Research Spotlight

Total Page:16

File Type:pdf, Size:1020Kb

Research Spotlight RESEARCH ADMINISTRATION Bureau of Field Services Michigan Department of Transportation Research Spotlight Cable median barriers: Project Information REPORT NAME: Study of High- A cost-effective means Tension Cable Barriers on Michigan Roadways to save lives START DATE: October 2011 Median-crossover crashes are among the most hazardous events that can occur on freeways, often leading to serious injury or death. In recent REPORT DATE: October 2014 years, high-tension cable median barriers have emerged as a cost- RESEARCH REPORT NUMBER: effective alternative to conventional barriers in preventing such crashes. RC-1612 MDOT began installing them on state freeways in 2008. This research TOTAL COST: $223,895 project confirmed that cable median barriers are effective at reducing crossover crashes and improving freeway safety in Michigan, produced COST SHARING: 20% MDOT, 80% guidelines to help identify the best locations to install them, and FHWA through the SPR, Part II, developed content for public outreach materials explaining their benefit. Program MDOT Project Manager Problem Carlos Torres, P.E. Freeway median barriers made of concrete, steel Geometric Design Unit guardrail or high-tension Design Division cable are all effective at Michigan Department of preventing crossover Transportation crashes, but they can be 425 West Ottawa Street costly to install and main- Lansing, MI 48909 tain. Cable median barriers [email protected] have lower installation costs 517-335-2852 than concrete or guardrail Since their installation on selected Michigan highways beginning in alternatives, though they 2008, cable median barriers have reduced crossover crash rates in are more easily damaged these highway segments by 87 percent. by vehicle strikes, leading to higher maintenance and repair costs. over 300 miles of cable barriers on state In addition, while cable barriers minimize highways. Research was needed to evaluate crossover crashes, their close proximity to whether cable barriers have proven to be the roadway can lead to an increase in less a successful, cost-effective treatment in severe crashes. Michigan, accounting for unique factors Based on successes in other states, in such as the significant snowfall that some 2008 MDOT began an initiative to install areas of the state receive. (continued) ments fell by 87 percent, and the barriers Value “This project confirmed successfully contained 97 percent of the This study confirms that cable median that cable median bar- vehicles that hit them. barriers are a cost-effective treatment for riers are saving lives in Cable barriers have improved overall reducing crossover crashes, fatalities and safety at the locations where they have been Michigan by preventing serious injuries in Michigan. The guidelines installed. The most serious crash types—fa- developed through this research give crossover crashes. The tal and severe injury crashes—decreased by MDOT a framework for determining where increase in minor, proper- 33 percent after cable median barriers were cable barriers are likely to have the greatest installed, according to rigorous statistical ty-damage only crashes is positive impact and return on investment analysis. Since their installation, cable based on crash data and site characteristics a small tradeoff compared barriers are estimated to have saved 20 lives specific to Michigan. MDOT is reviewing with the life-saving ben- and prevented over 100 serious injuries in these recommendations for possible efits of cable barrier.” Michigan. incorporation into future updates to the As expected, low-severity crashes department’s median treatment design Carlos Torres, P.E. increased following the cable barrier instal- guidelines. Project Manager lation; crashes involving only property To help educate drivers about the damage or minor injuries increased by safety benefits of cable median barriers, 155 percent. Researchers’ analysis showed Research the researchers also developed content for that placing the cable barrier farther from public outreach messaging, including an For each highway segment where cable the roadway (toward the center of the update to MDOT’s 2011 brochure on cable median barriers were installed, researchers median) would result in fewer low-severity median barriers. conducted a detailed review of crash crashes, but this can be impractical because reports in the years before and after instal- of soil conditions, slope grade, drainage lation. They performed statistical analyses characteristics, or increased installation Research Administration to obtain the most accurate estimate of the and maintenance costs. barriers’ effects on crash frequency and Overall, cable median barriers were severity. They also compared the safety slightly more prone to penetration by Principal Investigator performance of cable median barriers, a vehicle than thrie-beam guardrail or Peter T. Savolainen, Ph.D., P.E. thrie-beam median guardrails and concrete concrete barrier, but they were the most Wayne State University median barriers. effective in preventing redirection back into Detroit, MI 48202 Researchers examined the effects of the travel lanes. Other findings include: several site-specific factors on the cable [email protected] • Motorcycles: Cable barriers did not 515-294-3381 barriers’ performance, including annual significantly impact motorcycle crash snowfall, traffic volume, median width trends. Contact Us and road geometry. From these analyses, • Winter roadway conditions: Crash PHONE: 517-636-4555 they developed guidelines to help MDOT frequency increased in times of adverse E-MAIL: [email protected] identify and prioritize locations best suited weather and road conditions, but the cable WEB SITE: www.michigan.gov/ for cable barrier installation, where the barriers continued to contain vehicles as mdotresearch return on investment would be greatest. intended. Finally, the researchers conducted • Rollovers: Median rollover crash rates This final report is available an economic analysis to assess the cost- decreased by 50 percent after cable barriers online at effectiveness of the cable barrier system, were installed. www.michigan.gov/documents/mdot/ considering installation and maintenance Researchers found that cable barrier RC1612_474931_7.pdf. costs as well as safety benefits. is a cost-effective median treatment in Michigan. Factoring in both installation Results costs and maintenance costs, they calcu- Cable median barriers have been highly lated a time of return—the time needed for effective at reducing crossover crashes in expected benefits to equal costs—of 13.4 Research Spotlight produced by Michigan. After the barriers were installed, years. Cable barrier has a design life of 20 CTC & Associates LLC. crossover crash rates on those highway seg- to 25 years..
Recommended publications
  • UDOT Supplemental Specifications
    UDOT Supplemental Specifications Table of Contents Section No. Title – Type 1. 01355 Environmental Compliance – Supplemental Specification (01/01/17) 2. 01455 Material Quality Requirements – Supplemental Specification (01/01/17) 3. 01456 Materials Dispute Resolution – Supplemental Specification (01/01/17) 4. 01554 Traffic Control – Supplemental Specification (01/01/17) 5. 01557S Maintenance of Traffic – Special Provision (04/19/16) 6. 01571 Temporary Environmental Controls – Supplemental Specification (01/01/17) 7. 01721 Survey – Supplemental Specification (01/01/17) 8. 02056 Embankment, Borrow, and Backfill – Supplemental Specification (01/01/17) 9. 02221 Remove Structure and Obstruction – Supplemental Specification (01/01/17) 10. 02316 Roadway Excavation – Supplemental Specification (01/01/17) 11. 02610 Drainage Pipe – Supplemental Specification (01/01/17) 12. 02701 Pavement Smoothness – Supplemental Specification (01/01/17) 13. 02742S Project Specific Surfacing Requirements – Department Special Provision (06/30/15) 14. 02744S Stone Matrix Asphalt (SMA) – Materials Special Provision (06/30/15) 15. 02748 Prime Coat/Tack Coat – Supplemental Specification (01/01/17) 16. 02765M Pavement Marking Paint – Materials Special Provision (10/05/15) 17. 02768 Pavement Marking Materials – Supplemental Specification (01/01/17) 18. 02822 Right-of-Way Fence and Gate – Supplemental Specification (01/01/17) 19. 02841 W-Beam Guardrail – Supplemental Specification (01/01/17) 20. 02842 Delineators – Supplemental Specifications (01/01/17) 21. 02843 Crash Cushions and Barrier End Treatments – Supplemental Specification (01/01/17) 22. 02844 Concrete Barrier – Supplemental Specification (01/01/17) 23. 02890 Retroreflective Sheeting – Supplemental Specification (01/01/17) 24. 02891 Traffic Sign – Supplemental Specification (01/01/17) 25. 13557 Variable Message Sign – Supplemental Specification (01/01/17) Supplemental Specification 2017 Standard Specification Book SECTION 01355 ENVIRONMENTAL COMPLIANCE PART 1 GENERAL 1.1 SECTION INCLUDES A.
    [Show full text]
  • Cable Barrier Submission
    Washington State Cable Median Barrier In-Service Study Doug McClanahan Washington State Department of Transportation PO Box 47329 Olympia Washington 98504-7329 Tel: (360) 705-7264 Fax: (360) 705-7330 [email protected] Richard B. Albin Washington State Department of Transportation PO Box 47329 Olympia Washington 98504-7329 Tel: (360) 705-7451 Fax: (360) 705-7330 [email protected] John C. Milton Washington State Department of Transportation PO Box 47329 Olympia Washington 98504-7329 Tel: (360) 705-7299 Fax: (360) 705-7330 [email protected] Submitted for presentation at the 83rd Annual Meeting of the National Transportation Research Board, Washington D.C., 2004. Estimated word count: 4080 text. November 2003 Washington State Cable Median Barrier In-Service Study Doug McClanahan Washington State Department of Transportation Richard B. Albin Washington State Department of Transportation John C. Milton Washington State Department of Transportation ABSTRACT Since 1989, the American Association of State Highway and Transportation Engineers (AASHTO) Roadside Design Guide has contained information on a cable median barrier design that mounts the middle cable on the back side of the posts so that it can contain and redirect vehicles that strike the system from either side. Cable median barrier has been tested in accordance with NCHRP Report 350 Test Level 3. However, there are only a couple of studies that have been performed on the in-service performance of this system. This report documents Washington’s experience with cable median barrier by analyzing its initial installation cost, maintenance costs, maintenance experiences, and accident history before and after installation. The report is based on accident and maintenance report data associated with 24.4 total miles of cable median barrier located in three distinct locations along Interstate 5 (I-5).
    [Show full text]
  • NDOT Statewide Integrated Transportation Reliability Program ______
    ______________________________________________ NDOT Statewide Integrated Transportation Reliability Program _____________________ DRAFT Technical Memorandum No. 6 – Performance Measurement Plan Prepared by: October, 2009 092202013 Copyright © 2009, Kimley-Horn and Associates, Inc. TABLE OF CONTENTS DRAFT – PERFORMANCE MEASUREMENT PLAN 1. OVERVIEW OF PERFORMANCE MEASUREMENT PLAN ................................................................. 1 1.1 What is Performance Measurement and Why Use it? ......................................................... 1 1.2 How Performance Measurement is Used in Other States .................................................... 2 1.3 How Can Performance Monitoring Benefit NDOT and its Partners? ................................ 4 1.4 How is Transportation Performance Currently Being Monitored? .................................... 4 1.5 What is the Best Way to Measure Reliability in Nevada? ................................................... 5 1.6 How Do Performance Measures Relate to ITRP Strategies?............................................. 10 2. OUTCOME-BASED PERFORMANCE MEASURES .......................................................................... 11 3. ACTIVITY-BASED PERFORMANCE MEASURES ........................................................................... 23 4. PERFORMANCE MEASUREMENT REPORTING ............................................................................ 33 1.1 Overview of the Process and Progress ...............................................................................
    [Show full text]
  • Use of Barriers in Rural Open Road Conditionsâ•fla Synthesis Study
    Purdue University Purdue e-Pubs JTRP Technical Reports Joint Transportation Research Program 2012 Use of Barriers in Rural Open Road Conditions—A Synthesis Study Erdong Chen Purdue University, [email protected] Jennifer Brown Purdue University, [email protected] Andrew Tarko Purdue University, [email protected] Recommended Citation Chen, E., J. Brown, and A. Tarko. Use of Barriers in Rural Open Road Conditions—A Synthesis Study. Publication FHWA/IN/JTRP-2012/08. Joint Transportation Research Program, Indiana Department of Transportation and Purdue University, West Lafayette, Indiana, 2012. doi: 10.5703/ 1288284314670. This document has been made available through Purdue e-Pubs, a service of the Purdue University Libraries. Please contact [email protected] for additional information. JOINT TRANSPORTATION RESEARCH PROGRAM INDIANA DEPARTMENT OF TRANSPORTATION AND PURDUE UNIVERSITY USE OF BARRIERS IN RURAL OPEN Road Conditions— A SYNTHESIS STUDY Erdong Chen Graduate Research Assistant School of Civil Engineering Purdue University Jennifer Brown Graduate Research Assistant School of Civil Engineering Purdue University Andrew P. Tarko Professor of Civil Engineering School of Civil Engineering Center for Road Safety Purdue University Corresponding Author SPR-3515 Report Number: FHWA/IN/JTRP-2012/08 DOI: 10.5703/1288284314670 RECOMMENDED CITATION Chen, E., J. Brown, and A. P. Tarko. Use of Barriers in Rural Open Road Conditions—A Synthesis Study. Publication FHWA/IN/JTRP-2012/08. Joint Transportation Research Program, Indiana Department of Transportation
    [Show full text]
  • Feature 215 Medians
    Chapter 7. RCI Features & Characteristics Feature 215 FEATURE 215 MEDIANS Roadway Side Allows Tie LRS Package Feature Type Interlocking Secured C Yes Yes Length Yes Yes Responsible Party for District Planning Data Collection Definition/Background: Denotes type of medians and median barriers on divided highways. MDBARTYP | TYPE OF MEDIAN BARRIER Who/What uses this Offset Offset HPMS MIRE Information Required For Direction Distance 35 Planning, Maintenance, Work All functionally classified N/A N/A Program, Traffic Operations, roadways on the SHS, all HPMS HPMS standard samples off the SHS, Active Exclusive roadways, all SIS related roadways, and all managed lanes. Definition/Background: Denotes type of median barrier. Important When Gathering: A barrier is defined as any longitudinal and vertical physical structure between roadbeds preventing motorists from crossing to the other side of the travelway. How to Gather this Data: Record appropriate code. Special Situations: When more than one barrier type exists, use Code 20-Other. Codes Descriptions 03 Cable Barrier 04 Guardrail (all types) 05 Fence 06 Barrier Wall 20 Other 28 Canal, river, or other waterway 7-172 | RCI Handbook Feature 215 EXAMPLES EXAMPLES OF CODING COMBINATIONS RCI Handbook | 7-173 Chapter 7. RCI Features & Characteristics Feature 215 MEDWIDTH | HIGHWAY MEDIAN WIDTH Who/What uses this Offset Offset HPMS MIRE Information Required For Direction Distance 36 Planning, Maintenance, Work All functionally classified N/A N/A Program, Traffic Operations, roadways on the SHS, all HPMS HPMS standard samples off the SHS, Active Exclusive roadways, all SIS related roadways, and all managed lanes. Definition/Background: Denotes the median width in feet.
    [Show full text]
  • Seminar Presentation
    2014 SPECIFICATIONS UPDATE Book Cover for the 2014 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges Hierarchy of Organizational Elements 3 TXDOT SPECIFICATION FORMAT 2004 Format 2014 Format 4 GENERAL REQUIREMENTS ITEMS 1 – 9 Roxana Garcia, P.E. ITEM 1 – Definitions of Terms New Definitions: . Concrete Construction Joint. A joint formed by placing plastic concrete in direct contact with concrete that has attained its initial set. Intelligent Transportation System. An integrated system that uses video and other electronic detection devices to monitor traffic flows. Monolithic Concrete Placement. The placement of plastic concrete in such a manner and sequence to prevent a construction joint. Replacement Alternate. A bid item identified in the proposal form that a Bidder may substitute for a specific regular item of work. Suspension. Action taken by the Department or federal government pursuant to regulation that prohibits a person or company from entering into a Contract, or from participating as a subcontractor, or supplier of materials or equipment used in a highway improvement Contract as defined in Transportation Code, Chapter 223, Subchapter A. 6 ITEM 2 – Instructions to Bidders . Incorporated the current special provisions for Item 2. Clarifies that a bid proposal form will not be issued to a Bidder who is suspended or debarred by the Commission, Department, or any federal agency. Separates the language regarding confidential questionnaire and bidder’s questionnaire. Separates the language for electronic and manual bids. Updates the section regarding Home State Bidding Preferences with the latest legislative requirements. 7 ITEM 3 – Award and Execution of Contract . For projects with railroad requirements, the Contractor submits the right of entry agreement and associated insurance during contract execution.
    [Show full text]
  • ATTACHMENT D02 Table of Guidance, Gaps & Needs in The
    ATTACHMENT D02 Table of Guidance, Gaps & Needs in the RDG NCHRP 15-65 DEVELOPMENT OF SAFETY PERFORMANCE BASED GUIDELINES FOR THE ROADSIDE DESIGN GUIDE January 2018 Christine E. Carrigan, P.E., Ph.D. Malcolm H. Ray, P.E., Ph.D. P.O. Box 312 12 Main Street Canton, Maine 04221 RDG Guidance Summary Table Version: 3-12.2017 Author: EMR Table or Type of Decision Making Section Section Title Description of Guidance Ref? Figure Guidance Basis From NCHRP 2 Economic Evaluation of Roadside Safety Gap: Work recently completed but not implemented - The Roadside Safety Analysis Program (RSAPv3) Update Gap 20-07(360) 22-27 From Roadside Topography and Drainage Gap: Work recently completed but not implemented - Guidelines for Cost-effective Safety Treatment of Roadside NCHRP 3 Gap 20-07(360) Features Ditches 16-05 From Roadside Topography and Drainage NCHRP 3 Gap: Work recently completed but not implemented - Development of Clear Recovery Area Guidelines Gap 20-07(360) Features 17-11(02) From Roadside Topography and Drainage NCHRP 3 Gap covered by recently initiated research - Guidelines for Slope Traversability Gap 20-07(360) Features 17-55 3.1 The Clear-Zone Concept Old guidance: high-speed highways, 30 ft. clear zone allows 80% of errant vehicles to recover Y(6) Out-Dated Eng. Judgement 3.1 Tab. 3-1 The Clear-Zone Concept Table of recommended clear zone by speed, ADT, & fore/back slope severity No Design 3.1 Tab. 3-2 The Clear-Zone Concept Table of horizontal curve adjustment factor to clear-zone by radius and speed No Placement From Gap: push the forgiving roadside concept more.
    [Show full text]
  • Attachment 1 ATP Project List (PDF)
    ATTACHMENT 1 Active Transportation Program (ATP) Project List District January 1 - March 31, 2019 PPNO Approved ATP Approved Actual Current Award County Budget Budget Expended EAC Finish Finish Finish Amount No . Route Title Location and Type of Work Phase ($1,000 s) ($1,000 s) ($1,000 s) ($1,000 s) Milestone Date Date Date ($1,000 s) 1 01 Humboldt Bay Trail The project is located along the NCRA and Caltrans Highway PAED 0 0 0 0 Baseline 0 2391 South 101 corridor between Eureka and Brainard Slough (~2 miles PSE 0 0 0 0 PAED 08/29/18 HUM south of Arcata) with Humboldt Bay to the west and north. RW Sup 0 0 0 0 RW Cert 05/01/20 Construction of 4.2 mile Class I bike path along the N. Coast Con Sup 0 0 0 0 RTL 07/23/20 Railroad Authority and Hwy 101 transportation corridor RW Cap 0 0 0 0 Begin Const 10/15/20 between Eureka and Arcata, and construction of cable barrier Con Cap 13 ,296 13 ,296 0 0 End Const 07/07/22 Total 13 ,296 13 ,296 0 0 2 01 McKinleyville Safe The McKinleyville Safe Routes to School Program will be PAED 25 25 0 25 Baseline 0 2504 A Routes to School located in McKinleyville, an unincorporated community within PSE 40 40 0 0 PAED 06/28/20 HUM Program Humboldt County, California. Specifically, the project focuses RW Sup 0 0 0 0 RW Cert 03/02/21 on McKinleyville Avenue, from Gassaway Avenue to the south Con Sup 0 0 0 0 RTL 04/01/21 entrance of McKinleyville High School and Bates Roads from RW Cap 12 12 0 0 Begin Const 05/01/21 Fernwood Drive to Morris Elementary School.
    [Show full text]
  • Suggested Maintenance Practices for Roadside Weed and Brush Problems
    Suggested Maintenance Practices for Roadside Weed and Brush Problems Circular E-958 January 2017 Oklahoma Cooperative Extension Service Division of Agricultural Sciences and Natural Resources Oklahoma State University Clayton Hurst Extension Associate Oklahoma State University Lydia Calhoun Extension Assistant Oklahoma State University Dennis Martin Turfgrass Specialist Oklahoma State University Recommendations in this publication are based on research supported by the Oklahoma Department of Transportation. Suggested Maintenance Practices for Roadside Weed and Brush Control Right-of-way vegetation management is a very important grass), brush, switchgrass, total vegetation control and aquatic part of the overall roadside maintenance program. The veg- weeds. With respect to recommended timing of applications, etation adjacent to the road surface is a functional part of the refer to the spray zone map (Figure 1) based on your location road. In addition to mechanical methods, herbicides are used within Oklahoma. for managing right-of-way vegetation. When used correctly, Please remember these are only suggestions and the follow- herbicides can selectively control undesirable weeds and leave ing information is for preliminary planning. There is no substitute nearby beneficial plants unharmed. for an applicator scouting roadside areas regularly to note the This Extension circular summarizes herbicides, amounts conditions of the desired species, weeds present, and their of product per acre, water carrier rates, timing of application, stage of development. Be sure to follow the manufacturer’s and important comments regarding vegetation management directions, not withstanding the information contained in this programs. These programs include control of Johnsongrass, circular. Read and follow all label directions. annual grasses and broadleaves, silver bluestem (silver beard- Zone 3 Zone 2 Zone 1 Figure 1.
    [Show full text]
  • Cable Median Barrier Failure Analysis and Prevention
    University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Final Reports & Technical Briefs from Mid- America Transportation Center Mid-America Transportation Center 2012 Cable Median Barrier Failure Analysis and Prevention Dean L. Sicking University of Nebraska-Lincoln, [email protected] Cody S. Stolle University of Nebraska-Lincoln, [email protected] Follow this and additional works at: https://digitalcommons.unl.edu/matcreports Part of the Civil Engineering Commons Sicking, Dean L. and Stolle, Cody S., "Cable Median Barrier Failure Analysis and Prevention" (2012). Final Reports & Technical Briefs from Mid-America Transportation Center. 45. https://digitalcommons.unl.edu/matcreports/45 This Article is brought to you for free and open access by the Mid-America Transportation Center at DigitalCommons@University of Nebraska - Lincoln. It has been accepted for inclusion in Final Reports & Technical Briefs from Mid-America Transportation Center by an authorized administrator of DigitalCommons@University of Nebraska - Lincoln. Nebraska Transportation Center Report # TRP-03-275-12 Final Report 25-1121-0001-428 Cable Median Barrier Failure Analysis and Prevention Dean L. Sicking, Ph.D., P.E. Professor Department of Civil Engineering University of Nebraska-Lincoln Cody S. Stolle, Ph.D., E.I.T. Postdoctoral Research Associate 2012 NTC Nebraska Transportation Center 262 WHIT 2200 Vine Street Lincoln, NE 68583-0851 (402) 472-1975 “This report was funded in part through grant[s] from the Federal Highway Administration [and Federal Transit Administration], U.S. Department of Transportation. The views and opinions of the authors [or agency] expressed herein do not necessarily state or reflect those of the U. S. Department of Transportation.” MATC University Transportation Center Research Program Fiscal Years 2010-2012 CABLE MEDIAN BARRIER FAILURE ANALYSIS AND PREVENTION Submitted by Cody S.
    [Show full text]
  • CDOT Cable Barrier Guide 2017
    August 18, 2017 CDOT Cable Barrier Guide COLORADO DEPARTMENT OF TRANSPORTATION CABLE BARRIER GUIDE 1.0 SUMMARY AND DESCRIPTION 1.1 Summary High-tension cable barrier consists of steel wire cables mounted on weak steel posts and is used to prevent vehicles from crossing medians into opposing traffic lanes or to contain roadside departures. Cable barrier is cost effective to install compared to rigid or semi-rigid barrier systems and tends to result in less severe damage to the impacting vehicle. Cable barrier does not act as a windbreak, and therefore will not cause snow drifting. 1.2 Description CDOT uses a type of high-tension cable barrier that consists of pre-stretched cables mounted on lightweight steel posts and tightened to several thousand pounds of tension. High-tension cable barrier can be placed in long run lengths. The run length is the distance of cable barrier between end anchors. The run length may be limited by the presence of median openings or obstacles such as structures, median columns, etc. High-tension cable barrier is installed by CDOT using concrete footings in which metal tubes are cast to form sockets for the posts. The socket allows a post to be replaced with relative ease during repairs. The damaged post is removed from the socket and replaced with a new post. This eliminates the need for specialized post driving equipment and subsurface utility location for each repair. High-tension systems can be used on slopes of 4:1 and flatter. CDOT requires FHWA approved cable barrier meeting performance criteria in the National Cooperative Highway Research Program (NCHRP) Report 350, Recommended Procedures for the Safety Performance Evaluation of Highway Features, for Test Level 3 to be allowed on high speed highways.
    [Show full text]
  • Design Manual Chapter 1610 Traffic Barriers
    Chapter 1610 Traffic Barriers 1610.01 Introduction Exhibit 1610-6 Barrier Length of Need 1610.02 Barrier Impacts Exhibit 1610-7 Barrier Length of Need on Curves 1610.03 General Barrier Design Considerations Exhibit 1610-8 Beam Guardrail Trailing End Placement for 1610.04 Beam Guardrail Divided Highways 1610.05 High-Tension Cable Barrier Exhibit 1610-9 Beam Guardrail Post Installation 1610.06 Concrete Barrier Exhibit 1610-10 Guardrail Connections 1610.07 Bridge Traffic Barriers Exhibit 1610-11 Transitions and Connections 1610.08 Other Barriers Exhibit 1610-12 Median Cable Barrier Placement 1610.09 References Exhibit 1610-13 Roadside Cable Barrier Placement Exhibit 1610-14 Cable Barrier Placement: Overlap on Divided Highways Exhibit 1610-1 Concrete Barrier Placement Guidance: Assessing Impacts to Wildlife Exhibit 1610-15 Cable Barrier Placement: Cable Barrier Termination/Overlap with Beam Guardrail Exhibit 1610-2 Traffic Barrier Locations on Slopes Exhibit 1610-16 Concrete Barrier Shapes Exhibit 1610-3 Longitudinal Barrier Deflection Exhibit 1610-17 Type 7 Bridge Rail Upgrade Criteria Exhibit 1610-4 Longitudinal Barrier Flare Rates Exhibit 1610-18 Thrie Beam Rail Retrofit Criteria Exhibit 1610-5 Barrier Length of Need on Tangent Sections Chapter Organization: The first sections (Introduction and Barrier Impacts) present information to consider when deciding whether to install a barrier. The next section (General Barrier Design Considerations) contains guidance common to ALL barrier types, such as deflection distance, length of need and sight distance. The remaining sections present design information organized by specific barrier type (beam guardrail, cable barrier, etc.). Refer to the Glossary for many of the terms used in this chapter.
    [Show full text]