` Table 1: Status of Kuthur PHC
Total Page:16
File Type:pdf, Size:1020Kb
` Table 1: Status of Kuthur PHC ............................................................................................................................... 2 Table 2: Source and Quality of Power at Kuthur PHC ........................................................................................... 2 Table 3: Average Metrological Data of the Site at Kuthur PHC ............................................................................ 2 Table 4: Solar Irradiation Data of the Site at Kuthur PHC ..................................................................................... 3 Table 5: Field Survey Analysis for Electrical Connected Load of Kuthur PHC .................................................... 3 Table 6: Maximum Electrical Demand Calculation for Kuthur PHC ..................................................................... 4 Table 7: Status of Chare PHC ................................................................................................................................. 5 Table 8: Source and Quality of Power at Chare PHC ............................................................................................. 6 Table 15: Average Metrological Data of the Site at Chare PHC ............................................................................ 6 Table 16: Solar Irradiation Data of the Site at Chare PHC ..................................................................................... 6 Table 17: Field Survey Analysis for Electrical Connected Load of Chare PHC .................................................... 7 Table 18: Maximum Electrical Demand Calculation for Chare PHC ..................................................................... 7 Table 19: Status of Angangba PHC ........................................................................................................................ 9 Table 20: Source and Quality of Power at Angangba PHC .................................................................................... 9 Table 21: Average Metrological Data of the Site at Angangba PHC ..................................................................... 9 Table 22: Solar Irradiation Data of the Site at Angangba PHC .............................................................................. 9 Table 23: Field Survey Analysis for Electrical Connected Load of Angangba PHC ........................................... 10 Table 24: Maximum Electrical Demand Calculation for Angangba PHC ............................................................ 10 Table 31: Status of Longjang PHC ....................................................................................................................... 11 Table 32: Source and Quality of Power at Longjang PHC ................................................................................... 12 Table 33: Average Metrological Data of the Site at Longjang PHC .................................................................... 12 Table 34: Solar Irradiation Data of the Site at Longjang PHC ............................................................................. 12 Table 35: Field Survey Analysis for Electrical Connected Load of Longjang PHC ............................................ 13 Table 36: Maximum Electrical Demand Calculation for Longjang PHC ............................................................. 13 Table 43: Status of Khonoma PHC....................................................................................................................... 15 Table 44: Source and Quality of Power at Khonoma PHC ................................................................................... 16 Table 45: Average Metrological Data of the Site at Khonoma PHC .................................................................... 16 Table 46: Solar Irradiation Data of the Site at Khonoma PHC ............................................................................. 16 Table 47: Field Survey Analysis for Electrical Connected Load of Khonoma PHC ............................................ 17 Table 48: Maximum Electrical Demand Calculation for Khonoma PHC ............................................................ 17 Table 49: Status of Jotsoma PHC ......................................................................................................................... 19 Table 50: Source and Quality of Power at Jotsoma PHC ..................................................................................... 20 Table 51: Average Metrological Data of the Site at Jotsoma PHC ....................................................................... 20 Table 52: Solar Irradiation Data of the Site at Jotsoma PHC ............................................................................... 20 Table 53: Field Survey Analysis for Electrical Connected Load of Jotsoma PHC ............................................... 20 Table 54: Maximum Electrical Demand Calculation for Jotsoma PHC ............................................................... 21 Table 37: Comparative Analysis of Electrical Connected Load and Demand Assessment of Surveyed Primary Health Centres ...................................................................................................................................................... 22 Kuthur PHC in Tuensang District Location: Tuensang District, Nagaland, India Latitude: 26.3226; Longitude: 94.8844 Elevation: 2089 meters (6855 feet) Kuthur PHC view in Google Earth: Table 1: Status of Kuthur PHC Recently updated from sub centre to PHC Number of beds in the Kuthur PHC 4 District name Tuensang Block name Tuensang Sadar Town/Village name Kuthur No of SC covered by Kuthur PHC No of villages covered by the PHC 23 Total population served Age of the buildings 52 years Roof type CGI double slope RCC Roof top free for solar installation NA Clear ground area available for Solar Panel About 500 sqm Table 2: Source and Quality of Power at Kuthur PHC Centre is power distribution grid connected Yes Line Voltage (220 V, 415 V or 11 kV) 220 V DG set NON Distance of nearest distribution line pole 20 m (mtrs) Power availability hrs in a day 5-6 hrs No of load shedding frequency/day 5/day Power quality in terms of voltage fluctuating Table 3: Average Metrological Data of the Site at Kuthur PHC Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Average Average sunrise time 5.46 5.20 4.80 4.36 3.97 3.86 3.97 4.25 4.51 4.82 5.15 5.39 (hrs) Average sunset time 16.16 16.50 16.80 17.06 17.37 17.56 17.57 17.25 16.81 16.32 15.95 15.89 (hrs) Average day light hrs 10.7 11.3 12 12.7 13.4 13.7 13.6 13 12.3 11.5 10.8 10.5 12.27 Average Wind speed 11.81 12.5 12.06 10.48 9.47 9.08 9.15 8.39 8.25 9.15 9.83 10.16 10.01 Km/Hr Total rain fall (mm) 11.16 27.72 52.39 132.3 214.21 303 344.1 283.96 239.7 116.25 20.7 8.37 1753.86 Minimum temperature 7.01 9.18 13 16.4 19.3 21.1 21.2 21 19.5 15.9 10.9 7.9 7.01 (º C) Maximum 22.7 27.5 31.8 32.4 31.9 30.4 29.3 29.6 28.5 26.7 24.1 21 32.4 temperature (º C) Table 4: Solar Irradiation Data of the Site at Kuthur PHC Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Average Averaged Insolation Incident On A Horizontal 4.12 4.61 5.09 5.09 4.9 4.59 4.3 4.3 4.01 4.3 4.36 4.05 4.47 Surface (kWh/m2/day) Averaged Direct Normal 6.46 5.96 5.37 4.3 3.54 2.98 2.66 2.93 3.06 4.71 6.64 6.9 4.62 Radiation (kWh/m2/day) Radiation Incident On An Equator-Pointed Tilted 5.85 5.76 5.49 5.07 4.88 4.57 4.28 4.3 4.08 4.96 5.94 6.18 5.11 Surface (kWh/m2/day) OPT At OPT angle of 51 42 27 11 0 0 0 5 18 36 49 54 24.3 Table 5: Field Survey Analysis for Electrical Connected Load of Kuthur PHC Facility Nos No Fan (W) Wattage Wattage Load (W) Load Total Load Total Area in SFT in Area Point (Nos) Point Illumination Other Equipment Other Patient waiting area 1 180 2 72 72 Toilets 3 75 3 66 66 In patient wards (2 beds) 1 160 2 86 86 Nurses room (Heater + 1 80 1 36 3200 3236 Sterilizer boiler) Labour Room (with 2 toilet) 1 160 3 94 950 1044 (Suction & warmer) Laboratory (Centrifuge+ 1 64 1 100 2100 2200 Autoclave) Medical Officer room (with 1 110 3 94 94 toilet) Kitchen (with toilet) 1 89 2 58 58 Cold chain room (1 fridge 61 1 60 1 36 156 192 kg) Corridors 3 683 5 180 180 Residential quarters 6 872 7 238 238 Outside light 4 144 144 Total 20 2533 34 1204 6406 7610 Table 6: Maximum Electrical Demand Calculation for Kuthur PHC Total connected illumination load KW 1.20 Total connected equipment load KW 6.406 Total connected electrical load KW 8.00 Maximum demand of illumination load at 0.8 KW 1.00 factor Maximum demand of equipment load at 0.6 KW 4.00 factor Total maximum demand KW 5.00 Power factor for illumination 0.95 Demand of illumination KVA 2.00 Power factor for equipment 0.9 Demand of equipment KVA 6.00 Total electrical peak demand KVA 8.00 Max current for demand at 415 V 3 Ph, AC Amp 12.00 Location: Tuensang District, Nagaland, India Latitude: 26.294; Longitude: 94.615 Elevation: 1006 meters (3301feet) Chare PHC in Tuensang District Chare PHC main building: Clear land by the side of PHC: Chare PHC area view in Google Earth: Table 7: Status of Chare PHC Number of beds in the Chare PHC 4 District name Tuensang Block name Longkhim Town/Village name Chare 5 Nos, Chare New Town, Chare Old Town No of SC covered by Chare PHC Chare Village, Chungliyimti 'A', Chungliyimti 'B' No of villages covered by the PHC Total population served 5600 Age of the buildings 15 years Roof type CGI double slope RCC Roof top free for solar installation NA Clear ground area available for Solar Panel About 1000 sqm Table 8: Source and Quality of Power at Chare