Rainier Square Redevelopment

Total Page:16

File Type:pdf, Size:1020Kb

Rainier Square Redevelopment Rainier Square Development University of Washington Metropolitan Tract Addendum to Final Environmental Impact Statement Downtown Height and Density Changes January 2005 Master Use Permit Project No. 3017644 City of Seattle Department of Planning and Development April 30, 2015 Prepared by: Parametrix Inc. Environmental Impact Statement Addendum Addendum to ENVIRONMENTAL IMPACT STATEMENT for the Downtown Height and Density Changes January 2005 Addressing Environmental Impacts of Rainier Square Development University of Washington Metropolitan Tract Rainier Square Redevelopment Master Use Permit # 3017644 City of Seattle Department of Planning and Development This Environmental Impact Statement Addendum has been prepared in compliance with the State Environmental Policy Act (SEPA) of 1971 (Chapter 43.21C, Revised Code of Washington); the SEPA Rules, effective April 4, 1984, as amended (Chapter 197-11 Washington Administrative Code); and rules adopted by the City of Seattle implementing SEPA – Seattle’s Environmental Policies and Procedures Code (Chapter 25.05, Seattle Municipal Code). The Seattle Department of Planning and Development (DPD). DPD has determined that this document has been prepared in a responsible manner using appropriate methodology and DPD has directed the areas of research and analysis that were undertaken in preparation of this DSEIS. This document is not an authorization for an action, nor does it constitute a decision or a recommendation for an action. Date of Issuance of this EIS Addendum ..................................April 30, 2015 Rainier Square Development i University of Washington Metropolitan Tract Environmental Impact Statement Addendum Cite as: City of Seattle Department of Planning and Development University of Washington Metropolitan Tract Rainier Square Redevelopment April 30, 2015 Addendum to Final Environmental Impact Statement Downtown Height and Density Proposal, January 2005 Prepared by Parametrix Inc., Seattle, WA. 554-4475-012 ii Rainier Square Development University of Washington Metropolitan Tract Environmental Impact Statement Addendum Fact Sheet TITLE Rainier Square Development, University of Washington, Metropolitan Tract, Rainier Square Redevelopment DESCRIPTION OF Construction of an office, retail and hotel development including PROPOSAL AND A 59-story office/residential tower, 846 feet high with 780,750 ALTERNATIVES square feet of office development and 178 residential units A 160 to 180 room hotel Approximately 74,000 square feet of retail space Below grade parking for approximately 879 vehicles PROPONENT University of Washington, Wright Runstad and Company ANTICIPATED Demolition of the existing Rainier Square is anticipated to begin in the CONSTRUCTION first quarter of 2016. Construction of the office/residential tower and hotel may proceed separately. Occupancy of the lower office levels of the tower are expected in the summer of 2018 with full occupancy of the office and residential levels in 2019. LEAD AGENCY City of Seattle RESPONSIBLE OFFICIAL Diane Sugimura, Director City of Seattle, Department of Planning and Development Seattle Municipal Tower 700 Fifth Avenue, Suite 2000 PO Box 34019 Seattle, WA 98124-4019 CONTACT PERSON Bruce Rips, Land Use Planner City of Seattle, Department of Planning and Development Seattle Municipal Tower 700 Fifth Avenue, Suite 2000 PO Box 34019 Seattle, WA 98124-4019 Telephone 206-615-1392 FAX: 206-386-4039 E-Mail: [email protected] Rainier Square Development i University of Washington Metropolitan Tract Environmental Impact Statement Addendum Fact Sheet (continued) LICENSES, PERMITS, AND Final Approval and Notice to Proceed by the University of APPROVALS POTENTIALLY Washington REQUIRED City of Seattle Permits o Master Use Permit o Demolition Permit o Clearing and Grading Permit o Stormwater Control Permits o Street Use Permits, including truck hauling specifications o Electrical and Mechanical Permits AUTHORS AND PRINCIPAL Parametrix Inc. CONTRIBUTORS 719 2nd Avenue, Suite 200 Seattle, WA 98104 206.394.3700 EIS Preparation THIS DOCUMENT IS A This document is an addendum to the Environmental Impact SUPPLEMENT TO Statement for Downtown Height and Density Changes, January 2005 Copies are available at: University of Washington Suzzallo Library Seattle Central Public Library DATE OF ISSUE OF EIS April 30, 2015 ADDENDUM LOCATION OF City of Seattle, Department of Planning and Development BACKGROUND Seattle Municipal Tower INFORMATION 700 Fifth Avenue, Suite 2000 Seattle, WA 98124-4019 Or, Internet project library: http://web6.seattle.gov/dpd/edms/ Project number: 3017644 DATE OF FINAL ACTION ON Master Use Permit approval is expected summer 2015 THE PROPOSAL Construction Permits are expected between July and December 2015 ii Rainier Square Development University of Washington Metropolitan Tract Environmental Impact Statement Addendum Fact Sheet (continued) AVAILABILITY OF THE EIS Copies of this Addendum are available for review at: ADDENDUM City of Seattle Department of Planning and Development Seattle Municipal Tower 700 Fifth Avenue, Suite 2000 PO Box 34019 Seattle, WA 98124-4019 Copies are available from the City of Seattle, Department of Planning and Development for the cost of reproduction. Copies are also available online at: http://web6.seattle.gov/dpd/edms/ Project number: 3017644http://f2.washington.edu/cpo/projects/sepa Rainier Square iii University of Washington Metropolitan Tract Environmental Impact Statement Addendum Table of Contents 1 Description of Proposal ...................................................................................................1-1 1.1 Proponent ............................................................................................................1-1 1.2 Location of Proposal ............................................................................................1-1 1.3 Background Information .......................................................................................1-2 1.3.1 Downtown Height and Density Changes EIS .................................. 1-2 1.3.2 Site Vicinity ..................................................................................... 1-4 1.3.3 Metropolitan Tract ........................................................................... 1-5 1.3.4 Existing Site .................................................................................... 1-7 1.4 Project Proposal ..................................................................................................1-7 1.4.1 General ........................................................................................... 1-7 1.4.2 Base Structure and Street Frontage ............................................. 1-10 1.4.3 Office/Residential Tower ............................................................... 1-13 1.4.4 Hotel ............................................................................................. 1-13 1.4.5 Parking and Service Access ......................................................... 1-17 1.4.6 Construction Timing and Sequencing, .......................................... 1-17 2 Environmental Impacts ....................................................................................................2-1 2.1 Land Use .............................................................................................................2-3 2.1.1 Downtown Height and Density Changes EIS .................................. 2-3 2.1.2 Addendum Information on Affected Environment ........................... 2-5 2.1.3 Addendum Information on Impacts ................................................. 2-8 2.1.4 Mitigation Measures ...................................................................... 2-19 2.2 Housing ............................................................................................................. 2-21 2.2.1 Downtown Height and Density EIS ............................................... 2-21 2.2.2 Addendum Information on Affected Environment ......................... 2-22 2.2.3 Addendum Information on Impacts ............................................... 2-24 2.3 Urban Design – Height, Bulk and Scale ............................................................. 2-25 2.3.1 Downtown Height and Density EIS ............................................... 2-25 2.3.2 Addendum Information on Project Impacts ................................... 2-29 2.3.3 Mitigation Measures ...................................................................... 2-37 2.4 Urban Design – Pedestrian Amenities and Open Space .................................... 2-39 2.4.1 Downtown Height and Density EIS ............................................... 2-39 2.4.2 Addendum Information on Project Impacts ................................... 2-40 2.4.3 Mitigation Measures ...................................................................... 2-42 2.5 Views and Aesthetics ......................................................................................... 2-43 2.5.1 Downtown Height and Density EIS ............................................... 2-43 2.5.2 Addendum Information on Impacts ............................................... 2-48 2.5.3 Mitigation Measures ...................................................................... 2-53 2.6 Shadows ............................................................................................................ 2-54 2.6.1 Downtown Height and Density EIS ............................................... 2-54 2.6.2 Addendum Information on Affected Environment
Recommended publications
  • Federal Reserve Bank of San Francisco, Seattle Branch 1949-50
    Federal Reserve Bank of San Francisco, Seattle Branch 1949-50 1015 Second Avenue 093900-0520 see below C. D. BOREN AND A. A. DENNY 12 2, 3, 6, 7 LOTS 2, 3, 6 AND 7, BLOCK 12, TOWN OF SEATTLE, AS LAID OUT ON THE CLAIMS OF C. D. BOREN AND A. A. DENNY (COMMONLY KNOWN AS BOREN & DENNY’S ADDITION TO THE CITY OF SEATTLE) ACCORDING TO PLAT THEREOF RECORDED IN VOLUME 1 OF PLATS, PAGE 27, RECORDS OF KING COUNTY, EXCEPT THE EASTERLY 12 FEET THEREOF CONDEMNED IN DISTRICT COURT CASE NO. 7097 FOR SECOND AVENUE, AS PROVIDED BY ORDINANCE NO. 1107 OF THE CITY OF SEATTLE. 1015 Second Avenue LLC vacant c/o Martin Selig Real Estate, Attention Pete Parker, 1000 Second Avenue, Suite 1800, Seattle, WA 98104-1046. Federal Reserve Bank of San Francisco Bank Naramore, Bain, Brady, and Johanson (William J. Bain, project principal) Engineer: W. H. Witt Company (George Runciman, project engineer) Kuney Johnson Company Pete Parker c/o Martin Selig Real Estate, Attention Pete Parker, 1000 Second Avenue, Suite 1800, Seattle, WA 98104-1046. (206) 467-7600. October 2015 Federal Reserve Bank of San Francisco, Seattle Branch Bank Landmark Nomination Report 1015 Second Avenue, Seattle October 2015 Prepared by: The Johnson Partnership 1212 NE 65th Street Seattle, WA 98115-6724 206-523-1618, www.tjp.us Federal Reserve Bank of San Francisco, Seattle Branch Landmark Nomination Report October 2015, page i TABLE OF CONTENTS 1. INTRODUCTION ................................................................................................................................ 1 1.1 Background ......................................................................................................................... 1 1.2 City of Seattle Landmark Nomination Process ...................................................................... 2 1.3 Methodology .......................................................................................................................
    [Show full text]
  • Rainier Square Development DRAFT
    Rainier Square Development University of Washington Metropolitan Tract Addendum to Final Environmental Impact Statement Downtown Height and Density Changes January 2005 Master Use Permit Project No. 3017644 City of Seattle Department of Planning and Development February 11, 2015 DRAFT FOR CITY STAFF REVIEW 0NLY Prepared by: Parametrix Inc. Environmental Impact Statement Addendum Addendum to ENVIRONMENTAL IMPACT STATEMENT for the Downtown Height and Density Changes January 2005 Addressing Environmental Impacts of Rainier Square Development University of Washington Metropolitan Tract Rainier Square Redevelopment Master Use Permit # 3017644 City of Seattle Department of Planning and Development This Environmental Impact Statement Addendum has been prepared in compliance with the State Environmental Policy Act (SEPA) of 1971 (Chapter 43.21C, Revised Code of Washington); the SEPA Rules, effective April 4, 1984, as amended (Chapter 197-11 Washington Administrative Code); and rules adopted by the City of Seattle implementing SEPA – Seattle’s Environmental Policies and Procedures Code (Chapter 25.05, Seattle Municipal Code). The Seattle Department of Planning and Development (DPD). DPD has determined that this document has been prepared in a responsible manner using appropriate methodology and DPD has directed the areas of research and analysis that were undertaken in preparation of this DSEIS. This document is not an authorization for an action, nor does it constitute a decision or a recommendation for an action. Date of Issuance of this EIS Addendum .............................................DATE Rainier Square Development i University of Washington Metropolitan Tract Environmental Impact Statement Addendum Cite as: City of Seattle Department of Planning and Development University of Washington Metropolitan Tract Rainier Square Redevelopment February 2015 Addendum to Final Environmental Impact Statement Downtown Height and Density Proposal, January 2005 Prepared by Parametrix Inc., Seattle, WA.
    [Show full text]
  • August 26, 2005
    LPB 150/16 REPORT ON DESIGNATION Name and Address of Property: Federal Reserve Bank of San Francisco, Seattle Branch 1015 Second Avenue Legal Description: LOTS 2, 3, 6 AND 7, BLOCK 12, TOWN OF SEATTLE, AS LAID OUT ON THE CLAIMS OF C.D. BOREN AND A. A. DENNY (COMMONLY KNOWN AS BOREN & DENNY’S ADDITION TO THE CITY OF SEATTLE) ACCORDING TO PLAT THEREOF RECORDED IN VOLUME 1 OF PLATS, PAGE 27, RECORDS OF KING COUNTY, EXCEPT THE EASTERLY 12 FEET THEREOF CONDEMNED IN DISTRICT COURT CASE NO. 7097 FOR SECOND AVENUE, AS PROVIDED BY ORDINANCE NO. 1107 OF THE CITY OF SEATTLE. At the public meeting held on March 2, 2016 the City of Seattle's Landmarks Preservation Board voted to approve designation of the Federal Reserve Bank of San Francisco, Seattle Branch at 1015 Second Avenue as a Seattle Landmark based upon satisfaction of the following standard for designation of SMC 25.12.350: C. It is associated in a significant way with a significant aspect of the cultural, political, or economic heritage of the community, City, state or nation; and D. It embodies the distinctive visible characteristics of an architectural style, or period, or a method of construction; and E. It is an outstanding work of a designer or builder; and F. Because of its prominence of spatial location, contrasts of siting, age, or scale, it is an easily identifiable visual feature of its neighborhood or the city and contributes to the distinctive quality or identity of such neighborhood or the City. DESCRIPTION The former Federal Reserve Bank of San Francisco, Seattle Branch, is located in Seattle’s Central Business District on the western side of the Second Avenue, between Spring and Madison Streets.
    [Show full text]
  • Resource List
    Exhibit O RESOURCE LIST The Commission is prohibited, under RCW 42.17.260(7), from providing lists of applicants for commercial purposes. We read this statute as constraining us from making available the names, addresses, and phone numbers of applicants who have received Credit Reservation Contracts to those parties who could provide services necessary for the viability of the projects, such as lenders, lawyers, and accountants. We are pursuing an alternative approach of supplying to the applicant’s lists of practitioners in various fields: accountants, attorneys, consultants, lenders, property managers, and syndicators. We hope that the resource list will facilitate applicants in obtaining the advice and resources to produce a successful project. We have assembled this list with two cautions. First, the list is not exhaustive. We contacted practitioners that we were aware were active in providing services to tax credit projects, and were approached by others to be included on a resource list. There are likely others available that we are not aware of or that we may have overlooked. Second, the Commission does not endorse any of the companies or individuals on the attached lists, and has not verified that the comments provided by those on the list are accurate. We have merely compiled the list. You should use your own judgment in selecting any of the parties listed to assist in your project. We update the resource list periodically. Anyone wishing to be added to the list should contact the Tax Credit Division at (206) 464-7139 or email us at [email protected] for a copy of the resource information form.
    [Show full text]
  • Nifty from the Last 50 – Arranged by Architect
    Nifty From The Last 50 – arranged by architect Architect: Style: Modern - New Formalism Builder: Historic Name: Common Name: Wells Fargo Bank Built Date: 1970 circa Address: 11205 Pacific Ave, Parkland, WA Architect: Style: Modern - Populuxe / Googie Builder: Historic Name: Common Name: The Fingernail, Howard Amon Park Amphitheater Built Date: 1960 circa Address: Lee Blvd, Richland, WA Architect: Style: Builder: Historic Name: Common Name: Washington Federal Savings and Loan Built Date: 1968 circa Address: 4800 Rainier Ave S, Seattle, WA Architect: Style: Modern - Structural Aesthetics Builder: Dawley Brothers Construction Historic Name: 1007 Washington Building Common Name: Built Date: 1959 Address: 1007 N Washington St, Olympia, WA 98501 Architect: Style: Builder: Historic Name: 1st Federal Savings Common Name: Built Date: 1968 circa Address: 141 W 1st St, Port Angeles, WA Wednesday, May 17, 2006 Page 1 of 51 Architect: Style: Builder: Historic Name: 200 Aloha St. Apartments Common Name: Built Date: 1953 Address: 200 Aloha St, Seattle, WA Architect: Style: Modern - International Style Builder: Historic Name: 210 Union Building Common Name: Built Date: 1954 Address: 210 Union Ave SE, Olympia, WA 98501 Architect: Style: Builder: Historic Name: Alaska Copper and Brass Company Common Name: Built Date: 1957 circa Address: 3223 6th Ave S, Seattle, WA Architect: Style: Builder: Historic Name: Auburn High School Common Name: Built Date: 1950 Address: 800 4th St NE, Auburn, WA 98002 Architect: Style: Builder: Historic Name: Bank Common Name:
    [Show full text]
  • In Joint Session With
    September 8, 2011 TO: Members of the Board of Regents Ex officio Representatives to the Board of Regents FROM: Joan Goldblatt, Secretary of the Board of Regents RE: Schedule of Meetings: September 15, 2011 Special Meeting WEDNESDAY, SEPTEMBER 14, 2011 5:30 p.m. Hill-Crest DINNER FOR REGENTS AND GUESTS THURSDAY, SEPTEMBER 15, 2011 8:30 to 10:15 a.m. 142 Gerberding Hall FINANCE, AUDIT AND FACILITIES COMMITTEE: Regents Smith (Chair), Blake, Brotman, Cole (alternate), Jewell 10:30 to 11:20 a.m. 142 Gerberding Hall ACADEMIC AND STUDENT AFFAIRS COMMITTEE: Regents Harrell (Chair), Barer, Cole, Gates, Knowles in Joint Session with FINANCE, AUDIT AND FACILITIES COMMITTEE: Regents Smith (Chair), Blake, Brotman, Cole (alternate), Jewell 11:35 a.m. to 12:10 p.m. 142 Gerberding Hall ACADEMIC AND STUDENT AFFAIRS COMMITTEE: Regents Harrell (Chair), Barer, Cole, Gates, Knowles 12:30 p.m. PHOTOGRAPH OF THE BOARD OF REGENTS 1:00 p.m. Petersen Room SPECIAL MEETING OF THE BOARD OF Allen Library REGENTS The Regular Meeting of the Board for Thursday, September 15, 2011 is cancelled due to the change in scheduling of the meeting of the full Board from 3:00 p.m. to 1:00 p.m. The Board with the revised schedule will convene a Special Meeting on Thursday, September 15, 2011 with committee meetings beginning at 8:30 a.m. and the full session of the Board scheduled at 1:00 p.m. To request disability accommodation, contact the Disability Services Office at: 206.543.6450 (voice), 206.543.6452 (TTY), 206.685.7264 (fax), or email at [email protected].
    [Show full text]
  • 1411 4Th Ave Seattle, WA 98101 Igniting Innovation and Imagination in the Heart of Seattle’S CBD
    1411 4th Ave Seattle, WA 98101 Igniting Innovation and Imagination in the Heart of Seattle’s CBD Our historical location at 1411 4th Ave spans eleven floors of flexible office space in the heart of downtown Seattle. Close proximity to bus lines, the University Street Station light rail, and Pier 50 ferry terminal make getting here, and anywhere else in the city, easy. Some of Seattle’s best restaurants, cafés, bars, and attractions are within walking distance of the office, making your work day that much better. Whether you’re juicy burger or juice bar, happy hour or 5-star cuisine, in need of a single desk or an entire suite, you’ll find a progressive, welcoming community here that supports who you are and where you’re going. Examples of WeWork spaces 1411 4th Ave | 2 1411 4th Ave | 3 Where Historic Beauty Meets Modern Workspace The arresting art deco façade of this historic 1929 landmark building gives way to light-filled, modern workspace that welcomes members from across industries. Comprised of unique visual elements and curated art, our workplace is designed to capture the innovative, industrious spirit that is ingrained in the building. Amenities include a meditation room, a new mothers’/wellness room, unlimited micro-roasted coffee, and premium conference rooms and lounges that cultivate a collaborative, supportive community. Bike storage and showers onsite make bike commutes and midday workouts easier. And our dog-friendly policy means your four-legged muse can come to work every day. Whether you’re flying solo and need a single desk or have a large team and need a suite, you’ll find space here that motivates you to push harder and inspires you to go further.
    [Show full text]
  • Major Office (Specialty Area 280)
    Major Offices Specialty Area 280 Commercial Revalue for 2020 Assessment Roll Department of Assessments Setting values, serving the community, and pursuing excellence 500 Fourth Avenue, ADM-AS 0708 Seattle, WA 98104-2384 OFFICE (206) 296-7300 FAX (206) 296-0595 Email: [email protected] http://www.kingcounty.gov/assessor/ Department of Assessments 1 Department of Assessments 500 Fourth Avenue, ADM-AS-0708 John Wilson Seattle, WA 98104-2384 OFFICE: (206) 296-7300 FAX (206) 296-0595 Assessor Email: [email protected] http://www.kingcounty.gov/assessor/ Dear Property Owners, Our field appraisers work hard throughout the year to visit properties in neighborhoods across King County. As a result, new commercial and residential valuation notices are mailed as values are completed. We value your property at its “true and fair value” reflecting its highest and best use as prescribed by state law (RCW 84.40.030; WAC 458-07-030). We continue to work to implement your feedback and ensure we provide you accurate and timely information. We have made significant improvements to our website and online tools to make interacting with us easier. The following report summarizes the results of the assessments for your area along with a map. Additionally, I have provided a brief tutorial of our property assessment process. It is meant to provide you with background information about our process and the basis for the assessments in your area. Fairness, accuracy and transparency set the foundation for effective and accountable government. I am pleased to continue to incorporate your input as we make ongoing improvements to serve you.
    [Show full text]
  • Rainier Square Development University of Washington Metropolitan Tract Rainier Square Redevelopment
    Appendices APPENDIX B Pedestrian Le vel Wind Analysis APPENDIX C Transportation Impact Study APPENDIX D Greenhouse Gas Emissions Calculation Spreadsheet Addendum to ENVIRONMENTAL IMPACT STATEMENT for the Downtown Height and Density Changes January 2005 Addressing Environmental Impacts of Rainier Square Development University of Washington Metropolitan Tract Rainier Square Redevelopment Master Use Permit # 3017644 City of Seattle Department of Planning and Development APPENDIX B Pedestrian Level Wind Analysis Tel: 519.823.1311 Fax: 519.823.1316 Rowan Williams Davies & Irwin Inc. 650 Woodlawn Road West Guelph, Ontario, Canada N1K 1B8 5th Avenue and Union Street Seattle, WA Final Report Pedestrian Wind Consultation RWDI # 1402464 February 5, 2015 SUBMITTED TO SUBMITTED BY Wright Runstad & Company William Schinkel, B.A.Sc. Technical Coordinator Care of: [email protected] Ron Klemencic, P.E., S.E., Hon. AIA Gregory P. Thompson, M.A.Sc. Chairman & CEO Senior Project Manager / Associate Magnusson Klemencic Associates [email protected] 1301 Fifth Avenue, Suite 3200 Seattle, WA Jon K. Galsworthy, Ph.D., P.Eng. 98101-2699 Technical Director / Principal Direct: 206-215-8203 [email protected] Main: 206-292-1200 Mobile: 206-909-8208 [email protected] This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or confidential. If you have received this in error, please notify us immediately. ® RWDI name and logo are registered trademarks in Canada and the United States of America Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com 5th Avenue and Union Street – Seattle, WA Pedestrian Wind Consultation RWDI#1402464 February 5, 2015 TABLE OF CONTENTS 1.
    [Show full text]
  • Downtown Seattle
    Commercial Revalue 2015 Assessment Roll AREA 30 King County, Department of Assessments Seattle, Wa. Lloyd Hara, Assessor Department of Assessments Accounting Division Lloyd Hara 500 Fourth Avenue, ADM-AS-0740 Seattle, WA 98104-2384 Assessor (206) 205-0444 FAX (206) 296-0106 Email: [email protected] http://www.kingcounty.gov/assessor/ Dear Property Owners: Property assessments for the 2015 assessment year are being completed by my staff throughout the year and change of value notices are being mailed as neighborhoods are completed. We value property at fee simple, reflecting property at its highest and best use and following the requirement of RCW 84.40.030 to appraise property at true and fair value. We have worked hard to implement your suggestions to place more information in an e-Environment to meet your needs for timely and accurate information. The following report summarizes the results of the 2015 assessment for this area. (See map within report). It is meant to provide you with helpful background information about the process used and basis for property assessments in your area. Fair and uniform assessments set the foundation for effective government and I am pleased that we are able to make continuous and ongoing improvements to serve you. Please feel welcome to call my staff if you have questions about the property assessment process and how it relates to your property. Sincerely, Lloyd Hara Assessor Area 30 Map The information included on this map has been compiled by King County staff from a variety of sources and is subject to change without notice.
    [Show full text]
  • 10 MUST SEE SEATTLE Architectural Sites
    AIA KNOWLEDGE COMMUNITIES 2012 KNOWLEDGE LEADERSHIP ASSEMBLY SEATTLE, WASHINGTON | AUGUST 8-10, 2012 AIA KNOWLEDGE COMMUNITIES 10 MUST SEE SEATTLE Architectural Sites BROUGHT TO YOU BY THE COMMITTEE ON DESIGN 1 © Benjamin Benschneider 1 welcome to SEAT TLE Olympic sculpure park (2007) 2901 Western Avenue, Seattle The best way to truly know great architecture (206) 654-3100 | www.nmajh.org is through directly experiencing it. When the Weiss/Manfredi AIA Committee on Design travels we make sure Envisioned as a new model for an urban sculpture park, the we visit the best architecture our destinations project is located on a industrial site at the water’s edge. have to offer – and we hope our little guide can The design creates a continuous constructed landscape for help you slip a few tours into your visit. art, forms an uninterrupted Z-shaped “green” platform, and descends 40 feet from the city to the water, capitalizing Certainly not meant to be an exhaustive guide, on views of the skyline and Elliot Bay and rising over the the following pages represent 10 top new existing infrastructure to reconnect the urban core to the revitalized waterfront. projects we recommend you experience while here. We have also listed a few Seattle icons for An exhibition pavilion provides space for art, performances and educational programming. From this pavilion, the your tour. pedestrian route descends to the water, linking three new Enjoy! archetypal landscapes of the northwest: a dense temperate evergreen forest, a deciduous forest and a shoreline garden. The design not only brings sculpture outside of the museum walls but brings the park itself into the landscape of the city.
    [Show full text]
  • Rainier Square Redevelopment Agenda
    RAINIER SQUARE REDEVELOPMENT AGENDA • Project Overview • Building Adjacent to Rainier Tower • Dual-Plate Shear Wall Core RAINIER SQUARE REDEVELOPMENT PROJECT STATISTICS Rainier Square Tower by the Numbers: Residential 308,000 SF Office 722,000 SF Retail 79,000 SF Parking 391,000 SF Total 1,500,000 SF* *Does not include the adjacent 12-story hotel • 852 feet tall • 32-month construction schedule PROJECT STATISTICS Rainier Square Tower is a part of the Metropolitan Tract, an 11-acre parcel owned by the University of Washington. Due to the fact that the University owns Fifth Avenue and University Street the Rainier Interesting Project Facts: Square project is built right to the curb line on those streets. • Second tallest building in Seattle • First use of dual plate shear wall construction in a high rise application • First project nationwide to utilize Occupant Evacuation Elevator (OEO) operation • Highest residential floors in Seattle • Longest telescoping building maintenance unit (needed for window washing) • Likely the only building in Seattle that has incorporated snow cleats into the façade SHORING How is the existing tower supported? New tower Existing tower SECANT WALL SHORING OPERATION Soldier Pile Secant and Lagging Shoring Shoring Wall Wall SHORING MONITORING DUAL PLATE SHEAR WALL What is it and why do it? DUAL-PLATE SHEAR WALL CORE West 8th Rainier Square 28 stories + 5 levels 59 stories + 7 levels of parking of parking 11 months from mat 10 months from mat foundation to last slab foundation to last slab on metal deck pour on metal deck pour DUAL-PLATE SHEAR WALL CORE Courtesy Magnusson Klemencic Associates Day 82 DUAL-PLATE SHEAR WALL CORE Courtesy Magnusson Klemencic Associates Day 224 DUAL-PLATE SHEAR WALL CORE Courtesy Magnusson Klemencic Associates Day 380 CORE MOCKUP CORE MOCKUP CORE LIFT SEQUENCE Questions?.
    [Show full text]