2015 January
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Regional Transit Technical Advisory Committee October 29, 2014 Full
MEETING OF THE REGIONAL TRANSIT TECHNICAL ADVISORY COMMITTEE Wednesday, October 29, 2014 10:00 a.m. – 12:00 p.m. SCAG Los Angeles Main Office 818 W. 7th Street, 12th Floor, Policy Committee Room A Los Angeles, California 90017 (213) 236-1800 Teleconferencing Available: Please RSVP with Ed Rodriguez at [email protected] 24 hours in advance. Videoconferencing Available: Orange SCAG Office Ventura SCAG Office 600 S. Main St, Ste. 906 Orange, CA 92863 950 County Square Dr, Ste 101 Ventura, CA 93003 Imperial SCAG Office Riverside SCAG Office 1405 North Imperial Ave., Suite 1 , CA 92243 3403 10th Street, Suite 805 Riverside, CA 92501 SCAG San Bernardino Office 1170 W. 3rd St, Ste. 140 San Bernardino, CA 92410 If members of the public wish to review the attachments or have any questions on any of the agenda items, please contact Matt Gleason at (213) 236-1832 or [email protected]. REGIONALTRANSIT TECHNICAL ADVISORY COMMITTEE AGENDA October 29, 2014 The Regional Transit Technical Advisory Committee may consider and act upon any TIME PG# of the items listed on the agenda regardless of whether they are listed as information or action items. 1.0 CALL TO ORDER (Wayne Wassell, Metro, Regional Transit TAC Chair) 2.0 PUBLIC COMMENT PERIOD - Members of the public desiring to speak on items on the agenda, or items not on the agenda, but within the purview of the Regional Transit Technical Advisory Committee, must fill out and present a speaker’s card to the assistant prior to speaking. Comments will be limited to three minutes. -
[Title Over Two Lines (Shift+Enter to Break Line)]
BUS TRANSFORMATION PROJECT White Paper #2: Strategic Considerations October 2018 DRAFT: For discussion purposes 1 1 I• Purpose of White Paper II• Vision & goals for bus as voiced by stakeholders III• Key definitions IV• Strategic considerations Table of V• Deep-dive chapters to support each strategic consideration Contents 1. What is the role of Buses in the region? 2. Level of regional commitment to speeding up Buses? 3. Regional governance / delivery model for bus? 4. What business should Metrobus be in? 5. What services should Metrobus operate? 6. How should Metrobus operate? VI• Appendix: Elasticity of demand for bus 2 DRAFT: For discussion purposes I. Purpose of White Paper 3 DRAFT: For discussion purposes Purpose of White Paper 1. Present a set of strategic 2. Provide supporting analyses 3. Enable the Executive considerations for regional relevant to each consideration Steering Committee (ESC) to bus transformation in a neutral manner set a strategic direction for bus in the region 4 DRAFT: For discussion purposes This paper is a thought piece; it is intended to serve as a starting point for discussion and a means to frame the ensuing debate 1. Present a The strategic considerations in this paper are not an set of strategic exhaustive list of all decisions to be made during this considerations process; they are a set of high-level choices for the Bus Transformation Project to consider at this phase of for regional strategy development bus transformation Decisions on each of these considerations will require trade-offs to be continually assessed throughout this effort 5 DRAFT: For discussion purposes Each strategic consideration in the paper is 2. -
Virtual Construction Update Meeting March 30, 2021 | 6 PM Using Zoom & Submitting Questions
Virtual Construction Update Meeting March 30, 2021 | 6 PM Using Zoom & Submitting Questions This meeting is being recorded. Video file will be posted on our web site at metro.net/crenshaw Public video and mics are disabled. We cannot hear you or see you. Submit a question/comment via text: Please ask questions and submit comments via the Q&A feature or text us. Welcome, thank you for joining us! 10 min Project Overview Annette Cortez, Community Relations Manager 10 min North Segment Ron Macias, Principal Community Relations Officer 10 min South Segment Saroya Sandiford, Principal Community Relations Officer 15 min On The Move Riders Program Brittany Mullins, Principal Community Relations Officer Sidney Urmancheev, Transportation Associate 10 min Business Support Programs Kyle Wagner, (Interim) Business Interruption Fund Manager 5 min Eat Shop Play Program Jesus Galeno, Transportation Associate Robyn Lopez, Community Relations Officer 30 min Moderation / Q&A Isai Rosa, Principal Community Relations Officer 3 COVID-19 Compliance 4 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH) Southwestern Maintenance Yard Contractor, Completed March 2019 • 8.5-mile light-rail servicing the Cities of Los Angeles, Inglewood and El Segundo • 8 new stations: • 3 underground • 4 at-grade • 1 aerial • Life of Project Budget: $2.148 Billion • Project has reached 98% completion 5 Northern Segment Overview Crenshaw Bl between Metro E Line (Expo) and 67th St Structural Elements of Stations • Three underground • One at-grade Civil Elements of Tunnels and Trackwork • Dual parallel bored tunnels • Hyde Park “Cut and Cover” tunnel Street Restoration Segments • Underground station areas • Hyde Park underground tunnel Underground Station Construction Underground Station Construction • Expo/Crenshaw Station • Martin Luther King Jr. -
Sponsored by Arlington County
Sponsored by Arlington County Department of Environmental Services Department of Human Services Department of Parks and Recreation A REV 03/16 H 2484 ARLINGTON COUNTY TRANSPORTATION SERVICES FOR OLDER ADULTS AND PERSONS WITH DISABILITIES AT-A-GLANCE This brochure gives Arlington residents age 60 and over an overview of the many transportation services available. Each program listed has details outlining eligibility requirements and includes phone numbers and/or a web address for more information and applications. Together these programs provide a wide range of options designed to meet specific needs. Fees are varied based on the individual program. Please note: Some of the transit options listed are for individuals with disabilities, and there is no age requirement to use these services. Please see each program for more information and point of contact. NOTE: TTY stands for Text Telephone. It is a special device that lets people who are deaf, hard of hearing, or speech-impaired use the phone to communicate. A TTY is required at both ends of the conversation in order to communicate. TABLE OF CONTENTS Accessible and Inexpensive Public Transportation Arlington Transit - ART Discount ...............2 Metro Discount & Senior SmarTrip Card .........3 Metro Travel Training ........................4 Assisted Public Transportation for People with Disabilities Metro Access ...............................5 STAR (Specialized Transit for Arlington Residents)..........................6 STAR Assisted Transportation Services ..........8 STAR Temporary -
Public Transportation
TRANSPORTATION NETWORK DIRECTORY FOR PEOPLE WITH DISABILITIES AND ADULTS 50+ MONTGOMERY COUNTY, MD PUBLIC TRANSPORTATION Montgomery County, Maryland (‘the County’) cannot guarantee the relevance, completeness, accuracy, or timeliness of the information provided on the non-County links. The County does not endorse any non-County organizations' products, services, or viewpoints. The County is not responsible for any materials stored on other non-County web sites, nor is it liable for any inaccurate, defamatory, offensive or illegal materials found on other Web sites, and that the risk of injury or damage from viewing, hearing, downloading or storing such materials rests entirely with the user. Alternative formats of this document are available upon request. This is a project of the Montgomery County Commission on People with Disabilities. To submit an update, add or remove a listing, or request an alternative format, please contact: [email protected], 240-777-1246 (V), MD Relay 711. MetroAccess and Abilities-Ride MetroAccess Paratransit – Washington Metropolitan Area Transit Authority (WMATA) MetroAccess is a shared-ride, door-to-door public transportation service for people who are unable to use fixed-route public transit due to disability. "Shared ride" means that multiple passengers may ride together in the same vehicle. The service provides daily trips throughout the Transit Zone in the Washington Metropolitan region. The Transit Zone consists of the District of Columbia, Montgomery and Prince George’s Counties in Maryland, Arlington and Fairfax Counties and the cities of Alexandria, Fairfax and Falls Church in Northern Virginia. Rides are offered in the same service areas and during the same hours of operation as Metrorail and Metrobus. -
Purple Line Functional Plan? 6 Table 9 Stewart Avenue to CSX/WMATA Right-Of-Way 23
Approved and Adopted September 2010 purple line F u n c t i o n a l P l a n Montgomery County Planning Department The Maryland-National Capital Park and Planning Commission P u r p l e L i n e F u n c t i o n a l P l a n I A p p r o v e d a n d A d o p t e d 1 p u r p l e l i n e f u n c t i o n a l p l a n Approved and Adopted a b s t r a c t The Commission is charged with preparing, adopting, and amending or extending The General Plan (On Wedges and Corridors) for the Physical This plan for the Purple Line transit facility through Montgomery County Development of the Maryland-Washington Regional District in Montgomery contains route, mode, and station recommendations. It is a comprehensive and Prince George’s Counties. amendment to the approved and adopted 1990 Georgetown Branch Master Plan Amendment. It also amends The General Plan (On Wedges and The Commission operates in each county through Planning Boards Corridors) for the Physical Development of the Maryland-Washington appointed by the county government. The Boards are responsible for all Regional District in Montgomery and Prince George’s Counties, as local plans, zoning amendments, subdivision regulations, and amended, the Master Plan of Highways for Montgomery County, the administration of parks. Countywide Bikeways Functional Master Plan, the Bethesda-Chevy Chase Master Plan, the Bethesda Central Business District Sector Plan, the Silver The Maryland-National Capital Park and Planning Commission encourages Spring Central Business District and Vicinity Sector Plan, the North and West the involvement and participation of individuals with disabilities, and its Silver Spring Master Plan, the East Silver Spring Master Plan, and the facilities are accessible. -
Metropolitan Council 2020 Capital Budget With
Metropolitan Council Projects Summary ($ in thousands) Project Requests for Gov's Gov's Planning State Funds Rec Estimates Project Title Rank Fund 2020 2022 2024 2020 2022 2024 Busway Capital Improvement Program Bus 1 GO 55,000 50,000 50,000 55,000 0 0 Rapid Transit Regional Parks and Trails Grant Program 2 GO 15,000 15,000 15,000 10,000 10,000 10,000 Inflow and Infiltration Grant Program 3 GO 9,500 9,500 9,500 5,000 5,000 5,000 Total Project Requests 79,500 74,500 74,500 70,000 15,000 15,000 General Obligation Bonds (GO) Total 79,500 74,500 74,500 70,000 15,000 15,000 State of Minnesota Final Capital Budget Requests January 2020 Page 1 Metropolitan Council Agency Profile metrocouncil.org/ AT A GLANCE • 3.1 million residents in the seven-county area in 2017 (55 percent of total state population) • 888,000 more people from 2010 to 2040 (31% increase) per Council forecasts • 419,000 more households from 2010 to 2040 (38% increase) per Council forecasts • 495,000 more jobs from 2010 to 2040 (32% increase) per Council forecasts • 94.2 million transit rides in 2017 • 2.38 million rides on Metro Mobility in 2017 • 250 million gallons of wastewater treated daily • 110 communities provided with wastewater treatment in 2018 • Nine treatment plants and 600 miles of regional sewers • 59 million regional park visits in 2017 • 56 regional parks and park reserves totaling 55,000 acres in the seven-county metropolitan area • 49 regional trails totaling nearly 400 miles • 7,200 low-income households provided affordable housing by the Council’s Metro HRA in 2017 PURPOSE The Metropolitan Council is the regional policy-making body, planning agency, and provider of essential services for the Twin Cities metropolitan region. -
City Council Work Session Agenda Section Work Session Meeting Date April 5, 2021
CITY COUNCIL WORK SESSION AGENDA SECTION WORK SESSION MEETING DATE APRIL 5, 2021 ITEM: BUS RAPID TRANSIT (BRT) LINES DEPARTMENT: Public Works BY/DATE: Kevin Hansen/April 1, 2021 CITY STRATEGY: (please indicate areas that apply by adding a bold “X” in front of the selected text below) X_Safe Community _Diverse, Welcoming “Small-Town” Feel _Economic Strength _Excellent Housing/Neighborhoods _Equity and Affordability X_Strong Infrastructure/Public Services _Opportunities for Play and Learning _Engaged, Multi-Generational, Multi-Cultural Population BACKGROUND: ‘NetworkNext’ is a 20-year plan initiated by Metro Transit for expanding and improving the bus network serving the metro area. Transit improvements under consideration include improved local and express routes, integrated shared mobility options, and new arterial bus rapid transit (BRT) lines. Bus rapid transit (BRT) provides an improved customer experience with frequent service and faster trips in our the Metro’s busiest bus corridors. Metro Transit first studied a dozen potential BRT lines in 2011-2012. This study led to the implementation of the METRO A Line in 2016 and the METRO C Line in 2019. Metro Transit has reported both lines have been very successful in increasing ridership and customers satisfaction. In 2020 and 2021, Metro Transit engaged the public to help identify the Metro’s next BRT priorities. Each step was based on four principles that guided the planning process for BRT, rooted in public engagement, Metropolitan Council transit policy, and the performance of the bus network: Advance equity and reduce regional racial disparities Build on success to grow ridership Design a network that supports a transit-oriented lifestyle Ensure the long-term sustainable growth of the bus network In February 2021, following months of analysis and community engagement, Metro Transit finalized recommendations for the next expansions in the BRT network: The METRO F Line will serve the Central Avenue corridor, modifying Route 10 from downtown Minneapolis to Northtown Mall via Central and University avenues. -
Potomac Yard
Alexandria Transit Vision Plan – POTOMAC YARD The Potomac Yard community is generally located in northeastern Alexandria along Richmond Highway, between Slaters Lane and Four Mile Run. It is currently served by one Metrobus route (Metroway), and two DASH routes (AT-9 and AT-10). For Potomac Yard, the key changes for the 2030 ATV Network include: • AT-9 replaced by the “N8”. The existing AT-9 will be replaced by the new “N8” route with all-day, frequent service from the new Potomac Yard Metro to Arlandria, Shirlington, Mark Center, the West End and Van Dorn Metro. Route will operate every 15 minutes or better, seven days per week, providing significant improvements in transit access for Potomac Yard residents and businesses. • New “N6 route with direct connection to Old Town Alexandria. The new “N6” route will run between Potomac Yard and Old Town Alexandria (King/Washington) via Slater Lane and Old Town North. The direct connection between the new Potomac Yard Metrorail and the heart of Old Town Alexandria will run every 30 minutes, seven days per week. • DASH AT-10 stays the same. The AT-10 route will maintain its current alignment and service levels between Potomac Yard, Del Ray and King Street Metro. • Metroway remain the same. The 2030 network maintains the existing Metroway route at existing levels of service. What can I access via transit in 30 minutes from Potomac Yard at 12pm in 2030? Existing Network 2030 Network % Change Residents 64,272 87,571 +36% Jobs 63,878 88,351 +38% (See reverse side for www.dashbus.com/transitvision more information.) For Potomac Yard, the key changes for the 2022 ATV Network include: • AT-9 replaced by the “N8”. -
Work Session Virtual Meeting Held Via Webex December 8, 2020 6:15 Pm
WORK SESSION VIRTUAL MEETING HELD VIA WEBEX DECEMBER 8, 2020 6:15 PM Call to order 1. Metropolitan Transit Project Manager Shahin Khazrajafari will be presenting an overview of the forthcoming Metro Transit D Line Bus Rapid Transit project, the anticipated construction timeline, and will be available to answer any questions. Adjournment Auxiliary aids for individuals with disabilities are available upon request. Requests must be made at least 96 hours in advance to the City Clerk at 612-861-9738. AGENDA SECTION: Work Session Items AGENDA ITEM # 1. WORK SESSION STAFF REPORT NO. 31 WORK SESSION 12/8/2020 REPORT PREPARED BY: Joe Powers, Assistant City Engineer DEPARTMENT DIRECTOR REVIEW: Kristin Asher, Public Works Director/City Engineer 12/2/2020 OTHER DEPARTMENT REVIEW: N/A CITY MANAGER REVIEW: Katie Rodriguez, City Manager 12/2/2020 ITEM FOR WORK SESSION: Metropolitan Transit Project Manager Shahin Khazrajafari will be presenting an overview of the forthcoming Metro Transit D Line Bus Rapid Transit project, the anticipated construction timeline, and will be available to answer any questions. EXECUTIVE SUMMARY: Metro Transit is moving towards construction of planned improvements to the Route 5 corridor with the D Line Bus Rapid Transit (BRT) project after securing final project funding at the legislature in the recent bonding bill. The project will be a positive asset to the City of Richfield and enhance the overall metro transit system in our region. The D Line will substantially replace Route 5, running primarily on Portland Avenue within Richfield and on Chicago, Emerson and Fremont Avenues in Minneapolis. Rapid bus brings better amenities, such as: Faster, more frequent service; Pre-boarding fare payment for faster stops; Neighborhood-scale stations with amenities; Enhanced security; and, Larger & specialized vehicles. -
Planning a Public Transportation System with a View Towards Passengers’ Convenience
Planning a Public Transportation System with a View Towards Passengers’ Convenience by Jonas Harbering Planning a Public Transportation System with a View Towards Passengers’ Convenience Dissertation zur Erlangung des mathematisch-naturwissenschaftlichen Doktorgrades ”Doctor rerum naturalium” der Georg-August-Universit¨atG¨ottingen im Promotionsprogramm ”PhD School of Mathematical Sciences” (SMS) der Georg-August University School of Science (GAUSS) vorgelegt von Jonas Harbering aus Flemhude G¨ottingen,2015 Betreuungsausschuss Prof. Dr. Anita Sch¨obel, Institut f¨urNumerische und Angewandte Mathematik, Georg- August-Universit¨atG¨ottingen Prof. Dr. Stephan Westphal, Institut f¨urAngewandte Stochastik und Operations Research, Technische Universit¨atClausthal Mitglieder der Pr¨ufungskommision Referentin: Prof. Dr. Anita Sch¨obel, Institut f¨urNumerische und Angewandte Mathe- matik, Georg-August-Universit¨atG¨ottingen Koreferent: Prof. Dr. Juan Antonio Mesa, Institut f¨urAngewandte Mathematik, Univer- sit¨atSevilla Weitere Mitglieder der Pr¨ufungskommision Prof. Dr. Stephan Westphal, Institut f¨urAngewandte Stochastik und Operations Research, Technische Universit¨atClausthal Prof. Dr. Andrea Krajina, Institut f¨urMathematische Stochastik, Georg-August-Universit¨at G¨ottingen Prof. Dr. Preda Mihailescu, Mathematisches Institut, Georg-August-Universit¨atG¨ottingen Prof. Dr. Jens Grabowski, Institut f¨urInformatik, Georg-August-Universit¨atG¨ottingen Tag der m¨undlichen Pr¨ufung: 1. Februar 2016 ii Contents 1. Introduction 1 2. General Literature -
Tysons Corner Express
TYSONS CORNER EXPRESS S From Woodbridge to TART D A WOODBRIDGE WSON BEACH Tysons Corner 1 OCCOQUAN Woodbridge VIS HWY VRE Station A Connecting services: JEFF D Amtrak; Greyhound; VRE GORDON / R (Subject to change without notice) T 2 123 Route 123 / I-95 Exit 160 Commuter Lot I-95 SPRINGFIELD I95/495 CAPITAL BE LTWAY / I -495 BRADDOCK Map not to scale / I-495 Y ARLINGTON BLVD US 50 A W T L LEE HWY US 29 BE L NORTH A T CAPI I66 Bus Stop (Bus also stops at the numbered timepoints) Transfer Center Commuter Lot Point of Interest Tysons Corner Tysons Corner Metro Station Metrorail Station Center OmniRide (Bus Bay D) VRE Train Station Connecting bus services: Fairfax Connector; Metrobus ©2021, Potomac and Rappahannock (Subject to change without notice) Transportation Commission WEST PARK Design by Smartmaps, Inc. TYSONS BLVD 3 RT 123 Booz Allen BAE Hamilton Systems TIONAL GALLERIA A Tysons SOLUTIONSSAIC Galleria INTERN GREENSBORO END Mall ARK Hilton 5 WEST P Freddie SPRING HILL Mac LINCOLN WAY WEST BRANCH TYSONS FREDDIE MAC CIR This OmniRide route is JONES BRANCH JONES BRANCH 4 TYCO funded by the Virginia CORNER Department of Rail and Freddie Gannett Co ARK Mac RUN Public Transportation to (USA Today) P West Park mitigate congestion along Transit Center I-95 and I-495. Connecting services: Shuttle to East Tysons Corner 1 2 3 4 5 1 2 3 4 5 Woodbridge VRE Route 123 & Tysons Jones Branch Dr Jones (Trips timed to connect I-95 Metro and Branch with VRE schedule) Commuter Station Lincoln Way before Lot (Bus Bay D) West Park Trip These are approximate drop-o times.