Project site

ImHaugaland site

80 Ha of land, 15 km to International airport.

Value proposition in brief zoned for light industry and with other relevant country roads, and international airport, ISPS permits in place. It also has solutions for power certified port next to the site are good. The Statkraft Data Center Sites invites large data supply and connectivity including indicative city centre of Haugesund is about 30 minutes centers to . We develop shovel-ready pricing and timeframe. away by car. The site is facilitated by Statkraft. sites and projects that reduce the investor’s The site is facilitated by Statkraft. The area is risk. This effort is a continuation of our more Project 59 ° 19'39.5 "N 5 ° 23'52.0" E located between 25m and 47m above sea than 120 year legacy as a facilitating partner level. Water and sanitary are available on with the power intensive industry. Project Haugaland site, 80 Ha, is part of a 500 site. Industrial zoning regulation and consent Norway has the lowest wholesale electricity Ha industrial park, owned by Haugaland is completed. price in Europe Næringspark AS. The site has significant and the lowest energy tax possible as well. Our growth opportunities. Haugaland consists of a Distances main infrastructure reliable high voltage grid makes hyperscale fairly flat area situated next to a strong datacenters without back-up generators substation with 6 MW available in 2019, 35 Haugesund airport: 15 km, Haugesund city: possible, reducing cost significantly. MW in 2022 and 500MW in 2026. Other 20 km, city: 65 km, Stavanger Eachproject consists of well suitable land ready infrastructure i.e. dark fibre access, proper Airport: 72 km Updated December 2019

CONTACTS Atle Haga Statkraft Data Center Sites Program director P.O. Box 200 Lilleaker, N-0216 , Phone: +47 91 37 46 19 Norway E-mail: [email protected] www.statkraftdatasentersites.com

No