Singh Vytas Pelegrimas, Pe Civil Engineer

Total Page:16

File Type:pdf, Size:1020Kb

Singh Vytas Pelegrimas, Pe Civil Engineer SINGH VYTAS PELEGRIMAS, PE CIVIL ENGINEER Mr. Pelegrimas has practiced civil I290 Phase I Study – Illinois Department of Transportation engineering in the public and Civil Engineer providing interchange design studies for 7 interchanges. He is also preparing private sectors since 2001. He interchange design studies for 21 signalized intersections and is investigating existing cross also worked during summers road conditions. He is responsible for accident analysis, traffic maintenance and traffic while pursuing his degree in civil studies. Construction Cost $560M engineering at the University of Ashland Avenue at Pershing Road, Cook County, IL for CDOT Illinois. He is familiar with Civil Engineer responsible for preparation of Location Drainage Study and hydraulic computer programs such as analysis. Project consists of overpass structure removal at Ashland Avenue over Pershing HEC-RAS, HEC-1, HYDRAIN, Road and replacing it with an at grade intersection of Ashland Avenue at Pershing Road TR-20, TR-55 and WISPRO used for hydraulic and hydrological Tank Farm Road, O’Hare Airport, Chicago, IL for OMP studies and analysis. He has Design Engineer responsible for erosion control and maintenance of traffic plans, estimates prepared geometric design of and specifications for relocated Tank Farm Road. The proposed civil plans will also include roadways, pavement markings the Construction Safety and Phasing Plans. The secondary task will include the lighting plans, MOT plans, signing plans, rehabilitation, traffic signal study and interconnect plans. Construction Cost $1.9M traffic studies and drainage studies. Irving Park Road at York Road, Bensenville IL for IDOT Civil Engineer responsible for traffic signal design. The existing lighting and proposed lighting warrants were analyzed to ensure the design met national standards and the client Education expectations. Underpass lighting was attached to the new CPRR Bridge over Irving Park BS, Civil Engineering, University Rd to enhance motorist safety. The signalized intersection at Irving Park Rd and York Rd of Illinois, Chicago, 2001 was redesigned to greatly improve traffic flow and included an interconnected traffic signal system. Construction Cost $40M BS, Civil Engineering, VT University, Lithuania, 1997 US 30 at EJ&E / CN Railroad, Lynwood, IL for IDOT Design Engineer responsible for Crash Analysis. The analysis includes a summary of the Pavement Design Course, IDOT, crash data on US Route 30, an evaluation of areas where crashes occurred and 2005 identification of safety problems that exist. The crash analysis conducted for this project included a 0.74 mile segment (M.P. 152.07 to M.P. 152.81) of Route 30 from south of the Professional Certifications, Lansing Ditch to the Illinois State line. Construction Cost $50M Accreditation, Special Phase I Studies, Various Locations for IDOT Licensing Civil Engineer responsible for Crash and HCS Analysis for 3 intersections. The Crash PE – Illinois/062-062214 analysis includes a summary of the crash data and identification of safety problems that (2009) exist at the intersections. HCS analysis includes investigation of intersection operations PE – Wisconsin/41217-6 (2010) reflective of different design alternatives and traffic volumes. Years of Industry IL 72 at Beverly Road & Rock Road Phase I, Cook County for IDOT Experience Civil Engineer responsible for preparation of Intersection Design Study, Location Drainage Study, HCA Analysis, contract plans and estimates. Project consists of the addition of a 10 years second turn lane for WB IL Route 72, which requires adjustment to traffic signal phasing, roadway widening and median modifications to accommodate dual left turns. Arsenal Road Interchange at Interstate 55 Mr. Pelegrimas is providing design support for the drainage systems which includes ditches, several box culverts, storm sewers, detention ponds, underdrain systems, and ripraps according to Illinois Department of Transportation standards as well as Will County Highway Department design standards. The scope requires the removal and relocation of the Arsenal Road Interchange 1 mile south with a new geometric configuration. Construction cost $44M I-294 M.P. 44.50 (Dempster Street) to M.P. 49.00 (Willow Road) for ISTHA Civil Engineer responsible for preparing the contract plans, estimates and specifications for SINGH VYTAS PELEGRIMAS, PE CIVIL ENGINEER drainage, pavement markings and signs for this section of the Tollway. The project includes reconstruction and widening of the pavements from three lanes to four lanes, ramps, shoulders, new drainage structures, modification of existing drainage system including detention facilities. Construction cost $100M ORT Design for Plazas 1, 5 & 7 for ISTHA Civil Engineer responsible for the drainage design and preparation of drainage plans, erosion control plans, estimates and specifications. Construction cost $50M North South Tollway (I-355) for ISTHA Civil Engineer responsible for the drainage design and preparation of drainage plans, erosion control plans, estimates and specifications. Construction cost $50M US-20 Rohlwing Road to Addison Street, DuPage County, IL for IDOT Civil Engineer responsible for the drainage design and preparation of drainage plans, erosion control plans, estimates and specifications, and surveys. The project consists of reconstruction of US Route 20, new drainage system and traffic signal modernization. Construction cost $20M IL 53, Army Trail Road to Elgin O’Hare, DuPage County, IL for IDOT Civil Engineer responsible for preparation of the Location Drainage Study and hydraulic analysis. Project consists of widening and reconstructing roadway pavement from two lanes to five lanes, bridge construction and culvert extensions with a closed storm sewer system. Construction cost $20M Prairie Parkway, IL for IDOT Civil Engineer responsible for coordinating and collecting traffic data. The data was collected manually and with machines. Mr. Pelegrimas also conducted delay and timing runs. Project cost $500M Lake Cook Road, Cook County, IL for CCHD Civil Engineer responsible for the drainage design and preparation of drainage plans, erosion control plans, estimates and specifications, and surveys. The project consists of widening the roadway from two to three lanes. In-line detention storage and auxiliary sewers are proposed. The scope will also incorporate new culvert design. Construction cost $4M IL 53/I-290, Higgins Road to Devon Avenue, IL for IDOT Civil engineer responsible for pavement marking and signing plans. Project consists of expressway reconstruction. Construction cost $ 30M Iowa 100, Linn County, for Iowa DOT Civil Engineer responsible for the drainage design and preparation of drainage plans, erosion control plans, estimates and specifications, and surveys. The project consists of extending the existing highway and constructing a new highway in Linn County. Mr. Pelegrimas is preparing the hydraulic and hydrologic design and TS&L plans for 3 new culverts under the Iowa 100 highway extension. The first 10.0’x6.0’ RCB culvert is located in the E Avenue interchange area. The existing drainage swale will be rerouted to follow the ditches on the east side of the E Avenue interchange ramps. The second 8.0’x6.0’ RCB culvert is a mainline Iowa 100 cross drainage structure. The third triple 12.0’x6.0’ RCB culvert will be located at Ushers Ferry Creek’s crossing of the mainline. Construction cost $40M I-290 from 12/20/45 to IL 50, for IDOT SINGH VYTAS PELEGRIMAS, PE CIVIL ENGINEER Civil Engineer responsible for civil engineering portions of the project. The project consists of reconstruction of the expressway facility within the limits of the project to provide an additional (fourth) lane in each direction as a high occupancy vehicle lane (HOV). This includes numerous interchanges to be reconstructed, as well as railroad bridges and retaining walls. The proposed project it to be based on an HOV feasibility study that was prepared for the corridor in 1998 and is compatible with the Phase I study for Interstate 290 to the west that was completed in January 2000. The work includes alternate geometric studies, interchange and intersection design studies, bridge studies, combined design report, accident analysis, location design study and other studies as required. Mr. Pelegrimas coordinated and analyzed the collection of traffic data. The data was collected manually and with machines; and he conducted delay and timing runs. Project cost $500M Des Plaines Game Farm, Will County, IL for CDB Civil Engineer responsible for all civil engineering portions of the project. The project consisted of constructing a new office building and rehabilitating a shop building. The work also included new parking lots, access roads, new septic system and septic field. Construction cost $2M Central Avenue, 147th Street to 155th Street for Cook County Civil Engineer responsible for the preparation of plans, estimates, specifications, Drainage Study and design of the closed storm sewer system. Project consists of widening and reconstruction of the roadway pavement from two lanes to three lanes. Construction cost $3M .
Recommended publications
  • Illinoistollwaymap-June2005.Pdf
    B C D E F G H I J K L Issued 2005 INDEX LEE ST. 12 45 31 Racine DESPLAINES RIVER RD. Janesville 43 75 Sturtevant 294 Addison . .J-6 Grayslake . .I-3 Palos Hills . .J-8 Union Grove Devon Ave 11 Burlington 90 Plaza Alden . .G-2 Gurnee . .J-3 Palos Park . .J-8 Footville Elmwood Park 11 Algonquin . .H-4 Hammond . .L-8 Park City . .J-3 Elkhorn 11 Alsip . .K-8 Hanover Park . .I-6 Park Forest . .K-9 NORTHWEST 51 11 72 Amboy . .C-7 Harmon . .B-7 Park Ridge . .K-5 14 11 TOLLWAY Antioch . .I-2 Harvey . .K-8 Paw Paw . .E-8 94 142 32 1 Arlington . .C-9 Harwood Heights . .K-6 Phoenix . .L-8 39 11 Delavan 36 HIGGINS RD. 1 Arlington Heights . .J-5 Hawthorn Woods . .I-4 Pingree Grove . .H-5 90 41 31 TRI-STATE TOLLWAY Ashton . .C-6 Hebron . .H-2 Plainfield . .H-8 83 67 142 Aurora . .H-7 Hickory Hills . .K-7 Pleasant Prairie . .J-2 50 O’Hare East Barrington . .I-5 Highland . .L-9 Poplar Grove . .E-3 Plaza 72 Bartlett . .I-6 Highland Park . .K-4 Posen . .K-8 Darien 75 45 90 Batavia . .H-6 Hillcrest . .D-6 Prospect Heights . .J-5 Beach Park . .K-3 Hillside . .J-6 Richton Park . .K-9 50 158 River Rd. Bedford Park . .K-7 Hinkley . .F-7 Racine . .K-1 50 Plaza Paddock Lake Bellwood . .J-6 Hinsdale . .J-7 Richmond . .H-2 213 Lake Geneva O’Hare West KENNEDY EXPY. 43 14 Williams Bay Kenosha Plaza Beloit .
    [Show full text]
  • 95Th Street Project Definition
    Project Definition TECHNICAL MEMORANUM th 95 Street Line May 2019 TABLE OF CONTENTS Executive Summary...............................................................................................ES-1 Defining the Project......................................................................................ES-2 Project Features and Characteristics ..........................................................ES-3 Next Steps .....................................................................................................ES-7 1 Introduction .........................................................................................................1 1.1 Defining the Project ...............................................................................2 1.2 95th Street Line Project Goals.................................................................2 1.3 Organization of this Plan Document.....................................................3 2 Corridor Context ..................................................................................................6 2.1 Corridor Route Description ....................................................................6 2.2 Land Use Character ..............................................................................6 2.3 Existing & Planned Transit Service .........................................................8 2.4 Local and Regional Plans......................................................................8 2.5 Historical Resources ...............................................................................9
    [Show full text]
  • Illinois Department of Public Health Division of Health Care Facilities and Programs Health Facilities Directory Home Health Agency
    Illinois Department of Public Health Division of Health Care Facilities and Programs Health Facilities Directory Home Health Agency Facility Name Facility Address City County Zip Contact Person Phone # License # 1st Assist Home Healthcare, LLC 1019 W. Wise Rd., Ste. 200 Schaumburg Cook 60193 Pamela Canete (630) 339-3688 1010496 1st Choice Home Health Agency, Inc 7254 W. Benton Drive Frankfort Will 60423 Edward Assam (815) 464-9980 1011184 1st Family Home Healthcare, Inc. 666 Russell Court, Ste 308 Woodstock Mc Henry 60098 Ramon Sagrado (815) 337-4240 1011088 1st Home Healthcare, Inc. 5875 N. Lincoln Ave., Ste 229 Chicago Cook 60659 Joseph D. de la Cruz (773) 275-7935 1010441 24/Seven Health Care Services, Inc. 3318 W. Peterson Ave. Chicago Cook 60659 Lourdes Redoble (773) 463-3755 1011165 3 Angels Home Health 8700 N. Waukegan Rd., Ste 224 Morton Grove Cook 60053 Farhan Siddiqui (847) 581-1400 1010960 4 Seasons Home Healthcare Services Corporation 2015 S. Arlington Hghts Rd, Ste 102 Arlington Heights Cook 60005 Alberto V. Jovellanos (847) 357-8008 1011478 5 Star Healthcare, Inc. 1974 Miner Street, 1st Floor Des Plaines Cook 60016 Vincente Cabrera (847) 257-0130 1010292 A & S Home Healthcare, Inc. 6900 Main Street, Ste. 200 Downers Grove Du Page 60516 Sultan Surti (630) 964-6100 1010705 A & Z Home Health Care, Inc. 3232 Ridge Road, Ste. 1 Lansing Cook 60438 Patricia Omorogbe (708) 418-1608 1010566 A Plus Home Health Care Corporation 7906 South Crandon Avenue, #7 Chicago Cook 60616 Anman Ubir (773) 793-4527 1010978 A Touch From Above, Corp. 3729 Chicago Road Steger Will 60475 Ellen Cajayon-Tucker (708) 833-8643 1010893 A2Z Healthcare Services, LLC 15347 70th Court Orland Park Cook 60462 LaShonda Crockett (708) 332-9070 1011069 Aaron Nursing Services, Inc.
    [Show full text]
  • 7-ELEVEN (DARK) 1740 Dempster Street Mt
    NET LEASE INVESTMENT OFFERING 7-ELEVEN (DARK) 1740 Dempster Street Mt. Prospect, Illinois (Chicago MSA) TABLE OF CONTENTS TABLE OF CONTENTS I. Executive Profile II. Market Overview III. Location Overview IV. Location & Tenant Overview Executive Summary Market Report Photographs Demographic Report Investment Highlights Rent Comparables Aerial Location Overview Property Overview Site Plan Tenant Overview Map NET LEASE INVESTMENT OFFERING DISCLAIMER STATEMENT DISCLAIMER The information contained in the following Offering Memorandum is proprietary and strictly confidential. STATEMENT: It is intended to be reviewed only by the party receiving it from The Boulder Group and should not be made available to any other person or entity without the written consent of The Boulder Group. This Offering Memorandum has been prepared to provide summary, unverified information to prospective purchasers, and to establish only a preliminary level of interest in the subject property. The information contained herein is not a substitute for a thorough due diligence investigation. The Boulder Group has not made any investigation, and makes no warranty or representation. The information contained in this Offering Memorandum has been obtained from sources we believe to be reliable; however, The Boulder Group has not verified, and will not verify, any of the information contained herein, nor has The Boulder Group conducted any investigation regarding these matters and makes no warranty or representation whatsoever regarding the accuracy or completeness of the information provided. All potential buyers must take appropriate measures to verify all of the information set forth herein. NET LEASE INVESTMENT OFFERING EXECUTIVE SUMMARY EXECUTIVE The Boulder Group is pleased to exclusively market for sale a single tenant net leased 7-Eleven property located SUMMARY: within the Chicago MSA, in Mount Prospect, Illinois.
    [Show full text]
  • Chicago - Urban New Construction & Proposed Multifamily Projects 1Q20
    Chicago - Urban New Construction & Proposed Multifamily Projects 1Q20 ID PROPERTY UNITS 7 Edge on Broadway 105 7 8 Eagles Building Redevelopment 134 131 14 Four50 Residences 80 57 22 Lathrop Homes Redevelopment 414 Total Lease Up 733 111 35 1900 West Lawrence Avenue 59 45 Dakin Street & Sheridan Road 54 110 Foster Beach Total Under Construction 113 56 54 1801 West Grace Street 62 132 55 1825 West Lawrence Avenue 166 56 5356 North Sheridan Road 50 113 57 Loft Lago 59 58 Wilson Red Line Development 110 35 137 55 59 Lake Shore Drive 332 Mixed-Use Development 112 58 Montrose Beach 60 Panorama 140 134 61 Clark and Drummond 84 133 62 Edith Spurlock 485 Redevelopment-Lincoln Park 136 109 Lathrop Chicago Redevelopment Phase II 702 110 5440 North Sheridan Road 78 111 Edgewater Medical Center Redevelopment 141 135 45 112 4601 North Broadway 197 114 8 113 Draper Phase II, The 368 54 114 3921 North Sheridan 120 59 Total Planned 3,094 141 131 Loft Lago 59 132 Park Edgewater 365 60 133 1030 West Sunnyside Avenue 144 14 134 4511 North Clark Street 56 139 Lincoln Park 135 Immaculata High School 220 138 136 Montrose Phase II, The 160 137 Winthrop Avenue Multi-Residential 84 109 140 138 Ashland Avenue 79 22 198 139 Bel Ray Redevelopment 136 62 61 Peggy Notebaert 140 Lincoln Park Plaza Phase II 57 198 Hotel Covent Redevelopment 114 Nature Museum 141 Optima Lakeview 246 Total Prospective 1,720 2000 ft Source: Yardi Matrix LEGEND Lease-Up Under Construction Planned Prospective Chicago - Urban New Construction & Proposed Multifamily Projects 1Q20 162 30 81
    [Show full text]
  • Chicago Region Congestion Management Highway Network
    Chicago Region Congestion Management Highway Network 7 4 I 3 S L L 8 7 I R 1 3 L I A 1 3 1 I 3 L L 17 I 3 0 7 S IL 173 U R S A 1 1 IL 173 2 IL 173 0 4 U 173 SRA 307 S S IL R A IL 173 07 4 I 3 A 1 R L S 5 0 1 4 1 S 0 4 1 3 2 9 R 1 U S 5 A ( A S L G U I R 2 4 R S 1 7 5 3 US 12 2 S E 1 R E L I N A S I B L 6 R 0 8 A A 3 2 Y 4 0 R 8 O IL 132 Yorkhouse Road A D ) Yorkhouse Rd 73 1 L I I L 1 3 2 GOLF (G R SUNSET AVE IL S 3 R AN S 1 A GREENWOOD R D SRA 602 A 4 AV E) EN U 10 08 4 1 2 L I IL 8 3 Grand Ave S ) H D Clark/Division E A CHARLES RD R O IL 120 I S t D R R 0 SRA 508 e A 1 A e D N r 2 t N 0 SRA 508 0 6 2 R 2 L 1 A I 0 S A 1 2 O R R L e I A l S ( 8 0 0 l 6 12 RA 5 I IL S D 2 a US 0 L 14 7 12 0 1 3 4 S S Lake St S a SRA 2 A Chicago/State 00 L R A 5 U go Ave I Chica L 5 4 R 0 I 8 S L S Grayslake 1 20 U McHenry County Lake County Ontario St Ontario / Ohio Corridor Ohio St Illinois / Grand Corridor L EY RO Grand Ave CK A D) 3 BU 90 Illinois St 2 PETERSON ROAD ( I L 13 7 ¨§ L ¦ I SRA 211 Grand/State SRA 211 Ogilvie U U S Washington/Dearborn 14 S I L S 6 Libertyville 4 r 0 R 1 t o S State/Lake A ( d Clark/Lake i S k r r e 9 K Washington/State 2 a r W l 0 0 u 3 O o C Millennium Station 4 9 a n 2 K t C c n St e hingto 7 Was 4 A S ´ L I 1 I 4 k v s E e R 0 3 t e L t e A I ison St ad a I S M 1 H L t r S L n e i S n I 2 I s D v A 1 G i a e a Downtown Routes t l r R n r H i g S i i S P a v D l W n ms St SRA Route #'s Ada IL 176 h e P o s 6 s 7 c 1 s downtown are 411 I A s L i I r L e u IL 176 e e Jackson Blvd Y 6 f unless otherwise noted f M D D SRA 509 b 1 0 0 ) e 6 / A / J m US 20 SR 8 3 n ay u SRA 601 IL 176 Congress Parkw l o 290 o s r ¦¨§ C IL 60 (TOWNLINE ROAD) IL 60 e f 0 0.5 Crystal Lake f LaSalle St.
    [Show full text]
  • Budget Locations Within Illinois
    Budget Locations within Illinois Addison, IL 159 South Rohlwing Road Addison 60101 IL 630-916-6957 Aurora, IL 1311 North Lake Street Aurora 60506 IL 630-892-2383 Aurora, IL Sears 2 Fox Valley Center Sears At Fox Valley Mall Aurora 60504 IL 630-585-5512 630-585-5581 Bloomington, IL 3201 Cira Drive Suite 117 Central Illinois Regional Apo Bloomington 61704 IL 309-661-8029 309-661-8042 Midway Apo/Chicago 5150 West 55th Street Midway Airport Chicago 60638 IL 773-948-7002 O’Hare Apo/Chicago 10000 Bessie Coleman Drive O’Hare Airport Chicago 60666 IL 773-894-1900 Chicago Union Stn 225 S Canal Street Union Train Station Chicago 60606 IL 708-392-6981 708-392-6982 Lakeview Chicago 3721 North Broadway Street Lakeview Chicago 60613 IL 773-528-1770 Wabash Chicago 714 South Wabash Avenue Chicago 60605 IL 312-960-3100 North Loop Budget 214 North Clark Street North Loop Chicago 60601 IL 312-263-0086 Logan Square 3255 West Fullerton Avenue Chicago 60647 IL 773-252-4352 773-252-4363 S Wabash 1830 S Wabash Ave Chicago 60616 IL 312-225-5396 Grossingr Autoplx 1561 North Fremont Street Chicago 60642 IL 312-219-6153 312-219-6154 Chicago Ridge Srs 6501 West 95th Street Sears Auto Center Chicago Ridge 60415 IL 708-423-4930 Collinsville IL 1706 Vandalia Street Collinsville 62234 IL 618-344-2356 Crystal Lake,IL 5186 Northwest Highway 1 Mile West Of Highway 31 Crystal Lake 60014 IL 815-356-9440 Decatur Apo IL 910 South Airport Road Decatur Municipal Airport Decatur 62521 IL 217-422-0153 Downers Grove IL 1340 Ogden Avenue Downers Grove 60515 IL 630-964-5233 Elk Grove
    [Show full text]
  • Chicago Arts + Industry Commonsave (CAIC)K Nort Avenue N West Fullerton V
    Chicago Arts + Industry Chicago,Commons IL N Table of Contents p03 Slide Deck p13 The Narrative 2 N Slide Deck 3 Kenwood Gardens Kenwood St. Laurence School Stony Island Arts Bank Garfield Park Industrial Arts ard e u n e v A h t ianapolis Boulev 5 Ind B e v A h t u o S levard apolis Bou treet Indian East 112th Street et outh S re t ast 108th S E e v A g n i w E h t u o S S ast 87th 87th ast Ave E South Avenue L Ewing South South Lake Shore Drive O e u n e v A h t u o treet S Ewing hore Dr hore ve S A outh Lake outh S South South Mackinaw Avenue 06th Street t 100th S hore Dr ve A S as st 1 South Buffalo Avenue E South Burley Avenue Ea South Harbor South t South Lake South South Shore Drive reet 1st Street h St East 93rd S ast 9 South Commercial Ave E East 95t al Ave al South Exchange Avenue ci East 92nd Street er Comm h h Sout Shore Drive t S South Muskegon 76th Ave East ny Avenue South Southt ho S venue Ant ast 75th ast A E uth ast 104th St hange So E East 83rd Street South Torrence Avenue South Exc South Colfax Ave treet d r a v e e l u t o a B Y h t u s o S South South Shore Drive tte arque t t M Dr S ue 100th ast Eas E rd S East 93 outh Anthony Aven e S riv an D es Dr y South V Ha ette South Jeffery Boulevard Vlissingen Rd st st qu a East 103rd Street E ar M nue e ast E East 76th Street ago Av East 87th Street ayes r D South Lake st H Shore Dr South Hyde Park Boulevard Ea outh South Chic t South Cornell Avenue S South Stony Island Avenue South Stony Island Ave ast 55th S South Stony Island Avenue treet E t S East 47th 47th East ast
    [Show full text]
  • ARCHER STATION LA Fitness, Ross Dress for Less, AT&T & Athletico Physical Therapy 2620-2640 W Pershing Road Chicago, IL 60632 TABLE of CONTENTS
    NET LEASE INVESTMENT OFFERING ARCHER STATION LA Fitness, Ross Dress for Less, AT&T & Athletico Physical Therapy 2620-2640 W Pershing Road Chicago, IL 60632 TABLE OF CONTENTS TABLE OF CONTENTS I. Executive Profile II. Financial Overview III. Location Overview IV. Market & Tenant Overview Executive Summary Class C Tax Incentive Photographs Demographic Report Investment Highlights Rent Roll Aerial Market Overview Property Overview ProForma Analysis Site Plan Tenant Overview Maps NET LEASE INVESTMENT OFFERING DISCLAIMER STATEMENT DISCLAIMER The information contained in the following Offering Memorandum is proprietary and strictly confidential. It is intended STATEMENT: to be reviewed only by the party receiving it from The Boulder Group and should not be made available to any other person or entity without the written consent of The Boulder Group. This Offering Memorandum has been prepared to provide summary, unverified information to prospective purchasers, and to establish only a preliminary level of interest in the subject property. The information contained herein is not a substitute for a thorough due diligence investigation. The Boulder Group has not made any investigation, and makes no warranty or representation. The information contained in this Offering Memorandum has been obtained from sources we believe to be reliable; however, The Boulder Group has not verified, and will not verify, any of the information contained herein, nor has The Boulder Group conducted any investigation regarding these matters and makes no warranty or representation whatsoever regarding the accuracy or completeness of the information provided. All potential buyers must take appropriate measures to verify all of the information set forth herein. NET LEASE INVESTMENT OFFERING EXECUTIVE SUMMARY EXECUTIVE The Boulder Group is pleased to exclusively market for sale Archer Station, a fully leased four tenant shopping center located in SUMMARY: the city of Chicago.
    [Show full text]
  • 314 Bus Time Schedule & Line Route
    314 bus time schedule & line map 314 Ridgeland View In Website Mode The 314 bus line (Ridgeland) has 2 routes. For regular weekdays, their operation hours are: (1) North: 5:25 AM - 7:07 PM (2) South: 6:00 AM - 7:47 PM Use the Moovit App to ƒnd the closest 314 bus station near you and ƒnd out when is the next 314 bus arriving. Direction: North 314 bus Time Schedule 41 stops North Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 5:25 AM - 7:07 PM Morton College Tuesday 5:25 AM - 7:07 PM Central Ave & Pershing Rd 5600 Pershing Road, Cicero Wednesday 5:25 AM - 7:07 PM Pershing Rd & 57th Ave Thursday 5:25 AM - 7:07 PM 5642 Pershing Road, Cicero Friday 5:25 AM - 7:07 PM Pershing Rd & 58th Ave Saturday 5:58 AM - 6:58 PM 5746 Pershing Road, Cicero Pershing Rd & Austin Blvd 3841 Ridgeland Avenue, Berwyn 314 bus Info Pershing Rd & 61st Ave Direction: North 6048 Pershing Road, Berwyn Stops: 41 Trip Duration: 24 min Pershing Rd & Lombard Ave Line Summary: Morton College, Central Ave & 3843 Lombard Avenue, Berwyn Pershing Rd, Pershing Rd & 57th Ave, Pershing Rd & 58th Ave, Pershing Rd & Austin Blvd, Pershing Rd & Pershing Rd & Highland Ave 61st Ave, Pershing Rd & Lombard Ave, Pershing Rd & 3845 Highland Avenue, Berwyn Highland Ave, Pershing Rd & Austin Blvd, Ridgeland Ave & 38th St, Ridgeland Ave & 37th St, Ridgeland Pershing Rd & Austin Blvd Ave & 36th St, Ridgeland Ave & 35th St, Ridgeland 3841 Ridgeland Avenue, Berwyn Ave & Ogden Ave, Ridgeland Ave & 33rd St, Lavergne Metra Station, Ridgeland Ave & 29th St, Ridgeland Ridgeland
    [Show full text]
  • Comprehensive Plan ~Pdote Village of Morton Grove, Illinois
    Comprehensive Plan ~pdote Village of Morton Grove, Illinois Prepared for the VIllage of Morton Gro~ 1/llnols by~ Pefligrew, Allen 8 ~Inc. and McDonough Assodates, Inc. • October, 1999 Table of Contents Page: Introduction v The Morton Grove Community v The Comprehensive Planning Process v Purpose of the Comprehensive Plan vi Organization of the Plan Report vi SECTION 1: COMMUNITY CONDITIONS & POTENTIALS Figure 1: Community Setting 1-1 Figure 2: Generalized Land-Use 1-3 Figure 3: Land-Use Changes: 1979-1998 1-5 Figure 4: Zoning 1-7 Figure 5: Parks & Reaeation 1-9 Figure 6: Public & Private Schools 1-11 Figure 7: Other Community Facilities 1-13 Figure 8: Transportation 1-15 Figure 9: Public Utilities 1-17 Figure 70: Issues & Concerns 1-19 Table 7: Parks and Reaeation 1-21 Table 2: Public and Private Schools 1-22 Table 3: Other Community Fadlities 1-23 SECTION 2: DEMOGRAPHIC & MARKET OVERVIEW Demographic Overview 2-1 Population 2-1 Households 2-2 Age Distribution 2-2 Radai!Ethnic Distribution 2-3 Income Distribution 2-3 Employment 2-4 Housing Trends 2-4 Market Overview 2-5 Residential Land-Use Demand 2-6 Industrial Land-Use Demand 2-7 Office Land-Use Demand 2-8 Retail/Service Land-Use Demand 2-8 SECTION 3: A VISION FOR THE FUTURE A Vision for Morton Grove 3-1 Participants in the Vision Workshops 3-1 Vision Statement 3-2 Morton Grove Comprehensive Plan - -------- -------- Pagei Table of Contents (continued) Planning Goals & Objectives 3-4 Community Image, Appearance and Identity 3-4 Housing and Residential Areas 3-5 Commercial Development
    [Show full text]
  • City of Chicago Requirements for Scooter Sharing Emerging Business Permit Pilot Program
    CITY OF CHICAGO REQUIREMENTS FOR SCOOTER SHARING EMERGING BUSINESS PERMIT PILOT PROGRAM I. Definitions. For purposes of this scooter sharing emerging business permit application document, the following definitions shall apply: “Business operations window” means the time period(s) within the term of the scooter sharing EBP in which vendors are allowed to conduct business operations, i.e., offering scooter rental services in accordance with the terms of the scooter sharing EBP. “City” means the City of Chicago. “Code” means the Municipal Code of Chicago. “Commissioner” means the City’s Commissioner of Business Affairs and Consumer Protection. “Pilot Area” means the geographic area in which a vendor’s scooters may be rented from and end a trip, subject to the terms of the pilot program, and all generally applicable parking rules and restrictions. The pilot area for the pilot program shall be the entire portion of the City bounded as follows, and as shown in the attached Pilot Area Map: beginning at the intersection of North California Avenue and West Irving Park Road; thence east on West Irving Park Road to the North Branch Chicago River; thence southeasterly along the North Branch Chicago River to North Halsted Street; thence south on North Halsted Street to the South Branch of Chicago River; hence southwesterly along the South Branch of Chicago River to South Cicero Avenue; thence north on South Cicero Avenue to West Pershing Road; thence east on West Pershing Road to the Chicago Belt Railroad; thence north along the Chicago Belt Railroad to Roosevelt Road; thence west on Roosevelt Road to South Austin Boulevard; thence north on South Austin Boulevard to West North Avenue; thence west on West North Avenue to Harlem Avenue; thence north on Harlem Avenue to West Irving Park Road; hence east on West Irving Park Road to the place of the beginning.
    [Show full text]