Sarasota County Blueways Paddling Guide
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
2001 SWFWMD Land Acquisition Plan
Five-Year Land Acquisition Plan 2001 SWFWMD i Land Acquisition Five-Year Plan 2001 Southwest Florida Water Management District Five-Year Land Acquisition Plan 2001 If a disabled individual wishes to obtain the information contained in this document in another form, please contact Cheryl Hill at 1-800-423-1476, extension 4452; TDD ONLY 1-800-231-6103; FAX (352)754-68771 ii Table of Contents Table of Contents Introduction and History 111111111111111111111111111111111111111111111111111111111111111111111111111111111 1 Save Our Rivers 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 1 Preservation 2000 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111 1 Florida Forever 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 3 Selection and Evaluation Process 11111111111111111111111111111111111111111111111111111111111111111111 5 Less-Than-Fee Acquisitions 111111111111111111111111111111111111111111111111111111111111111111111111111 10 Partnerships 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 13 Surplus Lands111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 16 Land Use/Management Activities111111111111111111111111111111111111111111111111111111111111111111 17 Management Planning 11111111111111111111111111111111111111111111111111111111111111111111111111111 17 Land Use Implementation 111111111111111111111111111111111111111111111111111111111111111111111111 -
PART 1 BDV25 TWO977-25 Task 2B Delive
EVALUATION OF SELF CONSOLIDATING CONCRETE AND CLASS IV CONCRETE FLOW IN DRILLED SHAFTS – PART 1 BDV25 TWO977-25 Task 2b Deliverable – Field Exploratory Evaluation of Existing Bridges with Drilled Shaft Foundations Submitted to The Florida Department of Transportation Research Center 605 Suwannee Street, MS30 Tallahassee, FL 32399 [email protected] Submitted by Sarah J. Mobley, P.E., Doctoral Student Kelly Costello, E.I., Doctoral Candidate and Principal Investigators Gray Mullins, Ph.D., P.E., Professor, PI Abla Zayed, Ph.D., Professor, Co-PI Department of Civil and Environmental Engineering University of South Florida 4202 E. Fowler Avenue, ENB 118 Tampa, FL 33620 (813) 974-5845 [email protected] January, 2017 to July, 2017 Preface This deliverable is submitted in partial fulfillment of the requirements set forth and agreed upon at the onset of the project and indicates a degree of completion. It also serves as an interim report of the research progress and findings as they pertain to the individual task-based goals that comprise the overall project scope. Herein, the FDOT project manager’s approval and guidance are sought regarding the applicability of the intermediate research findings and the subsequent research direction. The project tasks, as outlined in the scope of services, are presented below. The subject of the present report is highlighted in bold. Task 1. Literature Review (pages 3-90) Task 2a. Exploratory Evaluation of Previously Cast Lab Shaft Specimens (page 91-287) Task 2b. Field Exploratory Evaluation of Existing Bridges with Drilled Shaft Foundations Task 3. Corrosion Potential Evaluations Task 4. Porosity and Hydration Products Determinations Task 5. -
Florida Communities Trust Annual Report 2016-2017
Florida Communities Trust Annual Report Fiscal Year 2016-2017 Office of Operations Land and Recreation Grants Section Florida Department of Environmental Protection September 30, 2017 3900 Commonwealth Boulevard, MS 103 Tallahassee, Florida 32399-3000 www.dep.state.fl.us Florida Communities Trust Annual Report Fiscal Year 2016-2017 1 Table of Contents LETTER FROM THE CHAIR ....................................................................................................... 1 PROJECT LOCATION MAP ........................................................................................................ 2 FLORIDA COMMUNITIES TRUST .............................................................................................. 3 MISSION AND ACCOMPLISHMENTS ......................................................................................... 4 PARK HAPPENINGS FOR FISCAL YEAR 2016-2017 ................................................................ 8 ACQUIRED PROJECTS BY COUNTY 1991-2017 .................................................................... 12 SUMMARY OF FINANCIAL ACTIVITIES ................................................................................... 29 FLORIDA COMMUNITIES TRUST BOARD MEMBERS ............................................................ 31 Front Cover Photo: Victory Pointe Park (f.k.a. West Lake Park) Unique Abilities 2017 Cycle FCT # 16-005-UA17, City of Clermont, FL Back Cover Photo: Myers-Stickel Property Unique Abilities 2017 Cycle FCT # 16-012-UA17, St. Lucie County, FL Florida Communities Trust -
Oad" Charged in Funds Discussed · Honored by Arvida Resort Approval by SMATS So,."" $1111 Page1 Longboat League 5
nd Bridge Study n anager n "Railroad" Charged In Funds Discussed · Honored By Arvida Resort Approval By SMATS So,."" $1111 Page1 Longboat League 5... ,,02' Longboat Youth Receive Riter Reveals Actual Cost Number Of Children On Key Profits From Celebration Of White Key As $75,000 Still Subject To Question See Page ' See Page1 See Page 5 Lewin Charges "Railroad" - , n ._- - ---:---- In Arvida Approval There were fireworks before Tuesday's Commis sioner's workshop even began. As Mayor Ken McCall started to open the meeting, Commissioner AI Lewin asked permission to make a statement . "Kangaroo Court" - Lewin "I was shOCked ," he began, "to read in the news paper that such important mailers as the l ongboat Key Club and Arvida's resort hotel were scheduled on the agenda when Commissioner Dchs and 1 were absent. "It was my understanding that we had a unanimous agreement nOI to act until all of us were present. "This criticism is not of the proposal , but of the way it was conducted," he continued, charging that it was reminiscent of a "kangaroo court." "We have debated th is maner for months," he con· tinued, "then it was rushed through in one quick move," he charged, chiding his fellow commissioners for their "cavalier auitude." (Continued on Page 3) Bombshell! ... or Dud? The agenda at Tuesday's Commissioners' At flrslli1lance, It would seem as If the brldlilels up, the sailboat Is about to 1iI0 under and lomeone Is waiting for the am· workshop had been completed when Tae Riter bulance. That is exactly what hsppened this week, but It turned out all rllilht. -
Policy Committee Meeting
Agenda Policy Committee Meeting Friday, March 15,2002 1:00 P.M. Sarasota Bradenton International Airport 6000 Airport Circle Sarasota, Florida 34243 Airport Authority Boardroom Welcome, Introductions Approval of Minutes from October 26,2002 Meeting Director's Report Mark Alderson -3 N. Tamiami Trail e EPA Bi-ennial Review . .e 104 1. Public Involvement and Education Scott Carpenter Sarasota, FL 34234 Proposal 2. Proposed Technical ProjectsLJpdate Gary Raulerson 3. Sea Grass Reporting Gary Raulerson 4. Discussion of Proposed FY03 Work Plan Mark Alderson 5. Results - Atmospheric Deposition Study Kellie Dixon and Red Tide 6. Financial Status Report Marian Pomeroy Adjourn MINUTES POLICY COMMITTEE MEETING Friday, October 26,2001 1:00 p.m. Sarasota Bradenton International Airport 6000 Airport Circle Sarasota Florida 34243 Airport Authority Boardroom Present: Policy Committee Members Mr. Bo Crum, E.P.A. Reg. IV, Chief, Coastal Program The Honorable Richard Martin, Sarasota City Commissioner P\ Ms. Ce Ce McKiernan, Dept. of Environmental Protection Ms. Deborah Getzoff, FDEP The Honorable Pat Glass, Manatee Board of County Commissioners The Honorable Jon Thaxton, Sarasota Board of County Commissioners Mr. Bruce Wirth, P.E., Director, Resource Management Department Management Committee Members Mr. Mike McNees, City Manager, City of Sarasota Mr. Paul Bispham, Citizens Advisory (:onunittee Mr. Annon Bozeman, U.S. Army Corps of Engineers Mr. Mark Harnrnond, Manager, SWIM, SWFWMD Mr. George Henderson, Florida Marine Research Institute Mr. Charles Hunsicker, Manatee County Office of Administration Mr. Rob Patten, Sarasota County Environmental Services Ms. Felicia Robinson, U.S. Region IV Mr. John Stevely, Florida Sea Grant Sarasota Bay National Estuary Program Staff Mr. -
Natural Systems
Natural Systems NATURAL SYSTEMS INTRODUCTION Natural resources in Southwest Florida have had a major influence on the area’s economic development and growth. The most important of these resources are the Region’s location and climate, land and water resources, vegetation and wildlife, and inland and tidal wetlands. These resources have attracted the large number of retirees and tourists to the region, thereby fueling the area’s service, trade, and construction industries. THE CLIMATE Temperature Due to the Region's southerly location, a near-subtropical climate with an associated high annual rainfall is typical. Average monthly temperatures range from 64.3 degrees Fahrenheit in January to 82.6 degrees Fahrenheit in August. Freezes are not common in the Region, but may occur once or twice a year. "Jacket weather" occurs periodically during the fall and winter months. Weather and climate are very important factors in the economy of Southwest Florida. The combination of warm weather, decreased humidity, and low rainfall during the winter months encourages tourism and an influx of seasonal residents. A high yearly rainfall and moderate winter temperatures enable agriculture to thrive year-round. Periods of freezing weather, when they occur, have adverse effects upon the local economy. Unusually severe winter freezes and resulting agricultural losses in other parts of the state have caused a migration of agricultural interests into the Region from counties to the north. Precipitation Patterns Patterns of precipitation in Southwest Florida exhibit strong seasonal variations. The Region enjoys a rainy season from May through October and a dry season from November through April. Increased atmospheric moisture and incoming solar radiation levels in May generally trigger the rainy season, while a reversal of these conditions occurs in September to signal the start of the dry season. -
Section I Notices of Development of Proposed Rules and Negotiated Rulemaking
Florida Administrative Weekly Volume 34, Number 32, August 8, 2008 Section I PURPOSE AND EFFECT: The purpose of the rule Notices of Development of Proposed Rules development is to address the newly required designations for Major Areas of Interest, accelerated coursework, career and Negotiated Rulemaking education certification, and Ready to Work credential, on the standard high school diploma. DEPARTMENT OF EDUCATION SUBJECT AREA TO BE ADDRESSED: Diploma State Board of Education Designations. RULE NO.: RULE TITLE: SPECIFIC AUTHORITY: 1001.02, 1003.428, 1003.429, 6A-1.09422 Florida Comprehensive Assessment 1003.438 FS. Test Requirements LAW IMPLEMENTED: 15.03(3), 1001.02, 1003.428, PURPOSE AND EFFECT: The purpose of the rule 1003.4285, 1003.429, 1003.43, 1003.438 FS. development is to amend the rule to remove the passing score IF REQUESTED IN WRITING AND NOT DEEMED on the grade 10 FCAT Writing+ to qualify for a standard high UNNECESSARY BY THE AGENCY HEAD, A RULE school diploma and to remove the current grade-level scale DEVELOPMENT WORKSHOP WILL BE HELD AT THE scores in order to comply with Senate Bill (SB) 1908. SB 1908 DATE, TIME AND PLACE SHOWN BELOW: requires that the Commissioner discontinue administration of DATE AND TIME: August 28, 2008, 9:00 a.m. the multiple-choice test items on the comprehensive PLACE: Call 1(888)808-6959, code: 4137943 assessment of writing until a new comprehensive test of THE PERSON TO BE CONTACTED REGARDING THE writing is administered in 2012-2013. Until 2012-2013, the PROPOSED RULE DEVELOPMENT AND A COPY OF comprehensive assessment of writing will consist of an essay THE PRELIMINARY DRAFT IS: Holly Edenfield, Executive to be scored on a scale of 1 to 6. -
Recommended Minimum Flows for the Chassahowitzka River System
Recommended Minimum Flows For the Chassahowitzka River System Photo: W. Sotera October 30, 2012 Michael G. Heyl, Doug Leeper, Ron Basso Southwest Florida Water Management District Brooksville, Florida 34604-6899 and Marty Kelly (Formerly with Southwest Florida Water Management District) With contributions by Balanced Environmental Management Systems, Inc. ChassMFL_Final.docx Last Save: 12/11/2012 9:18 AM ii ChassMFL_Final.docx Last Save: 12/11/2012 9:18 AM Recommended Minimum Flows for the Chassahowitzka River System October 30, 2012 Michael G. Heyl, Doug Leeper, Ron Basso Southwest Florida Water Management District Brooksville, Florida 34604-6899 and Marty Kelly (Formerly with Southwest Florida Water Management District) With contributions by Balanced Environmental Management Systems, Inc. Prime Contractor The Southwest Florida Water Management District (District) does not discriminate on the basis of disability. This nondiscrimination policy involves every aspect of the District's functions, including access to and participation in the District's programs and activities. Anyone requiring reasonable accommodation as provided for in the Americans with Disabilities Act should contact the District's Human Resources Bureau Chief, 2379 Broad Street, Brooksville, Florida 34604-6899; telephone (352) 796-7211, ext. 4702 or 1-800-423-1476 (FL only), ext. 4702; TDD (FL only) 1-800-231-6103; or email to [email protected]. iii ChassMFL_Final.docx Last Save: 12/11/2012 9:18 AM Acknowledgements We would like to thank several of our colleagues at the Southwest Florida Water Management District for their contributions and useful suggestions concerning the work summarized in this report We are also indebted to District staff who conducted field sampling for the project (Don Hampton, Courtney James, Tammy Hinkle, Jason Hood and Richard Gant) and to Barbara Matrone for her assistance in document production. -
HYATT REGENCY SARASOTA HYATT REGENCY SARASOTA L
YOUR GUIDE TO SARASOTA B R e il De v ly . soto Pkwy 53rd St er ma e y - 53rd e St . W Beechmont r r Dr r n i e r W Sh D i Av Sa n Av C N n u J u . H D . a d Innesbrook Ln n c r S Ave D g i A a Shore hest ridg d Alamo Ln e v c un e d S r den Sp D r e e y Hl e Nature c r St d L e 52n Ai e Echo Av nwoo M o te y r Oakland Hills Av c in Av Woodsto herr ck St Po d y k Ke g Av Dr n a C ho Av w n Av ring i Sa e W Presidio St c gl e o in r n o R S D D d u Ra ve a Cypress Point St n pphire D Sa r R v A Mecca Dr e i i e Prado Dr d d h 51st St en e Av g E Laurel Valley Av 51st St 51st St Bel- Av a ac Gl e Rd 51st St s Av Cir e Burn t ing Tree n ld Ter St oke e ro c B B o e Traylor Av n h m r e ns t o o e le s a D t al a s b R g e D t Av P S l Sapphire b e l ns n r r i e a Mi Ac r e D y u aci r ir a C Dr y Pe m Dr v r o oca e Shores Park Brae Burn Av Industrial ha s Sea Island Av o F D d Av In e a s B t r s S i t n g o R ert ert B n ic in o e S n r n C e e Palm Sp e i r r l g A A m d l o r i D h Av v t a ar v h t e w t Dr e G L C y y o on Blvd r in Dr t n l o C ar Tri Par Dr B M 49th St g F ir Woodland Dr n d 49th St Rilma e e e Sa ie k Dr r v ge Royal Palm D k y r age Sko o No San- l Midlothian St A a il ro a Remi s V o 48th t B d r Pl e S Ct t t n a Av Win d h v St n u H i Mi am met f A g A S ray le e o r u t v e Bl M s ro a G u v Old Elm St l r e 4 t ddle S e S a e d h d ore 7 C Dr St a 47th St t 47th St h h S Av Grassy Olympia Fields St Carmichael r Ci 47th St N Sprain St e 47th St 47th St 47th St A North- Dr in e Spr. -
Destination Strategic Plan 2025 JLL Tourism & Destinations Practice
Hotels & Hospitality | 2019 Sarasota County Destination Strategic Plan 2025 JLL Tourism & Destinations Practice DAN FENTON DAVID HOLDER BETHANIE DEROSE Executive Vice President Vice President Senior Associate +1 (408) 309-3450 +1 (315) 569-8908 +1 (609) 457-5361 [email protected] [email protected] [email protected] Table of Contents 5 | Executive Summary 9 | Background 15 | State of Sarasota County Tourism 27 | Destination Strategic Plan Priorities & Recommendations 57 | Direction of Visit Sarasota County 69 | Conclusion 71 | Appendix 4 Visit Sarasota: Destination Strategic Plan Priorities + Recommendations Visit Sarasota: Destination Strategic Plan Priorities + Recommendations 5 Section 1: Executive Summary Visit Sarasota County (VSC) recognizes that the future of Sarasota County depends on having an innovative strategic plan shaped by visitor research, analysis and thoughtful consideration of input from stakeholders and partners across the county. To accomplish this work, VSC partnered with JLL's Tourism practice, an international tourism and destinations consulting group, to assemble a comprehensive destination plan that would build off the efforts and accomplishments since the organization’s 2020 strategic planning initiative and identified goals. Specifically, by 2025, VSC seeks to: • Ensure funding and program development are aligned among VSC, its partners, government entities, non-profits and meets long-term goals of the community • Assess gaps in the tourism, sports, cultural infrastructure to identify potential new or enhanced tourism demand generators. • Recommend actions and activities to increase visitor flow across all segments (leisure, meetings, sports). • Review the effectiveness of VSC’s marketing programs and recommendations to improve these initiatives. Examine VSC impact compared to its direct competitors with their much larger budgets. -
Myakka River State Park Unit Management Plan Approved
MYAKKA RIVER STATE PARK UNIT MANAGEMENT PLAN APPROVED STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Division of Recreation and Parks December 7, 2004 Department of Environmental Protection Marjory Stoneman Douglas Building Jeb Bush 3900 Commonwealth Boulevard, MS 140 Colleen Castille Governor Tallahassee, Florida 32399-3000 Secretary Phone: (850) 245-2784 Fax: (850) 245-2786 December 7, 2004 Ms. BryAnne White Office of Park Planning Division of Recreation and Parks 3900 Commonwealth Blvd.; M.S. 525 Tallahassee, Florida 32399 Re: Myakka River State Park Lease # 3636 Ms. White: On October 15, 2004, the Acquisition and Restoration Council recommended approval of theMyakka River State Park management plan. On December 7, 2004, the Office of Environmental Services, acting as agent for the Board of Trustees of the Internal Improvement Trust Fund, approved the management plan for the Myakka River State Park. Pursuant to Section 253.034, Florida Statutes, and Chapter 18-2, Florida Administrative Code this plan’s ten-year update will be due on December 7, 2014. Approval of this land management plan does not waive the authority or jurisdiction of any governmental entity that may have an interest in this project. Implementation of any upland activities proposed by this management plan may require a permit or other authorization from federal and state agencies having regulatory jurisdiction over those particular activities. Pursuant to the conditions of your lease, please forward copies of all permits to this office upon issuance. Sincerely, Paula L. Allen Office of Environmental Services Division of State Lands Department of Environmental Protection "More Protection, Less Process” Printed on recycled paper. -
Outstanding Bridges of Florida*
2013 OOUUTTSSTTAANNDDIINNGG BBRRIIDDGGEESS OOFF FFLLOORRIIDDAA** This photograph collection was compiled by Steven Plotkin, P.E. RReeccoorrdd HHoollddeerrss UUnniiqquuee EExxaammpplleess SSuuppeerriioorr AAeesstthheettiiccss * All bridges in this collection are on the State Highway System or on public roads Record Holders Longest Total Length: Seven Mile Bridge, Florida Keys Second Longest Total Length: Sunshine Skyway Bridge, Lower Tampa Bay Third Longest Total Length: Bryant Patton Bridge, Saint George Island Most Single Bridge Lane Miles: Sunshine Skyway Bridge, Lower Tampa Bay Most Dual Bridge Lane Miles: Henry H. Buckman Bridge, South Jacksonville Longest Viaduct (Bridge over Land): Lee Roy Selmon Crosstown Expressway, Tampa Longest Span: Napoleon Bonaparte Broward Bridge at Dames Point, North Jacksonville Second Longest Span: Sunshine Skyway Bridge, Lower Tampa Bay Longest Girder/Beam Span: St. Elmo W. Acosta Bridge, Jacksonville Longest Cast-In-Place Concrete Segmental Box Girder Span: St. Elmo W. Acosta Bridge, Jacksonville Longest Precast Concrete Segmental Box Girder Span and Largest Precast Concrete Segment: Hathaway Bridge, Panama City Longest Concrete I Girder Span: US-27 at the Caloosahatchee River, Moore Haven Longest Steel Box Girder Span: Regency Bypass Flyover on Arlington Expressway, Jacksonville Longest Steel I Girder Span: New River Bridge, Ft. Lauderdale Longest Moveable Vertical Lift Span: John T. Alsop, Jr. Bridge (Main Street), Jacksonville Longest Movable Bascule Span: 2nd Avenue, Miami SEVEN MILE BRIDGE (new bridge on left and original remaining bridge on right) RECORD: Longest Total Bridge Length (6.79 miles) LOCATION: US-1 from Knights Key to Little Duck Key, Florida Keys SUNSHINE SKYWAY BRIDGE RECORDS: Second Longest Span (1,200 feet), Second Longest Total Bridge Length (4.14 miles), Most Single Bridge Lane Miles (20.7 miles) LOCATION: I–275 over Lower Tampa Bay from St.