Information of Major and Medium Irrigation Projects Report : Yearly District : Aurangabad Reporting Year : 2011-12
Total Page:16
File Type:pdf, Size:1020Kb
Information of Major and Medium irrigation projects Report : Yearly District : Aurangabad Reporting Year : 2011-12 Ajintha Anjana Bor Brhmagavhan Hiradpuri Nandur Purna Shivna Vakod Med. LABEL OF FORMER VARIABLE Aapegaon Andheri Ambadi Palshi Dahegaon Upsa Sinchan Dheku Gadadgarh Girija Bandhara Jayakwadi Khelna Kolhi Lahuki Madhmeshwar Narangi-Sarangi Nevpur Takli Sukhna Tembhapuri Project Name Of Taluka In Whoch Project Is Paithan Sillod Kannad Kannad Vaijapur Paithan Vaijapur Soegaon Khuldabad Paithan Paithan Sillod Vaijapur Aurangabad Vaijapur Vaijapur Kannad Kannad Aurangabad Gangapur Phulambri Located A) Year Of Complition Of Work 0 1983 1982 2002 1998 2000 1962 1970 1989 0 1976 1966 1966 1979 0 1998 2002 2007 1968 2003 0 B) If Work Is Not Completed Then The 2013 0 0 0 0 0 0 0 0 2013 0 0 0 0 2014 0 0 0 0 0 2014 Year In Which Work Completed C) Estimated Cost Of Project (In Lac) 10859 259 216 5961 2538 1071.76 40 47 1020 9327 24524 71 23 109 66119 2122 2087 22863 116 461 6997 Height Of Dam Sanctioned (Meter) 15.79 21 19.28 18.45 15.6 0 13.8 21 19.1 14.2 37.73 20.9 14.86 16.3 0 14.5 16.47 20.4 16.92 17.77 14.28 Height Of Dam Completed (Meter) 15.79 21.2 19.28 18.45 15.6 0 13.8 21 19.1 14.2 37.73 20.9 14.86 16.3 0 14.5 16.47 20.4 16.92 17.77 14.28 Canol Sanctioned Length (Km) 0 9.86 16.9 22.65 10.5 20 25 7.5 25.2 0 340 20 9.65 2.5 159 10 20 84.77 22.53 9.7 12 Canol Completed Length (Km) 0 9.86 16.9 22.65 10.5 20 25 7.5 25.2 0 340 20 9.65 2.5 159 10 20 64.77 22.53 9.7 12 Maximum Capacity (Million Cube Meter) 0 8.53 11.78 15.55 13.4 2909 13.56 5.58 24.5 9.69 2909 12.6 3.63 6.58 0 13.29 11.88 39.36 21.34 21.57 2.519 Actual Storage As On 31 /200 (Million 0 0.843 4.27 5.37 0.36 0 5.09 0.76 13 0.59 1148.01 1.78 0.882 0.213 0 0 0.52 0 0 7.16 0 Cube Meter) Total Command Area (Hector) 1120 2226 3709 2030 1925 4798 3830 2012 6220 1657 203960 5071 1336 1353 70486 1639 22223 6389 4160 8504 2217 Cultivable Area Under Command Area 1065 1967 2374 2750 1925 4798 3564 1973 5628 1491 183560 4935 1068 1323 52864 1639 2201 6389 3136 6378 2556 Expected Irrigated Area After 870 1578 2226 2030 1925 3205 2712 1180 3595 1118 187631 2429 472 1092 43860 1639 1695 6389 2122 4784 2307 Complition Of Project (Hectare) Irrigated Area In The Year (Hectare) 0 827 910 1809 921 1223 757 826 958 0 177220 1907 106 1175 5214 694 981 2082 2122 1452 129 Usage Of Water For Drinking 0 1.81 1.18 0.92 0.25 0 0.04 0.18 2.93 0 80.701 4.77 0.58 0.25 0 0.95 1.01 0.14 0.06 0.37 0 Prpose ( Million Cube Meter) Usage Of Water For 0 2.12 5.33 4.53 3.42 3.38 2.44 2.23 6.49 0 845.678 5.44 0.18 1.28 62.67 1.05 3.51 17.46 3.47 13 0 Agricultural ( Million Cube Meter) Usage Of Water For Industry ( Million 0 0 0 0 0 0 0 0 0 0 16.11 0 0 0 0 0 0 0 0 0 0 Cube Meter) Usage Of Water For Energy 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Generation ( Million Cube Meter) Usage Of Water For Other 0 0 0 0 0 0 0 0 0 0 0.949 0 0 0 0 0 0 0 0 0 0 Purpose ( Million Cube Meter) Recovery Of Water Tax ( Rs. Lac) 0 11.08 5.35 2.17 0.45 6.89 1.4 3.02 18.7 0 5576.38 6.24 2.51 2.26 10.98 3.87 1.59 6.96 12.14 11.33 0 Balanced Water Tax ( Rs. Lac) 0 10.04 28.68 0.2 10.52 47.63 58.2 0.61 11 0 15862.71 16.77 5.44 6.84 8.36 0.28 3.24 0.56 38.44 0.5 0 No. Of Water Usages / Distribution 0 0 2 0 0 0 0 2 7 0 12 0 0 0 87 0 0 3 11 0 0 Co-Operative Socities Source : 'Executive Engineer, Irrigation Department Local Sectors,Superitendent Engineer, Irrigation Department, Zilla Parishad' Navigation Path : www.mahasdb.maharashtra.gov.in > Home > Aurangabad > Irrigation And Flood Control > Reports This report should be updated within 2 months after completion of Reporting period Data as on August 25, 2013 on SDB PAGE 1 / 1.