Grid Disturbances in NER Grid from 01-March-2021 to 31-March-2021 Event Load Category as per Violation of Sl. Date and Time of Date and Time of Outage Generation Generation Load Loss in Region Name of Element Owner / Agency Loss CEA Grid Fault Clearing Time in msec Regulation / No. Tripping Restoration Duration Loss (MW) Loss in MU MU (MW) Standards Standard , Elangkangpokpi, & New Moreh areas of Power System were connected with the rest of NER Grid through 132 kV -Churachandpur D/C. 132 KV Kakching - line was under shutdown to avoid overloading of 132 KV Loktak - Ningthoukong line.

At around 05:12 hrs on 02.03.2021, 132 kV Ningthoukong - Churachandpur D/C tripped. Due to tripping of Churachandpur, these elements, Churachandpur, Elangkangpokpi, Kakching & New Moreh areas of Manipur Power System Elangkangpokpi, Kakching 1 NER MSPCL 02-03-2021 05:12:00 02-03-2021 05:28:00 00:16 were separated from rest of NER Grid and subsequently collapsed due to no source in this area. 0 18 0 0.0048 GD 1 80 NIL & New Moreh areas of Manipur Power System Power was extended to Churachandpur, Elangkangpokpi, Kakching & New Moreh areas of Manipur Power System by charging 132 kV Ningthoukhong-Churachandpur line 1 at 05:28 hours on 02.03.2021

Karong area of Manipur Power System was connected with the rest of NER Grid through 132 kV (MA) - Karong line and 132 kV Karong-Kohima line.

At 08:55 Hrs on 02.03.2021, 132 kV Imphal(MA) - Karong line and 132 kV Karong-Kohima line tripped. 3 (e) of CEA Karong area of Manipur MSPCL & DoP Due to tripping of these elements, Karong area of Manipur Power System was separated from the rest of 2 NER 02-03-2021 08:55:00 02-03-2021 09:32:00 00:37 0 11 0 0.0068 GD 1 464 Grid Standard Power System Nagaland NER Grid and subsequently collapsed due to no source in this area. Regulations Power was extended to Karong area of Manipur Power System by charging 132 kV Imphal(MA) - Karong line at 09:32 hours on 02.03.2021

Rabindranagar area of Tripura Power System & Monarchak Power Station were connected with the rest of NER Grid through 132 kV Monarchak - Udaipur line. 132 kV Monarchak - Rokhia Line was under planned shutdown.

Monarchak Power Station At 12:20 Hrs on 02.03.2021, 132 kV Monarchak - Udaipur line tripped. Due to tripping of this element, 3 NER & Rabindranagar area of TSECL 02-03-2021 12:20:00 02-03-2021 12:45:00 00:25 Rabindranagar area of Tripura Power System & Monarchak Power Station were separated from rest of NER 68 6 0.03 0.0025 GD 1 120 NIL Tripura Power System Grid and subsequently collapsed due to load-generation mismatch.

Power was extended to Monarchak Power Station & Rabindranagar area of Tripura Power System by charging 132 kV Monarchak - Udaipur line at 12:45 Hrs on 02.03.2021

BTPS area of Assam Power System comprises of downstream load of 132 kV buses of Dhaligaon, Kokrajhar, Gossaigaon, Gauripur, Bilasipara and Bornagar S/S was connected with the rest of NER Gird through 220/132 kV, 100 MVA ICT I & 160 MVA ICT II at BTPS(AS). 132 kV Bornagar- Rangia line and 132 kV Dhaligaon-Nalbari line were kept opened for system requirements. 3 (e) of CEA BTPS (AS) area of Assam 4 NER AEGCL 06-03-2021 09:33:00 06-03-2021 09:58:00 00:25 At 09:33 Hrs on 06.03.2021, 220/132 kV, ICT I & II at BTPS along with 220 kV Salakati-BTPS D/C 0 90 0 0.037 GD 1 440 Grid Standard Power system tripped. Due to tripping of these elements, BTPS area was separated from rest of NER grid and collapsed Regulations due to no source in this area.

Power was extended to BTPS (AS) area of Assam Power system by charging 220KV Salakati -BTPS-1 at 10:50 Hrs on 06.03.2021

Tenga & Khupi areas of Arunachal Pradesh Power System was connected with the rest of NER Grid through 132 kV Balipara - Tenga line.

Tenga & Khupi areas of At 12:05 Hrs on 07.03.2021, 132 kV Balipara - Tenga line tripped. Due to tripping of this element,Tenga & 5.2 (R) of IEGC Arunachal Pradesh Power DoP, Arunachal & 3 (e) of CEA 5 NER 07-03-2021 12:05:00 07-03-2021 14:07:00 02:02 Khupi areas of Arunachal Pradesh Power System were separated from the rest of NER Grid and 3.8 17 0.008 0.035 GD 1 840 system & Dikshi Power Pradesh & NEEPCO subsequently collapsed due to load generation mismatch in these areas. Grid Standard Station Regulations Power supply extended to Tenga & Khupi S/S & Dikshi Power Station by charging of 132 kV Balipara - Tenga Line at 14:07 Hrs on 07.03.2021. Yiangangpokpi, Kongba, Hundung and Thoubal Area of Manipur Power system was connected with the rest of NER Grid through 132 kV Imphal-Yiangangpokpi D/C lines. 132 KV Kakching - Thoubal line was under shutdown to avoid overloading of 132 KV Loktak - Ningthoukong line.

Yiangangpokpi, Kongba, At 16:14 Hrs on 10.03.2021, 132 kV Imphal-Yiangangpokpi D/C line tripped. Due to tripping of these 3 (e) of CEA Hundung and Thoubal 6 NER MSPCL 10-03-2021 16:14:00 10-03-2021 16:46:00 00:32 elements,Yiangangpokpi, Kongba, Hundung and Thoubal Areas of Manipur Power System were separated 0 25 0 0.013 GD 1 610 Grid Standard Area of Manipur Power from the rest of NER Grid and subsequently collapsed due to no source in these areas. Regulations system. Power supply extended to Yiangangpokpi, Kongba, Hundung and Thoubal Area of Manipur Power system by charging 132 kV Imphal-Yiangangpokpi D/C lines at 16:46 Hrs on 10.03.2021

Note: Root Cause and Remedial Measures for these events is available in the following link: https://www.nerldc.in/root-cause-remedial-measures-of-grid-events/ Grid Disturbances in NER Grid from 01-March-2021 to 31-March-2021 Event Load Category as per Violation of Sl. Date and Time of Date and Time of Outage Generation Generation Load Loss in Region Name of Element Owner / Agency Loss CEA Grid Fault Clearing Time in msec Regulation / No. Tripping Restoration Duration Loss (MW) Loss in MU MU (MW) Standards Standard Kongba and Thoubal Area of Manipur Power system were connected with the rest of NER Grid through 132 kV Yiangangpokpi - Kongba line. 132 KV Kakching - Thoubal line was under shutdown to avoid overloading of 132 KV Loktak - Ningthoukong line.

At 12:30 Hrs on 12.03.2021, 132 kV Yiangangpokpi - Kongba line tripped. Due to tripping of this element, Kongba and Thoubal Area 7 NER MSPCL 12-03-2021 12:30:00 12-03-2021 12:41:00 00:11 Kongba and Thoubal Areas of Manipur Power System were separated from the rest of NER Grid and 0 13 0 0.0024 GD 1 120 NIL of Manipur Power system. subsequently collapsed due to no source in these areas.

Power supply extended to Kongba and Thoubal Area of Manipur Power system by charging 132 kV Yiangangpokpi - Kongba line at 12:41 Hrs on 12.03.2021. 132 kV Kongba - Thoubal line charged at 12:43 Hrs on 12.03.2021 Mokokchung, Sanis and Wokha Areas of Nagaland Power system were connected with the rest of NER Grid through 132 kV Mokokchung (PG) - Mokokchung (DoP, Nagaland) 1&2 lines, 132 kV Doyang - Mokokchung (DoP, Nagaland) line, 132 kV Kohima-Wokha line & 132kV Doyang-Sanis line. 132 kV Mariani (AS) - Mokokchung (DoP, Nagaland) line kept idle charged at Mokokchung (DoP, Nagaland) end.

At 11:48 Hrs on 13.03.2021, 132 kV Mokokchung (PG) - Mokokchung (DoP, Nagaland) 1&2 lines, 132 kV Doyang - Mokokchung (DoP, Nagaland) line, 132 kV Kohima-Wokha line & 132kV Doyang-Sanis line Mokokchung, Sanis and tripped. Due to tripping of these elements, Mokokchung, Sanis and Wokha areas of Nagaland Power system 3 (e) of CEA 8 NER Wokha Areas of Nagaland DoP, Nagaland 13-03-2021 11:48:00 13-03-2021 12:07:00 00:19 were separated from the rest of NER Grid and subsequently collapsed due to load generation mismatch in 30 22 0.0095 0.0069 GD 1 560 Grid Standard Power system. these areas. Regulations

Power was extended to Mokokchung(NL) S/S by charging 132 kV Mokokchung(PG)-Mokokchung(NL) D/C lines at 12:07 Hrs on 13.03.2021 , to Wokha by charging 132 kV Kohima-Wokha line at 11:59 Hrs on 13.03.2021 and to Sanis by charging 132 kV Sanis-Wokha line at 12:21 Hrs on 13.03.2021

Daporijo Area of Arunachal Pradesh Power system was connected with the rest of NER Grid through 132 kV Ziro- Daporijo Line.

At 05:49 Hrs on 18.03.2021,132 kV Ziro- Daporijo Line tripped. Due to tripping of this element, Daporijo 5.2 (R) of IEGC Daporijo area of Arunachal & 3 (e) of CEA 9 NER DoP, Arunachal Pradesh 18-03-2021 05:49:00 18-03-2021 06:30:00 00:41 area of Arunachal Pradesh was separated from the rest of NER Grid and subsequently collapsed due to no 0 17 0 0.012 GD 1 640 Pradesh Power System source in this area. Grid Standard Regulations Power was extended to Daporijo area of Arunachal Pradesh Power System by charging 132 kV Ziro- Daporijo Line at 06:30 Hrs on 18.03.2021. Rabindranagar area of Tripura Power System & Monarchak Power Station were connected with rest of NER Grid through 132 kV Monarchak- Udaipur line and 132 kV Monarchak - Rokhia line.

At 11:00 Hrs on 20.03.2021, 132 kV Monarchak- Udaipur line and 132 kV Monarchak - Rokhia line Rabindranagar area of tripped. Due to tripping of these elements, Rabindranagar area of Tripura Power System & Monarchak 3 (e) of CEA 10 NER Tripura Power System & TSECL 20-03-2021 11:00:00 20-03-2021 11:30:00 00:30 Power Station were separated from rest of NER Grid and subsequently subsequently collapsed due to load 98 6 0.049 0.003 GD 1 320 Grid Standard Monarchak Power Station generation mismatch in this area. Regulations

Power supply was extended to Monarchak area by charging132 kV Rokhia - Monarchak T/L and 132 kV Monarchak -Rabindranagar T/L at 11:30 hrs on 20.03.2021

Ningthoukong, Churachandpur, Elangkangpokpi, Kakching & New Moreh areas of Manipur Power System is connected with rest of NER grid through 132 kV Imphal-Ningthoukong & Loktak-Ningthoukong line. 132 KV Kakching - Thoubal line was under shutdown to avoid overloading of 132 KV Loktak - Ningthoukong line.

Ningthoukong, At 14:05 Hrs on 26.03.21, 132 kV Imphal-Ningthoukong & Loktak-Ningthoukong line tripped. Due to Churachandpur, tripping of these elements, Ningthoukong, Churachandpur, Elangkangpokpi, Kakching & New Moreh areas 11 NER Elangkangpokpi, Kakching MSPCL 26-03-2021 14:05:34 26-03-2021 14:16:00 00:10 of Manipur Power System were separated from rest of NER Grid and subsequently collapsed due to no 0 23 0 0.004 GD 1 120 NIL & New Moreh areas of source in these areas. Manipur Power System Power was extended to Ningthoukong, Churachandpur, Elangkangpokpi, Kakching & New Moreh areas of Manipur Power System by charging 132 kV Imphal-Ningthoukhong Line at 14:16 Hrs on 26.03.2021

Jawaharnagar area of Assam Power System is connected with rest of NER grid through 220 kV Jawaharnagar - Sarusajai Line & 220 kV Jawaharnagar - Samaguri Line.

At 07:43 Hrs on 27.03.21, 220 kV Jawaharnagar - Sarusajai Line & 220 kV Jawaharnagar - Samaguri Line Jawaharnagar area of tripped. Due to tripping of these elements, Jawharnagar area of Assam Power System was separated from 12 NER AEGCL 27-03-2021 07:43:00 27-03-2021 08:05:00 00:22 0 25 0 0.009 GD 1 120 NIL Assam Power System rest of NER Grid and subsequently collapsed due to no source in the area.

Power was extended to Jawharnagar area of Assam Power System by charging 220 kV Jawaharnagar - Sarusajai Line at 08:05 Hrs on 27.03.2021.

Note: Root Cause and Remedial Measures for these events is available in the following link: https://www.nerldc.in/root-cause-remedial-measures-of-grid-events/ Grid Disturbances in NER Grid from 01-March-2021 to 31-March-2021 Event Load Category as per Violation of Sl. Date and Time of Date and Time of Outage Generation Generation Load Loss in Region Name of Element Owner / Agency Loss CEA Grid Fault Clearing Time in msec Regulation / No. Tripping Restoration Duration Loss (MW) Loss in MU MU (MW) Standards Standard Churachandpur, Elangkangpokpi, Kakching & New Moreh areas of Manipur Power System is connected with rest of NER grid through 132 kV Ningthoukong - Churachandpur 1 & 2 lines. 132 KV Kakching - Thoubal line was under shutdown to avoid overloading of 132 KV Loktak - Ningthoukong line.

At 22:37 Hrs on 30.03.2021,132 kV Ningthoukong - Churachandpur D/C lines tripped. Due to tripping of Churachandpur, these elements, Churachandpur, Elangkangpokpi, Kakching & New Moreh areas of Manipur Power System Elangkangpokpi, Kakching were separated from rest of NER Grid and subsequently collapsed due to no source in these areas. 13 NER MSPCL 30-03-2021 22:37:00 30-03-2021 22:41:00 00:04 0 20 0 0.0003 GD 1 80 NIL & New Moreh areas of Manipur Power System Power supply was extended to Churachandpur, Elangkangpokpi, Kakching & New Moreh areas of Manipur Power System by charging 132 kV Ningthoukhong - Churachandpur 1 & 2 Lines at 22:40 & 22:41 hrs respectively on 30.03.2021.

Khupi & Tenga areas of Arunachal Power System is connected with rest of NER grid through 132 kV Balipara - Tenga line.

At 02:10 Hrs on 31.03.2021,132 kV Balipara - Tenga tripped. Due to tripping of this element, Khupi & Khupi & Tenga areas of Tenga areas of Arunachal Power System were separated from rest of NER Grid and subsequently collapsed 14 NER DoP, Arunachal Pradesh 31-03-2021 02:10:00 31-03-2021 02:35:00 00:25 4 13 0.002 0.005 GD 1 120 5.2 (R) of IEGC Arunachal Power System due to load generation mismatch in these areas.

Power was extended to Tenga & Khupi S/S by charging 132 kV Balipara - Tenga Line at 02:35 Hrs on 31.03.2021.

Note: Root Cause and Remedial Measures for these events is available in the following link: https://www.nerldc.in/root-cause-remedial-measures-of-grid-events/ Grid Incidents in NER Grid from 01-March-2021 to 31-March-2021 Category Load Load Sl. Date and Time of Date and Time of Outage Generation Generation as per Region Name of Element Owner / Agency Event Loss Loss No. Tripping Restoration Duration Loss (MW) Loss in MU CEA Grid (MW) in MU Standards AGBPP Unit 6 tripped at 00:30 hours on 05-03-21. 1 NER GI-II AGBPP Unit 6 05-03-2021 00:30 05-03-2021 02:30 02:00 38 0 0.08 0 GI-II Revision done from Block No. 11 on 05-03-21 Doyang Unit 3 tripped at 17:56 hours on 06-03-21. Revision 2 NER GI-I Doyang Unit 3 06-03-2021 17:56 06-03-2021 19:30 01:34 21 0 0.03 0 GI-I done from Block No. 79 on 06-03-21 BgTPP Unit 3 tripped at 14:03 hours on 07-03-21. Revision 3 NER GI-II BgTPP Unit 3 07-03-2021 14:03 07-03-2021 15:30 01:27 127 0 0.18 0 GI-II done from Block No. 63 on 07-03-21 AGBPP Unit 2 tripped at 14:58 hours on 30-03-21. 4 NER GI-II AGBPP unit 2 30-03-2021 14:58 30-03-2021 15:29 00:31 29.9 0 0.02 0 GI-II Revision done from Block No. 67 on 30-03-21 AGTCCPP Unit 4 & 6 tripped at 15:21 hours on 30-03-21. 5 NER GI-I AGTCCPP unit 4 & 6 30-03-2021 15:21 30-03-2021 17:00 01:39 34.4 0 0.06 0 GI-I Revision done from Block No. 69 on 30-03-21

Note: Root Cause and Remedial Measures for these events is available in the following link: https://www.nerldc.in/root-cause-remedial-measures-of-grid-events/ The following numbers of Grid Disturbances(GD) & Grid Incidents (GI) occurred in NER during the period w.e.f 01-March-2021 to 31-March-2021 as per CEA Grid Standards

Sl. No. Category of GD Total Counts

1 GI 1 2 2 GI 2 3 3 GD 1 14 4 GD 2 0 5 GD 3 0 6 GD 4 0 7 GD 5 0

Note: Root Cause and Remedial Measures for these events is available in the following link: https://www.nerldc.in/root-cause-remedial-measures-of-grid-events/