The list of promising investment projects to be developed in the Republic of Uzbekistam for 2020

Estimated Name Name Project Dates of № project cost of initiators and projects of the regions capacity implementation (million USD) 200 Total 12 474,6 including:

I Secretariat for the development of fuel and energy and basic industries 6 497,3

Ministry of Energy 1 500,0

Construction of a 100 MW solar photovoltaic station under public- by regions of the 1 600 MW 2020-2024 600,0 private partnership in the regions of the republic republic

Construction of a combined cycle thermal power plant in the 2 Surkhandarya region with a capacity of 900 MW on a public- Surkhandarya region 900 MW determining determining private partnership

Construction of a combined cycle thermal power plant in the 3 region with a capacity of 850 MW on a public-private 850 MW determining determining partnership

Construction of a combined cycle gas turbine unit (CCGT) with a 4 capacity of 1300 MW on a public-private partnership in the Syrdarya region 2х650 MW 2022-2023 900,0 Syrdarya region 2

Estimated Name Name Project Dates of № project cost of initiators and projects of the regions capacity implementation (million USD) JSC "Uzbekneftegaz" 808,3

Automation of process control systems and modernization of by regions of the automation of process control 5 determining determining plant facilities republic systems

6 Geological exploration at the Mingbulak field determining 200 tons of oil determining 255,3

improving the quality of 7 Modernization and reconstruction of the SIZ products, increasing the depth 2019-2025 553,0 of processing

JSC "Thermal Power Plants" 1 492,7

8 Modernization of power units № 1-7 at Novo-Angren TPP Tashkent region 300 MW 2020-2025 1 250,0

Expansion of the Angren TPP with the construction of a 130-150 9 MW power unit with district heating for the combustion of high- Tashkent region 130-150 MW 2020-2022 242,7 ash coal "(stage II)

JSC "National Electric Networks of "

10 Power supply construction of a nuclear power plant (NPP) determining 2020-2022 determining

JSC "Uzbekhydroenergo" 1 626,1 3

Estimated Name Name Project Dates of № project cost of initiators and projects of the regions capacity implementation (million USD)

Construction of the Verkhnepskemskaya hydropower station on 11 Tashkent region 200 MW 2023-2028 200,0 the Pskem river in the Bostanlyk district of Tashkent region

Construction of the Mullalakskaya hydropower station on the 12 Tashkent region 240 MW 2018-2025 480,0 Pskem river in the Bustanlyk district of Tashkent region

Construction of the Khodzhikent pumped-storage hydroelectric 13 Tashkent region 200 MW 2022-2026 320,0 station in the Bustanlyk district of Tashkent region

Construction of the Akbulak hydropower station (HPP) on the 14 Tashkent region 60 MW 2022-2026 160,0 Akbulak river in the Bustanlyk district of Tashkent region

Construction of small hydropower plant (SHPP) at Sichankul 15 Kashkadarya region 24,2 MW 2022-2024 53,2 discharge in Mirishkorsky district of Kashkadarya region

Construction of small hydropower plant (SHPP) on stake 39 + 19 16 region 4 MW 2025-2026 17,2 of Dargom canal in Samarkand district of Samarkand region

Construction of small hydropower plant (SHPP) on stake 58 + 28 17 Samarkand region 4,3 MW 2027-2028 18,4 of the Dargom canal in the Urgut district of the Samarkand region

Construction of small hydropower plant (SHPP) on stake 88 + 17 18 Samarkand region 4,3 MW 2028-2029 18,4 of the Dargom canal in the Urgut district of the Samarkand region 4

Estimated Name Name Project Dates of № project cost of initiators and projects of the regions capacity implementation (million USD)

Construction of Taligulyanskaya small hydropower plant (SHPP) 19 № 2 Samarkand region 5,5 MW 2027-2028 19,8 on the Dargom canal in Pastdargom district of Samarkand region

Construction of Taligulyanskaya small hydropower plant (SHPP) 20 № 4 on the Dargom canal in Pastdargom district of Samarkand Samarkand region 11 MW 2026-2027 40,1 region

Modernization of UE "Cascade of Chirchik HPP" power increase 21 Tashkent region 2021-2025 42,8 (HPP-8) in the Kibray district of Tashkent region up to 73,4 MW

Modernization of UE "Cascade of Kadirinskiye HPP" (HPP-12) power increase 22 Tashkent region 2022-2025 10,9 in Kibray district of Tashkent region up to 12,7 MW

Modernization of UE "Cascade of Tashkent hydroelectric power power increase 23 Tashkent city 2021-2024 28,6 stations" (hydroelectric power station-4) in the city of Tashkent up to 6,8 MW

Modernization of the branch "Cascade of Shakhrikhan power increase 24 Hydroelectric Power Station" (HPP-5A) in Asakinsky district of region 2022-2024 22,4 up to 12 MW

Modernization of the branch "Cascade of Samarkand HPP" (HPP- power increase 25 Samarkand region 2028-2030 16,9 3B) in Pastdargom district of Samarkand region up to 6,55 MW

Modernization of the branch "Cascade of Samarkand HPP" (HPP- power increase 26 Samarkand region 2025-2027 19,2 5B) in Pastdargom district of Samarkand region up to 8.95 MW

Modernization of the branch "Cascade of the Shakhrikhan power increase 27 Hydroelectric Power Station" (HPP-6A) in the Asakinsky district Andijan region 2024-2026 15,7 up to 8.20 MW of Andijan region 5

Estimated Name Name Project Dates of № project cost of initiators and projects of the regions capacity implementation (million USD)

Modernization of UE "Cascade Urta-Chirchik HPP" (HPP-28) in power increase 28 Tashkent region 2020-2025 39,6 the Bustanlyk district of Tashkent region up to 130 MW

Modernization of UE "Cascade of Chirchik HPP" (HPP-7) in power increase 29 Tashkent region 2020-2023 46,8 Kibray district of Tashkent region up to 85.5 MW

Modernization of UE "Cascade of Kadirinsky HPP" (HPP-15), in power increase 30 Tashkent region 2026-2028 17,3 the Kibray district of Tashkent region up to 9.2 MW

Modernization of Unitary Enterprise "Cascade of Tashkent power increase 31 Tashkent city 2025-2027 23,0 Hydroelectric Power Station" (HPP-21), Tashkent up to 3.8 MW

Modernization of the branch "Cascade of Samarkand HPP" (HPP- power increase 32 Samarkand region 2021-2023 15,8 1B) in Pastdargom district of Samarkand region up to 3.1 MW

SE "Navoi MMC" 162,4 Expansion of gold ore mining 33 at the Karakutan field (Yangi Davon) Samarkand region given 2022-2025 55,0 in the Pakhtachinsky district of the Samarkand region

Opening and development of reserves of the Sarmich deposit in 34 Navoi region given 2021-2024 107,4 the Navbahor district of the Navoi region

JSC "Uzkimyosanoat" 683,4

Organization of the production of granular potassium chloride on 35 Kashkadarya region 180 thousand tons 2020-2023 15,0 the basis of "Dexkanabadskiy zavod kaliynix udobreniy " LLC 6

Estimated Name Name Project Dates of № project cost of initiators and projects of the regions capacity implementation (million USD)

Organization of the production of melamine 36 Ferghana region 60 thousand tons 2020-2024 200,0 based on JSC "Ferganaazot"

Organization of the production of synthetic fibers for mixed 37 Ferghana region 100 thousand tons 2020-2023 100,0 fabrics on JSC "Ferghanaazot"

Organization of the production of silicone and adhesive elements Republic of 38 8 thousand tons 2020-2023 11,2 in the Republic of Karakalpakstan

7.5 thousand tons of catalysts, including gas synthesis / methanation conversion, gas desulfurization 39 Organization of the production of catalysts in the Tashkent region Tashkent region 2020-2024 125,0 and sulfur trap, natural gas reforming, ammonia synthesis, sulfuric acid synthesis, organic peroxides for polymerization processes

Organization of the production of various molds for the industrial 40 Jizzakh region 1000 t 2023-2024 10,0 sector on the basis of "Jizzax plastmassa" JSC

60 thousand tons of caustic Organization of caustic soda production 41 determining soda and 56 thousand tons of 2022-2025 213,0 and chlorine for PVC production chlorine

Organization of the production of EVA films on the basis of JSC 42 Jizzakh region 1500 t 2023-2024 2,5 "Jizzax plastmassa" 7

Estimated Name Name Project Dates of № project cost of initiators and projects of the regions capacity implementation (million USD)

Organization of the production of banner fabric and various PVC 43 Jizzakh region 4500 t 2022-2023 2,0 sheets on the basis of"Jizzax plastmassa" JSC

Organization of the production of plant protection chemicals in 44 Navoi region 5 thousand tons determining 4,7 the Navoi region JSC "Uzmetkombinat" 18,0

Construction of pipe production 45 Tashkent region 100 thousand tons 2021-2022 15,0 in the Tashkent region

Organization of a workshop for the production of non-standard 46 Tashkent region 6.0 thousand tons 2021-2022 3,0 steel metal structures

State Committee for Geology of the Republic of Uzbekistan 10,0

Conducting a geological study of promising areas Surkhandarya and 47 exploration work determining 5,0 in Surkhandarya and Navoi regions Navoi regions

Jizzakh and Conducting a geological study of promising areas for rare metals 48 Kashkadarya exploration work determining 5,0 and rare earth elements in the Jizzakh and Kashkadarya regions area

“Uzeltehsanoat” Association 15,0 49 Organization of battery production (starter lead-acid) determining determining 2020-2023 3,8 50 Production of devices for servicing plastic cards (terminals) Tashkent city 200 thousand units determining 3,0 Manufacture of chargers for electric vehicles at IP "Toshelectro- 51 Tashkent city 500 units determining 2,0 apparat" LLC 8

Estimated Name Name Project Dates of № project cost of initiators and projects of the regions capacity implementation (million USD)

Production of elevators, escalators, barrier cameras and turnstiles 52 region 250 units determining 3,0 at "Mega Kamera Stroy" LLC

53 Electric cable manufacturing Samarkand region 300 km determining 0,1

400 units Production of elevators, escalators and metal frames at "Gold 54 Samarkand region 300 units 2023-2025 3,1 Brend Elevator" LLC 250 units "Uztekstilprom" Association 104,0 Creating a complex 12 thousand tons of yarn, 55 at "Sh. Rashidov nomli Tukimachilik Kombinati" LLC in the Jizzakh region 2020-2021 74,5 16 million pcs. textile products Jizzakh region 5 million square meters of Organization of cotton fabric production cotton fabric, 56 Bukhara region 2020-2023 6,5 in the Bukhara region 6 million pcs. sewing and knitwear

Organization of production of sewing and knitwear in the 57 Khorezm region 5 million pcs. sewing knitwear 2020-2023 5,0 Khorezm region

Organization of production of sewing and knitwear in the Republic of 58 2 million pcs. sewing knitwear 2020-2023 1,5 Republic of Karakalpakstan Karakalpakstan 59 Organization of production of hosiery Andijan region 2.5 million pairs 2020-2023 1,5 2 thousand tons of painted 60 Organization of the production of painted canvas Jizzakh region 2020-2023 1,0 canvas 61 Organization of production of sewing and knitwear Samarkand region 4 million pcs sewing knitwear 2020-2023 1,5 9

Estimated Name Name Project Dates of № project cost of initiators and projects of the regions capacity implementation (million USD) 4 million square meters of cotton fabric, 62 Organization of cotton fabric production Kashkadarya region 2020-2023 4,0 3 million pieces of sewing and knitwear 3 thousand tons of painted 63 Organization of the production of painted canvas Tashkent region 2020-2023 2,5 canvas

64 Organization of production of sewing and knitwear Tashkent region 5 million pcs. sewing knitwear 2020-2023 3,0

65 Organization of production of hosiery Ferghana region 5 million pairs of hosiery 2020-2023 3,0 "Uzbekipaksanoat" Association 33,4 48 tons of raw silk, 9.2 tons of silk thread, 18.4 tons of silk Organization of the production of raw silk, silk thread, silk fabric 66 wool, 4.0 thousand cubic 2020-2021 5,0 and silk carpets at "Golden Silk"LLC meters of silk fabric, 35 square meters. m silk carpets

48 tons of raw silk, 9.2 tons of silk thread, 18.4 tons of silk Organization of production of raw silk, silk thread, silk fabric and 67 Namangan region wool 55.2 thousand meters of 2020-2021 5,0 silk carpets at LLC "Sof Ipak Invest" silk fabric, 50 square meters. m silk carpets

48 tons of raw silk, 9.2 tons of silk thread, 18.4 tons of silk Organization of the production of raw silk, silk fabric and silk 68 Tashkent region wool 55.2 thousand meters of 2020-2021 2,4 carpets at LLC "Okkurgon ipagi" silk fabric, 50 square meters. m silk carpets 24 т шелка-сырца, 55,2 тыс. Organization of production of raw silk, silk wool, silk fabric and 69 Tashkent region п.м шелковой ткани, 35 кв. м 2020-2021 2,0 silk carpets at "Toshkent Silk Pro" LLC шелковых ковров 10

Estimated Name Name Project Dates of № project cost of initiators and projects of the regions capacity implementation (million USD) 24 tons of raw silk, Organization of the production of raw silk, silk fabric at LLC "Bio 70 Tashkent region 35 sqm silk carpets, 55.2 2020-2021 3,0 Farm Elit" thousand meters of silk fabric 24 tons of raw silk, 55.2 Organization of the production of raw silk, silk fabric and silk thousand meters of silk fabric, 71 Tashkent region 2020-2021 2,0 carpets at LLC "Pure Silk Fabric" 35 square meters. m silk carpets Organization of the production of raw silk and silk fabric at "JM 20 thousand boxes of industrial 72 Tashkent region 2020-2021 2,0 Buston Silk" LLC varieties of gren 48 tons of raw silk, 55.2 Organization of production of raw silk, silk thread, silk fabric and thousand meters of silk fabric, 73 Ferghana region 2020-2021 5,0 silk carpets at "Yodgorlik" LLC 35 square meters. m silk carpets 24 tons of raw silk, 55.2 Organization of production of raw silk, silk thread, silk fabric and thousand meters of silk fabric, 74 Ferghana region 2020-2021 5,0 silk carpets at LLC "Nurli tong silk" 35 square meters. m silk carpets 48 tons of raw silk, Organization of the production of raw silk, silk wool and silk 75 Syrdarya region 18.4 tons of silk wool, 2020-2021 2,0 fabric at LLC "Agro Global" 45.6 thousand lm silk fabric JSC "Uzagrotechsanoathholding" 44,0

Organization of production of tooling (foundry, welding, 76 Tashkent city up to 70 t 2020-2022 10,0 stamping, assembly, etc.), Tashkent

Organization of production of components and assemblies of the 12 thousand 77 Tashkent city 2020-2022 6,0 hydraulic system of agricultural machinery, Tashkent machine kits 11

Estimated Name Name Project Dates of № project cost of initiators and projects of the regions capacity implementation (million USD)

Localization of cotton machines, 78 Tashkent city up to 1000 units 2020-2022 5,0 Tashkent city

Mastering the production of high-clearance four-wheeled tractors, 79 Tashkent city up to 100 units 2020-2022 5,0 Tashkent

Mastering the production of new types of grain and forage 80 Tashkent city up to 100 units 2020-2022 5,0 harvesters, Tashkent

Organization of production of tractor mounted systems and 12 thousand 81 Tashkent city 2020-2022 4,0 modernization of the production of hot stampings machine kits 82 Organization of the production of driveshafts Tashkent city up to 5000 units 2020-2022 4,5 Organization of the production of sprinkler machines on the basis 83 Almazor district 500 units 2020-2021 1,0 of "Agregatniy zavod" JSC Organization of production of working bodies of tillage and sowing equipment Almazar and Mirzo- 84 up to 40 thousand units 2021,00 2,0 on the basis of JSC "Agregatniy zavod" "and JSC" Tashkentskiy Ulugbek districts zavod selskoxozyastvennoy texniki "" " Mastering the production of flexible hoses and fittings for drip 85 Tashkent city up to 500 units 2020-2022 1,5 irrigation "Uzbekzargarsanoati"Association 12

Estimated Name Name Project Dates of № project cost of initiators and projects of the regions capacity implementation (million USD)

Implementation of the Jewelry Cluster project in Tashkent with the participation of small businesses providing intersectoral cooperation consisting of: foundry, production of 86 Tashkent city determining determining determining jewelry by vacuum casting, casting with stones using 3D technology, a training center for the training of jewelers - fixers, cutters, 3D- specialists design and modeling

Implementation of the project with the participation of small The Republic of businesses, jewelry enterprises in the form of production and trade Karakalpakstan, pavilions in the tourist centers of Bukhara and (2021), Bukhara, 87 Nukus (2022), Samarkand (2022-2023). ), Kashkadarya, determining 2020-2027 determining Shakhrisabz city (2024-2026), Namangan city (2026-2027), pos. Namangan, Burchmulla (2022-2025, taking into account the prospects for the Samarkand, Tashkent development of the resort and tourist zone Chimgan") and Khorezm regions

II Secretariat for the Integrated Development of Territories, Communications and the Defense Industry 4 044,2

Ministry of Housing and Communal Services 1 581,9

Construction of a water conduit and water supply networks to improve water supply in the settlements of Butakor, Yorboshi, Ok- 1 URV 88 Andijan region 2020-2023 24,0 Yor, Yangiobod, Guliston, Ayrilish and Orol of Andijan district 41.6 km of Andijan region 13

Estimated Name Name Project Dates of № project cost of initiators and projects of the regions capacity implementation (million USD)

Construction, expansion and reconstruction of the sewage treatment plant "PK-162" to improve the water supply of 89 Kashkadarya region 150 thousand m3 / day 2020-2023 50,0 Nishansky, Karshinsky, Kasbinsky, Mirishkorsky districts and part of Mubareksky district of Kashkadarya region

Construction and reconstruction of networks to improve water 90 supply in the cities of Kasansay, and the village of Namangan region 102.9 km 2021-2025 18,0 Yarkurgan, of Namangan

Improvement of the drinking water supply system of the 91 Syrdarya region 61.8 thousand m3 / day 2021-2025 45,0 Bayavutsky and Mirzaabad district of the Syrdarya region

Construction and reconstruction of networks to improve water 27.6 km of trunk, 92 Surkhandarya region 2021-2025 14,0 supply in the district of Surkhandarya region 20 km

Reconstruction and expansion of water treatment plants from an 93 open source in Chirchik with a capacity increase of up to 100 Tashkent region 100 thousand m3 2021-2025 18,0 thousand m3 per day

Construction of sewage system and WWTP 94 Andijan region 100 thousand m3 / day 2021-2025 24,0 in the city of Shahrikhan of Andijan region

Construction and reconstruction of sewage systems in Asaki 95 Andijan region 100 thousand m3 / day 2021-2025 30,0 district of Andijan region

Construction of sewer systems 96 and improving the water supply of the Khojaabad district of Andijan region 100 thousand m3 / day 2021-2025 18,0 Andijan region 14

Estimated Name Name Project Dates of № project cost of initiators and projects of the regions capacity implementation (million USD)

Construction and recons