Arrangement of Tourism Infrastructure in the Town of Vani

Total Page:16

File Type:pdf, Size:1020Kb

Arrangement of Tourism Infrastructure in the Town of Vani SFG3426 V29 Arrangement of tourism infrastructure Public Disclosure Authorized in the town of Vani Environmental and Social Screening Report Public Disclosure Authorized Public Disclosure Authorized August 2017 Public Disclosure Authorized Sub-Project Description The Sub-Project (SP) envisages the rehabilitation of 300 m² area of central park in Vani, located in the center of the town. The population and tourists, visiting the region use this park as a meeting place. However, the SP area is not well maintained and 25 previously installed lights are damaged. The park is not illuminated in the evenings and nights, walking paths are destroyed, the pavement at the nearby area is damaged. There are no benches and garbage receptacles. The municipality did not have enough funds to cover rehabilitation of the tourist infrastructure. However, if SP is implemented, the municipality will cover the maintenance costs, which are associated with significantly less expenses. This is confirmed in the letter provided by the municipality (Attachment 2). The SP envisages the rehabilitation of 300 m² area of central park, which is the property of the Vani municipality. The SP implementation will not result any impacts on any privately used land or assets. Works under the proposed SP include installation of lighting poles, arranging benches, small garbage receptacles and decorative pavements and installing wireless internet. The municipality of Vani has a great tourist potential. The most famous tourist attraction in the municipality is Otar Lortkipanidze State Archaeological Museum of Vani. After its full rehabilitation, which is expected to be completed in 2017, the museum will be one of the best in the Caucasus. There are a balneological resort of Sulori, which is famous for its thermal and mineral waters and several museums of famous Georgian poets in the municipality. According to the official data of Vani municipality and Georgian National Tourism Administration, more than 4,000 tourists visit Vani annually (about 800 are foreign tourists among others). The number of tourists has increased by 9% in 2016. Once rehabilitation of the Archaeological Museum is completed in 2017, the number of tourists will increase by 15-17%. The following activities are planned to be implemented within the SP: 1. Dismantling the existing edging and poles; 2. Installing 22 lighting posts on 900 m² area; 3. Installing 12 benches; 4. Installing 12 waste receptacles; 5. Installing wireless router; 6. Installing two-sided, illuminated light-box (height of the map will be 210 cm, width 115 cm and thickness 20 cm) with indications of historic places and tourist routes. Environmental Screening and Classification (A) Impact Identification Has sub-project a tangible impact on the The SP construction phase covers 3 months’ period. The SP environment? will have a small-scale and short-term impact on the environment only in the construction phase. What are the significant beneficial and adverse The SP will be environmentally neutral in the operation environmental effects of the sub-project? phase and is expected to have minor negative environmental impacts at the construction phase. As a result of installation of benches, lightening, waste receptacles, light-box, the dust and emissions from the operation of construction machinery will increase, background noise and vibration levels will rise insignificantly, various types of construction waste is expected to generate. However the flow of traffic will not be affected. Does the sub-project have any significant The long-term social impact of the SP will be beneficial and potential impact on the local communities? will result significant improvement of the social conditions of local population and tourists. Improved tourist infrastructure will contribute to the growth of the tourist and visitor flows. The implementation of the SP will result in the improvement of central part of the town. Increased number of tourists will provide an opportunity to local entrepreneurs to generate additional income through selling various goods and services to tourists. The entertainment center for children at Otar Lortkipanidze state Archaeological Museum of Vani will have an increased number of customers. Implementation of the SP will not require turning off electricity for local population, since there will be a separate electricity line provided for lighting of posts. Significant social impact of SP, such as change of local demographic structure and influx of new settlers is not envisaged. What impact has the sub-project on the human The dust, vibration and noise originated during the small- health? scale construction works will not have impact on the human health or safety. (B) Impact Mitigation What alternatives to the sub-project design have During the SP design, a no-project alternative was been considered and what mitigation measures considered and turned down as the implementation of the SP are proposed? will help attract both foreign visitors that will have a positive impact on the social conditions of the local population. Planned works will not cause cutting of trees and preventive measures will be undertaken to avoid any damage to the nearby standing trees. Reduction of adverse environmental impact during the installation works will be possible through protecting the following key conditions: fencing the construction site in the parks where the sculptures should be installed, fixing the relevant signs throughout the construction perimeter, proper management of waste and constant monitoring, ensuring the technical functionality of machinery used during construction works, selecting less sensitive period for construction works. If at any stage of the SP cycle the affected community members have complaints/ questions/ recommendations, these can be addressed to the sub-grantee, contractor, or Elkana, whose contact information will be made available at the SP site. Have concerned communities been involved During community mobilization, several priorities were and have their interests and knowledge been identified, including installation of artistic lighting in the adequately taken into consideration in sub- town center, renovation of central park and park on the Peace project preparation? Hill. Renovation of central park was prioritized by the community. (C) CATEGORIZATION AND CONCLUSION Conclusion of the environmental screening: ✓ Sub-project is declined □ ✓ Sub-project is accepted ■ ✓ Sub-project is classified as environmental Category B and needs EMP ■ ✓ Sub-project is classified as environmental Category C and does not need EMP □ Social Screening Social safeguards screening information Yes No 1 Is the information related to the affiliation, ownership and land use status of the sub-project site available and verifiable? (The screening cannot be ✓ completed until this is available) 2 Will the sub-project reduce people’s access to their economic resources, such as land, pasture, water, public services, sites of common public use or other ✓ resources that they depend on? 3 Will the sub-project result in resettlement of individuals or families or require the acquisition of land (public or private, temporarily or permanently) ✓ for its development? 4 Will the sub-project result in the temporary or permanent loss of crops, fruit trees and household infrastructure (such as ancillary facilities, fence, canal, ✓ granaries, outside toilets and kitchens, etc.)? If answer to any above question (except question 1) is “Yes”, then OP/BP 4.12 Involuntary Resettlement is applicable and mitigation measures should follow this OP/BP 4.12 and the Resettlement Policy Framework Cultural resources safeguard screening information Yes No 5 Will the sub-project be implemented in the vicinity of a cultural heritage ✓ site? 6 Will the sub-project require excavation near any historical, archaeological ✓ or cultural heritage site? If answer to question 5 is “yes”, then OP/BP 4.11 Physical Cultural Resources is applicable. In this case, sub-project proponent must provide evidence that consultation was held with and an agreement on this sub- project was obtained from an authorized representative of culture and heritage protection authority. If answer to question 6 is “Yes”, then OP/BP 4.11 Physical Cultural Resources is applicable and possible chance finds must be handled in accordance with OP/BP and relevant procedures provided in this EMF. Environmental Management Plan Arrangement of tourism infrastructure in the town of Vani PART A: GENERAL PROJECT AND SITE INFORMATION INSTITUTIONAL & ADMINISTRATIVE Project title Empowering Poor Communities and Micro-Entrepreneurs in the Georgia Tourism Sector Sub-Project title The arrangement of tourism infrastructure in the town of Vani Scope of site-specific activity To arrange the tourist infrastructure in the town of Vani the following activities are planned to be implemented within the SP: • Dismantling the existing edging and poles; • Installing 22 lighting posts on 900 m² area; • Installing 12 benches; • Installing 12 waste receptacles; • Installing wireless router; • Installing two-sided, illuminated light-box (height of the map will be 210 cm, width 115 cm and thickness 20 cm) with indications of historic places and tourist routes. Institutional arrangements Task Team Leader: Safeguards Specialist: (WB) Gloria La Cava Darejan Kapanadze, Environment Rebecca Lacroix and David Jijelava, Social Implementation arrangements Implementing entity: Works supervisor: Works contractor: (Borrower) Biological Farming Biological
Recommended publications
  • ER Vani Archaeological Site
    Vani Archaeological Monuments Protective Covering and Vani Archeological Site Territory Renovation Sub-project Environmental and Social Screening and Environmental Review WORLD BANK FINANCED REGIONAL DEVELOPMENT PROJECT 2 August, 2015 Environmental Screening and Classification Sub-project (SP) envisages rehabilitation of Vani Archeological Site infrastructure and arrangement of public services. In particular, provision of roof covering for 5 excavated monuments and rehabilitation of a bridge connecting Vani Archeological museum to archeological site is foreseen by the SP. Information banners, outdoor seats, and litter bins will be arranged on the territory as well. In order to protect archeological area, arrangement of metal/laminated glass protective covers are foreseen for the following monuments: 1. Gate (on the area 100 m2); 2. Mosaic Temple (on the area 220 m2); 3. Round Temple (on the area 120 m2); 4. Upper Terrace Sanctuary (on the area 20 m2) and 5. The Upper Terrace Child’s Grave (on the area 3 m2). The works for arrangement of protective covers include: - Installation of the temporary wood protective covers for the archaeological monuments; - Dismantle of existing metal protective covers and fences; - Construction of reinforced concrete foundations; - Installation of roof metal constructions; - Arrangement of glass railing; - Arrangement of roof deck with galvanized tin and metal profile (laminated glass protective cover will be arranged for Chapel and Child burial ground). Works for rehabilitation of bridge connecting Vani Archeological Museum to archeological site includes: - Removing of the protective grid rail of the bridge; - Cleaning existing metal deck surface from rust with sand blasting and anti-corrosion solution; - Painting of metal surface; - Wrapping metal bearing structure standing at the both sides of the bridge with stretched stainless steel sheets; - Replacing of the protective grid rail with stainless steel woven grid that will be coated with transparent and elastic plastic material.
    [Show full text]
  • YOUTH POLICY IMPLEMENTATION at the LOCAL LEVEL: IMERETI and TBILISI © Friedrich-Ebert-Stiftung
    YOUTH POLICY IMPLEMENTATION AT THE LOCAL LEVEL: IMERETI AND TBILISI © Friedrich-Ebert-Stiftung This Publication is funded by Friedrich-Ebert-Stiftung. The views expressed in this publication are not necessarily those of the Friedrich-Ebert Stiftung. Commercial use of all media published by the Friedrich-Ebert-Stiftung (FES) is not permitted without the written consent of the FES. YOUTH POLICY IMPLEMENTATION AT THE LOCAL LEVEL: IMERETI AND TBILISI Tbilisi 2020 Youth Policy Implementation at the Local Level: Imereti and Tbilisi Tbilisi 2020 PUBLISHERS Friedrich-Ebert-Stiftung, South Caucasus South Caucasus Regional Offi ce Ramishvili Str. Blind Alley 1, #1, 0179 http://www.fes-caucasus.org Tbilisi, Georgia Analysis and Consulting Team (ACT) 8, John (Malkhaz) Shalikashvili st. Tbilisi, 0131, Georgia Parliament of Georgia, Sports and Youth Issues Committee Shota Rustaveli Avenue #8 Tbilisi, Georgia, 0118 FOR PUBLISHER Felix Hett, FES, Salome Alania, FES AUTHORS Plora (Keso) Esebua (ACT) Sopho Chachanidze (ACT) Giorgi Rukhadze (ACT) Sophio Potskhverashvili (ACT) DESIGN LTD PolyGraph, www.poly .ge TYPESETTING Gela Babakishvili TRANSLATION & PROOFREADING Lika Lomidze Eter Maghradze Suzanne Graham COVER PICTURE https://www.freepik.com/ PRINT LTD PolyGraph PRINT RUN 150 pcs ISBN 978-9941-8-2018-2 Attitudes, opinions and conclusions expressed in this publication- not necessarily express attitudes of the Friedrich-Ebert-Stiftung. Friedrich-Ebert-Stiftung does not vouch for the accuracy of the data stated in this publication. © Friedrich-Ebert-Stiftung 2020 FOREWORD Youth is important. Many hopes are attached to the “next generation” – societies tend to look towards the young to bring about a value change, to get rid of old habits, and to lead any country into a better future.
    [Show full text]
  • Pre-Election Monitoring of October 8, 2016 Parliamentary Elections Second Interim Report July 17 - August 8
    International Society for Fair Elections and Democracy Pre-Election Monitoring of October 8, 2016 Parliamentary Elections Second Interim Report July 17 - August 8 Publishing this report is made possible by the generous support of the American people, through the United States Agency for International Development (USAID) and the National Endowment for Democracy (NED). The views expressed in this report belong solely to ISFED and may not necessarily reflect the views of the USAID, the United States Government and the NED. 1. Introduction The International Society for Fair Elections and Democracy (ISFED) has been monitoring October 8, 2016 elections of the Parliament of Georgia and Ajara Supreme Council since July 1, with support from the United States Agency for International Development (USAID) and the National Endowment for Democracy (NED). The present report covers the period from July 18 to August 8, 2016. 2. Key Findings Compared to the previous reporting period, campaigning by political parties and candidates has become more intense. ISFED long-term observers (LTOs) monitored a total of 114 meetings of electoral subjects with voters throughout Georgia, from July 18 through August 7. As the election campaigning moved into a more active phase, the number of election violations grew considerably. Failure of relevant authorities to take adequate actions in response to these violations may pose a threat to free and fair electoral environment. During the reporting period ISFED found 4 instances of intimidation/harassment based on political affiliation, 2 cases of physical violence, 3 cases of possible vote buying, 4 cases of campaigning by unauthorized persons, 8 cases of misuse of administrative resources, 4 cases of interference with pre- election campaigning, 4 cases of use of hate speech, 7 cases of local self-governments making changes in budgets for social and infrastructure projects; 3 cases of misconduct by election commission members.
    [Show full text]
  • 6. Imereti – Historical-Cultural Overview
    SFG2110 SECOND REGIONAL DEVELOPMETN PROJECT IMERETI REGIONAL DEVELOPMENT PROGRAM IMERETI TOURISM DEVELOPMENT STRATEGY Public Disclosure Authorized STRATEGIC ENVIRONMENTAL, CULTURAL HERITAGE AND SOCIAL ASSESSMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Tbilisi, December, 2014 ABBREVIATIONS GNTA Georgia National Tourism Administration EIA Environnemental Impact Assessment EMP Environmental Management Plan EMS Environmental Management System IFI International Financial Institution IRDS Imereti Regional Development Strategy ITDS Imereti Tourism Development Strategy MDF Municipal Development Fund of Georgia MoA Ministry of Agriculture MoENRP Ministry of Environment and Natural Resources Protection of Georgia MoIA Ministry of Internal Affairs MoCMP Ministry of Culture and Monument Protection MoJ Ministry of Justice MoESD Ministry of Economic and Sustaineble Developmnet NACHP National Agency for Cultural Heritage Protection PIU Project Implementation Unit PPE Personal protective equipment RDP Regional Development Project SECHSA Strategic Environmental, Cultural Heritage and Social Assessment WB World Bank Contents EXECUTIVE SUMMARY ........................................................................................................................................... 0 1. INTRODUCTION ........................................................................................................................................... 14 1.1 PROJECT CONTEXT ...............................................................................................................................
    [Show full text]
  • Sub-Project: Rehabilitation and Expansion of the Vani Archeological Museum
    MUNICIPAL DEVELOPMENT FUND OF GEORGIA Public Disclosure Authorized Public Disclosure Authorized Rehabilitation and Expansion of the Public Disclosure Authorized Vani Archeological Museum Environmental Review Public Disclosure Authorized Tbilisi, Georgia September 2012 ABBREVIATIONS WB World Bank MRDI Ministry of Regional Development and Infrastructure MDF Municipal Development Fund EMF Environmental Management Framework EMP Environmental management plan ER Environmental Review MoE Ministry of Environment Protection MoCMP Ministry of Culture and Monument Protection NACHP National Agency for Cultural Heritage Preservation RDP Regional Development Project CH Cultural Heritage Sub-Project: Rehabilitation and Expansion of the Vani Archeological Museum Environmental Screening and Classification The proposed subproject envisages construction of new building adjacent to the existing building, rehabilitation of Vani archeological museum existing building, equipping of new exhibition areas, laboratories and storage areas with modern technologies (climate control, fire extinguishing, security and lighting systems), increase of public space and arrangement of museum shop and café, arrangement of special elevators and WC for disabled persons. • Water supply and sewage systems – Archaeological Museum water supply will be provided by the connection of the existing water supply network from Chanturia Street. The museum has a sewerage collector; there are also holes and sewerage collector at the dining hall and the house of archaeologists. Subproject includes rehabilitation of sewage system and arrangement of compact-block treatment structure with 2 m3/24 hr capacity. After passing through the treatment block, water will be discharged to river Chishura; • Arrangement of combined heating, cooling and air conditioning system - Provision of the heating and cooling systems will imply installation of steel and plastic pipes operating at 20-800C temperature.
    [Show full text]
  • Institute for Development of Freedom of Information
    Institute for Development of Freedom of Information Statistical Data on Gender Equality in Civil Service in Georgia September, 2015 The research was conducted within the scopes of "Public Information Database - www.opendata.ge". Financial support was provided by the Open Society Georgia Foundation and Open Society Foundations. The contents of this report are the responsibility of IDFI and do not reflect the position of Open Society Georgia Foundation or Open Society Foundations. Hence, the mentioned organizations shall not be held liable for the contents of the report. Statistical Data on Gender Equality in Civil Service | 1 Although universally recognized norms and principles of international law state that every human being have an equal right to employment regardless of sex, representation of women in the public service, especially on the leadership positions of decision making in the public administration is a challenge to the whole world, including Georgia. It should be noted that the Georgian legislation has been more or less approximating the practice of European countries regarding the increase of the role of women in socio-economic areas. Attitude towards the gender imbalance by the statutory regulations of Georgia is explicit. Parliament of Georgia adopted a Law of Georgia on Gender Equality in 2010 and elaborated the action plan, aiming to eliminate the discrimination based on sex. The Law of Georgia on Gender Equality includes mechanisms for promoting gender equality in labor relations, in particular, the law declares that state should support the equal opportunities of employment for both sexes. Moreover, permanent Gender Equality Council of the Parliament of Georgia was established at the Parliament.
    [Show full text]
  • Realizing the Urban Potential in Georgia: National Urban Assessment
    REALIZING THE URBAN POTENTIAL IN GEORGIA National Urban Assessment ASIAN DEVELOPMENT BANK REALIZING THE URBAN POTENTIAL IN GEORGIA NATIONAL URBAN ASSESSMENT ASIAN DEVELOPMENT BANK Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) © 2016 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2444 www.adb.org Some rights reserved. Published in 2016. Printed in the Philippines. ISBN 978-92-9257-352-2 (Print), 978-92-9257-353-9 (e-ISBN) Publication Stock No. RPT168254 Cataloging-In-Publication Data Asian Development Bank. Realizing the urban potential in Georgia—National urban assessment. Mandaluyong City, Philippines: Asian Development Bank, 2016. 1. Urban development.2. Georgia.3. National urban assessment, strategy, and road maps. I. Asian Development Bank. The views expressed in this publication are those of the authors and do not necessarily reflect the views and policies of the Asian Development Bank (ADB) or its Board of Governors or the governments they represent. ADB does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. This publication was finalized in November 2015 and statistical data used was from the National Statistics Office of Georgia as available at the time on http://www.geostat.ge The mention of specific companies or products of manufacturers does not imply that they are endorsed or recommended by ADB in preference to others of a similar nature that are not mentioned. By making any designation of or reference to a particular territory or geographic area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]
  • The Public Administration Reform (Par) Roadmap Monitoring in 8 Municipalities of Western Georgia
    THE PUBLIC ADMINISTRATION REFORM (PAR) ROADMAP MONITORING IN 8 MUNICIPALITIES OF WESTERN GEORGIA REPORT No2 2020 1 MONITORING MEETING OF PROJECT PARTNERS TRAININGS FOR CIVIL SOCIETY ORGANIZATIONS ON PAR MONITORING CSO FORUM MEETINGS 2 THE PUBLIC ADMINISTRATION REFORM (PAR) ROADMAP MONITORING IN 8 MUNICIPALITIES OF WESTERN GEORGIA REPORT No 2 VANI, TERJOLA, BAGDATI, KHONI AMBROLAURI, TSAGERI, LANCHKHUTI, OZURGETI Publication prepared by Published under the THE CULTURAL-HUMANITARIAN FUND “SUKHUMI” project “A Common THE FUND OF WOMEN ENTREPRENEURS Forum of CSOs from Guria, Imereti and IMERETI SCIENTISTS’ UNION “SPECTRI” Racha-Lechkhumi for PAR Roadmap The Director of the project: Monitoring”. ALLA GAMAKHARIA (The Cultural-Humanitarian Fund “Sukhumi”) This publication has been produced with the assistance of the The project coordinators: European Union. Its TEA TORINAVA (The Cultural-Humanitarian Fund “Sukhumi”) contents are the sole MERI GELASHVILI (The Fund of Women Entrepreneurs) responsibility of the Cultural-Humanitarian KETEVAN TSKHAKAIA (Imereti Scientists’ Union “Spectri”) Fund “Sukhumi” and do not necessarily Editor: LALI SHENGELIA reflect the views of the Layout: LIA KOSTAVA European Union.” 2020 CONTENTS PROGRESS ASSESSMENT OF PUBLIC ADMINISTRATION REFORM (PAR) IMPLEMENTATION IN LOCAL SELF - GOVERNMENTS THE SECOND MONITORING CONSOLIDATED REPORT 6 1. INTRODUCTION 6 2. MONITORING AIM AND METHODOLOGY 9 3. MONITORING FINDINGS - PROGRESS AND GAP ASSESSMENT 9 3.1. TRANSPARENCY 9 3.2. EFFICIENCY 13 3.3. INCLUSIVENESS/PARTICIPATION 15
    [Show full text]
  • Rehabilitation of Vani Museum Access Road: Lortkipanidze, Giorgadze and Gorgasali Streets in the Town of Vani, Imereti
    Rehabilitation of Vani Museum access road: Lortkipanidze, Giorgadze and Gorgasali Streets in the town of Vani, Imereti Environmental and Social Screening and Environmental Management Plan WORLD BANK FINANCED SECOND REGIONAL DEVELOPMENT PROJECT (RDP II) Tbilisi, Georgia May 2019 Environmental Screening The Subproject (SP) site is located in Vani municipality of Imereti region, West Georgia. The SP aims to ensure safe transport connection to the Vani museum as well as to the private houses located along the road. The road to be rehabilitated is divided into two sections. The first section is Gorgasali street (total length – 665 m) starting from the central square and crossing Chishura River by the reinforced-concrete bridge (total length – 18 m, width – 7.5 m). The second section is Giorgadze Street and Lortkifanidze Street (total length – 1625 m). Giorgadze Street also crosses the mentioned river with a metal bridge with the length of 23 m and the width of 5.7m. SP envisages implementation of the following works: - Demolition of the existing damaged asphalt layer and using it for arrangement of road embankment; - Arrangement of the road pavement and sidewalks with asphalt/concrete layer and reinforcement concrete pipes; - Arrangement of cuvettes along the road with grate and junctions and driveways; - Rehabilitation of the existing bridges constructed over Chishura Rv.: arrangement of pavement with asphalt/concrete layer, replacement of the metal railings, arrangement of gabion; - Placing of permanent traffic signs, including warning, prohibitory and indication signs; - Removal of shrubbery along the road; - Arrangement of drainage system. The road to be rehabilitated is an interstate road on the balance of the Roads Department of Georgia.
    [Show full text]
  • Separation of Powers Program
    PROMOTING RULE OF LAW IN GEORGIA (PROLoG) CA # AID-114-A-15-00004 QUARTERLY REPORT YEAR THREE APRIL 1, 2017 – JUNE 30, 2017 1 PROMOTING RULE OF LAW IN GEORGIA ACTIVITY (PROLoG) QUARTERLY REPORT YEAR THREE APRIL 1, 2017 – JUNE 30, 2017 Prepared under the USAID’s Promoting Rule of Law in Georgia (PROLoG) Activity, Cooperative Agreement Number AID-114-A-15-00004 Submitted to: USAID/Georgia as of July 28, 2017 Implementer East-West Management Institute, Inc. Responsible Parties: Giorgi Chkheidze, Chief of Party, Tbilisi, [email protected] Mark Dietrich, Project Director, Washington, D.C. [email protected] Disclaimer This report is made possible by the support of the American People through the United States Agency for International Development (USAID). The contents of this report are the sole responsibility of East-West Management Institute, Inc. and do not necessarily reflect the views of USAID or the United States Government 2 TABLE OF ACRONYMS ACCESS Advancing CSO Capacities and Engaging Society for Sustainability ADR Alternative Dispute Resolution CA Cooperative Agreement CEPEJ European Community for the Efficiency of Justice CIDA Civil Development Agency CRRC Caucasus Resource Research Center CLE Continuing Legal Education COE Council of Europe COP Chief of Party DCOP Deputy Chief of Party ECtHR European Court of Human Rights EHRAC European Human Rights Advocacy Centre EMC Human Rights Education and Monitoring Center EWMI East-West Management Institute Free-Uni Free University of Tbilisi GDI Georgian Democracy Imitative GBA Georgian
    [Show full text]
  • Rehabilitation of Vani Museum Access Road: Lortkipanidze, Giorgadze and Gorgasali Streets in the Town of Vani, Imereti Environme
    Rehabilitation of Vani Museum access road: Lortkipanidze, Giorgadze and Gorgasali Streets in the town of Vani, Imereti Environmental and Social Screening and Environmental Management Plan WORLD BANK FINANCED SECOND REGIONAL DEVELOPMENT PROJECT (RDP II) Tbilisi, Georgia April 2019 Environmental Screening The Subproject (SP) site is located in Vani municipality of Imereti region, West Georgia. The SP aims to ensure safe transport connection to the Vani museum as well as to the private houses located along the road. The road to be rehabilitated is divided into two sections. The first section is Gorgasali street (total length – 665 m) starting from the central square and crossing Chishura River by the reinforced-concrete bridge (total length – 18 m, width – 7.5 m). The second section is Giorgadze Street and Lortkifanidze Street (total length – 1625 m). Giorgadze Street also crosses the mentioned river with a metal bridge with the length of 23 m and the width of 5.7m. SP envisages implementation of the following works: - Demolition of the existing damaged asphalt layer and using it for arrangement of road embankment; - Arrangement of the road pavement and sidewalks with asphalt/concrete layer and reinforcement concrete pipes; - Arrangement of cuvettes along the road with grate and junctions and driveways; - Rehabilitation of the existing bridges constructed over Chishura Rv.: arrangement of pavement with asphalt/concrete layer, replacement of the metal railings, arrangement of gabion; - Placing of permanent traffic signs, including warning, prohibitory and indication signs; - Removal of shrubbery along the road; - Arrangement of drainage system. The road to be rehabilitated is an interstate road on the balance of the Roads Department of Georgia.
    [Show full text]
  • Installation of Tourist Information Signs And
    SFG3426 V8 Installation of tourist information Public Disclosure Authorized signs and sculptures in Vani Environmental and Social Screening Report Public Disclosure Authorized Public Disclosure Authorized March 2017 Public Disclosure Authorized Sub-Project Description Vani is an attractive town for visitors as several remarkable touristic attractions are located there, like: 1. Vani Archeological Museum-Reserve; 2. Church of the Archangels Michael and Gabriel of the XII-XIII cc; 3. Galaktion Tabidze House Museum; 4. Titsian Tabidze House Museum; 5. Kalistrate Tsintsadze House Museum; 6. Korneli Kekelidze House Museum; 7. Sulori Balneal Resort. Due to the lack of tourist information signs, the above listed objects are not visible for tourists. In order to attract tourists, the sub-project (SP) intends to install the tourist information signs and banners, and support the development of navigation infrastructure in Vani. In addition, SP aims to improve the appearance of the town center and parks of Vani through molding and installing replica of the V century BC sculptures of four archaeological exhibits – Bull, Deer, Tamada (toastmaster) and Eagle – found in Vani. There will be a contest to design and make sculptures. Members of Kutaisi Regional Organization of Painters and Sculptors, who have a vast experience in designing and making sculptures for Kutaisi and other cities of West Georgia, will be invited to participate in the contest. Conceptual drawings will be agreed with Vani Municipality and the Administration of the Archaeological Museum. As Vani Municipality center has two entrances (road entering Vani from Kutaisi and road entering Vani from Samtredia), the tourist information banner and information sign pole with seven arrows, pointing to all seven above mentioned touristic sites will be installed in the town center (in front of the 8th August War Heroes' Park) that will be visible for tourists, helping them to orient themselves easily.
    [Show full text]