Complaint No. 155/2019

CONSUMER GRIEVANCES REDRESSAL FORUM Uttar Bijli Vitran Nigam UHBVN COMPLEX, #,9*: SECTOR_8, HU DA, N[AR GYMKHANA C,LUB, KURUKSHETRA - 136118 (HARYANA) Lffiilth,l E-mail: !i:tL .1.*r1:gjJl:! ,1.ul Phone No.01744-222855

To

Smt. Urmila Devi W/o Sh. Rakesh Singh, Modern Sr. Sec. School, Chhara Beri Road, Sector-2, Bahadu rga rh. Mob.9910759789.

Memo. ruo. Ch- /p /UH/CGRF-1551201.e Dated , 30 -S -Aou

Subject: - Order in respect of complaint of Smt. Urmila Devi W/o Sh. Rakesh Singh, Modern Sr. Sec. School, Chhara Beri Road, Sector-2, .

Enclosed please find herewith the order of the Forum dated

Ku ru ksh etra Endst No ,h-l7/U(/Ct|,F- tS;fart7 Dated:Q2 - 6-Uf

Copy of the above is forwarded to the SDO (OP) City Sub Uban Sub-Diviiion, UHBVN, Bahadurgarh for his kind information and compliance please. Secretary, CGRF, UHBVN,

Ku ru kshetra

CC. 1. The Secretary/HERC, Sec-4, Panchkula. 2. rhe CE/OP, UHBVN, . 3. The CGM/Commercial UHBVN, Panchkula. 4. The SE/OP, Circle, UHBVN, Jhaj.jar. 5. fhe XEN/lT, UHBVN, Panchkula. (for posting on UHBVN site) 6. Ihe XEN/OP. City Division, UHBVN, Bahadurgarh. Complaint No. 155/2019

CONSUMER GRIEVANCES REDRESSAL FORUM Uttar Haryana Bijli Vitran Nigam UHBVN COMPLEX,

SECTOR-8, HIJDA, NEAR GYMKI-IANA CLIJB, 'Fs# tfftvlt{ KURUKSHETRA - L36118 (HARYANA) E-ma il : u h bvncgrf@grna il.corn Phone No.01744-2Z28Ss

Complaint No. UH/CGRF _ 155/2019 Date of Institution:_ 09.03.2019 Date of-Hea ring:_ eQ.,S.Ja4 Date of Order:_ J". S_AD;f

Before the consumer Grievances Redressar Forum, uHBVNL.

Present:

j.. Sh. B.S. Garg, Chairperson.

2. Sh. DeepakJain, Memoer

3. Sh. AshwaniKumar Duhan, Independent Member

In the matter of complaint of smt. Urmila Devi w/o sh. Rakesh singh of Bahadurgarn.

...... ,...... Com p la ina n t/petitio n e r

Vs

(1) XEN/OP. Division UHBVN, Bahadurgarh.

(2)SDO/OP Sub Urban Sub-Division, UHBVN, Bahadurgarh.

...... Respondents

Appearance: For Complainant :

Forthe Respondent ;sDo (oP) sub Urban Sub-Division, UHBVN, Bahadurgarh.

ar/t/tf Complaint No. 155/2019

ORDER

The consumer Smt. Urmila Devi W/o Sh. Rakesh Singh, Modern Sr. Sec. School,

Chhara Beri Road, Sector-2, Bahadurgarh under SDO (OP) Sub Urban Sub-Division, UHBVN,

Bahadurgarh has made a complaint regarding shifting of line and supply. The Forum has the jurisdiction to try this complaint.

"The complainant had pleaded:-

"lt is requested that even after repeated requests made to SDO (OP) Sub Urban Sub-Division, UHBVN, Bahadurgarh, my work is not being done. The school is getting supply from RDS feeder whereas nearby it the electricity of urban supply is operative. There is a transformer existing in the boundary wall of the school for which I remain afraid so that anybody may not blame for theft of electricity just on suspicion. The supply may very kindly be got connected on urban side for which whatsoever amount becomes chargeable lam ready to deposit the same. As has been heard about this Forum I hope that you will take a decisive step so that the little students coming in the school do not become victim of any accident. So it is requested that the transformer may very kindly be shifted outside the school premises"

The complaint was received in the office of the Forum on 08.03.2019. The

Forum considered the facts and found the petition feasible for acceptance and same was admitted. Accordingly, notices of motion dated 08.03.2019 were issued to both the parties.

REPLY/VERSION OF THE SDO RESPONDENT.

The SDO Respondent has submitted his reply as under:

I.1 Complaint of Smt. Urmila Devi, Modern School, Bahadurgarh in the subject cited matter is stated that there are two feeders namelV 11 KV Kassar RDS with ACSR and 1l- KV NIF Urban with AB Cable, running over the playground of the school diagonally. The supply of the school is running from NIF Urban Feeder presently. The cable is in deteriorated condition and it is accident prone and cause of breakdown frequently. 2. That the consumer agreed to make shift the L1. KV Kassar RDS Feeder along with inside the school boundary and only one No.T/f. connected with 11 KV NIF Feeder (Urban)of the subject cited consumer only. By connecting the connection and transformer with nearest 11 KV Road Feeder (Urban) of City Sub-Division No" ll, resulting the worn-out AB cable will be dismantled from the school premises. 3. That the consumer is ready to deposit the cost of the above mentioned work. i) Shiftine of RDS Kassar along with Boundary of the school' o/4r Complaint No. L55/20L9

iil S:i.l ng of the school connection to 11 KV Jhajjar Road feeder of City Sub-Division 'Jr I Rahadrrrcarh. iii)This dismantled of cable crossing the playground of the school' The work will be done within L5 days after deposit of estimated amount as above.

DECISION:-

After examining the complaint of the Complainant and the reply submitted by the Respondent SDO as well as after hearing the arguments of both the parties, it has been made out that two feeders namely 11 KV Kassar RDS which is on ACSR and l.L KV NIF Urban

Feeder which is laid on AB Cable, are crossing from the playground of the school diagonally and the SDO Respondent in his reply has admitted that the cable laid on the Feeder is in deteriorated condition and is also accidental prone. Also due to crossing of this feeder diagonally the complainant is also facing difficulty as it is an educational institute. During the discussions it also came out that the SDO Respondent stated that there is no problem in

shifting of 11 KV RDS feeder along with inside school boundary and 1.1 KV NIF Feeder urban which is having only the last transformer of this school, can easily be connected on 11 KV

jhajjar Road Feeder which is very adjacent to the transformer feeding the supply to the

school.

Simultaneously, the complainant is also ready to deposit the total cost involved inthisprocessandalsoagreedtoprovidetherequiredrightofway. HencetheForumdecides

that SDO Respondent should shift L1 KV RDS Feeder along with boundary well of the school and the supply of this school be catered on 11. KV Jhajjar Road Feeder and

the idle oortion of 11 KV NIF Feeder be dismantled. The cost of this work be got deposited

from the beneficiary i.e. the complainant,

The file may be consigned to the record without any cost to either of the

pa rties.

The order is signed and issued by the Consumer G es Redressal Forum onA2-S-, bC\l^r,/' f (B:S.'G'arg) ,r"k'#l shwani Kumar Duhan) Chairperson Member Independent Member CGRF, Kurukshetra CGRF, Kurukshetra CGRF, Kurukshetra