Item 24 - Appendix 1.Xls

Total Page:16

File Type:pdf, Size:1020Kb

Item 24 - Appendix 1.Xls Item 24 - Appendix 1.xls DPD Ref Site Location / Access Description / Current Uses Options Delivery / Implementation Planning History Ownership Developer / Partners ACTON - MAIN SITES ACT01 South Acton The site comprises predominantly 1,800 residential units Council-led Housing Identified as one of the Council’s P/2004/5577 - Outline Council Housing Estate municipal housing to the south of Acton Regeneration involving major intervention housing application for 756 residential Some private Town Centre. The estate is close to Residents of the Estate suffer redevelopment and replacement estates where a phased units, 2490m2 retail (A1), 625m2 public transport provision at Acton from significant levels of of existing dwellings with a mix regeneration and redevelopment Office (A2 & B1) / food & drink Town Underground Station and South deprivation compounded by of new dwelling types and programme is to be undertaken. (A3/A4/A5), 997m2 live/work Acton Railway Station as well as bus physical design factors such as tenures as well as associated London and Quadrant Housing units, 100m2 general industry routes serving the Uxbridge Road. the nature and quality of the amenities. Pedestrian, cyclist Trust and Countryside (B2), 1775m2 community / However, public transport is housing and public realm as well and public transport links within Properties selected as preferred leisure (D1/D2). Granted March predominantly routed around the as provision of, and connections and to outside the estate should development partners for 13- 2006. estate’s edge, with connections to, local amenities. be improved. phase 13-year regeneration, on- P/2007/2310 - Reserved Matters between the estate and wider area site from November 2010. for phases 2.1A and 2.1B. sometimes being prohibitive. Granted December 2007. P/2008/4713 - Reserved Matters for phase 2.2. Granted April 2009. Planning application expected July 2010 for phase 2.3 for approx. 163 residential units on site of Kipling Tower / Bollo Court and Masterplan outline planning application expected Autumn 2011. ACT02 Oaks Shopping The site is located between High Street The shopping centre opened in Retail-led mixed use with Shopping centre: Centre and and Churchfield Road in Acton Town 1995 but is now dominated by residential. Newpark Churchfield Road Centre with access possible from both ‘discount’ stores and makes a Investments Car Park, High roads. The site is well connected, poor contribution to the street Development should enhance Street / located within 1km of Acton Central scene. the street frontages of High Churchfield Road Churchfield Road Railway Station, Acton Town Street and/or Churchfield Road. car park: Council / Hoopers Mews Underground Station and Ealing Common Underground Station. South Acton Railway Station and West Acton Underground Station are just over 1km from the site. The site benefits from proximity to bus routes serving the Uxbridge Road. ACT03 North London The site is located on the edge of Acton Builders yard Residential-led mixed-use with Predominantly: Line Yard, Town Centre to the east of Birkbeck workshop / community / SGBD Property Birkbeck Road / Road and adjacent to the London education. Holdings Ltd. High Street Overground railway line running south 5 parking spaces from Acton Central Station. The site is Should enhance the street at north: private accessed from High Street to the south. frontages along The Vale. Birkbeck Mews The site is well connected, sitting Pedestrian and cycle occupiers adjacent to Acton Central Railway connections north-south should Station and within 1.5km of Acton be improved. Mainline Station, and underground services including at Ealing Common Underground Station. The site benefits from proximity to bus routes serving High Street. Page 1 of 36 Item 24 - Appendix 1.xls Potential Net Residential Units ACTON - MAIN SITES 862 210 200 Page 2 of 36 Item 24 - Appendix 1.xls DPD Ref Site Location / Access Description / Current Uses Options Delivery / Implementation Planning History Ownership Developer / Partners ACT04 Acton Town Hall The site includes the Town Hall located The site contains a number of Mixed-use leisure centre, 25m Anticipated delivery 2015. Council Complex, High on High Street / Winchester Street, the Victorian buildings which are pool (replacing Acton Pool), Street, Acton library, the Swimming Baths on Acton constrained from meeting library (replacing existing), Acton Town Hall Development Lane, Winchester Lane / Salisbury Street, the Priory modern requirements by community facilities (replacing Brief draft to be published Street and Community Centre on Acton Lane and ongoing maintenance demands. Priory Community Centre) to be September 2010. Salisbury Street, the Salisbury Street Car Park. The site The Council has explored provided on the existing Town Acton is well connected, located in close opportunities for refurbishment, Hall and Pool site. proximity to Acton Central Railway alternative uses and re-provision Station, with Acton Town Underground both on and off site, balancing The remainder of the site should Station, Ealing Common Underground heritage and conservation be used for enabling residential Station, South Acton Railway Station concerns with function and works. and West Acton Underground Station funding. all within 1-1.5km of the site. The site Should respect site's historic benefits from proximity to bus routes character. serving the Uxbridge Road. ACT05 Acton Bus/Tram The site is located on the western edge Former bus/tram depot. Residential-led mixed use. Developer: Crest Nicholson. PP/2009/1648 - 85 flats on Depot, 283-303 of Acton Town Centre and is accessed floors above 1,022 sqm Uxbridge Road, via Uxbridge Road and Gunnersbury A1/A2/A3 and B1(a) floorspace. Acton W3 9QU Road. The site is well connected, Submitted July 2009. Minded to located within 1km of Acton Central refuse permission September Railway Station, Acton Town 2009. Appeal allowed December Underground Station and Ealing 2009. Common Underground Station. South Acton Railway Station and West Acton Underground Station are just over 1km from the site. The site benefits from proximity to bus routes along the Uxbridge Road. ACT06 2 Bollo Lane, The site is located in South Acton The site is an employment Residential-led mixed use. Developer: Community Housing P/2005/3585 - Outline for South Acton W4 adjacent to Chiswick Park Underground location in active use. Association. residential-led mixed-use 5LE Station. The site is reasonably well comprising 48 flats and 1,273 connected, sitting adjacent to Chiswick sqm of office space. Granted Park Underground Station. There is December 2007. also a direct bus connection from Bollo Lane to Chiswick Town Centre and P/2009/3548 - Residential (56 north to Park Royal and Wembley. units) and offices (1,050sqm). Refused February 2010. Appeal pending determination. ACT07 Acton Mainline Acton Mainline Station. Redevelopment of Acton Reliant on delivery of Crossrail. Station Mainline Station with introduction of Crossrail / interchange facilities and safeguarding for existing aggregates / freight operations. Page 3 of 36 Item 24 - Appendix 1.xls Potential Net Residential Units 104 85 48 Page 4 of 36 Item 24 - Appendix 1.xls DPD Ref Site Location / Access Description / Current Uses Options Delivery / Implementation Planning History Ownership Developer / Partners ACT08 Castle Timber Site can be accessed from Horn Lane. Residential. Reliant on delivery of Crossrail. and Building Adjacent to Acton Mainline railway (and Materials, 239 future Crossrail) station and served by Should overcome issues of and 265 Horn bus routes using Horn Lane. noise, vibration and residential Lane amenity with regard to adjacent railway. Dependent on conclusions of Employment Land Review (ELR). ACT09 Depot, Horn Lane Site can be accessed from Horn Lane. Residential. Reliant on delivery of Crossrail. opposite York Adjacent to Acton Mainline railway (and Road future Crossrail) station and served by Should overcome issues of bus routes using Horn Lane. noise, vibration and residential amenity with regard to adjacent railway and waste transfer site. Dependent on conclusions of Employment Land Review (ELR). ACT10 Land at Western The site sits along the Western Avenue Residential. TfL Avenue (A40) / (A40) road corridor. Limited bus Gipsy Corner / services operate along this route and Development should include Allan Way / constrained pedestrian movement in provisions for the identified Kathleen Avenue this location limits access to Green Corridor. underground and rail stations. ACT11 Land at Western The site sits along the Western Avenue Residential. TfL Avenue (A40) / (A40) road corridor. Limited bus Gipsy Corner / services operate along this route and Development should include Court Way / Allan constrained pedestrian movement in provisions for the identified Way this location limits access to Green Corridor. underground and rail stations. ACT12 Land at Western The site sits along the Western Avenue Residential. TfL Avenue (A40) / (A40) road corridor. Limited bus Gipsy Corner / services operate along this route and Development should include Park View / Court constrained pedestrian movement in provisions for the identified Way this location limits access to Green Corridor. underground and rail stations. ACT13 Land at Western The site sits along the Western Avenue Residential. Test applications? TfL Avenue (A40) / (A40) road corridor. Limited bus Gibbon Road services operate along this route and Development should include constrained pedestrian
Recommended publications
  • Greenford Square, London Ub6
    TWO GREENFORD SQUARE A self-contained office and education facility GREENFORD SQUARE, LONDON UB6 0HE (dual D1 & B1 use), set in a six acre landscaped From 9,418 sq ft - 97,028 sq ft campus, offering secure on-site car parking, with excellent transport links into central London. BUILDING OVERVIEW Two Greenford Square is set in a six Only a 9 minute walk to Sudbury Hill • Dual D1 & B1 use. acre, multi-use, campus providing an tube (Piccadilly Line) and overground • HQ Campus of 97,028 sq ft. attractive working environment within station, with direct connections to a landscaped setting. London Marylebone in just 16 minutes. TO LET • Self-contained options for 28,269 sq ft and 68,759 sq ft. The building is adjacent to the Ferrero Within an 8 minute walk from Greenford UK HQ and the mixed-use Greystar tube (Central Line) and overground • 275 car parking spaces at a regeneration, Greenford Quay. station, with direct links to West Ealing ratio of 1:353 sq ft. in only 11 minutes, one of five Crossrail stations that the London Borough of Ealing has to offer. 01 VEHICLE ACCESS OLDFIELD LANE NORTH FERRERO UK & IRELAND HQ 275 SPACE CAR PARK VEHICLE ACCESS B E PEDESTRIAN R K E ACCESS L E Y A V E N U E A4127 D A O R D R O F N E E R G GREENFORD QUAY REDEVELOPMENT 1,965 NEW HOMES AND 200,000 SQ FT OF COMMERCIAL ACCOMMODATION 02 Greystar is creating a new canal-side neighbourhood, • 1,965 residential units and 200,000 sq ft of • High-quality and well-managed public which is inclusive of the surrounding community and retail and commercial space.
    [Show full text]
  • Uncovering the Underground's Role in the Formation of Modern London, 1855-1945
    University of Kentucky UKnowledge Theses and Dissertations--History History 2016 Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945 Danielle K. Dodson University of Kentucky, [email protected] Digital Object Identifier: http://dx.doi.org/10.13023/ETD.2016.339 Right click to open a feedback form in a new tab to let us know how this document benefits ou.y Recommended Citation Dodson, Danielle K., "Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945" (2016). Theses and Dissertations--History. 40. https://uknowledge.uky.edu/history_etds/40 This Doctoral Dissertation is brought to you for free and open access by the History at UKnowledge. It has been accepted for inclusion in Theses and Dissertations--History by an authorized administrator of UKnowledge. For more information, please contact [email protected]. STUDENT AGREEMENT: I represent that my thesis or dissertation and abstract are my original work. Proper attribution has been given to all outside sources. I understand that I am solely responsible for obtaining any needed copyright permissions. I have obtained needed written permission statement(s) from the owner(s) of each third-party copyrighted matter to be included in my work, allowing electronic distribution (if such use is not permitted by the fair use doctrine) which will be submitted to UKnowledge as Additional File. I hereby grant to The University of Kentucky and its agents the irrevocable, non-exclusive, and royalty-free license to archive and make accessible my work in whole or in part in all forms of media, now or hereafter known.
    [Show full text]
  • Cabinet Appendices Pack
    b CABINET APPENDICES PACK Date and Time: Monday 15 April 2013 7.00 pm Venue : Room 8, Lambeth Town Hall, Brixton Hill, SW2 1RW Contact for enquiries: Website: Gary O’Key www.lambeth.gov.uk/committee Democratic Services Officer Tel/Voicemail: 020 7926 2183 Lambeth Council – Democracy Live Fax: 020 7926 2361 on Facebook Email: [email protected] http://www.facebook.com/ Governance and Democracy @LBLdemocracy on Twitter Lambeth Town Hall, Brixton Hill, http://twitter.com/LBLdemocracy London, SW2 1RW To tweet about Council agendas, minutes or meetings use #Lambeth Despatched: Friday 5 April 2013 CABINET MEMBERS: Councillor Lorna Campbell - Cabinet Member for Equalities and Communities Councillor Jim Dickson - Cabinet Member for Health and Wellbeing Councillor Rachel Heywood - Cabinet Member for Children and Families Councillor Jack Hopkins - Cabinet Member for Safer and Stronger Communities Councillor Paul McGlone - Cabinet Member for Finance and Resources Councillor Jackie Meldrum - Deputy Leader of the Council Councillor Lib Peck - Leader of the Council Councillor Sally Prentice - Cabinet Member for Culture and Leisure Councillor Pete Robbins - Cabinet Member for Housing and Regeneration Councillor Imogen Walker - Cabinet Member for Environment and Sustainability AGENDA Page Nos. 3. Waterloo Area Supplementary Planning Document: Approval 1 - 194 (Report 3/13-14 and appendices) Key Decision Bishop’s ward Leader of the Council Executive Director of Housing, Regeneration & Environment Contact: Sandra Roebuck, Programme Manager, Neighbourhood
    [Show full text]
  • A31 Note: Gunnersbury Station Does Not Have OWER H91 E D
    C R S D E A U T S A VE N E R A N B B D L W Based on Bartholomews mapping. Reproduced by permission of S R E i N U st A R O HarperCollins Publishers Ltd., Bishopbriggs, Glasgow. 2013Y ri E E A Y c W R A t D A AD www.bartholomewmaps.com N C R 272 O Y V L D R i TO T AM 272 OL E H D BB N n A O CAN CO By Train e N Digital Cartography by Pindar Creative N U L E n w i a L Getting to BSI m lk 5 i AVE 1 ng N A Acton0- t V 1 im • The London Overground runs between E t e e LD ROAD B491 D N a SOUTHFIE E Y Town fr R Address: Chiswick Tower, U imR B o B E U O 440 m Richmond and Stratford stopping at Travel to E x L D B A R o S L AD R r O E RO O s 389 Chiswick High Road, London, W4 4AL Y R G R E p EY L i SPELDHUR Gunnersbury. ID ST R A R R t RO M p NR B E A O N e D NU O H L A A UB E LL C D GS BO T Y British Standards 1 R E RSET E E 9 N L SOM T N All visitors must enter the building through F 44 U N H • The ‘Hounslow Loop’ has stations at G SOUTH ROAD BEDFORD B E3 E B E R the main entrance on Chiswick High Road O Kew Bridge, Richmond, Weybridge, N O L PARK D Institution S ACTON L A A A D N E O R E O D and report to Reception on arrival.
    [Show full text]
  • Monmouthshire Local Development Plan (Ldp) Proposed Rural Housing
    MONMOUTHSHIRE LOCAL DEVELOPMENT PLAN (LDP) PROPOSED RURAL HOUSING ALLOCATIONS CONSULTATION DRAFT JUNE 2010 CONTENTS A. Introduction. 1. Background 2. Preferred Strategy Rural Housing Policy 3. Village Development Boundaries 4. Approach to Village Categorisation and Site Identification B. Rural Secondary Settlements 1. Usk 2. Raglan 3. Penperlleni/Goetre C. Main Villages 1. Caerwent 2. Cross Ash 3. Devauden 4. Dingestow 5. Grosmont 6. Little Mill 7. Llanarth 8. Llandewi Rhydderch 9. Llandogo 10. Llanellen 11. Llangybi 12. Llanishen 13. Llanover 14. Llanvair Discoed 15. Llanvair Kilgeddin 16. Llanvapley 17. Mathern 18. Mitchell Troy 19. Penallt 20. Pwllmeyric 21. Shirenewton/Mynyddbach 22. St. Arvans 23. The Bryn 24. Tintern 25. Trellech 26. Werngifford/Pandy D. Minor Villages (UDP Policy H4). 1. Bettws Newydd 2. Broadstone/Catbrook 3. Brynygwenin 4. Coed-y-Paen 5. Crick 6. Cuckoo’s Row 7. Great Oak 8. Gwehelog 9. Llandegveth 10. Llandenny 11. Llangattock Llingoed 12. Llangwm 13. Llansoy 14. Llantillio Crossenny 15. Llantrisant 16. Llanvetherine 17. Maypole/St Maughans Green 18. Penpergwm 19. Pen-y-Clawdd 20. The Narth 21. Tredunnock A. INTRODUCTION. 1. BACKGROUND The Monmouthshire Local Development Plan (LDP) Preferred Strategy was issued for consultation for a six week period from 4 June 2009 to 17 July 2009. The results of this consultation were reported to Council in January 2010 and the Report of Consultation was issued for public comment for a further consultation period from 19 February 2010 to 19 March 2010. The present report on Proposed Rural Housing Allocations is intended to form the basis for a further informal consultation to assist the Council in moving forward from the LDP Preferred Strategy to the Deposit LDP.
    [Show full text]
  • LICENSING SUB COMMITTEE Fairway Pavilion, West Middlesex Golf Club, Greenford Road, Southall (Dormers Wells Ward)
    Ealing Council Democratic Services Officer: Town Hall Lee Teasdale New Broadway tel: 020 8825 7919 London W5 2BY fax: 020 8825 6909 e-mail: [email protected] LICENSING SUB COMMITTEE Fairway Pavilion, West Middlesex Golf Club, Greenford Road, Southall (Dormers Wells Ward) nd Date: Wednesday, 2P P March 2016 Time: 4pm or upon conclusion of the previous hearing Venue: Liz Cantell Room , Ealing Town Hall MEMBERSHIP: Councillors Kate Crawford, Munir Ahmed and Roz Reece. AGENDA 1. Apologies for Absence 2. Urgent Matters Any urgent matters that the Chair has agreed should be considered. 3. Matters to be Considered in Private 4. Declarations of Interest 5. Opposed Variation to a Premises Licence Fairway Pavilion, West Middlesex Golf Club, Greenford Road, Southall MARTIN SMITH CHIEF EXECUTIVE rd 23P PPP February 2016 SUMMARY OF PROCEDURE FOR LICENSING SUB-COMMITTEE HEARINGS 1. The procedure to be followed at Licensing Sub Committee Hearings will be outlined by the Chairman at the beginning of each hearing. 2. Parties to the hearing can be represented by a friend or legal adviser who acts as their spokesperson. 3. The procedure to be followed is summarised* below and will generally be followed although the procedure may be varied at the Chair’s discretion • The Licensing Officer will introduce the Report and provide clarification on any factual issues. • The applicant will present the application and call any witnesses in respect of whom permission to appear has been given and answer any questions put to them. • Those who have made relevant representations will make their representations and call any witnesses in respect of whom permission to appear has been given and answer any questions put to them.
    [Show full text]
  • Woodend Farm, Huntley, Gloucestershire Gl19 3Ha
    WOODEND FARM, HUNTLEY, GLOUCESTERSHIRE GL19 3HA WOODEND FARM, HUNTLEY, GLOUCESTERSHIRE GL19 3HA A SUBSTANTIAL GRADE II LISTED VICTORIAN FARMHOUSE WITH EARLIER FEATURES BEING SOLD TOGETHER WITH 17½ ACRES OF ADJACENT PASTURE LAND TO BE SOLD IN 3 LOTS WOODEND FARM (LOT 1) SOLICITORS SITUATION & DESCRIPTION Harrison Clark Rickerbys inc. Shawcross, Overross House, Ross Park, Ross-on-Wye, Situated in fine open countryside just outside the busy village of Huntley having access to both Herefordshire HR9 7US. Tel: 01989 562377. For the Attention of Mary Wathen. the A40 Gloucester to Ross-on-Wye road and the A4136 Huntley to Monmouth road. The village offers Primary School, Village Shop and Post Office, noted Butchers, Public House and LOCAL AUTHORITY a Garden Centre together with a local Cricket Club and a 9 hole Golf Course. Forest of Dean District Council, Council Offices, High Street, Coleford, Glos. GL16 8HG Tel: 01594 810000 Delightfully situated on the south-eastern edge of the Royal Forest of Dean the property is close to May Hill with fine walks and hacking out countryside. OUTGOINGS The Market Town of Newent is under 5 miles to the north where there is a Secondary School. Council Tax Bandings:- 1 Woodend Farmhouse: Band ‘C’ The City of Gloucester is only some 9 miles away to the east with all the facilities that one Woodend Cottage: Band ‘C’ would expect from a City together with its fine Cathedral and also having main line railway 2 Woodend Farmhouse: Band ‘D’ station for fast access to London Paddington, Birmingham New Street and Bristol Parkway together with a private Airport at Staverton.
    [Show full text]
  • Storm Callum 12Th - 14Th October 2018
    Investigation Report into Flooding - Storm Callum 12th - 14th October 2018 P2.23 Final Version July 2019 1 | P a g e Title of document Storm Callum Section 19 Flood Investigation Report Document date March 2019 Authors Carmarthenshire County Council Service responsible Flood Defence and Coastal Protection, Waste and Environmental Services. Department Environment Review March 2019 (Multi agency) Approval 29 July 2019 (CCC Executive Board) Published September 2019 Document History Revision Purpose description Originated Checked Reviewed Approved Date 0 Initial draft BK Mar 2019 P1.1 First draft for BK CCC Mar Internal review NRW 2019 DCWW Network Rail P1.2 BK CA April 2019 P2 BK CCC 7 May CMT 2019 P2.1 BK CCC PEB 3 June 2019 P2.22 BK CCC 5 July Scrutiny 2019 P2.23 BK CCC 29 July Executive 2019 Board P2.23 Final Version July 2019 2 | P a g e Contents 1 Introduction ......................................................................................... 5 2 The focus of the report .......................................................................... 7 3 Storm Callum ....................................................................................... 9 3.1 Forecasting and Prediction time line .................................................. 9 3.2 Rainfall data ................................................................................... 9 3.3 The Wind ..................................................................................... 11 4 Flood Investigation, Johnstown (Carmarthen) .......................................
    [Show full text]
  • 30Hr Childcare: Analysis of Potential Demand and Sufficiency in Ealing
    30hr Childcare: Analysis of potential demand and sufficiency in Ealing. Summer 2016 Introduction: Calculating the number of eligible children in each Ward of the borough The methodology utilised by the DfE to predict the number of eligible children in the borough cannot be replicated at Ward level (refer to page 14: Appendix 1 for DfE methodology) Therefore the calculations for the borough have been calculated utilising the most recent data at Ward level concerning the proportions of parents working, the estimates of 3& 4 year population and the number of those 4yr old ineligible as they are attending school. The graph below illustrates the predicted lower and upper estimates for eligible 3&4 year olds for each Ward Page 1 of 15 Executive Summary The 30hr eligibility criteria related to employment, income and the number of children aged 4 years attending reception class (who are ineligible for the funding) makes it much more likely that eligible children will be located in Wards with higher levels of employment and income (potentially up to a joint household income of £199,998) and lower numbers of children aged 4years in reception class. Although the 30hr. childcare programme may become an incentive to work in the future, in terms of the immediate capital bid, the data points to investment in areas which are quite different than the original proposal, which targeted the 5 wards within the Southall area. The 5 Southall Wards are estimated to have the fewest number of eligible children for the 30hr programme. The top 5 Wards estimated to have the highest number of eligible children are amongst the least employment and income deprived Wards in Ealing with the lowest numbers of children affected by income deprivation.
    [Show full text]
  • Reasons-For-Closure-West-Ealing
    This branch is closing – but we're still here to help Our West Ealing branch is closing on Friday 30 October 2020 Reasons for closure, and alternative ways to bank This branch is closing – but your bank is always open This first booklet will help you understand why we’ve made the decision to close this branch. It also sets out the banking services and support that will be available to you after this branch has closed. In a second booklet, which will be available from the branch prior to it closing or online at home.barclays/ukbranchclosures, we'll share concerns and feedback from the local community. We'll also detail how we are helping people transition from using the branch with alternative ways to carry out their banking requirements. Here are the main reasons why the West Ealing branch is closing: • The number of transactions has gone down in the previous 24 months, and additionally 89% of our branch customers also use other ways to do their banking such as online and by telephone. • Customers using other ways to do their banking has increased by 21% since 2012. • In the past 12 months, 66% of this branch's customers have been using nearby branches. • We've identified that only 126 customers use this branch exclusively for their banking Proposals to close any branch are made by the Barclays local leadership teams and verified at a national level ahead of any closure announcement. If you have any questions and concerns about these changes then please feel free to get in touch with Steve Day, your Market Director for North West London.
    [Show full text]
  • A Framework for Southall
    A Framework for April 2008 Tribal Urban Studio in association with Southall Michael Beaman Ltd London Borough of Ealing A Framework for April 2008 Tribal Urban Studio in association with Southall Michael Beaman Ltd London Borough of Ealing architec ture planning de sign Tribal Urban Studio in association with Michael Beaman Ltd Contents Contents List of Figures 1 Setting the Scene 1 Figure 1.1: Context Within London 2 1.1 Why a Framework for Southall? 1 Figure 1.2: Southall Context 3 1.2 The Process 1 Figure 1.3: Southall – Character and Place 4 1.3 Contextual Analysis 1 Figure 2.1: The Framework Plan 8 Figure 3.1: Southall Town Centre UDP Boundary 11 2 The Framework in Outline 7 Figure 3.2: Retail Centres in LB Ealing 12 2.1 Objectives for Southall as a Place 7 Figure 4.1: Major Transport Connections 19 2.2 The Framework in outline 7 Figure 5.1: Housing Character & Analysis Plan 28 Figure 7.1: The Community Hub concept - potential service provision 34 Figure 7.2: Potential Locations for the Community Hub 35 Figure 8.1: Areas for Change and Improvement 39 Part A: Planning for Change Figure 8.2: Town Centre Development Ideas 41 3 Retail and the Town Centre 11 Figure 8.3: Detailed Transport Development Ideas 43 Figure 8.4: Transport Development Ideas 45 3.1 The Current Position 11 Figure 8.5: Housing Opportunities 47 3.2 Planning for Change 12 Figure 8.6: Public Realm Proposals Plan 49 4 Transport 17 Figure 8.7: Employment Sites Identified for Change 51 4.1 The Current Position 17 4.2 Planning for Change 20 List of Tables 5 Housing, Public
    [Show full text]
  • Carmarthenshire Revised Local Development Plan (LDP) Sustainability Appraisal (SA) Scoping Report
    Carmarthenshire Revised Local Development Plan (LDP) Sustainability Appraisal (SA) Scoping Report Appendix B: Baseline Information Revised Carmarthenshire Local Development Plan 2018 - 2033 1. Sustainable Development 1.1 The Carmarthenshire Well-being Assessment (March 2017) looked at the economic, social, environmental and cultural wellbeing in Carmarthenshire through different life stages and provides a summary of the key findings. The findings of this assessment form the basis of the objectives and actions identified in the Draft Well-being Plan for Carmarthenshire. The Assessment can be viewed via the following link: www.thecarmarthenshirewewant.wales 1.2 The Draft Carmarthenshire Well-being Plan represents an expression of the Public Service Board’s local objective for improving the economic, social, environmental and cultural well- being of the County and the steps it proposes to take to meet them. Although the first Well- being Plan is in draft and covers the period 2018-2023, the objectives and actions identified look at delivery on a longer term basis of up to 20-years. 1.3 The Draft Carmarthenshire Well-being Plan will focus on the delivery of four objectives: Healthy Habits People have a good quality of life, and make healthy choices about their lives and environment. Early Intervention To make sure that people have the right help at the right time; as and when they need it. Strong Connections Strongly connected people, places and organisations that are able to adapt to change. Prosperous People and Places To maximise opportunities for people and places in both urban and rural parts of our county. SA – SEA Scoping Report – Appendix B July 2018 P a g e | 2 Revised Carmarthenshire Local Development Plan 2018 - 2033 2.
    [Show full text]