100% Final Design Submission RM 16-1224 Repairs to Substation 7 February 2020
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK 01 14 00.00 22 WORK RESTRICTIONS (PWD ME) PNSY PROJECTS 01 20 00.00 22 PRICE AND PAYMENT PROCEDURES (PWD ME) DESIGN-BID-BUILD PROJECTS 01 30 00.00 22 ADMINISTRATIVE REQUIREMENTS (PWD ME) 01 31 23.13 22 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT MANAGEMENT SYSTEM 01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES 01 33 00 SUBMITTAL PROCEDURES 01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES 01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME) 01 42 00 SOURCES FOR REFERENCE PUBLICATIONS 01 45 00.10 22 QUALITY CONTROL FOR MINOR CONSTRUCTION PWD ME 01 50 00.00 22 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS (PWD ME) 01 57 19.00 22 TEMPORARY ENVIRONMENTAL CONTROLS - PORTSMOUTH NAVAL SHIPYARD (PWD ME) 01 74 19.00 22 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT (PWD ME) 01 78 00.00 22 CLOSEOUT SUBMITTALS (PWD ME) 01 78 23 OPERATION AND MAINTENANCE DATA 01 78 24.00 22 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT INFORMATION (eOMSI) 01 86 26.07 40 RELIABILITY CENTERED ACCEPTANCE FOR ELECTRICAL SYSTEMS
DIVISION 02 - EXISTING CONDITIONS
02 32 00 SUBSURFACE DRILLING, SAMPLING, AND TESTING 02 41 00 DEMOLITION 02 42 91 REMOVAL AND SALVAGE OF HISTORIC CONSTRUCTION MATERIALS 02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS 02 82 00.00 22 ASBESTOS REMEDIATION (PNS PROJECTS) 02 83 00 LEAD REMEDIATION 02 83 00.00 22 LEAD, CHROMIUM, AND CADMIUM REMEDIATION (PNS PROJECTS) 02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 03 - CONCRETE
03 01 00 REHABILITATION OF CONCRETE 03 30 00 CAST-IN-PLACE CONCRETE 03 45 33 PRECAST STRUCTURAL CONCRETE
DIVISION 04 - MASONRY
04 03 00 CONSERVATION TREATMENT FOR PERIOD MASONRY
DIVISION 05 - METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 60 00 FLASHING AND SHEET METAL
PROJECT TABLE OF CONTENTS Page 1 100% Final Design Submission RM 16-1224 Repairs to Substation 7 February 2020
07 84 00 FIRESTOPPING
DIVISION 08 - OPENINGS
08 01 52 OPERATION AND MAINTENANCE OF WOOD WINDOWS 08 11 13 STEEL DOORS AND FRAMES 08 14 00 WOOD DOORS 08 71 00 DOOR HARDWARE 08 81 00 GLAZING
DIVISION 09 - FINISHES
09 01 90.50 PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR PAINTING 09 06 00 SCHEDULES FOR FINISHES 09 90 00 PAINTS AND COATINGS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 82 46.00 40 ELECTRIC UNIT HEATERS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS 26 05 33 DOCKSIDE POWER CONNECTION STATIONS 26 08 00 APPARATUS INSPECTION AND TESTING 26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS 26 13 00 SF6/HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED SWITCHGEAR 26 20 00 INTERIOR DISTRIBUTION SYSTEM 26 24 13 SWITCHBOARDS 26 27 13.10 30 ELECTRIC METERS 26 41 00 LIGHTNING PROTECTION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK 31 10 00 CLEARING FOR CIVIL WORKS 31 23 00.00 22 EXCAVATION AND FILL 31 32 23 FOUNDATION DRILLING AND GROUTING 31 60 00 FOUNDATION PREPARATION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS 32 31 13 CHAIN LINK FENCES AND GATES RevB (8/3/2020) DIVISION 33 - UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 23.19 MONORAIL HOISTS
CUSTOM SUPPLEMENTAL SPECIFICATION SECTIONS
N/A VOLTAGE REGULATORS N/A TRANSPORTABLE BREAKER LIFT SYSTEM
-- End of Project Table of Contents -- PROJECT TABLE OF CONTENTS Page 2