Gairo District – Morogoro Region

Total Page:16

File Type:pdf, Size:1020Kb

Gairo District – Morogoro Region Infrastructure Transparency Initiative Tanzania ROAD PROJECTS INFORMATION GAIRO DISTRICT – MOROGORO REGION THE CoST INITIATIVE MkakatiCoST, thewa InfrastructureCoST, unaotekelezwa Transparency chini ya Initiat uangaive,lizi which wa Baraza is hosted la Taifa by the la UjenziNational (NCC), Construction unalenga kuongezacouncil (NCC), Uwazi aims na Uwajibikaji at enhancing katika transparency utekelezaji andwa miundombinu accountability ya in ummathe implementation ili utekelezaji wakeof public ulinganeinfrastructure na dhamani projects ya infedha order zinazotumika. to achieve value Mkakati for money.huu unashirikisha The Initiative sekta is multi zote- stakeholderkuu tatu – Umma, and Binafsiinvolves na theasasi three zisizo major za kiraiastakeholder (CSOs). groups i.e. public, private and CSOs. MajukumuCoST activities makuu include ya CoST: ni: a)a) KuhamasishaSensitising Public Taasisi Procuring Nunuzi za Entities Umma kutoato disclose taarifa infrastructureza utekelezaji projectswa miradi reports ya miundombinu in order to ili kujengeacreate public umma understanding uelewa wa miradi of the hiyo; projects; b)b) KutoaTo assist taarifa PEs za to utekelezaji disclose datawa miradi to the yapublic; miundom binu kwa umma; c)c) KuhakikiTo undertake taarifa assurance za utekelezaji of the wa disclosed miradi ya data; miundombinu (assurance); d)d) KuhamasishaTo sensitise andna kuwahusisha involve all stakeholders wadau wote inkatika the monitoring ufuatiliaji wa of uwazitransparency na uwajibikaji and accountability katika miradi yain sekta implementation ya ujenzi; of public infrastructure projects; e)e) KubuniTo design mikakati and mbalimbaliimplement yacapacity kuwajengea building uwezo programmes wadau mbalimbali aimed at ilienabling washiriki stakeholders katika shughuli to zaparticipate uongezaji wain uwaziactivities na uawajibikaji aimed at katikaenhancing miradi transparencyya ujenzi kwa ufanisiand accountability wa kutosha. in public f) Kufuatiliainfrastructure na kushauri projects; juu ya uboreshaji wa sera na sheria mbalimbali zinazohusu uwazi na f) uwajibikaji.To monitor policies and legislation and advise on improvements that will enhance transparency and accountability. TARURA KatikaIn this awamu disclosure hii ya phase utoaji CoSTtaarifa, is CoSTcollaborating Tanzania with inashirikiana the Tanzania na Wakala Rural andwa BarabaraUrban Roads mijini naAgency Vijijini (TARURA)(TARURA) kutoato disclose taarifa data za onmiradi projects inayotekelezwa in Gairo and katikaKilosa wilayaDistricts za in Gairo,Morogoro Kilosa, Region. Morogoro Vijijini katika Mkoa wa Morogoro na Chamwino, Kongwa na Mpwapwa katika Mkoa wa Dodoma. AIM OF SHARING ROADS PROCUREMENT DATA WITH VILLAGES Lengo la kutoa taartifa hizi kwa umma, na hasa kwa vijiji vinavyopitiwa na barabara husika ni: a) ToKuwafahamisha inform benef wahusikaiciaries about juu ya themiradi projects hiyo ili sowajitayarishe that they arekutoa prepared ushirikiano to extandna kujenga collaboration mahusiano to na andWakala; build good relations with the Agency; b) ToKuhamasisha sensitise wahusikabeneficiaries kutoa to taarifa share zitakazofanikisha information that utekelezaji will enable wa themiradi Agency hiyo kwa improve ufanisi project na kwa implementation.gharama stahiki. MfanoThe information wa taarifa hizo may ni: inclu de: i)i) TroubleSehemu spots;ambazo kihistoria zimekuwa na usumbufu; ii)ii) ConflictUwezekano of interest wa kuwa with na makinzanocitizens affected na haki by na themategemeo road project; ya wananchi ; iii)iii) SourceChanzo ofcha matrrials mali ghafi such hasa as kifusi, water, changarawe, fill materials, maji, etc. n.k.; iv)iv) EnvironmentalMambo yahusuyo issues; mazingira; v) SourcesHaki ya kutumia of Labour; ardhi and inakopita barabara; vi) InformationChanzo hanz thato cha will nguvu improve kazi; naproject implementation to make sure they are built with value vii) forUfuatiliaji money wa in jumla order wa to miradimake sureili kuhakikisha the public inajengwa gets finctional kwa thamani infrastructure.. stahiki na kuhakikisha uma CONTACTS Contact your Village Executive Officer, Ward Executive Officer or to CoST using the information below. 11TH FL. SAMORA TOWER, Mansfield Street, P.O. Box 70039, 11101 Dar Es Salaam, E-mail: [email protected], Web : www.ncc.go.tz, Tel. +255739500313 /713620232 REPORT ON ROADS PROJECTS TO BE IMPLEMENTED BY TARURA JULY - SEPTEMBER 2018 GAIRO DISTRICT(BUDGET – INCLUDES WORKS, SUPERVISION AND ADMINISTRATION) Road ROAD NAME WARD NAME VILLAGES Tenda No. LOT TENDER TENDER WINNING TOTAL Code AE/092/2018 NO. ANNOUCE OPENING BIDDER BUDGET -2019/MOR/ MENT DATE DATE INFORMATI TZS MIL. .... ON DATE Routine Maintenance,Periodic Maintenance,Spot Improvement of Nongwe - Unonesala Road and Routine Maintenance of Chagongwe - Lufikiri - Kumbulu road 57036 Nongwe - Unonesala Nongwe Nongwe,Mtega,Unone W/28 1 7/23/2018 8/6/2018 9/17/2018 100.34 57053 Chagongwe - Lufikiri - Kumbulu Chagongwe Chagongwe,Lufikiri, Kumbulu Construction of Bridge along Mlembule-Chanjale Road and Spot Improvement along Chingholwe - Mwenzele (No.30) -Manvisi road. 57045 Mlembule-Chanjale Chanajale Ching'olwe, Chanjale, Kumbulu W/29 1 7/23/2018 8/6/2018 9/17/2018 91.5 57044 Chingholwe - Mwenzele (No.30) - Chanajale Ching'olwe,Kumbulu, Mamvisi Manvisi. Routine Maintenance of Rubeho-Kisitwi and Routine Maintenance, Periodic Maintenance of Rubeho - Kishambo-Mamiwa and Routine maintenance , Spot Improvement of Mandege - Ngege 57049 Rubeho-Kisitwi, Rubeho Rubeho,Kisiwi W/30 1 7/23/2018 8/6/2018 9/17/2018 74.88 57090 Rubeho - Kishambo-Mamiwa Rubeho Rubeho,Kishambo,Mamiwa 57043 Mandege - Ngege Mandege Mandege,Njugwa Routine Maintenance of Chakwale-Leshata, & Spot Improvement, Periodic Maintenance and Construction of Culverts along Leshata Idibo & Routine Maintenance of Ndogomi -Mnyooko & Routine Maintenance and Spot Improvement of Iyogwe - Chogoali road. 57048 Chakwale-Leshata Idibo & Idibo & Leshata W/31 1 7/23/2018 8/6/2018 9/17/2018 115.00 Leshata 57091 Leshata- Idibo Idibo & Idibo & Leshata Leshata 57095 Ndogomi -Mnyooko Madege Chakwale-Madege,Ndogomi &Mnyooko 57059 Iyogwe - Chogoali. Iyogwe Iyogwe,Kilama,Chogoali Routine Maintenance ,Spot Improvement and Periodic Maintenance along Tabuhotel - Kitange road & Spot Improvement of Kibedya - Shabiby S/S Road and Spot Improvement of Meshugi - Mnyunwe- Nagwai JCT Road. 57012 Tabuhotel - Kitange Chigela Tabuhotel,Kitange W/32 1 7/23/2018 8/6/2018 9/17/2018 104.25 II,Iheneje,Idete,KitangeI 57035 Kibedya - Shabiby S/S Chigela Mogohigwa,Kibedya Routine Maintenance of Gairo Town Roads & Routine Maintenance of Msingisi - Luhwaji Road & Periodic Maintenance of Ukwamani - Meshugi Road 57073 Halmashauri -Ukwamani Magoweko Ukwani W/33 1 7/23/2018 8/6/2018 9/17/2018 95.50 57041 Msingisi - Luhwaji Msingisi Msingisi,Luhwaji Ukwamani - Meshugi Ukwamani & Ukwamani,Mkalama& Meshugi Mkala 11TH FL. SAMORA TOWER, Mansfield Street, P.O. Box 70039, 11101 Dar Es Salaam, E-mail: [email protected], Web : www.ncc.go.tz, Tel. +255739500313 /713620232 .
Recommended publications
  • The Case of Sweet Potatoes Cultivation in Gairo District in Morogoro Region
    Smallholder Commercialization and its Implication for Gender Relations in Tanzania: The Case of Sweet Potatoes Cultivation in Gairo District in Morogoro Region. A Research Paper presented by: Demokratus Mkandala. (Tanzania) in partial fulfilment of the requirements for obtaining the degree of MASTER OF ARTS IN DEVELOPMENT STUDIES Major: AGRARIAN, FOOD AND ENVIRONMENTAL STUDIES (AFES) Members of the Examining Committee: Prof. Murat Arsel Dr. Tsegaye Moreda Shegro The Hague, The Netherlands December 2019 Disclaimer: This document represents part of the author’s study programme while at the Institute of Social Studies. The views stated therein are those of the author and not necessarily those of the Institute. Inquiries: Postal Address Institute of Social Studies P. O. Box 29776 2502 LT The Hague The Netherlands Location: Kortenarkade 12 2518AX The Hague The Netherlands Telephone: +31 70 426 0460 Fax: +31 70 426 0799 Table of Contents List of Tables ...................................................................................................................................... i List of Acronyms:............................................................................................................................... ii Acknowledgements ........................................................................................................................... iii Abstract ............................................................................................................................................ iv Chapter 1: .........................................................................................................................................
    [Show full text]
  • A Contextual Analysis for Village Land Use Planning in Tanzania's
    A contextual analysis for village land use planning in Tanzania’s Bagamoyo and Chalinze districts, Pwani region and Mvomero and Kilosa districts, Morogoro region Sustainable Rangeland Management Project ILRI PROJECT REPORT ISBN: 92-9146-586-0 The International Livestock Research Institute (ILRI) works to improve food and nutritional security and reduce poverty in developing countries through research for efficient, safe and sustainable use of livestock. Co-hosted by Kenya and Ethiopia, it has regional or country offices and projects in East, South and Southeast Asia as well as Central, East, Southern and West Africa. ilri.org CGIAR is a global agricultural research partnership for a food-secure future. Its research is carried out by 15 research centres in collaboration with hundreds of partner organizations. cgiar.org A contextual analysis for village land use planning in Pwani and Morogoro regions of Tanzania i ii A contextual analysis for village land use planning in Pwani and Morogoro regions of Tanzania A contextual analysis for village land use planning in Tanzania’s Bagamoyo and Chalinze districts, Pwani region and Mvomero and Kilosa districts, Morogoro region Sustainable Rangeland Management Project Emmanuel Sulle and Wilbard Mkama Editor: Fiona Flintan (International Livestock Research Institute) July 2019 A contextual analysis for village land use planning in Pwani and Morogoro regions of Tanzania iii ©2019 International Livestock Research Institute (ILRI) ILRI thanks all donors and organizations which globally support its work through their contributions to the CGIAR Trust Fund This publication is copyrighted by the International Livestock Research Institute (ILRI). It is licensed for use under the Creative Commons Attribution 4.0 International Licence.
    [Show full text]
  • Morogoro Domestic Water Supply Plan IDH\R
    8 2 7 T z . M o 8 è, ited Republic of Tanzania Kingdom of the Netherlands Ministry of Water, Energy Ministry of Foreign Affairs —• - — and Minerals DGIS Morogoro Domestic Water Supply Plan Volume V Water Supply Development Final Report August 1980 IDH\r DHV Consulting Engineers '1 United Republic of Tanzania Kingdom of the Netherlands Ministry of Water, Energy Ministry of Foreign Affairs and Minerals DGIS Morogoro Domestic Water Supply Plan Volume V Water Supply Development LH Final Report August 1980 I3HV DHV Consulting Engineers PART E - WATER SUPPLY DEVELOPMENT TABLE OF CONTENTS PAGE 1 - INTRODUCTION 7 1.1. General 7 1.2. Aim 7 2. APPROACH 9 2.1. Introduction 9 2.2. Data collection and evaluation 9 2.2.1. Earlier studies in the survey area and the rural water supply sector in Tanzania 10 2.2.2. General description of the rural water supply sector 10 2.2.3. Design criteria and construction methods for improved rural water supply systems 11 2.2.4. Cost criteria 14 2.2.5. Water resources in the survey area 14 2.3. Proposed strategy for future domestic water supply development 15 2.4. References 18 3. DATA COLLECTION AND EVALUATION 21 3.1. General description of the rural water supply sector 21 3.1.1. Government policies and objectives 21 3.1.2. Current development programmes and budget allocations 23 3.1.3. The organization of the Maji Department and institutional arrangements 27 3.1.4. Problems and constraints in the rural water supply sector 31 3.2. Design criteria and construction methods for improved rural water supply systems 32 3.2.1.
    [Show full text]
  • Embedding Systematic Quality Assessments
    Mboya et al. BMC Health Services Research (2016) 16:578 DOI 10.1186/s12913-016-1809-4 RESEARCH ARTICLE Open Access Embedding systematic quality assessments in supportive supervision at primary healthcare level: application of an electronic Tool to Improve Quality of Healthcare in Tanzania Dominick Mboya1, Christopher Mshana1, Flora Kessy1, Sandra Alba2, Christian Lengeler3,4, Sabine Renggli3,4, Bart Vander Plaetse5, Mohamed A. Mohamed6 and Alexander Schulze5,7* Abstract Background: Assessing quality of health services, for example through supportive supervision, is essential for strengthening healthcare delivery. Most systematic health facility assessment mechanisms, however, are not suitable for routine supervision. The objective of this study is to describe a quality assessment methodology using an electronic format that can be embedded in supervision activities and conducted by council health staff. Methods: An electronic Tool to Improve Quality of Healthcare (e-TIQH) was developed to assess the quality of primary healthcare provision. The e-TIQH contains six sub-tools, each covering one quality dimension: infrastructure and equipment of the facility, its management and administration, job expectations, clinical skills of the staff, staff motivation and client satisfaction. As part of supportive supervision, council health staff conduct quality assessments in all primary healthcare facilities in a given council, including observation of clinical consultations and exit interviews with clients. Using a hand-held device, assessors enter data and view results in real time through automated data analysis, permitting immediate feedback to health workers. Based on the results, quality gaps and potential measures to address them are jointly discussed and actions plans developed. Results: For illustrative purposes, preliminary findings from e-TIQH application are presented from eight councils of Tanzania for the period 2011–2013, with a quality score <75 % classed as ‘unsatisfactory’.
    [Show full text]
  • 10.18697/Ajfand.76.16045
    DOI: 10.18697/ajfand.76.16045 FOOD INTAKE AND DIETARY DIVERSITY OF FARMING HOUSEHOLDS IN MOROGORO REGION, TANZANIA Kinabo J1, Mamiro P1*, Dawkins N2, Bundala N1, Mwanri A1 Majili Z1 , Jumbe T1, Kulwa K1 , Mamiro D3, Amuri N4, Ngowi M1 and J Msuya1 Peter Mamiro *Corresponding author email: [email protected] 1Department of Food Technology Nutrition and Consumer Sciences, Sokoine University of Agriculture, P. O. Box 3006, Morogoro, Tanzania 2Tuskegee Department of Food and Nutritional Sciences, Tuskegee University, Tuskegee, USA 3Department of Crop Science and Production, Sokoine University of Agriculture, P. O. Box 3005, Morogoro, Tanzania 4Department of Soil Science, Sokoine University of Agriculture, P. O. Box 3008, Morogoro, Tanzania DOI: 10.18697/ajfand.76.16045 11295 ABSTRACT The Tanzanian economy depends heavily on agriculture and hence human labor provides much of the power needed for farming activities. This study was carried out to determine the diversity and dietary adequacy of farming households in four selected districts of Morogoro region in Tanzania. Adult household members from 140 households participated in the study. A 24-hour dietary recall, dietary diversity score and frequency of food consumption tools were used to assess and quantify nutrient intake and adequacy of consumed diets in farming households. Tanzania food composition tables were used to compute estimates of the energy intake, macro and micronutrients consumed by farming households. Analysis was done using SPSS version 18 and Microsoft excel version 10. Cereal food group was consumed in relatively large quantities compared to other food groups in the surveyed households. The contribution of cereal group to energy intake was 75-82%, protein 8-16% and fat 9-14%.
    [Show full text]
  • Embedding Systematic Quality Assessments in Supportive
    Mboya et al. BMC Health Services Research (2016) 16:578 DOI 10.1186/s12913-016-1809-4 RESEARCH ARTICLE Open Access Embedding systematic quality assessments in supportive supervision at primary healthcare level: application of an electronic Tool to Improve Quality of Healthcare in Tanzania Dominick Mboya1, Christopher Mshana1, Flora Kessy1, Sandra Alba2, Christian Lengeler3,4, Sabine Renggli3,4, Bart Vander Plaetse5, Mohamed A. Mohamed6 and Alexander Schulze5,7* Abstract Background: Assessing quality of health services, for example through supportive supervision, is essential for strengthening healthcare delivery. Most systematic health facility assessment mechanisms, however, are not suitable for routine supervision. The objective of this study is to describe a quality assessment methodology using an electronic format that can be embedded in supervision activities and conducted by council health staff. Methods: An electronic Tool to Improve Quality of Healthcare (e-TIQH) was developed to assess the quality of primary healthcare provision. The e-TIQH contains six sub-tools, each covering one quality dimension: infrastructure and equipment of the facility, its management and administration, job expectations, clinical skills of the staff, staff motivation and client satisfaction. As part of supportive supervision, council health staff conduct quality assessments in all primary healthcare facilities in a given council, including observation of clinical consultations and exit interviews with clients. Using a hand-held device, assessors enter data and view results in real time through automated data analysis, permitting immediate feedback to health workers. Based on the results, quality gaps and potential measures to address them are jointly discussed and actions plans developed. Results: For illustrative purposes, preliminary findings from e-TIQH application are presented from eight councils of Tanzania for the period 2011–2013, with a quality score <75 % classed as ‘unsatisfactory’.
    [Show full text]
  • Tanzania Work Plan FY 2018 Project Year 7
    Tanzania Work Plan FY 2018 Project Year 7 October 2017–September 2018 ENVISION is a global project led by RTI International in partnership with CBM International, The Carter Center, Fred Hollows Foundation, Helen Keller International, IMA World Health, Light for the World, Sightsavers, and World Vision. ENVISION is funded by the US Agency for International Development under cooperative agreement No. AID-OAA-A-11-00048. The period of performance for ENVISION is September 30, 2011, through September 30, 2019. The author’s views expressed in this publication do not necessarily reflect the views of the US Agency for International Development or the United States Government. ENVISION Project Overview The US Agency for International Development (USAID)’s ENVISION project (2011–2019) is designed to support the vision of the World Health Organization (WHO) and its member states by targeting the control and elimination of seven neglected tropical diseases (NTDs), including lymphatic filariasis (LF), onchocerciasis (OV), schistosomiasis (SCH), three soil-transmitted helminths (STH; roundworm, whipworm, and hookworm), and trachoma. ENVISION’s goal is to strengthen NTD programming at global and country levels and support ministries of health (MOHs) to achieve their NTD control and elimination goals. At the global level, ENVISION—in close coordination and collaboration with WHO, USAID, and other stakeholders—contributes to several technical areas in support of global NTD control and elimination goals, including the following: • Drug and diagnostics procurement, where global donation programs are unavailable • Capacity strengthening • Management and implementation of ENVISION’s Technical Assistance Facility (TAF) • Disease mapping • NTD policy and technical guideline development • NTD monitoring and evaluation (M&E).
    [Show full text]
  • School Buildings, Facility Quality, Academic Performance
    Education 2019, 9(3): 51-62 DOI: 10.5923/j.edu.20190903.03 An Examination of School Buildings’ Physical Condition and Students’ Examination Performance Harriet Eliufoo*, Godwin Maro School of Architecture and Construction Management, Ardhi University, Dar es Salaam, Tanzania Abstract The study has examined the relationship between schools’ building physical condition and students’ examination performance in Tanzania. Data was collected through physical observation of schools’ building facilities and examination results from the National Examination Council of Tanzania for O-Level results for a period of seven years. A total of 97 government secondary schools were examined where a correlation analysis was made between a weighted physical condition status of a school and pass/fail ratio in examinations. The study has established though a positive correlation exists between a school’s physical condition and examination performance, such correlation is not of statistical significance. Keywords School buildings, Facility quality, Academic performance comprehension, language arts and mathematical science. 1. Introduction Quality of school facilities and association with student academic achievement in english and mathematics had Research conducted internationally has linked adequacy similarly been linked [21]. A more recent study has also of school infrastructure facilities and student academic echoed on the vital role of building facilities in the delivery performance [1-8] and that actualization of goals and of quality education [22]. objectives of an education system is influenced by the Declining performance of quality of education in physical of a school [9]. A poor physical learning Tanzania has been linked to a learning environment that is environment environment is an endemic feature for many not conducive to learning.
    [Show full text]
  • Flash Floods
    DREF operations update Tanzania: Flash Floods DREF n° MDRTZ015 GLIDE n° FF-2014-000009-TZA Operations manager: Dennis Kjeldsen Point of contact: Joseph Kimaryo, Director, Disaster Management, Tanzania RC Operations update n° 1: Timeframe Extension Timeframe covered by this update: 31.01.2014 - 29.04.2014 Operation start date: Timeframe: 3 months to 30 April, 2014; 31 January, 2014 extended to 30 May Overall operation budget: CHF 180,676 Disaster Relief Emergency Fund (DREF) allocated: CHF 180,676 Number of people affected: 10,000 N° of people being assisted: 2,000 (400 Households) Host National Society presence : Tanzanian Red Cross Society: 50 volunteers, 5 staff, 3 branches Red Cross Red Crescent Movement partners actively involved in the operation: IFRC, Spanish Red Cross and American Red Cross Other partner organizations actively involved in the operation: UNICEF, Government of Tanzania, the Military (Tanzania Peoples Defence Forces), Caritas and Islamic Foundation (food relief support to government.) Summary: Heavy rains caused flash floods in Morogoro region, located approximately 270 kilometres West of Dar Es Salaam, between 22nd and 23rd January, 2014. The rains which fell upstream in the regions of Tanga, Dodoma and Manyara overwhelmed the river banks downstream, especially Mkundi river, resulting in disastrous flash floods in three districts of Morogoro region, namely, Kilosa, Mvomero and Gairo. Kilosa district was the most affected with 1,865 households displaced. In Mvomero district 222 households were displaced and 10 households were displaced in Gairo district. In all three districts a total of 2,097 households (over 10,000 people) were displaced. In Kilosa district 4 wards were affected, namely, Magole, Dumila, Msowero and Kitete.
    [Show full text]
  • 2012 Population and Housing Census
    The United Republic of Tanzania 2012 POPULATION AND HOUSING CENSUS Population Distribution by Administrative Areas National Bureau of Statistics Ministry of Finance Dar es Salaam and Office of Chief Government Statistician President’s Office, Finance, Economy and Development Planning Zanzibar March , 2013 Foreword The 2012 Population and Housing Census (PHC) for United Republic of Tanzania was carried out on the 26th August, 2012. This was the fifth Census after the Union of Tanganyika and Zanzibar in 1964. Other Censuses were carried out in 1967, 1978, 1988 and 2002. The 2012 PHC, like others, will contribute to the improvement of quality of life of Tanzanians through the provision of current and reliable data for development planning, policy formulation and services delivery as well as for monitoring and evaluating national and international development frameworks. The 2012 PHC is unique in the sense that, the information collected will be used in monitoring and evaluating the Development Vision 2025 for Tanzania Mainland and Zanzibar Development Vision 2020, Five Year Development Plan 2011/12 – 2015/16, National Strategy for Growth and Reduction of Poverty (NSGRP) commonly known as MKUKUTA and Zanzibar Strategy for Growth and Reduction of Poverty (ZSGRP) commonly known as MKUZA. The census will also provide information for the evaluation of the Millennium Development Goals (MDGs) in 2015. The Poverty Monitoring Master Plan, which is the monitoring tool for NSGRP and ZSGRP, mapped out core indicators for poverty monitoring against the sequence of surveys, with the 2012 Census being one of them. Several of these core indicators for poverty monitoring will be measured directly from the 2012 Census.
    [Show full text]
  • Appendices to Vol 4B
    Vote 79 Morogoro Region Councils in the Region Council District Councils Code 2008 Morogoro Municipal Council 3043 Morogoro District Council 3044 Kilosa District Council 3045 Kilombero District Council 3046 Ulanga District Council 3096 Mvomero District Council 3115 Gairo District Council 2 Vote 79 Morogoro Region Council Development Budget Summary Local and Foreign 2014/15 Code Council Local Foreign Total 2008 Morogoro Municipal Council 4,097,100,000 5,017,119,000 9,114,219,000 3043 Morogoro District Council 2,306,241,000 3,413,021,000 5,719,262,000 3044 Kilosa District Council 4,131,956,000 3,680,619,000 7,812,575,000 3045 Kilombero District Council 6,597,629,000 2,630,448,000 9,228,077,000 3046 Ulanga District Council 3,612,546,000 2,837,870,000 6,450,416,000 3096 Mvomero District Council 3,697,548,000 2,740,113,000 6,437,661,000 3115 Gairo District Council 3,055,154,000 1,216,323,000 4,271,477,000 Total 27,498,174,000 21,535,513,000 49,033,687,000 3 Vote 79 Morogoro Region Code Description 2012/2013 2013/2014 2014/2015 Actual Expenditure Approved Expenditure Estimates Local Foreign Local Foreign Local Foreign Total Shs. Shs. Shs. 79 Morogoro Region 3280 Rural Water Supply & Sanitation 0 2,081,897,000 0 3,777,070,000 0 3,586,736,000 3,586,736,000 4390 Secondary Education Development 0 0 0 1,474,698,000 0 2,238,876,000 2,238,876,000 Programme 4404 District Agriculture Development Support 308,959,000 0 0 0 0 0 0 4457 Rural Financial Services Programmes 0 1,621,875,000 0 0 0 0 0 4486 Agriculture Sector Dev.
    [Show full text]
  • Invitation to Tender
    SPN TARURA Morogoro THE UNITED REPUBLIC OF TANZANIA PRESIDENT'S OFFICE - REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT TANZANIA RURAL & URBAN ROADS AGENCY TARURA MOROGORO REGION INVITATION TO TENDER DATE:11/07/2019 1 This Invitation to Tenders follows the General Procurement Notice which appeared in the PPRA Tender portal and Procurement Journal on Tuesday 11/06/2019 2 The Government of United Republic of Tanzania has set aside funds for the operation of the Regional Coordinator's Office TARURA - Morogoro for the Financial Year 2019/2020. It is intended that part of the proceeds of the funds to be used to cover eligible payments under the contracts for Works and Consultancy Service. 3 The Regional Coordinator TARURA-Morogoro on behalf of the Chief Executive-TARURA now invites sealed tenders from eligible National Contractors Registered by Contractors Registration Board (CRB) Tanzania in Classes indicated below. 4 The approximate quantities for major work items are as shown in the table given below. TENDER NAME APPROXIMATE MAJOR S/NO TENDER NO. ELIGIBILITY QUANTITY OF WORK A GAIRO DC Concrete class 15 - 74.07m3 Routine Maintenance, Spot Improvement, Periodic Maintenance Steel Reinforcement 574 kg of Chakwale-Kitaita,Iyogwe-Chogoali,Chakwale-Leshata,Chigage- concrete class 25 -315.18 m3 Civil Contractors 1 AE/092/2019/2020/MOR/W/01 Ndogomi,Italagwe-Ijava,Leshata-Idibo,Ndogomi-Mnyooko,Idibo- Stone masonry - 530.6m3 class VI and above Nhembo Road in Gairo District Council BRC - 1202m2 Hardcore 288 m3 Routine Maintenance,Periodic Maintenance,
    [Show full text]