Item 24 - Appendix 1.Xls
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Greenford Square, London Ub6
TWO GREENFORD SQUARE A self-contained office and education facility GREENFORD SQUARE, LONDON UB6 0HE (dual D1 & B1 use), set in a six acre landscaped From 9,418 sq ft - 97,028 sq ft campus, offering secure on-site car parking, with excellent transport links into central London. BUILDING OVERVIEW Two Greenford Square is set in a six Only a 9 minute walk to Sudbury Hill • Dual D1 & B1 use. acre, multi-use, campus providing an tube (Piccadilly Line) and overground • HQ Campus of 97,028 sq ft. attractive working environment within station, with direct connections to a landscaped setting. London Marylebone in just 16 minutes. TO LET • Self-contained options for 28,269 sq ft and 68,759 sq ft. The building is adjacent to the Ferrero Within an 8 minute walk from Greenford UK HQ and the mixed-use Greystar tube (Central Line) and overground • 275 car parking spaces at a regeneration, Greenford Quay. station, with direct links to West Ealing ratio of 1:353 sq ft. in only 11 minutes, one of five Crossrail stations that the London Borough of Ealing has to offer. 01 VEHICLE ACCESS OLDFIELD LANE NORTH FERRERO UK & IRELAND HQ 275 SPACE CAR PARK VEHICLE ACCESS B E PEDESTRIAN R K E ACCESS L E Y A V E N U E A4127 D A O R D R O F N E E R G GREENFORD QUAY REDEVELOPMENT 1,965 NEW HOMES AND 200,000 SQ FT OF COMMERCIAL ACCOMMODATION 02 Greystar is creating a new canal-side neighbourhood, • 1,965 residential units and 200,000 sq ft of • High-quality and well-managed public which is inclusive of the surrounding community and retail and commercial space. -
Uncovering the Underground's Role in the Formation of Modern London, 1855-1945
University of Kentucky UKnowledge Theses and Dissertations--History History 2016 Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945 Danielle K. Dodson University of Kentucky, [email protected] Digital Object Identifier: http://dx.doi.org/10.13023/ETD.2016.339 Right click to open a feedback form in a new tab to let us know how this document benefits ou.y Recommended Citation Dodson, Danielle K., "Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945" (2016). Theses and Dissertations--History. 40. https://uknowledge.uky.edu/history_etds/40 This Doctoral Dissertation is brought to you for free and open access by the History at UKnowledge. It has been accepted for inclusion in Theses and Dissertations--History by an authorized administrator of UKnowledge. For more information, please contact [email protected]. STUDENT AGREEMENT: I represent that my thesis or dissertation and abstract are my original work. Proper attribution has been given to all outside sources. I understand that I am solely responsible for obtaining any needed copyright permissions. I have obtained needed written permission statement(s) from the owner(s) of each third-party copyrighted matter to be included in my work, allowing electronic distribution (if such use is not permitted by the fair use doctrine) which will be submitted to UKnowledge as Additional File. I hereby grant to The University of Kentucky and its agents the irrevocable, non-exclusive, and royalty-free license to archive and make accessible my work in whole or in part in all forms of media, now or hereafter known. -
Cabinet Appendices Pack
b CABINET APPENDICES PACK Date and Time: Monday 15 April 2013 7.00 pm Venue : Room 8, Lambeth Town Hall, Brixton Hill, SW2 1RW Contact for enquiries: Website: Gary O’Key www.lambeth.gov.uk/committee Democratic Services Officer Tel/Voicemail: 020 7926 2183 Lambeth Council – Democracy Live Fax: 020 7926 2361 on Facebook Email: [email protected] http://www.facebook.com/ Governance and Democracy @LBLdemocracy on Twitter Lambeth Town Hall, Brixton Hill, http://twitter.com/LBLdemocracy London, SW2 1RW To tweet about Council agendas, minutes or meetings use #Lambeth Despatched: Friday 5 April 2013 CABINET MEMBERS: Councillor Lorna Campbell - Cabinet Member for Equalities and Communities Councillor Jim Dickson - Cabinet Member for Health and Wellbeing Councillor Rachel Heywood - Cabinet Member for Children and Families Councillor Jack Hopkins - Cabinet Member for Safer and Stronger Communities Councillor Paul McGlone - Cabinet Member for Finance and Resources Councillor Jackie Meldrum - Deputy Leader of the Council Councillor Lib Peck - Leader of the Council Councillor Sally Prentice - Cabinet Member for Culture and Leisure Councillor Pete Robbins - Cabinet Member for Housing and Regeneration Councillor Imogen Walker - Cabinet Member for Environment and Sustainability AGENDA Page Nos. 3. Waterloo Area Supplementary Planning Document: Approval 1 - 194 (Report 3/13-14 and appendices) Key Decision Bishop’s ward Leader of the Council Executive Director of Housing, Regeneration & Environment Contact: Sandra Roebuck, Programme Manager, Neighbourhood -
A31 Note: Gunnersbury Station Does Not Have OWER H91 E D
C R S D E A U T S A VE N E R A N B B D L W Based on Bartholomews mapping. Reproduced by permission of S R E i N U st A R O HarperCollins Publishers Ltd., Bishopbriggs, Glasgow. 2013Y ri E E A Y c W R A t D A AD www.bartholomewmaps.com N C R 272 O Y V L D R i TO T AM 272 OL E H D BB N n A O CAN CO By Train e N Digital Cartography by Pindar Creative N U L E n w i a L Getting to BSI m lk 5 i AVE 1 ng N A Acton0- t V 1 im • The London Overground runs between E t e e LD ROAD B491 D N a SOUTHFIE E Y Town fr R Address: Chiswick Tower, U imR B o B E U O 440 m Richmond and Stratford stopping at Travel to E x L D B A R o S L AD R r O E RO O s 389 Chiswick High Road, London, W4 4AL Y R G R E p EY L i SPELDHUR Gunnersbury. ID ST R A R R t RO M p NR B E A O N e D NU O H L A A UB E LL C D GS BO T Y British Standards 1 R E RSET E E 9 N L SOM T N All visitors must enter the building through F 44 U N H • The ‘Hounslow Loop’ has stations at G SOUTH ROAD BEDFORD B E3 E B E R the main entrance on Chiswick High Road O Kew Bridge, Richmond, Weybridge, N O L PARK D Institution S ACTON L A A A D N E O R E O D and report to Reception on arrival. -
Monmouthshire Local Development Plan (Ldp) Proposed Rural Housing
MONMOUTHSHIRE LOCAL DEVELOPMENT PLAN (LDP) PROPOSED RURAL HOUSING ALLOCATIONS CONSULTATION DRAFT JUNE 2010 CONTENTS A. Introduction. 1. Background 2. Preferred Strategy Rural Housing Policy 3. Village Development Boundaries 4. Approach to Village Categorisation and Site Identification B. Rural Secondary Settlements 1. Usk 2. Raglan 3. Penperlleni/Goetre C. Main Villages 1. Caerwent 2. Cross Ash 3. Devauden 4. Dingestow 5. Grosmont 6. Little Mill 7. Llanarth 8. Llandewi Rhydderch 9. Llandogo 10. Llanellen 11. Llangybi 12. Llanishen 13. Llanover 14. Llanvair Discoed 15. Llanvair Kilgeddin 16. Llanvapley 17. Mathern 18. Mitchell Troy 19. Penallt 20. Pwllmeyric 21. Shirenewton/Mynyddbach 22. St. Arvans 23. The Bryn 24. Tintern 25. Trellech 26. Werngifford/Pandy D. Minor Villages (UDP Policy H4). 1. Bettws Newydd 2. Broadstone/Catbrook 3. Brynygwenin 4. Coed-y-Paen 5. Crick 6. Cuckoo’s Row 7. Great Oak 8. Gwehelog 9. Llandegveth 10. Llandenny 11. Llangattock Llingoed 12. Llangwm 13. Llansoy 14. Llantillio Crossenny 15. Llantrisant 16. Llanvetherine 17. Maypole/St Maughans Green 18. Penpergwm 19. Pen-y-Clawdd 20. The Narth 21. Tredunnock A. INTRODUCTION. 1. BACKGROUND The Monmouthshire Local Development Plan (LDP) Preferred Strategy was issued for consultation for a six week period from 4 June 2009 to 17 July 2009. The results of this consultation were reported to Council in January 2010 and the Report of Consultation was issued for public comment for a further consultation period from 19 February 2010 to 19 March 2010. The present report on Proposed Rural Housing Allocations is intended to form the basis for a further informal consultation to assist the Council in moving forward from the LDP Preferred Strategy to the Deposit LDP. -
LICENSING SUB COMMITTEE Fairway Pavilion, West Middlesex Golf Club, Greenford Road, Southall (Dormers Wells Ward)
Ealing Council Democratic Services Officer: Town Hall Lee Teasdale New Broadway tel: 020 8825 7919 London W5 2BY fax: 020 8825 6909 e-mail: [email protected] LICENSING SUB COMMITTEE Fairway Pavilion, West Middlesex Golf Club, Greenford Road, Southall (Dormers Wells Ward) nd Date: Wednesday, 2P P March 2016 Time: 4pm or upon conclusion of the previous hearing Venue: Liz Cantell Room , Ealing Town Hall MEMBERSHIP: Councillors Kate Crawford, Munir Ahmed and Roz Reece. AGENDA 1. Apologies for Absence 2. Urgent Matters Any urgent matters that the Chair has agreed should be considered. 3. Matters to be Considered in Private 4. Declarations of Interest 5. Opposed Variation to a Premises Licence Fairway Pavilion, West Middlesex Golf Club, Greenford Road, Southall MARTIN SMITH CHIEF EXECUTIVE rd 23P PPP February 2016 SUMMARY OF PROCEDURE FOR LICENSING SUB-COMMITTEE HEARINGS 1. The procedure to be followed at Licensing Sub Committee Hearings will be outlined by the Chairman at the beginning of each hearing. 2. Parties to the hearing can be represented by a friend or legal adviser who acts as their spokesperson. 3. The procedure to be followed is summarised* below and will generally be followed although the procedure may be varied at the Chair’s discretion • The Licensing Officer will introduce the Report and provide clarification on any factual issues. • The applicant will present the application and call any witnesses in respect of whom permission to appear has been given and answer any questions put to them. • Those who have made relevant representations will make their representations and call any witnesses in respect of whom permission to appear has been given and answer any questions put to them. -
Woodend Farm, Huntley, Gloucestershire Gl19 3Ha
WOODEND FARM, HUNTLEY, GLOUCESTERSHIRE GL19 3HA WOODEND FARM, HUNTLEY, GLOUCESTERSHIRE GL19 3HA A SUBSTANTIAL GRADE II LISTED VICTORIAN FARMHOUSE WITH EARLIER FEATURES BEING SOLD TOGETHER WITH 17½ ACRES OF ADJACENT PASTURE LAND TO BE SOLD IN 3 LOTS WOODEND FARM (LOT 1) SOLICITORS SITUATION & DESCRIPTION Harrison Clark Rickerbys inc. Shawcross, Overross House, Ross Park, Ross-on-Wye, Situated in fine open countryside just outside the busy village of Huntley having access to both Herefordshire HR9 7US. Tel: 01989 562377. For the Attention of Mary Wathen. the A40 Gloucester to Ross-on-Wye road and the A4136 Huntley to Monmouth road. The village offers Primary School, Village Shop and Post Office, noted Butchers, Public House and LOCAL AUTHORITY a Garden Centre together with a local Cricket Club and a 9 hole Golf Course. Forest of Dean District Council, Council Offices, High Street, Coleford, Glos. GL16 8HG Tel: 01594 810000 Delightfully situated on the south-eastern edge of the Royal Forest of Dean the property is close to May Hill with fine walks and hacking out countryside. OUTGOINGS The Market Town of Newent is under 5 miles to the north where there is a Secondary School. Council Tax Bandings:- 1 Woodend Farmhouse: Band ‘C’ The City of Gloucester is only some 9 miles away to the east with all the facilities that one Woodend Cottage: Band ‘C’ would expect from a City together with its fine Cathedral and also having main line railway 2 Woodend Farmhouse: Band ‘D’ station for fast access to London Paddington, Birmingham New Street and Bristol Parkway together with a private Airport at Staverton. -
Storm Callum 12Th - 14Th October 2018
Investigation Report into Flooding - Storm Callum 12th - 14th October 2018 P2.23 Final Version July 2019 1 | P a g e Title of document Storm Callum Section 19 Flood Investigation Report Document date March 2019 Authors Carmarthenshire County Council Service responsible Flood Defence and Coastal Protection, Waste and Environmental Services. Department Environment Review March 2019 (Multi agency) Approval 29 July 2019 (CCC Executive Board) Published September 2019 Document History Revision Purpose description Originated Checked Reviewed Approved Date 0 Initial draft BK Mar 2019 P1.1 First draft for BK CCC Mar Internal review NRW 2019 DCWW Network Rail P1.2 BK CA April 2019 P2 BK CCC 7 May CMT 2019 P2.1 BK CCC PEB 3 June 2019 P2.22 BK CCC 5 July Scrutiny 2019 P2.23 BK CCC 29 July Executive 2019 Board P2.23 Final Version July 2019 2 | P a g e Contents 1 Introduction ......................................................................................... 5 2 The focus of the report .......................................................................... 7 3 Storm Callum ....................................................................................... 9 3.1 Forecasting and Prediction time line .................................................. 9 3.2 Rainfall data ................................................................................... 9 3.3 The Wind ..................................................................................... 11 4 Flood Investigation, Johnstown (Carmarthen) ....................................... -
30Hr Childcare: Analysis of Potential Demand and Sufficiency in Ealing
30hr Childcare: Analysis of potential demand and sufficiency in Ealing. Summer 2016 Introduction: Calculating the number of eligible children in each Ward of the borough The methodology utilised by the DfE to predict the number of eligible children in the borough cannot be replicated at Ward level (refer to page 14: Appendix 1 for DfE methodology) Therefore the calculations for the borough have been calculated utilising the most recent data at Ward level concerning the proportions of parents working, the estimates of 3& 4 year population and the number of those 4yr old ineligible as they are attending school. The graph below illustrates the predicted lower and upper estimates for eligible 3&4 year olds for each Ward Page 1 of 15 Executive Summary The 30hr eligibility criteria related to employment, income and the number of children aged 4 years attending reception class (who are ineligible for the funding) makes it much more likely that eligible children will be located in Wards with higher levels of employment and income (potentially up to a joint household income of £199,998) and lower numbers of children aged 4years in reception class. Although the 30hr. childcare programme may become an incentive to work in the future, in terms of the immediate capital bid, the data points to investment in areas which are quite different than the original proposal, which targeted the 5 wards within the Southall area. The 5 Southall Wards are estimated to have the fewest number of eligible children for the 30hr programme. The top 5 Wards estimated to have the highest number of eligible children are amongst the least employment and income deprived Wards in Ealing with the lowest numbers of children affected by income deprivation. -
Reasons-For-Closure-West-Ealing
This branch is closing – but we're still here to help Our West Ealing branch is closing on Friday 30 October 2020 Reasons for closure, and alternative ways to bank This branch is closing – but your bank is always open This first booklet will help you understand why we’ve made the decision to close this branch. It also sets out the banking services and support that will be available to you after this branch has closed. In a second booklet, which will be available from the branch prior to it closing or online at home.barclays/ukbranchclosures, we'll share concerns and feedback from the local community. We'll also detail how we are helping people transition from using the branch with alternative ways to carry out their banking requirements. Here are the main reasons why the West Ealing branch is closing: • The number of transactions has gone down in the previous 24 months, and additionally 89% of our branch customers also use other ways to do their banking such as online and by telephone. • Customers using other ways to do their banking has increased by 21% since 2012. • In the past 12 months, 66% of this branch's customers have been using nearby branches. • We've identified that only 126 customers use this branch exclusively for their banking Proposals to close any branch are made by the Barclays local leadership teams and verified at a national level ahead of any closure announcement. If you have any questions and concerns about these changes then please feel free to get in touch with Steve Day, your Market Director for North West London. -
A Framework for Southall
A Framework for April 2008 Tribal Urban Studio in association with Southall Michael Beaman Ltd London Borough of Ealing A Framework for April 2008 Tribal Urban Studio in association with Southall Michael Beaman Ltd London Borough of Ealing architec ture planning de sign Tribal Urban Studio in association with Michael Beaman Ltd Contents Contents List of Figures 1 Setting the Scene 1 Figure 1.1: Context Within London 2 1.1 Why a Framework for Southall? 1 Figure 1.2: Southall Context 3 1.2 The Process 1 Figure 1.3: Southall – Character and Place 4 1.3 Contextual Analysis 1 Figure 2.1: The Framework Plan 8 Figure 3.1: Southall Town Centre UDP Boundary 11 2 The Framework in Outline 7 Figure 3.2: Retail Centres in LB Ealing 12 2.1 Objectives for Southall as a Place 7 Figure 4.1: Major Transport Connections 19 2.2 The Framework in outline 7 Figure 5.1: Housing Character & Analysis Plan 28 Figure 7.1: The Community Hub concept - potential service provision 34 Figure 7.2: Potential Locations for the Community Hub 35 Figure 8.1: Areas for Change and Improvement 39 Part A: Planning for Change Figure 8.2: Town Centre Development Ideas 41 3 Retail and the Town Centre 11 Figure 8.3: Detailed Transport Development Ideas 43 Figure 8.4: Transport Development Ideas 45 3.1 The Current Position 11 Figure 8.5: Housing Opportunities 47 3.2 Planning for Change 12 Figure 8.6: Public Realm Proposals Plan 49 4 Transport 17 Figure 8.7: Employment Sites Identified for Change 51 4.1 The Current Position 17 4.2 Planning for Change 20 List of Tables 5 Housing, Public -
Carmarthenshire Revised Local Development Plan (LDP) Sustainability Appraisal (SA) Scoping Report
Carmarthenshire Revised Local Development Plan (LDP) Sustainability Appraisal (SA) Scoping Report Appendix B: Baseline Information Revised Carmarthenshire Local Development Plan 2018 - 2033 1. Sustainable Development 1.1 The Carmarthenshire Well-being Assessment (March 2017) looked at the economic, social, environmental and cultural wellbeing in Carmarthenshire through different life stages and provides a summary of the key findings. The findings of this assessment form the basis of the objectives and actions identified in the Draft Well-being Plan for Carmarthenshire. The Assessment can be viewed via the following link: www.thecarmarthenshirewewant.wales 1.2 The Draft Carmarthenshire Well-being Plan represents an expression of the Public Service Board’s local objective for improving the economic, social, environmental and cultural well- being of the County and the steps it proposes to take to meet them. Although the first Well- being Plan is in draft and covers the period 2018-2023, the objectives and actions identified look at delivery on a longer term basis of up to 20-years. 1.3 The Draft Carmarthenshire Well-being Plan will focus on the delivery of four objectives: Healthy Habits People have a good quality of life, and make healthy choices about their lives and environment. Early Intervention To make sure that people have the right help at the right time; as and when they need it. Strong Connections Strongly connected people, places and organisations that are able to adapt to change. Prosperous People and Places To maximise opportunities for people and places in both urban and rural parts of our county. SA – SEA Scoping Report – Appendix B July 2018 P a g e | 2 Revised Carmarthenshire Local Development Plan 2018 - 2033 2.