Figure 11.4.0

Total Page:16

File Type:pdf, Size:1020Kb

Figure 11.4.0 S H A Key M FIGURE 11.4.1 C H U N Frontier Closed Area Boundary PAK FU SHAN R I V ER E RIV R (S K Works Area (at Grade) HENZH O EN H K E) U SHA TA PAK KUNG AU [ Works Area (Tunnel) San Kwai Tin SECTION A, ZONE 1 Heung Yuen Wai Future BCP and Associated Road Works WANG LEK Tsung Yuen Ha Ha Heung Yuen Proposed Noise Barrier Lin Ma Hang Chuk Yuen Sheung Tam Modified Noise Barriers Proposed Shui Hang S for Widening of Fanling Highway WONG MAU HANG Ha Tam SHAN 500m Study Area of the Overall Project KONG YIU Shui Hang Tsiu Hang 500m Study Area of Individual Section San Tsuen TUNG LO Tong To HUNG FA CHAI Border SH AM HANG Shan Tsuen CHU Sew N R IV TUNG FUNG NGONG TONG Treatm E Kaw Liu Village Zone Boundary in Section R AU ROBIN'S NEST Tong To HE) Muk Min Tau EN (HUNG FA LENG) NZH SHE ( LUNG MEI Nga Yiu Tau Muk Wu FIGURE 11.4.3 Outline Zoning Plan Nga Yiu P TENG I N RI Tong To G YUEN VER Nga Yiu Ha Ta Kwu Ling VillageKan Tau Wai Ping Tsuen Agricultural (AGR) Muk Wu SHEK TSAI HA MAN KAM TO Conservation Area (CA) LO SHUE LING TA KWU LING SHUI NGAU TSO Fung Wong Wu Tong Fong SHEK O Comprehensive Development Area (CDA) Shek Chung Wo Keng Shan Au Chow Tin Tsuen Wu Shek Kok Ping Yeung Government/ Institution/ Community (G/IC) Lap Wo Tsuen Lei Uk WO KENG SHAN YUEN LENG NAM HANG San Uk Ling Shui Hau CHAI Ma Tseuk Leng Greenbelt (GB) Shek Kiu Tau Ma Tseuk Leng PAK HOK LAM Wo Tong Kong San Uk Ha Industrial (I) P ING Yim Tso Ha Y Pok Tau Ha U Wo Hang SECTIONE A, ZONE 2 Industrial (Group D) (I(D)) N Tai Long E R D G IV I E R R Y Lo Wu D Open Storage (OS) N SEUNG MATak Yuet A Liu Pok S LEI YUE Lau Govt. Farm HUNG LUNG Hoi Pui Leng Au Ha A CHAU Other Specified Uses (OU) HANG MIU KENG KONG NGA Ha Wo Hang Tai Po Tin Man Uk Pin LO WU PO CHEUNG SHAN Residential (Class D) (R(D)) Sha Ling Ping Che N FIGURE 11.4.2 Kai K G Shui Lau Hang Shue Recreation (REC) T Tai Wan SHEK MA U N Ping Che G New Village Nam Chung TAI SHEK MO R SHAN TONG I Nam Chung N V Lei Uk Village Type Development (V) Sheung Wo Hang A E Yeung Uk R M Sheung Shan C HU Nam Chung Kai Wat NG Kai Fong R Cheung Uk Ha Shan PAK HOK N A M C H U N G IV Garden Tai Tong Wu E Kai Wat SHAN Wang Shan Keuk R CHEUNG PO TAU Ngam Pin CHAM SHAN San Tsuen Loi Tung Luk Keng Wong Uk TAI HOM TUK Nam Chung Cheng Uk PRINCESS HILL Luk Keng Chan Uk PAI TAU LO Water Treatment Works SECTION A, ZONE 3 Ma Mei Leng Tsai N Ha Nam Chung HA L U K K E N G S Lo Uk G WANG LENG UN Ma Mei Ha Luk Keng Lam Uk TS Leng Tsui WA SHAN Hung Leng KONG SHAN Sheung Shui T Kan Tau Tsuen A Leng Pei Tsuen Wa Shan N Shek Pan Tam S Tsung Yuen HA N MA TAU LENG R IVER Ng Uk Tsuen Tan Chuk Hang Lo Wai Tan Chuk S Man Kok Ha Pak Tsuen H SZE TEI Hang Ho Sheung E Village KO PO SHAN K Sewage Treatment SHAN ung Kong Heung S H Works SHEUNG SHUI N E G U Ko Po N T Siu Hang San Uk Tsai G U N San Tsuen San Tong Po R Wai Loi G Siu Hang Kwan Tei I Barracks V K R E Tsuen Tai Yuen Tsuen I W R Tsuen V Ha Tsat Muk Kiu E A Po Sheung Tsui Lai SACRED HILL R LONG VALLEY (TIN PING SHAN) N Tsuen Garden T Tong Kok Hing Yan E Sze Tau Leng Kan Lung I R Tsuen Tsuen I Woodland V Hok Tau Pai FIGURE 11.4.4 E LO LUNG TIN Crest Ma Liu Shui R Shek Tsai San Wai San Tsuen Leng Fu Tei Pai KWAI TAU LENG SHEK WU HUI San Uk Tai Wo Sheung Tsat Muk Kiu Kwu Tung Tsuen TAI LENG PEI Wu Nga Yin Kong QUEEN'S HILL Tsung Pak Shek Wu Lok Yeung LUNG YEUK TAU Long Tin Ping San Tsuen Estate Ma Shi Po Rev Date Drawn Description Ch'k'd App'd On Shing Court R Ling Shan E Tai Tau Wing Ning PING TENG AU V Choi Po I Tsuen Tung Shan Ha R Leng Wing Fuk Wing Fai Court Sheung Shui Belair Monte Wai E Centre Centre Centre Po Kat Tsai Hok Tau Wai U Y 20/F Two Landmark East LING HILL Regentville Wing Ning G Kam Tsin Choi Yuen Estate Tung Kok N 100 How Ming Street U Casas Domingo Tsuen Wai E Yuk Po Court So Kwun Po H Lau Shui S SECTION B Kwun Tong, Kowloon Ma Wat Heung Fanling Garden Hong Kong LUEN WO HUI Tsuen Fan Gardens Ma Wat T +852 2828 5757 Tsz Tong NAM SHAN Tai Ping Wai F +852 2827 1823 NGAU TEI Estate Fanling Wai Tsuen Fan Leng On Lok Lo Wai W www.mottmac.com.hk Lau Tsuen Ng Uk Tsuen Shung Him Tong LAU SHUI HEUNG RESERVOIR Client Ka Shing Cheung Wah Pei Tau Court Tau Kai Leng Estate FANLING Ling Kok PING F Po UNG SHAN CIVIL ENGINEERING Ka Fuk SHEK AU SHAN Estate PO LENG AU Tong Hang AND DEVELOPMENT Ha Kung Tei Fanling FUK TSUEN SHAN WONG LENG Centre WONG KONG HOK TAU DEPARTMENT PO LENG SHAN LUNG SHAN FIGURE 11.4.5 Ping Kong WU TIP RESERVOIR Hang Tau SHAN LAI PEK SHAN On Po CHONG TSIN LENG Avon Park Project King Shing Dawning Court Yan Shing Views Ping Shan Chai Court SHUN AGREEMENT NO. CE45/2008(CE) Tong Kung Leng Tsing Kei Hang Wah Sum Nam Shan Mei Estate Wo Hop Shek Flora Plaza San Tsuen KAT TSAI SHAN AU LIANTANG/HEUNG YUEN WAI BOUNDARY Wo Hing Wo Hop Shek Tsuen Village Experimental Cheong Shing CONTROL POINT AND ASSOCIATED WORKS Farm Court Wah Ming Lai Pek Shan Yung Shing SECTIONEstate C -- INVESTIGATION KEI LAK TSAI Court Lin Tong Mei WO HOP SHEK Title Tai Lung Wa Mei Shan Kau Lung Hang Lo Wai Kiu Tau Chan Uk Po Ma Tseuk EXISTING ZONINGS WITHIN 500M STUDY AREA - T Cheung Uk Lei Uk A Lin Tong Mei Tong M Tsoi Yuen S H KEY PLAN Tsiu Keng U Shan Liu I Lo Wai H Kau Lung Hang SHA LO TUNG A N San Wai Ho Lek Pui G Tsiu Keng Pang Uk Yuen Leng Kilometres Nam Wa Po Lai Pek Shan Tsiu Keng San Tsuen San Wai CLOUDY HILL 0120.5 Designed Eng. Chk. (KAU LUNG HANG SHAN) A Shan Tseng Tau Ting Kok Ying Pun Drawn Coordination A Shan Tung Tsz FIGURE 11.4.6 Po Sam Pai Dwg. Chk. Approved Tsiu Lam Tai Wo Scale at A3 Project Status San Tau Kok 1 : 7500 CAD file © Mott MacDonald Hong Kong Limited Drawing No Rev This document should not be relied on or used in circumstances other than those for which it was originally prepared and for which Mott MacDonald Hong Kong Limited was commissioned. Mott MacDonald Limited accepts no responsibility for this document to any other party other than the person by whom it was commissioned. © COPYRIGHT RESERVED FIGURE 11.4.0.
Recommended publications
  • Race Starts This Weekend for MSIG Ultra @ Tai Po Double Category Newly Added for a Combined Race Distance of 119Km the Singaporean Pair Shared Their Strategy
    Press release and high-resolution images can be downloaded via the following link: https://drive.google.com/open?id=1uzadBWFndlxLwds6x7TN7WahvwdK3cU_ For Immediate Release Race starts this weekend for MSIG Ultra @ Tai Po Double category newly added for a combined race distance of 119km The Singaporean pair shared their strategy [Hong Kong, March 27, 2019] Over the persistent peaks of the Pat Sin Leng Range, Hong Kong’s most promising young trail runners are set to battle at the MSIG Ultra @ Tai Po on Saturday March 30 for more than a podium place. As the second qualifying event of the MSIG Youth Trail Running Development Programme, the 18-kilometre race will decide which four local trail runners will make the cut for the year-long training programme. While these young runners double down, a few others will double up — in the Double Category, which is also new for this year’s MSIG Ultra triumvirate of events. Participants will run the 75km on Saturday followed by the 44km the following day, for a total of 119 treacherous kilometres. The 75km and 18km races will be held on Saturday March 30, while the 44km will be held on Sunday March 31. Both the 75km and 44km races will start and finish at The Country Club at Hong Lok Yuen in Tai Po, while the 18km is a point-to-point course that will start on Bride’s Pool Road at Tai Mei Tuk and finish at Hong Lok Yuen. All distances will traverse the Pat Sin Leng range and Cloudy Hill, arguably the toughest climbs of the courses.
    [Show full text]
  • Cb(1)805/07-08(07)
    LC Paper No. CB(1)805/07-08(07) Panel on Information Technology and Broadcasting Extract from minutes of the meeting held on 12 November 2007 * * * * * IV. Progress in the implementation of digital terrestrial television broadcasting (LC Paper No. CB(1)203/07-08(03) -- Paper provided by the Administration LC Paper No. CB(1)230/07-08(01) -- Generic Code of Practice on Television Technical Standards (effective from 9 November 2007) LC Paper No. CB(1)203/07-08(04) -- Background brief prepared by the Legislative Council Secretariat LC Paper No. CB(1)242/07-08 -- Administration's paper on digital (tabled at the meeting and terrestrial television broadcasting subsequently issued via e-mail on (power-point presentation 13 November 2007) materials) (Chinese version only)) Presentation by the Administration 4. Following a brief introduction by the Deputy Secretary for Commerce and Economic Development (Communications and Technology) (DS(CT)), Principal Assistant Secretary for Commerce and Economic Development (Communications and Technology) (PAS(CT)), gave a power-point presentation to update members on the implementation of digital terrestrial television (DTT) broadcasting in Hong Kong. He highlighted the major points as follows: (a) Background of DTT broadcasting (i) The implementation of DTT was in good progress. Pursuant to the implementation framework for DTT broadcasting announced by the Government in 2004, the two domestic free television programmes service licensees, i.e. Asia Television Limited (ATV) and Television Broadcasts Limited (TVB), would launch DTT by end-2007 and expand the digital coverage to at least 75% of Hong Kong by end-2008. The two broadcasters would each be assigned a multiplex for launching the new digital services and would simulcast their four existing analogue programme channels in digital format by sharing a joint multiplex.
    [Show full text]
  • How Protected Are Marine Protected Areas?
    APRIL 2003 NUMBER 28 Porcupine! Newsletter of the Department of Ecology & Biodiversity, The University of Hong Kong How protected are marine protected areas? Marine protected areas (MPAs) are widely considered to be a means of conserving Editorial vulnerable marine species or habitats, and are increasingly proposed as fisheries management tools, globally. In Hong Kong, we already have a marine reserve, Among the many contributions made several marine parks and the government is also considering ‘fishery protection by John Hodgkiss to the local commu- areas’: all very different categories of MPAs that address very different objectives. nity over the last few decades has been So, what exactly is an MPA, what is its role in marine conservation and fisheries his 17 years as Editor of the Memoirs of management and how much marine protection is there in Hong Kong through the Hong Kong Natural History Soci- MPAs? ety. For the last 11 of those years, the Memoirs and Porcupine! have played Ask family or friends what they understand by a ‘marine protected area’ and they are complimentary roles in promoting inter- likely to respond that, if they think about it at all, they would imagine it to be a place est in and understanding of the ecology where things cannot be removed; secondarily respondents might add that damaging and biodiversity of Hong Kong. While input (like pollution) should also be avoided. IUCN defines a protected area Porcupine! has published the news - (terrestrial or aquatic) as "An area of land and/or sea especially dedicated to the new species, new sightings, new ideas, protection and maintenance of biological diversity, and of natural and associated new threats, new people, new publica- cultural resources, and managed through legal or other effective means".
    [Show full text]
  • Tony Banham Hong Kong University Press the University of Hong Kong Pokfulam Road Hong Kong
    Tony Banham Hong Kong University Press The University of Hong Kong Pokfulam Road Hong Kong www.hkupress.org © 2003 Hong Kong University Press First paperback edition 2005 ISBN 978-962-209-780-3 (Paperback) All rights reserved. No portion of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopy, recording, or any information storage or retrieval system, without prior permission in writing from the publisher. British Library Cataloguing-in-Publication Data A catalogue record for this book is available from the British Library. 10 9 8 7 6 5 4 3 Printed and bound by CTPS Limited in Hong Kong, China Contents Preface ix Acknowledgements xiii Abbreviations xvii Introduction 1 1. The Background 3 Hong Kong, 1841 to 1941 3 The Causes of the War 7 2. THE BATTLE 11 The Week Immediately Preceding the Fighting 11 The Battle 17 3. Phase I: The Loss of the Mainland 21 18 December Monday 23 19 December Tuesday 32 10 December Wednesday 40 未命名5> 5 8/27/2010, 5:32 PM vi CONTENTS 11 December Thursday 47 12 December Friday 56 4. Phase II: The Siege of the Island 65 13 December Saturday 66 14 December Sunday 73 15 December Monday 78 16 December Tuesday 83 17 December Wednesday 89 5. Phase III: The Invasion of the Island 93 18 December Thursday 95 6. Phase IV: The Forcing of Wong Nai Chung Gap 115 19 December Friday 117 7. Phase V: Pushing the Line West and Encircling Stanley 165 20 December Saturday 168 21 December Sunday 185 22 December Monday 199 23 December Tuesday 214 24 December Wednesday 230 25 December Thursday 248 26 December Friday 276 8.
    [Show full text]
  • Note for Public Works Subcommittee of Finance Committee
    For information PWSCI(2020-21)7 NOTE FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE Annual Report on Capital Works Reserve Fund Block Allocations for the 2019-20 Financial Year We have been compiling exception reports on block allocations under the Capital Works Reserve Fund (CWRF) to account for the difference between the actual programme and the indicative one which we presented to Members for approving the funding allocation. This report covers the 2019-20 financial year. Encls. 1 to 11 Enclosures 1 to 11 provide details on each block allocation under the 11 CWRF Heads of Expenditure and include – (a) a comparison of the approved provision and actual expenditure in 2019-20 and the reasons for those items with variations greater than 15%; (b) a list of minor works projects which were implemented in 2019-20 as planned, including those which had had the works contracts awarded but had not started incurring spending1, and those which were shelved or withdrawn (as compared with the indicative list in PWSC(2018-19)352; and (c) a list of new injection items (i.e. items not shown in the indicative list in PWSC(2018-19)35) approved in 2019-20, including those which had had the works contracts awarded but had not started incurring spending. 2. In overall terms, the approved allocation for CWRF block allocations in 2019-20 totalled $ 15,240.81 million3. The actual expenditure was $12,085.54 million, which was 20.7% below the approved allocation. The approved and actual expenditures of all subheads in 2019-20 are set out in the following table – /Subhead ....
    [Show full text]
  • LC Paper No. CB(4)330/17-18(04)
    LC Paper No. CB(4)330/17-18(04) For discussion on 11 December 2017 Legislative Council Panel on Information Technology and Broadcasting An Update on the Implementation of Digital Terrestrial Television Broadcasting Purpose This paper updates Members on the latest progress of the implementation of digital terrestrial television (DTT) services in Hong Kong. Current Coverage of Free Digital Television Services Domestic free television programme service licensees 2. Domestic free television programme service (free TV) licensees have to establish their own transmission networks or engage other network services to transmit their free TV services. Under the technology neutral regime enshrined in the Broadcasting Ordinance (Cap. 562), free TV licensees are free to make their own transmission arrangements to deliver their licensed services throughout Hong Kong. 3. Currently, among the three free TV licensees in Hong Kong, HK Television Entertainment Company Limited (HKTVE) and Television Broadcasts Limited (TVB) make use of television broadcasting spectrum (broadcasting spectrum) to provide DTT services. Another free TV licensee, Fantastic Television Limited (Fantastic TV), has since 14 May 2017 provided its digital television service by using a fixed network. The current coverage of these free TV licensees is as follows: Coverage of Domestic Free TV Services Free TV (Percentage of Hong Kong Licensees Population/Households) Fantastic TV About 93% (via fixed network) HKTVE About 99% (via broadcasting spectrum) TVB About 99% (via broadcasting spectrum) Radio Television Hong Kong 4. In respect of public service broadcaster, the Radio Television Hong Kong (RTHK) is now expanding its DTT network. To date, RTHK has established 19 transmitting stations1, and its DTT coverage has reached about 90% of the Hong Kong population.
    [Show full text]
  • TPMM Details 2018
    Tai Po Mountain Marathon Race Course 9:00 AM, Sunday 4 Feb 2018 Access via Tai Wo KCR Station or Ting Kok Road, Taipo Public buses: 71K, 72A, 73, 75K, E41 2018 route negotiated with AFCD (same since 2016 route) Start: Tai Po Old Market Temple, Ting Kok Road - Kau Lung Hang Shan (Cloudy Hill) - Sha Lo Tung - near Hok Tau Reservoir - Ping Fung Shan - Wong Leng – Left turn toward Luk Keng- Wang Shan Keuk Sheung Tsuen - Bride's Pool (End of Half Marathon) - Wu Kau Tang - Ha Miu Tin – Sam A Tsuen – Lai Chi Wo – Shan O – So Lo Pun – Ah Kung Au – Kuk Po – Kuk Po Lo Wai – A Ma Wat – Wu Kau Tang – Bride’s Pool Finish. Half Marathon Length – 15.3 km 1050 meters cumulative elevation gain Full Marathon Length – 36.30 km 1740 meters cumulative elevation gain Cutoff Times: 3.5 hours at the halfway point for full marathon runners; 4.0 hours for half marathon. 7.5 hours finishing cut off for the full marathon. There are 4 water stops on the full marathon course and 1water stop on the half marathon course. It is 5 km from the start to the first water stop, but another 10 km to the next water stop. Race Course Hints and Suggestions Maps - Although the course will be marked with white arrows, these arrows tend to fade overtime. Purchasing a North-East New Territories Country Park Map to take along on the run may be helpful if questions arise. Racers are also advised to familiarize themselves with the course ahead of time.
    [Show full text]
  • Trailwalker Practice
    Join Athletics Interest Group GrGrouphttp://www.hkicpa.org.hk/file/medi a/section5_membership/SRC/srcJoin Athletics Interest Group -Facebookgeneral/SR C form_August 2014.pdf Trailwalker Practice In order to enable members to prepare for the Oxfam Trailwalker (OTW), the Athletics Interest Group has planned a series of practice starting from easy to more difficult level. Five practices have already been held since April. Come join the training if you intend to join this challenging race. It also serves as part of the internal selection process for representative team. For the months of May and June, below are the training schedules: Longer trail Deadline Date, gathering Distance & Distance & Shorter trail (only for experienced for time & place time limit time limit hikers) enrolment MacLehose Trail Cont'd: 27 May (Sat) Tai Mo Shan Rotary Tai Lam Country Trail 8:00 am 22 km 10 km Park (M156) to Sze Pai Shek Shan, 23 May Tsuen wan 6 hrs 3.5 hrs Tai Tong Cheung Ngau Shan, MTR Station (OTW finish point) Au Tau, Yuen Long MTR 3 June (Sat) Tai To Yan, Ng Tung Cont'd: 8:15 am Chai, Tai Mo Shan, Wo 21 km 4 km Chuen Lun, Fu Yung 31 May Fanling Yang Shan, Heung 7.5 hrs 1.5 hrs Path, Tsuen Wan MTR MTR Station Shek, Chuen Lung Cont'd: 10 June (Sat) Wilson Trail Wilson Trail 8:00 am 25 km 11 km Yau Tong (W19) to Shing Mun Main Dam 6 June Yau Tong 8 hrs 3.5 hrs Tai Po Road (W69) (W69), Lead Mine Pass, MTR Station Tai Po Market (W90) Wilson Trail 17 June (Sat) Cont'd: Tai Mei Tuk, Pak Sin 8:00 am 17 km Lin Au, Zhou Ma Gang, 9 km Range (W126), Hok 13 June Tai Po Market 6 hrs Sze Fong Shan, Ng Tung 3.5 hrs Tau, Cloudy Hill, Tai MTR Station Chai, Lam Kam Road Wo (W98) 24 June (Sat) MacLehose Trail Cont'd: 8:15 am 24 km 24 km East Dam (M19) to Kei Kei Ling Ha (M68) to 20 June Sai Kung Bus 7 hrs 7 hrs Ling Ha (M68) Tai Po Road (M115) Terminus Remarks: 1.
    [Show full text]
  • Minutes of the 4 Meeting of RTHK Board of Advisors Held at 2:30 Pm
    Minutes of the 4 th meeting of RTHK Board of Advisors held at 2:30 pm, 26 August 2011 in the Conference Room of the Innovation and Technology Commission, Wu Chung House, Wanchai Present : Mr Lester G. HUANG, JP (Chairman) Dr Eugene CHAN Kin-keung, JP Ms FUNG May-gay Mr Ringo LAM Wing-kwan Mr C.K. LAU, JP Ms Marisa YIU Miss Lisa Marie DJENG Kar-yee Mr Raj Sital MOTWANI, BBS, JP Mr Gordon LEUNG, Acting Director of Broadcasting In attendance from RTHK Mr TAI Keen-man, Acting Deputy Director of Broadcasting Mr CHAN Yiu-wah, Head/Digital Audio Broadcasting Miss Jace AU, Leader of RTHK’s Working Group on Community Broadcasting Ms Amy KWONG (Board Secretariat) Absent with apologies Mr Maurice LEE Wai-man, BBS, JP Secretary : Mr David CHOW (Board Secretariat) 1. The Chairman welcomed Members to the meeting. He said that Ms Jolly WONG had resigned from the Board because of other commitments. He would send a letter of thanks to her for her contributions to the Board. Government would consider replacement in due course. 2. The Chairman further said that in response to a suggestion by some members at the last meeting as to whether Board meetings could be held on Hong Kong Island in addition to Broadcasting House, the Secretariat had consulted Members 1 of their preferences. On the basis of feedback collected, and provided that a conference room of another department on Hong Kong Island could be secured and the agenda of the meeting concerned did not require excessive logistical arrangements, the Secretariat would in future try to arrange Board meetings on both sides of the harbour.
    [Show full text]
  • GEO REPORT No. 186
    FACTUAL REPORT ON HONG KONG RAINFALL AND LANDSLIDES IN 2003 GEO REPORT No. 186 T.H.H. Hui & A.F.H. Ng GEOTECHNICAL ENGINEERING OFFICE CIVIL ENGINEERING AND DEVELOPMENT DEPARTMENT THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION FACTUAL REPORT ON HONG KONG RAINFALL AND LANDSLIDES IN 2003 GEO REPORT No. 186 T.H.H. Hui & A.F.H. Ng This report was originally produced in April 2004 as GEO Special Project Report No. SPR 3/2004 - 2 - © The Government of the Hong Kong Special Administrative Region First published, September 2006 Prepared by: Geotechnical Engineering Office, Civil Engineering and Development Department, Civil Engineering and Development Building, 101 Princess Margaret Road, Homantin, Kowloon, Hong Kong. - 3 - PREFACE In keeping with our policy of releasing information which may be of general interest to the geotechnical profession and the public, we make available selected internal reports in a series of publications termed the GEO Report series. The GEO Reports can be downloaded from the website of the Civil Engineering and Development Department (http://www.cedd.gov.hk) on the Internet. Printed copies are also available for some GEO Reports. For printed copies, a charge is made to cover the cost of printing. The Geotechnical Engineering Office also produces documents specifically for publication. These include guidance documents and results of comprehensive reviews. These publications and the printed GEO Reports may be obtained from the Government’s Information Services Department. Information on how to purchase these documents is given on the last page of this report. R.K.S. Chan Head, Geotechnical Engineering Office September 2006 - 4 - FOREWORD This report presents a summary of the factual information on rainfall and landslides in Hong Kong throughout 2003.
    [Show full text]
  • 5 August 2019 INFORMATION for PARTICIPANTS Part 2
    v.1 (12/07/19) 16th International Geography Olympiad Hong Kong 31 July - 5 August 2019 INFORMATION FOR PARTICIPANTS Part 2: Arriving at Hong Kong 1 v.1 (12/07/19) CONTENTS 1. Welcome to Hong Kong iGeo-2019 3 2. Arrival in Hong Kong and transportation to EdUHK 3 2.1 Arriving at Hong Kong International Airport on 30 July 3 2.2 Arriving Hong Kong other than on 30 July 4 4. The Education University of Hong Kong 9 4.1 Campus map 9 4.2 Campus and local facilities / Shopping 9 5. Hong Kong 11 5.1 Sights and Sites 11 5.2 Getting around 12 5.2.1 Taxis 12 5.2.2 Local Bus 12 5.2.3 Mass Transit Railway (MTR) 12 6. Language 14 7. Currency, Credit cards and Octopus cards 15 7.1 Cash 15 7.2 Credit cards 16 7.3 Octopus cards 16 8. General iGeo Contact 16 2 v.1 (12/07/19) 1. Welcome to Hong Kong iGeo-2019 Welcome to Hong Kong! This document will guide you as you arrive and get ready for the iGeo events! Please refer to this document for arrival information, transportation to The Education University of Hong Kong, checking into residences, registration, campus orientation, transportation with the city, language and currency information. The iGeo venue, The Education University of Hong Kong, is located in Tai Po. Tai Po District is one of the 18 districts of Hong Kong, lies to the northwest of the Tolo Harbour. In terms of population, this district is the second largest in Hong Kong, with around 300,000 inhabitants and is small in size - around 148 square kilometres.
    [Show full text]
  • The North Face 100® Hong Kong
    The North Face 100® Hong Kong TNF 100 and TNF 50 Hong Kong Route Descriptions: Both the 50 km and 100 km races start at 8 AM on Saturday, December 12th inside the Tai Mei Tuk car park in the Northern New Territories of Hong Kong SAR. Baggage check will take place by the Bradbury Camp Youth Hostel. Race assembly will take place on the bicycle path near Bradbury Camp. TNF 100 and TNF 50 Section 1: Tai Mei Tuk/Pat Sing Leng Nature Trail/Wu Kau Tang Approximate distance ~ 6.6 km Total elevation gain ~ 400 meters Total elevation loss ~ 315 meters Racers will run out the bicycle path and turn right onto Bride’s Pool Road for approximately 1 km. The course turns left by the AFCD/Plover Cove Visitor Center and onto Pat Sing Leng Nature Trail. The course continues along a footpath approximately 1.5 meters wide and gains altitude steadily. There are occasional breaks in the forest that afford views to the right of Plover Cove Reservoir. After attaining a height of land at about 300 meters, the path descends to an intersection where the Wilson Trail splits off to the left and racers continue on the Pat Sin Leng Nature Trail to the right. Following a descent, a stream crossing, a short climb and steeper descent on stone stairs, the course arrives at Bride’s Pool Road. Although the race organizer and the police will manage traffic control, racers should cross the road with caution. The road is also popular with cyclists who tend to disregard instructions to give way to runners crossing the road.
    [Show full text]