Shri Narendra Modi Hon’ble Prime Minister NEW RAILWAYS New Jharkhan A progressive journey since 2014 Lohardaga Parliamentary Constituency PREFACE
Indian Railways is the lifeline of the Nation and a catalyst for India’s progress and economic development. It plays a significant role in the socio-economic development of every region of the country including the state of Jharkhand. With a view to improve railway infrastructure and to extend the railway network in Jharkhand, Ranchi Railway Division was formed in the year 2003. The Government of Jharkhand always extends necessary support and cooperation to Indian Railways towards development of the state and improvement of services for the people.
Godda
Shivpur
Sanki
Tatisilwai
Map not to scale
In a mission mode, railways have achieved many visible milestones in Jharkhand in the last seven years in different fields i.e. construction of new lines, doubling, development of stations etc. On the freight side, loading has reached a new milestone where the potentiality of the state enriched with minerals played the lead role. The changing face of transport sector in Jharkhand and the expectations of its people are being fulfilled with topmost priority. In the wake of COVID-19 pandemic, Indian Railways is playing a significant role by taking various measures to combat the situation. With a view to contain the spread of Novel Coronavirus, Indian Railways is producing PPE Kits, Reusable Face Masks, Hand Sanitizer etc. In addition, coaches have been converted to COVID Care Centres. Some of the recent achievements of railways and ongoing projects parliamentary constituency-wise in the state of Jharkhand are being highlighted in this Pamphlet. It may be noted that the budget allocated to various projects is not apportioned state wise but ref lects the cost of the project. INPUTS BY RAILWAY IN LOHARDAGA CONSTITUENCY
A. ASSEMBLY SEGMENTS : Lohardaga, Mandar, Gumla, Sisai & Bisanpur B. WORKS COMPLETED IN LAST SEVEN YEARS: B.1 Infrastructural Developments: u Barkichanpi-Tori New Line (29.5 Km) at a cost of Rs.583 crores (total project cost) u New sta on commissioned at Barkichanpi & Bodagram u Lever frame replaced with PI at Lohardaga u Sliding Boom commissioned at RL-8 , RL-19 u Electrical Li ing Barrier at RL-19, RL-9. u Datalogger commissioned at Lohardaga, Barkichanpi and Bodagram u Fire figh ng equipment (Fire alarm and smoke detector ) commissioned at Lohardaga u Electrifica on of 110.6 KM track done in Ranchi-Lohardaga-Tori sec on along with provision of one OHE cum PSI depot at Lohardaga, 08 Switching Posts and 02 Trac on Sub-sta ons at Piska & Lohardaga. u Ranchi-Lohardaga Sec on : Limited Height Subway at KM. 488-1 in lieu of manned level crossing No.RL44 at KM 487/8-9 at a cost of Rs.1.85 crores u Ranchi Division : Through Ballast Renewal -121km at a cost of Rs. 8.24 crores u Ranchi Division (different sec ons) - Through Ballast Renewal 33.65 km. at a cost of 3.45 crores B.2 Passenger Ameni es : u Improvement of passenger ameni es at Pokla sta on by providing piped water supply, improving approach road and circula ng area u Replacement of 600 conven onal lights by LED lights u 01 bay RDSO type pla orm shelter constructed at each of Lohardaga, Kurkura, Pakra and Pokla - sta ons (total 4 bays) u Improvement of Adarsh Sta on RDSO type pla orm shelter, Pay and Use Toilet at Lohardaga u 9 number of Road Under Bridge in lieu of level crossing No.RL 22, 37, 39, 40, 41, 42, 43, HB 37 and 41 at a cost of Rs.14.34 crores u Provision of pla orm shelter at Pakra and Kurkura sta ons u Pla orm shelter, improvement to circula ng area at Pokla sta on u Improvement of circula ng area at Lohardaga sta on u Extension and surfacing of Pla orms at Nagjua, Itky and Argora sta on. u Conversion of halt sta on to full-fledged sta on with new loop line at Bodagram. C. OTHERS u 100 high Monumental Flag at Lohardaga Sta on D. ON-GOING WORKS: u Bondamunda-Ranchi (158.50 Km) New Line at a cost of Rs.3,177.60 crores u Replacement of 30 Nos. of power supply arrangement for Op c Fibre Cable Equipments u Ranchi Division : Replacement or rehabilita on of electrical power supply system at a cost of Rs. 2.75 crores u Elimina on of LC gate no RT-44 by of subway construc on u Ha a-Orga sec on: Provision of bridge inspec on steps, bridge tablet, parapet extension etc for minor bridges at cost 85 Lakhs. u Pla orm raising and surfacing work at Pokla and Pakra sta on. u New sta on building at Pokla, Pakra and Kurkura sta on.
SOME IMPORTANT PHOTOS
Enhanced circulating area at Lohardaga Station
Constructed Road Over Bridger - in Ranchi-Lohardaga Section