Shopping and Amenities Public Transport and Accesses Medical

Total Page:16

File Type:pdf, Size:1020Kb

Shopping and Amenities Public Transport and Accesses Medical Yanchep National Park - 11min Future Development By Others Charleston Road Hareby Street Lindquist Vista Charleston Road Easter Street et tre S tt a g y g s Wa Le ru lo Pe Conservation Area Lindquist Vista Leggatt Street C h a Althorpe Grove r le s to n Buccaneer Road R o Leeward Avenue a Gambier Grove d Kirkby View Sibsey Road Future Development By Others Carnac Way Hartog Way Althorpe Grove Milman Approach e ov Gr Reevesby Street Troubridge Approach el pp AMBERTON BEACH Ke Lipson Way ay Grantham Road W dis an Aquamarine Street Br d Loop a o R Cinnabar Drive Future Government n Leeward Avenue to Scooter Track & Pirate Playground s Alizarin Primary School rle Cornell Street ha C Marmion Avenue AMBERTON BEACH Onyx Lane Ceil Lane Vermilion Street Wheat Lane Heath Park Carmine Street Alizarin Loop Aquamarine Street Amberton Sales & Information Centre Fulvous Loop Cerulean Drive Mikado Road Maize Lane Bleu Chase Zaff re Street L e Enclosed Dog Park, Skate Park & Cricket Nets Eastern Oval e Navajo Way Fulvous Loop w Tyrian Street a r d Persian Street A Community Hub v Cornfl ower Drive Future Neighbourhood Shops e Broadside Avenue Future Alkimos Regional Centre and Train Station - 5min Canary Way n u u u e e AMBERTON BEACH Venetian Road e Majorelle Way Butler Train Station - 8min O Mitchell Freeway - 15min B c Indigo Street Cinnabar Drive r h o r n e z S e Jonquil Street t Gamboge Street r S e t e r e t t t e Way Rouge Lane Lapis Indigo Street Cerise Lane t t t Lemon Way Flying Fox Park Fawn Way Fawn Fawn Way Fawn Aero Road Sable VirtidianViridian Boulevard Boulevard Way Ocean View Park Verdigris Loop Aureate Way Aureate Way Giallo Way Giallo Way Apricot Road Icterine Road Mauve Way Mauve Mauve Way Mauve Mulberry Way Slate Way Celeste Street Taupe Lane Patina Street Viridian Boulevard Kombu Lane Kombu Lane Vert Lane Road Bice Lane Umber Lane Lane Bole Cyan Lane Blush Sepia Way Bisque Street Arylide Grove Urobilin Loop The Amberton Beach Bar and Kitchen Heath Avenue Ecru Street Ecru Ecru Street Ecru Pistachio Way Pistachio Way Idyllic View Aureate Way Aureate Aureate Way Aureate Feldspar Road Feldspar Feldspar Road Feldspar Citrine Street Garnet Lane Citrine Street Schauss Road Schauss Schauss Road Schauss Cornsilk Street Cornsilk Street Rosewood Street Rosewood Azul Way Azul Way Leeward Avenue Leeward Tangelo Grove Tangelo Tangelo Grove Tangelo Manatee Way Manatee Manatee Way Manatee Aureolin Road Aureolin Aureolin Road Aureolin Ochre Street Ochre Ochre Street Ochre Bronze Street Bronze Bronze Street Bronze Prussian Way Majorelle Way Majorelle Majorelle Way Majorelle Papaya Road Papaya Papaya Road Papaya Gamboge Street Gamboge Gamboge Street Gamboge Aquamarine Street Aquamarine Street Bole Lane Bole Bole Lane Bole Almond Street Celeste Street Celeste Street Celeste Street Celeste Street Celeste Street Celeste Street Broadside Avenue Broadside Broadside Avenue Broadside Isabelline Loop Lighthouse Park 500M 1000M From Beach From Beach Future Development By Others Oceans 27 - 4min Alkimos Shorehaven Primary School (Opening 2022) Legend Shopping and Amenities Public Transport and Accesses Parks and Open Spaces Sport and Leisure Education and Childcare Centres Anchorage The Amberton Beach Bar and Kitchen Marmion Avenue bus stops Lighthouse Adventure Playground Amberton Beach Future government primary school* Future neighbourhood centre* Freeway extension to Hester Avenue now open Alkimos Pirates Lacrosse Team Flying Fox Park Northshore Christian Grammar School – 4min Oceanside Gateway Shopping Precinct - 5min Planned rail extensions, further freeway extension, Ocean View Park Alkimos Tigers Junior Rugby League Club St James Anglican School – 5min duplication of Marmion Avenue Yanchep Central – 8min Heath Park Eglinton Junior Cricket Club Alkimos Beach Primary School – 7min The Green Future Alkimos Regional Centre and Train Station Brighton Town Centre – 10min Amberton Playing Fields Eastern Oval Northern Suburbs Land Based Fishing Club Yanchep District High School – 6min Butler Train Station – 8min Future Government Primary School* Ocean Keys Shopping Centre – 15min Scooter Track & Pirate Playground Sun City Country Club Golf Course – 10min Alkimos Shorehaven Primary School (Opening 2022) Mitchell Freeway – 15min Lakeside Joondalup – 25min Future foreshore node and playground Yanchep National Park Alkimos College - 5min (Year 7 commenced in 2020, Cycle Path expanding to Year 12 by 2025) Mindarie Marina – 18min Cycle and walk paths *Subject to council and government approval. Barbecue facilities and picnic area Medical Centres Yanchep National Park – 11min Alkimos Medical Centre – 3min Enclosed Dog Park Amberton Beach Sales & Yanchep Medical Centre – 8min Skate Park Information Centre Butler Boulevard Medical Centre – 8min Cricket Nets Joondalup Health Campus – 25min.
Recommended publications
  • Department of Justice Annual Report 2019-2020
    Government of Western Australia Department of Justice Annual Report 2019/20 Statement of compliance Hon John Quigley MLA Hon Francis Logan MLA Attorney General Minister for Corrective Services In accordance with Section 61 of the Financial Management Act 2006, I hereby submit for your information and presentation to Parliament, the Annual Report of the Department of Justice for the financial year ended 30 June 2020. This Annual Report has been prepared in accordance with the provisions of the Financial Management Act 2006. Dr Adam Tomison Director General Department of Justice 24 September 2020 Mail: GPO Box F317, PERTH WA 6841 Phone: 9264 1600 Web: www.justice.wa.gov.au ISSN: 1837-0500 (Print) ISSN: 1838-4277 (Online) The front cover features an artwork called 'Waterholes', painted by a prisoner from Casuarina Prison. This is how the artist describes the painting: “This is Ballardong Waterholes, in the Avon River in the Stirling Ranges. I painted it because it was the fresh waterhole where we would catch fresh marron. The green lines were the tracks we walked down to get to the waterholes.” Overview of the Agency Contents Overview of the Agency ..................................................................................................................5 Executive summary ....................................................................................................................................................................5 Operating locations ....................................................................................................................................................................9
    [Show full text]
  • Main Roads Western Australia Mitchell Freeway Extension - Burns Beach Road to Romeo Road Environmental Impact Assessment
    Main Roads Western Australia Mitchell Freeway Extension - Burns Beach Road to Romeo Road Environmental Impact Assessment May 2014 Abbreviations ASRIS Australian Soil Resource Information ASS Acid Sulfate Soil BoM Bureau of Meteorology CEMP Construction Environmental Management Plan CWG Community Working Group DAA Department of Aboriginal Affairs DAFWA Department of Agriculture and Food Western Australia DEC Department of Environment and Conservation DER Department of Environment Regulation DotE Department of the Environment DoW Department of Water DPaW Department of Parks and Wildlife DRF Declared Rare Flora DSEWPaC Department of Sustainability, Environment, Water, Population and Communities EIA Environmental Impact Assessment EP Act Environmental Protection Act 1986 EPA Environmental Protection Authority EPBC Act Environment Protection and Biodiversity Conservation Act 1999 ESA Environmentally Sensitive Area GHPD Government Heritage Property Disposal GPS Global Positioning System Ha Hectare (100 m x 100 m) HCWA Heritage Council of Western Australia IBRA Interim Biogeographic Regionalisation of Australia LGA Local Government Association Mbgl Metres below ground level MNES Matters of national environmental significance NEPM National Environmental Protection Measure OEPA Office of the Environmental Protection Authority PEC Priority Ecological Community RIWI Act Rights in Water and Irrigation Act 1914 TEC Threatened Ecological Community WCAct Wildlife Conservation Act 1950 WoNS Weeds of National Significance GHD | Report for Main Roads Western
    [Show full text]
  • Legislative Assembly
    Legislative Assembly Thursday, 27 May 2010 THE SPEAKER (Mr G.A. Woodhams) took the chair at 9.00 am, and read prayers. UNDERGROUND POWER PROGRAM Petition MR J.J.M. BOWLER (Kalgoorlie) [9.01 am]: On behalf of the member for Alfred Cove, I present the following petition — To the Honourable Speaker and Members of the Legislative Assembly of the Parliament of Western Australia in Parliament assembled. We, the undersigned residents of Western Australia, respectfully request that the Legislative Assembly increase the funds and resources allocated to the State Underground Power Program, originally introduced to provide underground power to established suburbs. There are approximately 340,000 homes within the Perth Metropolitan area still to be converted. At the rate of 3,000 — 4,000 homes converted per annum, conversion will not be completed for another 100 years. We ask that Ardross, Alfred Cove, Attadale North, Bicton, Booragoon, Melville and Palmyra, in the Alfred Cove Electorate be include in Round 5 of the Program because: • Power reliability will be enhanced; • Faults caused by storms, trees and wildlife will be reduced; • Community safety will be enhanced by reducing hazards caused by fallen power lines and ageing wooden electricity poles; • Amenity of suburbs will be improved when trees do not have to be pruned or removed to keep them clear of overhead wires; and • Residents will have to pay more for conversion in the future because of the increasing cost of materials and labour. The petition complies with the standards of the house and contains 36 signatures. [See petition 292.] PAPER TABLED A paper was tabled and ordered to lie upon the table of the house.
    [Show full text]
  • Alkimos Beach Brochure
    Alkimos Beach 03 It’s all here at Australia’s Best Residential Development Be where beachside living really does live up to your dreams. Where everything you need is on your doorstep. Not just pristine sands and the aqua blue ocean, but a masterplanned community with the thriving Gateway Shopping Precinct at its entry. There are places for you to shop. There are places for your children to learn. There are places for everyone to sit back and relax. And with DevelopmentWA’s future city scale development Alkimos Central, with a future Alkimos train and bus station, you will really belong in the heart of the North Coast. Beach Huts at the entry to Alkimos Beach Alkimos Beach 05 A multi award-winning community is waiting for you From day one, you are part of a genuine and active Alkimos Beach community. Meet people with common interests through workshops or sporting groups; catch up with friends or neighbours for coffee while the kids play at Escarpment Park or take part in the friendly neighbourhood events offered throughout the year. UDIA National Award Best Residential Development (2018) UDIA WA Award - Best Residential Development over 250 lots (2017) UDIA WA Award - EnviroDevelopment Chairman’s Choice Award (2016) WINNER 2017 Na onal Awards for Excellence 2016 2018 Sheila, Eva and Dan residents of Alkimos Beach Alkimos Beach 07 Your dream lots with two local beach accesses Alkimos Beach boasts white sandy beaches, rolling dunes and plenty of green open space. You can enjoy a premium coastal lifestyle right beside the glittering Indian Ocean.
    [Show full text]
  • Mitchell Freeway Extension Burns Beach Road to Hester Avenue
    MAIN ROADS WESTERN AUSTRALIA NEWSLETTER JANUARY 2016 Mitchell Freeway Extension Burns Beach Road to Hester Avenue BIG YEAR AHEAD The project is ramping up for a busy year ahead with works to extend Mitchell Freeway to Hester Avenue in Clarkson well underway. Project Manager Chris Raykos said the first six months of construction was hugely successful, setting the project on track for a mid-2017 completion. “We made significant progress in 2015, completing the detailed design and over 50% of the bulk earthworks.” Major works will continue in the coming months including earthworks, noise wall installation, fauna and pedestrian underpasses, Neerabup and Hester Avenue bridge construction and upgrade works along Hester Avenue and Wanneroo Road. Mitchell Freeway Extension is a $261.4 million project funded by the Aerial view of the future freeway alignment looking north from Burns Beach Road. Australian ($209.1 million) and West Australian ($52.3 million) Governments. DID YOU KNOW? The equivalent of 700 Olympic size swimming pools of material is expected to be moved by project completion. Major earthworks are expected to continue across the project area until mid-2016. PEDESTRIANS AND CYCLISTS BENEFIT FROM EXTENSION Pedestrians and cyclists will benefit from more than 15 km of new shared paths that will be installed as part of the project. LOCAL CONNECTIONS Local access to the main path network along the freeway will be provided at the following locations: • Fisherton Circuit, Kinross (existing connection) • Gardiner Heights, Kinross • Clydebank Crescent, Kinross • Clarkson Station car park near Orenco Bend • Clarkson Station car park near Capitol Turn • Grandoak Drive, Clarkson • Liberty Drive, Clarkson • Redbank Rise, Clarkson • Linlee Lane, Clarkson A four metre wide shared pedestrian and cyclist path will be constructed on the western side of the freeway from Burns Beach Road to Hester Avenue.
    [Show full text]
  • 12516238-REP Targeted Flora Survey
    Main Roads Western Australia Mitchell Freeway Extension Hester Avenue to Romeo Road Targeted Flora Survey March 2020 Table of contents 1. Introduction..................................................................................................................................... 2 1.1 Project background .............................................................................................................. 2 1.2 Purpose of this report........................................................................................................... 2 1.3 Survey area .......................................................................................................................... 2 1.4 Scope of works .................................................................................................................... 3 1.5 Report limitations and assumptions ..................................................................................... 3 2. Methodology ................................................................................................................................... 4 2.1 Desktop review .................................................................................................................... 4 2.2 Targeted flora ....................................................................................................................... 4 2.3 Field survey .......................................................................................................................... 6 3. Results ..........................................................................................................................................
    [Show full text]
  • Council Minutes
    Council Minutes UNCONFIRMED ORDINARY COUNCIL MEETING 7.00pm, 23 November, 2004 RAAFA Estate - Cambrai 85 Hester Avenue Merriwa CITY OF WANNEROO MINUTES OF ORDINARY COUNCIL MEETING 23 NOVEMBER, 2004 I UNCONFIRMED MINUTES OF ORDINARY COUNCIL MEETING HELD ON TUESDAY 23 NOVEMBER 2004 CONTENTS ITEM 1 ATTENDANCES 1 ITEM 2 APOLOGIES AND LEAVE OF ABSENCE 1 ITEM 3 PUBLIC QUESTION TIME 2 PQ02-11/04 MR V HARMAN, HESTER AVENUE, WANNEROO 2 PQ03-11/04 MR V HARMAN, HESTER AVENUE, WANNEROO 3 PQ04-11/04 MS S MARTIN, OCEAN DRIVE, QUINNS ROCKS 3 PQ05-11/04 MR C LINDSAY, WENTWORTH STREET, YANCHEP 3 ITEM 4 CONFIRMATION OF MINUTES 4 OC02-11/04 MINUTES OF ORDINARY COUNCIL MEETING HELD ON 02 NOVEMBER 2004 4 ITEM 5 ANNOUNCEMENTS BY THE MAYOR WITHOUT DISCUSSION 4 A02-11/04 MEETINGS ON TOUR 4 ITEM 6 QUESTIONS FROM ELECTED MEMBERS 4 ITEM 7 PETITIONS 4 NEW PETITIONS PRESENTED 4 PT02-11/04 LIGHTING – OLDHAM OVAL 4 PT03-11/04 VERGE AND PARK MOWING PROGRAM, YANCHEP/TWO ROCKS 5 PT04-11/04 USAGE OF UNIT 2/49 BERRIMAN DRIVE, WANGARA 5 PT05-11/04 ABANDONED HOUSE, 4 EAST ROAD, PEARSALL 5 PT06-11/04 TRAFFIC ISLAND, HUGHIE EDWARDS DRIVE, MERRIWA 5 CITY OF WANNEROO MINUTES OF ORDINARY COUNCIL MEETING 23 NOVEMBER, 2004 II UPDATE ON PETITIONS 6 PT01-11/04 LOCATION OF GNANGARA’S LAND USE BE CHANGED TO FUTURE URBAN 6 ITEM 8 REPORTS 6 DECLARATIONS OF INTEREST BY ELECTED MEMBERS, INCLUDING THE NATURE AND EXTENT OF THE INTEREST. DECLARATION OF INTEREST FORMS TO BE COMPLETED AND HANDED TO THE CHIEF EXECUTIVE OFFICER.
    [Show full text]
  • Mitchell Freeway Extension (Hester Avenue to Romeo Road) EPBC 2018/8367 Preliminary Documentation
    Main Roads Western Australia Mitchell Freeway Extension (Hester Avenue to Romeo Road) EPBC 2018/8367 Preliminary Documentation December 2019 GHD scope and limitations Main Roads commissioned GHD Pty Ltd (GHD) to develop the Preliminary Documentation for EPBC 2018/8367 Mitchell Freeway Extension (Hester Avenue to Romeo Road) for submission to the Australian Department of the Environment and Energy. This report has been prepared by GHD for Main Roads Western Australia and may only be used and relied on by Main Roads Western Australia for the purpose agreed between GHD and the Main Roads Western Australia. GHD otherwise disclaims responsibility to any person other than Main Roads Western Australia arising in connection with this report. GHD also excludes implied warranties and conditions, to the extent legally permissible. GHD has prepared this report on the basis of information provided by Main Roads Western Australia and others who provided information to GHD (including Government authorities), which GHD has not independently verified or checked beyond the agreed scope of work. GHD does not accept liability in connection with such unverified information, including errors and omissions in the report which were caused by errors or omissions in that information. The opinions, conclusions and any recommendations in this report are based on assumptions made by GHD described in this report, and conditions encountered and information reviewed at the date of preparation of the report. GHD disclaims liability arising from any of the assumptions being incorrect, and has no responsibility or obligation to update this report to account for events or changes occurring subsequent to the date that the report was prepared.
    [Show full text]
  • Wanneroo Cycle Plan 2018/19 to 2021/22
    Wanneroo Cycle Plan 2018/19 - 2021/22 Wanneroo Cycle Plan, 2018/19-2021/22 Contents 1 Introduction .................................................................................................................................... 2 1.1 Background ............................................................................................................................. 2 1.2 Wanneroo Cycle Plan 2018/19 to 2021/22............................................................................. 3 2 Stakeholders ................................................................................................................................... 4 3 Community Engagement ................................................................................................................ 4 4 Aim, Goals and Objectives .............................................................................................................. 5 5 Methodologies ................................................................................................................................ 5 5.1 Active Transport Travel Plans ................................................................................................. 5 5.2 End of Trip Facilities ................................................................................................................ 5 5.3 Transport Assessment of Development and Planning Applications ....................................... 6 5.4 A Linked Network of Fast, Safe and Direct Cycle Routes .......................................................
    [Show full text]
  • Mitchell Freeway Extension - Hester Avenue to Romeo Road
    PROJECT UPDATE SEPTEMBER 2020 Mitchell Freeway Extension - Hester Avenue to Romeo Road Jointly funded by the Federal ($107.5 million) and State ($107.5 million) Governments, the $215 million Mitchell Freeway Extension Project will About the Project It will alleviate pressure on the local improve safety and reduce We are planning a 5.6 kilometre road network, reduce travel times and congestion on the northern northern extension of the Mitchell improve safety and connectivity for freeway network. Freeway from Hester Avenue to people living and working in the area. Romeo Road in Alkimos and a bridge over the freeway at Lukin Drive. The Key construction features • Rail tunnel/bridge for the rail to • freeway extension Project will service 5.6 kilometres of freeway from exit the freeway median to Butler, the fast growing outer northern Hester Avenue, two lanes in each approximately 500m north of Lukin suburbs of Yanchep, Butler, Alkimos, direction Drive Eglington and Nowergup. It will also • Northbound on-ramp and • Northbound off-ramp and extend the freeway to Romeo Road southbound off-ramp at Hester southbound on-ramp at Romeo and provide new freeway access Avenue interchange Road where freeway terminates points at Lukin Drive and Romeo • Interchange at Lukin Drive (eastern • Upgrade from 3-way to 4-way Road. section of the Lukin Drive ends at signalised intersection at Romeo the interchange) This extension is part of a suite of Road and Marmion Avenue. • Road bridge over Nowergup rail- • transport infrastructure improvements Dual carriageway on Romeo Road yard access road designed to support Perth’s rapidly from Wanneroo Road to Marmion expanding outer northern suburbs.
    [Show full text]
  • Business Case for Wanneroo Road Stage 3 Duplication – Joondalup Drive to Flynn Drive (SLK 26.57 to 29.9) Department of Transport October 2016
    Business Case for Wanneroo Road Stage 3 Duplication – Joondalup Drive to Flynn Drive (SLK 26.57 to 29.9) Department of Transport October 2016 Contact Person: Kugan Kugananthan Contact Phone: 08 9323 4121 Contact Email: [email protected] Version Date: 18/11/2016 Business Case approval The following officers have approved this document: Contents 1 Problem/Opportunity Definition .................................................................. 6 2 Evidence of the Problem/Opportunity ........................................................ 7 2.1 Current Traffic Demand ................................................................................. 9 2.2 Future Traffic Demand ................................................................................... 9 2.3 Crash Statistics ............................................................................................ 11 3 Objectives and Outcomes ......................................................................... 12 3.1 Urgency ....................................................................................................... 12 4 Strategic Alignment ................................................................................... 13 5 Recommended Option ............................................................................... 14 5.1 Works in Scope ............................................................................................ 14 5.2 Interfaces with other Projects or Works ....................................................... 14 6
    [Show full text]
  • Mitchell Freeway Extension Burns Beach Road to Hester Avenue
    MAIN ROADS WESTERN AUSTRALIA NEWSLETTER JULY 2015 Mitchell Freeway Extension Burns Beach Road to Hester Avenue An official ground breaking ceremony held in May signified the start of construction on the six kilometre Mitchell Freeway extension to Clarkson. Western Australian Minister for Transport, Dean Nalder along with Members of State and Federal Parliament, representatives from the City of Wanneroo and key project team members to kick off the project. The ceremony, held on site at the point where the new Mitchell Freeway / Neerabup Road interchange will be constructed, recognised the extension as a vital link that will take pressure off local roads and stimulate investment to enhance development of Perth’s northern corridor. Highlighting the investment in the State’s road network, Mr Nalder said the project will deliver economic benefits to the local community. “It will allow for the continued commercial and residential growth in Perth’s northern suburbs and support the State’s economy more broadly, including the creation of more than Pictured above: From left Jan Norberger (Joondalup), Peter Kasambanis, Paul Miles 100 jobs at the peak of construction,” (Wanneroo), Ian Goodenough (Federal Member for Moore), Dean Nalder (WA Minister for Mr Nalder said. Transport), Albert Jacob (Ocean Reef), Tracey Roberts (Mayor of Wanneroo) The Australian Government has contributed $209.1 million to the $261.4 million project. Main Roads has awarded a contract to Leighton Contractors, who will be working It will allow for the closely with Main Roads to safely and efficiently deliver the project. We are pleased continued commercial to be able to commence construction and commit to an accelerated program of and residential growth in construction to help improve traffic flow in this area.
    [Show full text]