT Prem Sonwal Assistant Professor, Department of Geography, SCRS Government College, Sawai Madhopur (Rajasthan), India Email: [email protected] Abstract: Drinking water is an essential element for living. Article 47 of the Constitution of India makes it a top priority for the governments to provide safe and clean drinking water to every citizen of the country. In India, due to a 3-fold increase in population during 1951-2010, the per capita availability of water in the country as a whole decreased from 5,177 m3/year in 1951 to 1,588 m3/year in 2010. Supply of good quality water in sufficient quantities and safe sanitation practices in urban and rural areas are interconnected with the health and economic well-being of the people. Water used for the drinking purpose is known as potable water, which must be sparklingly clear, odourless, neither hard nor too soft and free from bacteria and impurities. In Rajasthan, 91 percent of the Domestic Water requirements of Rural / Urban Sector are being catered from Groundwater Sources and only 9 percent Water requirement is being met from surface water sources. In spite of poor quality and meager quantity, the groundwater resources in the state are the only most reliable and dependable source for sustenance of life. As a result of increasing population, urbanization, expansion of irrigated agriculture and other activities, the ground water level in Sawai Madhopur district has come under the category of 'over exploitation' category and the quality of water has also come down.
    [Show full text]
  • RCC/ERCC Contract Areawise Stage I Bidding E
    Contract Name Stage -1 MSTC e-tender No. (Technical Cum Initial Price Offer) 1.District- Nagaur Tehsil- Khimsar: MSTC/NRO/Directorate of Mines and Geology Masonry Stone dispatched from Udaipur/1/Udaipur/16-17/20550 exisiting held mining leases of mineral Masonry Stone of revenue area of Tehsil- Khimsar, District- Nagaur 2.District- Nagaur: revenue area of MSTC/NRO/Directorate of Mines and Geology Badi Khatu,Tehsil- Jayal and Choti Udaipur/2/Udaipur/16-17/20551 Khatu, Tehsil- Didwana Mineral Sand Stone, Pati, Katla, Khanda and Ballast dispatched from exisiting held quarry licences of mineral Sand Stone, Pati, Katla, Khanda and Ballast. 3. District- Nagaur: Masonry Stone MSTC/NRO/Directorate of Mines and Geology dispatched from exisiting held Udaipur/3/Udaipur/16-17/20552 mining leases of mineral Masonry Stone of revenue area of village- Pawa, Kodiya-Koniyada, Tehsil- Khimsar, District- Nagaur 4.District- Nagaur: Masonry Stone MSTC/NRO/Directorate of Mines and Geology dispatched from exisiting held Udaipur/4/Udaipur/16-17/20568 mining leases of mineral Masonry Stone of revenue area of Baliya, Raisinghpura and Peer pahadi of Tehsil- Didwana, District- Nagaur. 5.District- Nagaur: Masonry Stone MSTC/NRO/Directorate of Mines and Geology dispatched from exisiting held Udaipur/5/Udaipur/16-17/20569 mining leases of mineral Masonry Stone of revenue area of Tehsil- Nagaur and village- Rol of Tehsil- Jayal, District- Nagaur 6. District- Ajmer: Chunai Patthar MSTC/NRO/Directorate of Mines and Geology dispatched from exisiting held Udaipur/6/Udaipur/16-17/20570 mining leases of mineral Chunai Patthar of revenue area of Tehsil- Nasirabad, District- Ajmer 7.
    [Show full text]
  • Interview List for Selection of Appointment of Notaries in the State of Rajasthan
    Interview List for Selection of Appointment of Notaries in the State of Rajasthan Area of Practice S.No Name File No. Father Name Address Enrollment no. Applied for Behind the Petrol Pump Taranagar, Dist. N-11013/592/2016- Nanakram Rajgarh Road Taranagar R/344/1998 1 Madan Singh Sahu Churu NC Sahu Dist.Churu Rajasthan- Dt.13.04.98 331304 VPO Gaju Was Tehsil Taranagar, Dist. N-11013/593/2016- R/239/2002 2 Shiv Chand Ram Mahipat Ram Taranagar, Distt.Churu Churu NC Dt.24.02.02 Rajasthan-331304 Opp.Govt.Jawahar N-11013/594/2016- P.S.School Kuchaman R/1296/2003 3 Madan Lal Kunhar Kuchaman City Hanuman Ram NC City Nagar Rajasthan- Dt.31.08.03 341508 Ward No.11, Padampur, Bhupender Singh Padampur, Sri N-11013/595/2016- Nirmal Singh R/2384/2004 4 Distt. Sri Ganganagar , Brar Ganganagar NC Brar Dt.02.10.04 Rajasthan-335041 Brijendra Singh N-11013/596/2016- Lt.Sh.Johar Lal A-89, J.P. Colony, Jaipur, 5 Rajasthan R/ Meena NC Meena Rajasthan 3-R-22, Prabhat Nagar, Dt. & Sess. Court N-11013/597/2016- Lt.Sh.Himatlalj Hiran Magri, Sector-5, R/2185/2001 6 Om Prakash Shrimali Udaipur NC i Shrimali dave Udaipur, Rajasthan- Dt.07.12.01 313002 Sawai Madhopur C-8, Keshav Nagar, N-11013/598/2016- Mool Chand R/432/1983 7 Shiv Charan Lal Soni (only one Mantown, Sawai NC Soni Dt.12.09.83 memorial ) Madhopur, Rajasthan Kakarh- Kunj New City N-11013/599/2016- R/1798/2001 8 Pramod Sharma Kishangarh, Ajmer Ramnivas Kisangarh Ajmer NC Dt.15.09.01 Rajasthan-305802 414, Sector 4, Santosh Kumar Distt.
    [Show full text]
  • District Boundary Assembly Constituency
    NEW ASSEMBLY CONSTITUENCIES (Based on Rajasthan Gazette Notification SADULSHAHAR-1 Dated 25th January, 2006) GANGANAGAR-2 SANGARIA-7 KARANPUR-3 RAJASTHAN PILIBANGA (SC)-9 HANUMANGARH- 8 GANGANAGAR RAISINGHNAGAR (SC)-5 SURATGARH-4 HANUMANGARH BHADRA-11 NOHAR-10 ® ANUPGARH (SC)-6 TARANAGAR-20 LUNKARANSAR-16 SADULPUR-19 KHAJUWALA SARDARSHAHAR-21 (SC)-12 CHURU PILANI CHURU-22 (SC)-25 BIKANER MANDAWA-28 SURAJGARH-26 JHUNJHUNUN-27 TIJARA-59 JHUNJHUNUN DUNGARGARH-17 BIKANER FATEHPUR-32 WEST-13 KHETRI-31 BEHROR- BIKANER RATANGARH-23 EAST-14 NAWALGARH- 62 MUNDAWAR- 61 29 KISHANGARH KOLAYAT-15 UDAIPURWATI- BAS-60 LACHHMANGARH-33 30 NEEM KA THANA-38 KAMAN-70 SUJANGARH KOTPUTLI-40 (SC)-24 SIKAR-35 BANSUR-63 KHANDELA-37 ALWAR LADNUN- URBAN-66 RAMGARH-67 NOKHA-18 106 DHOD (SC)-34 SIKAR SRIMADHOPUR-39 ALWAR NAGAR-71 ALWAR VIRATNAGAR-41 RURAL (SC)-65 DEEG - DANTA KUMHER-72 RAMGARH-36 KATHUMAR DEEDWANA-107 SHAHPURA-42 PHALODI-122 (SC)-69 JAYAL RAJGARH - (SC)-108 BHARATPUR- NAGAUR- CHOMU-43 THANAGAZI-64 LAXMANGARH (ST)-68 73 109 NADBAI-74 NAWAN- JAISALMER- 115 JAMWA BHARATPUR 132 AMBER-47 MAHUWA-86 NAGAUR MAKRANA- RAMGARH BANDIKUI-85 WEIR 113 (ST)-48 (SC)-75 JAISALMER KHINVSAR-110 JHOTWARA-46 JAIPUR DAUSA- LOHAWAT-123 BAYANA POKARAN- ADARSH 88 NAGAR-53 DAUSA (SC)-76 133 PHULERA-44 SIKRAI RAJAKHERA-80 DEGANA- (SC)-87 HINDAUN 112 PARBATSAR- BASSI (SC)-82 BAGRU 114 (ST)-57 PUSHKAR- (SC)-56 TODABHIM DHOLPUR- JODHPUR 99 (ST)-81 DHAULPUR 79 OSIAN- DUDU BARI-78 125 (SC)-45 CHAKSU KARAULI-83 MERTA (SC)-58 LALSOT BAMANWAS BASERI BHOPALGARH (SC)-111 (ST)-89 (SC)-126
    [Show full text]
  • Final Population Figures, Series-18, Rajasthan
    PAPER 1 OF 1982 CENSUS OF INDIA 1981 SERIES 18 RAJASTHAN fINAL POPULATION FIGU~ES (TOTAL POPULATION, SCHEDULED CASTE POPULATION AND .sCHEDULED TRIBE POPULATION) I. C. SRIVASTAVA ·1)f the Indian Administrative Service Director of Census Operations Rajasthan INTRODUCfION The final figures of total population, scheduled caste and scheduled tribe population of Rajasthan Stat~ are now ready for release at State/District/Town and Tehsil levels. This Primary Census Abs­ tract, as it is called, as against the provisional figures contained in our three publications viz. Paper I, fFacts & Figures' and Supplement to Paper-I has been prepared through manual tabulation by over 1400 census officials including Tabulators, Checkers and Supervisors whose constant and sustained efforts spread over twelve months enabled the Directorate to complete the work as per the schedule prescribed at the national level. As it will take a few months more to publish the final population figures at the viJ1age as well as ward levels in towns in the form of District Census Handbooks, it is hoped, this paper will meet the most essential and immediate demands of various Government departments, autonomous bodies, Cor­ porations, Universities and rtsearch institutions in relation to salient popUlation statistics of the State. In respect of 11 cities with One lac or more population, it has also been possible to present ~the data by municipal wards as shown in Annexure. With compliments from Director of Census Operations, Rajasthan CONTENTS INTRODUCTION (iii) Total Population, Scheduled Caste and Scheduled Tribt' Population by Districts, 1981 Total Schedu1ed Caste and Scheduled Tribe Population. ( vi) 1. Ganganagar District 1 2.
    [Show full text]
  • Government of Rajasthan Department of Women & Child Development
    GOVERNMENT OF RAJASTHAN DEPARTMENT OF WOMEN & CHILD DEVELOPMENT DIRECTORATE OF WOMEN EMPOWERMENT Implementation of Protection of Women against Domestic Voilecne Act, 2005 1- Name of the State - RAJASTHAN 2- No. of Districts - 33 3- No. of Protection Officers appointed - 548 4- Details of Protection Officer- List enclosed LIST OF PROTECTION OFFICERS & SERVICE PROVIDERS UNDER THE PROTECTION OF WOMEN FROM DOMESTIC VIOLENCE ACT, 2005 A) Protection Officers STATE-RAJASTHAN DISTRICT-AJMER Sr.No Name & address with contact numbers Designation 1 Shri S.D. Gaur, DD, ICDS, Women & Child Development, Ajmer (T) 0145-2627154 DD 2 Smt Kumudani Sharma, CDPO Office, Ajmer City, (R) 0145-2426452 (O) 0145-2620582 CDPO 3 Smt. Mithlesh Jain, CDPO Office, Kishangarh Rural, Ajmer (M) 9928266768 CDPO 4 Smt. Mithlesh Jain, CDPO Office, Arai, Ajmer (M) 9928266768 CDPO (Addl. Charge) 5 Shri Deepak Sharma, CDPO Office, Byvar City, Ajmer (M) 9928070768 CDPO 6 Shri Vinay Chandra Jain, CDPO Office, Kekari, Ajmer (M) 9351454499 CDPO 7 Smt. Asha Sharma, CDPO Office, Pisagan, Ajmer (M) 9414708211 CDPO 8 Smt. Geeta Sharma, CDPO Office, Jawaja, Ajmer (M) 9982591310 CDPO 9 Shri Vijay Chandra Chandra Jain, CDPO Office, Kishangarh City, Ajmer (M) 9351454499 CDPO 10 Smt. Saroj Chaturvedi, CDPO Office, Srinagar, Ajmer (M) 9460932605 CDPO 11 Smt. Ashu Choudhary, CDPO Office, Masuda, Ajmer Addl. Charge 12 Shri Vijay Chandra Jain, CDPO Office, Bhinai, Ajmer (M) 9351454499 CDPO 13 Smt. Krishna Sharma, CDPO Office, Masuda, Ajmer (M) 9460203200 Pracheta 14 Smt. Uschav Sharma, CDPO, Office, Arai, Ajmer (M) 9460150630 Pracheta 15 Miss Aruna Gupta, CDPO Office, Srinagar, Ajmer, (M) 9414281364 Pracheta 16 Smt.
    [Show full text]
  • 49228-003: Rajasthan State Highway Investment Program
    Resettlement Plan July 2019 IND: Rajasthan State Highway Investment Program- Tranche 2 Package 1 (Annuity): Laxmipura-Dora-Dabi-Ranaji ka Gudha Subproject Road Prepared by Public Works Department, Government of Rajasthan for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 10 June 2019) Currency unit – Indian rupees (INR/Rs) ₹1.00 = $0.0144 $1.00 = ₹69.4071 ABBREVIATIONS ADB – Asian Development Bank DC – District Collector GOI – Government of India GRC – Grievance Redressal Committee IA – Implementing Agency IAY – Indira Awaas Yojana RFCTLARR – The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 RLAB – Draft Rajasthan Land Acquisition Bill NGO – Nongovernment organization PD – Project Director PIU – Project implementation Unit PRoW – Proposed Right-of-Way R&R – Rehabilitation and Resettlement RoW – Right-of-Way SO – Safeguards Officer SH – State Highway SPS – Safeguard Policy Statement SoR – PWD Schedule of Rate NOTES (i) The fiscal year (FY) of the Government of India and its agencies ends on 31 March. “FY” before a calendar year denotes the year in which the fiscal year ends, e.g., FY2019 ends on 31 March 2019. (ii) In this report, "$" refers to US dollars This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]
  • RAJASTHAN STATE COOPERATIVE BANK LTD.Pdf
    STATE DISTRICT BRANCH ADDRESS CENTRE IFSC CONTACT1 CONTACT2 CONTACT3 MICR_CODE Ajmer Central Co- RAJASTHA operative Bank Khailand Market Ajmer 998322870 N AJMER Ltd, Ajmer Pin Code No 305001 AJMER RSCB0011002 1 0145-2423742 305501002 Ajmer Central Co- RAJASTHA operative Bank PB156 Ajmer Pin Code 963634725 N AJMER Ltd, Ajmer No 305001 AJMER RSCB0011001 2 0145-2627396 305501001 Ajmer Central Co- Near Bus Stand Road RAJASTHA operative Bank Pisangan Pin Code No 998322875 N AJMER Ltd, Ajmer 305201 PISANGAN RSCB0011011 8 0145-2775234 305501031 AJMER CENTRAL COOPERATIVE BANK LTD., HEAD OFFICE, Ajmer Central Co- JAIPUR ROAD, PB156 RAJASTHA operative Bank Ajmer Pin Code No 998332371 N AJMER Ltd, Ajmer 305001 AJMER RSCB0011099 9 0145-2431613 305501000 Krshi Mandi- SUBHASH GANJ Ajmer Central Co- ANAJ RAJASTHA operative Bank MANDI,Nasirabad Pin 964990510 N AJMER Ltd, Ajmer Code No 305601 NASIRABAD RSCB0011010 5 01491-220057 305501030 Ajmer Central Co- Nagar Palika Bulding RAJASTHA operative Bank Pushkar Pin Code No 998322875 N AJMER Ltd, Ajmer 305022 PUSHKAR RSCB0011012 5 0145-2772007 305501032 Ajmer Central Co- Near Bus Stand RAJASTHA operative Bank Masuda Pin Code No 998322863 N AJMER Ltd, Ajmer 305623 MASUDA RSCB0011009 5 01462-266908 305501029 Ajmer Central Co- Near Bus Stand RAJASTHA operative Bank Kishangarh Pin Code KISHANGAR 998322873 N AJMER Ltd, Ajmer No 305801 H RSCB0011008 1 01463-246595 305501028 Ajmer Central Co- Opp.Nagar palika , RAJASTHA operative Bank Near Polic Thana Kekri 998322872 N AJMER Ltd, Ajmer Pin Code No 305404 KEKRI RSCB0011007 1 01467-220046 305501075 Ajmer Central Co- Krshi Mandi Samiti RAJASTHA operative Bank Bijaynager Pin Code 998322871 N AJMER Ltd, Ajmer No 305624 BIJAINAGAR RSCB0011006 0 01462-230060 305501050 NEAR COMMUNITY HEALTH CENTRE, Ajmer Central Co- opp.
    [Show full text]
  • L. N. Malviya Infra Projects Pvt. Ltd. 1
    Feasibility Report (Draft), Volume I Main Report Chapter 00- Executive Summary Preparation of Feasibility Report For Two Laning of State Tonk-Nainwa-Keshoraipatan Road Highways Package No. 14/SH/PPP/2014-15 Highway -IV 1. EXECUTIVE SUMMARY 0.1 BACKGROUND Public Works Department Government of Rajasthan, engaged in the up-gradation & widening of State Highways/ MDR’s & Mining roads across the state, intends to come across the services of technically expert consultancy firms to prepare detailed feasibility report, detailed financial analysis & detailed traffic survey for two laning of roads including project design, planning and project preparation, surveys, devise suitable financing model and contract award structure for making the project viable under Private Sector Participation, bid management and preparation of tender documents, to perform detail engineering for the project including detailed cost estimates and land acquisition plans etc. Public Works Department, Government of Rajasthan intends to develop the roads. So, the above department invites offers from reputed firms to provided services for the above assignments for preparation of Detailed Feasibility Report including detailed financial analysis and detailed traffic survey of the following roads – PACKAGE No. - 14 Length Sr. (as per Road No. Name of Road District No. TOR) km 1 Highway-I Uniara – Indergarh Road (SH-29) Tonk/Bundi 25 Bundi/ 2 Highway-II Lakheri – Bijoliya Road (SH-29) 115 Bhilwara Sawai Madhopur to Palighat up to State Sawai 3 Highway-III 34 Border Road (SH-34)
    [Show full text]