Amirudin Shari Said a Amirudin on Nov 30

Total Page:16

File Type:pdf, Size:1020Kb

Amirudin Shari Said a Amirudin on Nov 30 No let up in Services sector Keeping the travel Celebrating war with virus a rising star industry afloat the people’s monarch 5 7 10 8&9 FREE l DECEMBER 2020 EDITION l www.selangorjournal.my SELANGOR THE Selangor administration has outlined several measures to en- sure that the people have a con- tinuous supply of water. The ini- tiatives include to increase ground surveillance, use high-tech drones for monitoring difficult-to-access areas, and make amendments to the law to impose heavier penalties on offenders. Swift action by state agencies has also been instrumental in averting water cuts. Thirteen out of 21 re- ported incidents of pollution were intercepted before more damage was done. MORE ON PAGES 2to3 2 NEWS Selangor Journal l DECEMBER 2020 River diversion may be the remedy Hard to sniff out By NORRASYIDAH ARSHAD tects a pollution, we will stop the flow of the polluted river odour pollution SHAH ALAM - A pilot project to water immediately to avoid it divert river water during a pol- from entering the surface wa- lution incident is underway to ter intake of the water treat- ensure that users do not face ment plants (WTPs). water cuts. “Although the treatment State executive councillor plants are suspended, people for infrastructure and public will not have to worry because amenities Izham Hashim said this pilot project will operate water from existing reserve to keep supplying water,” he ponds will be temporarily said during a media briefing pumped to consumers while on Nov 26. the operations of water treat- Izham said the reserve ment plants are suspended. ponds will be able to sup- Izham said the project, ply water that lasts up to 100 which costs a total of RM200 days. million, will begin early next The project covers the Ran- year and is expected to be tau Panjang, Semenyih, and completed by December 2021. Sungai Selangor Phase 1, 2 “When the static station de- and 3 WTPs. Green tech to combat pollutants SHAH ALAM - Selangor is in the the contaminated materials final stages of developing an and increase the amount of ox- environment-friendly and high- ygen in the water. Izham tests the smells of polluted water samples at the Air Selangor headquarters tech method to address river “We are now waiting for the pollution in the state. final laboratory report and if it SHAH ALAM - There is current- the source of odour pollution. be processed although the pol- State executive councillor for succeeds, we will use this tech- ly no special device that can de- “Usually odour pollution lution level or TON (threshold infrastructure and public ame- nology for Selangor’s rivers. It tect odour pollution at raw wa- comes from organic matters, odour number) reading is low nities Izham Hashim said the will directly reduce the cost of ter sources, says state executive hence this device will be able and does not change the colour technology is being developed treating water for consumers,” councillor for infrastructure and to detect the source based on of the water. in collaboration with a private he said. public amenities Izham Hashim. changes to the water,” he said “Pengurusan Air Selangor Sdn company and a local water ex- Izham said the state govern- Whenever there is pollution, during a media briefing on the Bhd (Air Selangor) had once ex- pert. ment is also facing a big chal- it can only be detected using the water supply solution plan here perienced processing the water “With this technology, our lenge due to the large number olfactory sense. on Nov 26. with a one TON reading. A chem- experts have identified certain of factories situated near the However, Izham said the state Izham added that odour pol- ical reaction was formed which microorganisms that live in the two main river basins. - Berna- government is planning on us- lution occurs more frequently caused the smell to be stronger. river that can act as a filter to ma ing an organic carbon analyser than diesel or palm oil spills. We are complying with the ad- device, called the Total Organic He explained that water sourc- vice by the Health Ministry,” he Six stations to do Carbon (TOC) analyser, to detect es with odour pollution cannot said. 24-hour monitoring Planning ahead for dry spells SHAH ALAM - Six fixed sta- be located at Sungai Pajam, SHAH ALAM - The Selangor gov- ture, we must not be compla- gor’s Bual Bicara talk show ti- tions are being built near the Sungai Beranang and Sungai ernment is drafting a prepara- cent because we faced a serious tled ‘Pencemaran Air: Siapa Buat Sungai Selangor and Sungai Semenyih for the Sungai Se- tion plan to face the possibility dry spell in 2014. Following that, Onar’ (Water pollution: Who Semenyih river basins for con- menyih basin. of water disruption in the state the Hybrid Off River Augmen- is causing the interference?) tinuous monitoring of the raw “We build these stations be- during long droughts. tation System (HORAS) and the broadcast live on Facebook on water sources. cause we do not want to only State executive councillor for Offstream River System (ORS) Nov 23. State executive councillor rely on patrolling. Right now, infrastructure and public ameni- were developed. Izham had also advised the for infrastructure and public there are already two stations ties Izham Hashim said a holis- “I am confident that with- people to use water prudently amenities Izham Hashim said placed at Sungai Sembah and tic study on the matter will com- in the next 10 years, we would as the water consumption rate three stations will be placed Sungai Gong,” said Izham mence in the next few months be better prepared seeing that in the state is at 5,000 MLD (mil- at Rantau Panjang, Sungai during a media briefing on the to ensure there will be sufficient water disruption does not only lion litres per day), which is the Gong and Sungai Sembah solution plan to resolve pollu- supply of raw water. happen because of pollution or highest in the country and sur- for the Sungai Selangor ba- tion issues at Sungai Selangor “Even though there is no burst pipes but also droughts,” passes the recommendation by sin, while another three will and Sungai Semenyih. drought season in the near fu- said Izham during Media Selan- the World Health Organisation. Selangor Journal l DECEMBER 2020 NEWS 3 Amended Luas Enactment awaits Many water cuts royal assent By KHAIRUL AZRAN HUSSIN prevented, says MB GOMBAK - The Selangor Water Management Au- SHAH ALAM - The Selangor gov- “However, some of the incidents strategy, the state government aims thority (Luas) Amendment Bill 2020, which includes ernment has managed to prompt- could not be avoided. to continue preserving the water heftier penalties against polluters, will be enforced ly resolve 13 raw water pollution “The main constraint is that there supply sources,” he said. within a month after it was passed at the Selangor incidents this year, preventing the is no technology able to detect Meanwhile, state executive coun- Legislative Assembly on Nov 9. closure of water treatment plants odour pollution and (we) need to cillor for infrastructure and pub- Selangor Menteri Besar Dato’ Seri Amirudin (WTP), says its Menteri Besar. rely solely on the human nose,” said lic amenities Izham Hashim said Shari said several processes have to be carried Dato’ Seri Amirudin Shari said a Amirudin on Nov 30. on Nov 26 that among the types of out in order to gazette the amended law, which in- total of 21 cases of river pollution In addressing the issue, he said pollution detected include nine oil cludes seeking the consent of the Selangor Ruler were detected in the year 2020, the state government has allocated spills, seven from odour pollution, Sultan Sharafuddin Idris Shah Alhaj. with the latest incident reported on RM200 million in the 2021 Selangor three from industrial and aquacul- “Once His Royal Highness has granted the royal Nov 25 near Bandar Bukit Mahkota, Budget. ture effluent discharge and one case assent, the Bill will become law within a month’s time. Cheras. “Through a short and long term due to turbidity. “After that, any individual found guilty of pollut- ing the rivers will face heavier punishments,” he said when met after attending a briefing on oper- ations to tear down illegal structures near the Se- Cash reward for reporting environmental crimes langor river basin, held at the Selayang Municipal SHAH ALAM - The Selangor govern- He said in cases where an offence serve water resources will be more Council office here on Nov 24. ment is offering a reward, totalling has been committed, information is effective against such criminal activi- The amendments to the Luas Enactment 1999 RM20,000, to members of the public needed so that legal action can be ties,” he said on Nov 27. were passed at the Selangor State Legislative As- for information on any environmen- taken against the offenders. On Nov 10, the Ministry of Environ- sembly after a string of pollution incidents left mil- tal crime that can lead to the arrest of “The state government has for- ment and Water offered a reward of lions of taps in the state dry. the perpetrators. mulated various short-term, medi- RM5,000 to anyone who could pro- The Bill was approved with 11 amendments Selangor Menteri Besar Dato’ Seri um-term and long-term strategies to vide information and evidence that which include increasing the minimum penalty to Amirudin Shari said the reward is an minimise the impact of river pollution could lead to the arrest of individuals RM200,000 and setting the maximum fine to not incentive to get members of the pub- on the people in Selangor.
Recommended publications
  • Come Strides
    Advertising Feature MAY 28, 2021 From small steps COME GIANT STRIDES Having made its mark on the property development landscape, Matrix Concepts is a shining example of what tenacity, astute strategic planning and a robust management team can achieve. Growing from strength to strength in a relatively short period of time, the company’s principal business has expanded from property development to include construction, education, hospitality and healthcare. Advertising Feature MAY 28, 2021 AF2 CONTENTS BUILDING AF2 BRAND RECOGNITION BUILDING BRAND RECOGNITION pon its incorporation in 1996, Developer: Building Sustainable on top of the extensive range of Matrix Concepts Holdings Development Award 2021. It is also residential options, Bandar Sri Berhad (Matrix Concepts) inducted into Malaysia Developers’ Sendayan is well equipped with AF4 has conscientiously set Hall of Fame where membership choice amenities encompassing AN URBAN U about cultivating its business port- is exclusively accorded to winners educational, commercial, retail SANCTUARY folio and brand name in the state of of EdgeProp Malaysia’s Responsi- and recreational. Negeri Sembilan. Within two dec- ble Developer introduced in 2018. AF6 ades, the company has not only ex- “Nurturing BRINGING THE panded its development footprint Staking an unassailable Environments, Enriching HEAT to other parts of Malaysia and even claim in Seremban Lives” TO KLANG VALLEY abroad, it was successfully listed Comprising residential, commer- To begin with, commercial and re- on the main market of Bursa Ma- cial, institutional and industrial tail needs are amply serviced pri- AF8 laysia in 2013. properties, Matrix Concepts’ Bandar marily at Sendayan MetroPark and EXPANDING THE Having evolved into a recognised Sri Sendayan is a self-sustaining in- Sendayan Merchant Square, which HORIZON and respected property developer tegrated township that is conven- offer all the usual amenities.
    [Show full text]
  • Kualiti Air Marin Dan Pulau-Pulau Marine and Island Marine Water Quality
    Kualiti Air Marin dan Pulau-Pulau Marine and Island Marine Water Quality BAB Chapter 4 107 BAB 04 PENGAWASAN KUALITI MARINE WATER QUALITY AIR MARIN MONITORING Jabatan Alam Sekitar (JAS) Department of Environment (DOE) has menjalankan pengawasan kualiti been monitoring the marine water air marin bermula pada tahun 1978 quality since 1978 in Peninsular Malaysia di Semenanjung Malaysia dan 1985 and 1985 in Sabah and Sarawak with bagi Sabah dan Sarawak dengan the main objective to establish the tujuan untuk mengenalpasti status marine water quality status and to kualiti air marin dan menentukan determine the degree of pollution from tahap pencemaran daripada both the land-based as well as the sea punca-punca di daratan dan juga based sources. These sources may di laut. Punca-punca pencemaran pose threats to the marine resources ini boleh menimbulkan ancaman which would upset the stability and kepada sumber kehidupan marin diversity of the marine ecosystem. dan menganggu kestabilan serta kepelbagaian ekosistem marin. Pada tahun 2018, sebanyak 188 stesen In year 2018, a total of 188 coastal, pantai, 85 stesen kuala dan 95 stesen 85 estuary and 95 island stations were pulau telah dipantau. Sebanyak 1128 monitored. As many as 1128 samples sampel di kawasan pantai, 510 di kuala from coastal, 510 samples from estuary dan 570 di pulau telah diambil untuk and 570 samples from island monitoring dianalisis dan hasilnya dilaporkan stations were collected for analyses berdasarkan Indeks Kualiti Air Marin and reported based on the Marine (IKAM). Water Quality Index (MWQI). IKAM digunakan sebagai satu kaedah The MWQI was used to reflect the marine untuk menentukan kategori dan status water quality status and its category.
    [Show full text]
  • Baldatun Thoyyibatun Wa Rabbun Ghafur
    www.selangorku.com MediaSelangorku MediaSelangor tv.selangorku.com PERCUMA 3 - 10 Jun 2016, 27 Syaaban - 5 Ramadan 1437H #SmartSelangor SELANGOR NEGERI BALDATUN THOYYIBATUN WA RABBUN GHAFUR Masyarakat perlu mengambil peluang untuk terus beribadat dan menjadikan Ramadan sebagai Madrasah Ruhiyyah selaras firman Allah SWT di dalam surah al-Baqarah ayat ���. Ia jelas mewajibkan amalan berpuasa ketika Ramadan yang padanya diturunkan al-Quran dan menjadi petunjuk kepada umat Islam Dato’ Seri Mohamed Azmin Ali Menteri Besar BERITA PENUH MUKA � Aplikasi Maqasid JAWATANKUASA PANTAU Syariah dalam PROJEK TALIAN ELEKTRIK pentadbiran negeri Pembinaan Projek Penghantaran Talian Elektrik 5 ���/��� Taman Cheras Hartamas ke PMU Mahkota Cheras Selangor tuan rumah kilang Pastikan TNB patuhi peraturan dan piawaian UMWT Seksyen �� Akta Bekalan Elektrik ���� BERITA LANJUT MUKA � 10 Utama 2 SelangorKini 3 - 10 Jun 2016 Catat penurunan Pendapatan pelaburan KWSP susut ��.��% suku tahun pertama KUALA LUMPUR - Hasrat rak- Perkara itu disahkan Ketua berakhir 31 Mac 2016, berban- tan yang dijana adalah 59.98 men pendapatan tetap me- yat untuk mendapatkan dividen Pegawai Eksekutifnya, Datuk ding RM10.63 bilion suku sama peratus lebih rendah berban- wakili 51.72 peratus dari jum- tinggi dalam Kumpulan Wang Shahril Ridza Ridzuan dalam tahun lalu. ding RM6.36 bilion yang dicatat lah saiz pelaburan KWSP yang Simpanan Pekerja (KWSP) ta- satu kenyataan, baru-baru ini Katanya, keadaan itu berbeza suku tahun sama pada 2015. menjadi penyumbang utama hun ini dilihat sukar ekoran yang menyatakan KWSP men- tahun lalu dengan KWSP beru- “Walaupun pendapatan dari kepada pendapatan bagi suku pendapatan pelaburan badan catatkan pelaburan RM6.78 bil- paya meraih pulangan lebih baik pembayaran dividen adalah pertama 2016 dan kelas aset itu susut 36.21 peratus.
    [Show full text]
  • Pulih Sepenuhnya Pada 8:00 Pagi, 21 Oktober 2020 Kumpulan 2
    LAMPIRAN A SENARAI KAWASAN MENGIKUT JADUAL PELAN PEMULIHAN BEKALAN AIR DI WILAYAH PETALING, GOMBAK, KLANG/SHAH ALAM, KUALA LUMPUR, HULU SELANGOR, KUALA LANGAT DAN KUALA SELANGOR 19 OKTOBER 2020 WILAYAH : PETALING ANGGARAN PEMULIHAN KAWASAN Kumpulan 1: Kumpulan 2: Kumpulan 3: Pulih Pulih Pulih BIL. KAWASAN sepenuhnya sepenuhnya sepenuhnya pada pada pada 8:00 pagi, 8:00 pagi, 8:00 pagi, 21 Oktober 2020 22 Oktober 2020 23 Oktober 2020 1 Aman Putri U17 / 2 Aman Suria / 3 Angkasapuri / 4 Bandar Baru Sg Buloh Fasa 3 / 5 Bandar Baru Sg. Buloh Fasa 1&2 / 6 Bandar Baru Sri Petaling / 7 Bandar Kinrara / 8 Bandar Pinggiran Subang U5 / 9 Bandar Puchong Jaya / 10 Bandar Tasek Selatan / 11 Bandar Utama / 12 Bangsar South / 13 Bukit Indah Utama / 14 Bukit Jalil / 15 Bukit Jalil Resort / 16 Bukit Lagong / 17 Bukit OUG / 18 Bukit Rahman Putra / 19 Bukit Saujana / 20 Damansara Damai (PJU10/1) / 21 Damansara Idaman / 22 Damansara Lagenda / 23 Damansara Perdana (Raflessia Residency) / 24 Denai Alam / 25 Desa Bukit Indah / 26 Desa Moccis / 27 Desa Petaling / 28 Eastin Hotel / 29 Elmina / 30 Gasing Indah / 31 Glenmarie / 32 Hentian Rehat dan Rawat PLUS (R&R) / 33 Hicom Glenmarie / LAMPIRAN A SENARAI KAWASAN MENGIKUT JADUAL PELAN PEMULIHAN BEKALAN AIR DI WILAYAH PETALING, GOMBAK, KLANG/SHAH ALAM, KUALA LUMPUR, HULU SELANGOR, KUALA LANGAT DAN KUALA SELANGOR 19 OKTOBER 2020 WILAYAH : PETALING ANGGARAN PEMULIHAN KAWASAN Kumpulan 1: Kumpulan 2: Kumpulan 3: Pulih Pulih Pulih BIL. KAWASAN sepenuhnya sepenuhnya sepenuhnya pada pada pada 8:00 pagi, 8:00 pagi, 8:00
    [Show full text]
  • Development of an Erosion Model for Langat River Basin, Malaysia, Adapting GIS and RS in RUSLE
    Applied Water Science (2020) 10:165 https://doi.org/10.1007/s13201-020-01185-4 ORIGINAL ARTICLE Development of an erosion model for Langat River Basin, Malaysia, adapting GIS and RS in RUSLE Md. Rabiul Islam1 · Wan Zurina Wan Jaafar2 · Lai Sai Hin2 · Normaniza Osman3 · Md. Razaul Karim2 Received: 4 April 2018 / Accepted: 30 March 2020 / Published online: 16 June 2020 © The Author(s) 2020 Abstract This study is aimed to predict potential soil erosion in the Langat River Basin, Malaysia by integrating Remote Sensing (RS) and Geographical Information System (GIS) with the Revised Universal Soil Loss Equation (RUSLE) model. In RUSLE model, parameters such as rainfall erosivity factor (R), soil erodibility factor (K), slope length and steepness factor (LS), vegetation cover and management factor (C) and support practice factor (P) are determined based on the input data followed by the spatial analysis process in the GIS platform. Rainfall data from 2008-2015 are collected from the 29 rain gauge stations located within the study area. From the analysis, the magnitude of RUSLE model obtained corresponding to the parameter R, K, LS, C and P factors is varied between 800 to 3000 MJ mm ha − 1 h− 1 yr− 1, 0.035–0.5 Mg h MJ− 1 mm− 1, 0–73.00, 0.075–0.77 and 0.2–1.00, respectively. Findings of this study indicates that based on the calculated RUSLE parameter values, about 95% of the Langat River Basin area have been classifed as a very low to a low erosion vulnerability. Findings of this study would greatly benefts a decision maker in proposing a suitable soil management and conservation practices for the river basin.
    [Show full text]
  • MATRIX-130510-IPO Note
    KENANGA RESEARCH IPO Note 10 May 2013 Matrix Concepts SUBSCRIBE IPO Price: RM2.20 A Greater Klang Valley play Target Price: RM2.75 Share Price Performance Matrix Concepts Holdings (Matrix) is a Seremban, Negeri Sembilan based property developer with a market capitalization of RM660m. KLCI 1766.07 It owns a remaining landbank of 2355ac or a total GDV of RM6.5b YTD KLCI chg 4.6% which provides visibility of up to 2019. Their major driver, Bandar YTD stock price chg N.A. Sri Sendayan, Seremban is a beneficiary of increasing demand for affordable homes in the Greater Klang Valley. BSS also has Major Shareholders economic growth angles given its Sendayan Tech Valley (STV) Dato’ Lee Tian Hock 28.52 % which attracts a range of FDIs in the light-to-medium industrial Datin Yong Chou Lian 16.80 % space. The stock offers attractive FY13-14E dividend yields of Ho Kong Soon 5.06 % 8.1%-9.0% based on its dividend policy of 40% payout of PAT. We peg Matrix’s Fair Value at RM2.75 based on a conservative 40% discount to our DCF-driven FD RNAV of RM4.56. IPO Proceeds RM’m Working Capital 55.0 Vast land bank in Negeri Sembilan and Johor. Matrix Concepts has Infrastructure and Common Facilities 55.0 two major township landbanks with remaining 2355ac, which amounts to a GDV of RM6.5b; Bandar Sri Sendayan (BSS) in Seremban, Negeri Sembilan Repayment of Bank Borrowings 11.0 and Taman Seri Impian in Kluang, Johor. Its major driver is BSS, which Construction of Clubhouse 10.0 makes up 82% of the landbank.
    [Show full text]
  • (Gis) Approach for Analyzing Channel Planform Change with Examples of Langat River, Malaysia
    ID:327 USE OF GEOGRAPHICAL INFORMATION SYSTEM (GIS) APPROACH FOR ANALYZING CHANNEL PLANFORM CHANGE WITH EXAMPLES OF LANGAT RIVER, MALAYSIA M.E. Toriman1; M.Mokhtar2; M.B.Gasim3; R. Elfithri2 & Nor Azlina A.B1 1School of Social, Development & Environmental Studies, FSSK, Universiti Kebangsaan Malaysia. 43600 Bangi, Selangor 2Institute of Environmental & Development (LESTARI), Universiti Kebangsaan Malaysia.43600. Bangi Selangor, Malaysia. 3School of Environmental Sciences and Natural Resources, Faculty of Sciences and Technology, Universiti Kebangsaan Malaysia, 43600 Bangi Selangor Malaysia 4Fakulti Kejuruteraan Awam, Universiti Teknologi Malaysia, 81310 Universiti Teknologi Malaysia, Skudai Johor, Malaysia This article focuses on the Langat River Channel Planform changes in medium (25 to 100 years) and short time (over last few months to 25 years) scales using Geographical Information System analysis (GIS) involving the cross section and sinuosity analyses. Three sets of topographical maps for three different years (1969, 1976 and 1993) were digitized and rectified and type of changes for the non-stable reaches were defined by superimposing the digital maps of all dates. The results indicate that, middle stream is the most unstable reach followed by upstream which has a few unstable sub-reaches while the downstream shows no changes during the study period. Type of most of the lateral changes for upland reach was meander progression and for middle stream meander progression and avulsion construct most of changes. The middle stream of the channel was identified as the most unstable reach with an average 11.81% change in its sinuosity index. Meanwhile, the upland and downstream of the channel were behaving as more stable reaches with an average 6.92% and 8.47% changes in their sinuosity, respectively.
    [Show full text]
  • Company Information
    Sri Binaraya Sdn Bhd Company Profile 1 Table of Contents About Us .................................................................................................................................. 3 Company Information .............................................................................................................. 3 Corporate Structure .................................................................................................................. 4 Board of Directors .................................................................................................................... 5 List of Management................................................................................................................ 12 Plant and Equipment Inventory .............................................................................................. 14 Key Current Projects ............................................................................................................... 16 Residential .......................................................................................................................... 16 Mixed-use ........................................................................................................................... 19 Key Completed Projects .......................................................................................................... 21 Development Project ........................................................................................................... 21 Local Projects......................................................................................................................
    [Show full text]
  • Download Brochure
    _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ Double Storey Terrace House 20’ x 65’ F R E E H O L D _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ At Greenwoods Cendana, Life At Its Very Best Begins Wake up to fresh morning air and the calming embrace of nature Embrace a modern life, luxurious with abundant space and a well-planned environment. Enjoy priceless moments together, in a place surrounded by lush greenery Be at ease in a distinctive neighbourhood with a great community This is life at GREENWOODS CENDANA, where one can enjoy good living. A Distinctive Modern Lifestyle Community Artist Impression A neighbourhood crafted with wholesome and healthy spaces, distinctive modern homes and an environment that nurtures wholesome living and togetherness. A place to enjoy some of the simple joys in life, Greenwoods Cendana is ideal for multi- generational living and cherished family moments. Each corner unit comes with its own garden which can be converted into your own private sanctuary. Masterplan 4 TNB Jalan Salak Perdana 2 Persiaran Salak Perdana 1 Perdana Salak Persiaran N Persiaran Salak Perdana 1 Greenwoods Belian 5 Greenwoods Keranji 2 10 Future Development 14 Hill Park 2 Community Pocket Farm and 6 Greenwoods Cendana 11 Mosque - Jogging Track, Biking Trail, Discovery Playground Recreational Park, 7 Primary School 12 Multipurpose Hall Hiking Trail, 3 96 Residences Observation Deck 8 Secondary School 13 Recreational Pond and Amphitheatre 4 Greenwoods Keranji 9 Rumah Selangorku Jogging Track Amphitheatre Recreational Park Community Retail Hub Artist Impression A Central Park to Balance Green, Games and Gatherings.
    [Show full text]
  • Sendayan Techvalley
    BANDAR SRI SENDAYAN a first-class township where home is for you and your loved ones. Located within the Greater Klang Valley Conurbation in Seremban on 5,233 acres of freehold land, Bandar Sri Sendayan is planned and designed with one thing in mind; comfortable living & business friendly. A premier integrated development made complete with ample facilities and amenities, BANDAR SRI SENDAYAN is without a doubt a sanctuary of tranquil tropical living, wholesome values and most importantly, a sense of community. Families find it an oasis of fulfillment; businesses see it as a world of promising opportunities. Being Part of the Greater Klang Valley Conurbation, along the west coast of Peninsular Malaysia, where it is merely a 20-minute drive to THE MASTER PLAN OF BANDAR SRI SENDAYAN Kuala Lumpur International Airport (KLIA) and a 35-minute journey to Kuala Lumpur (KL). Located within very close proximity to existing and progressing town centres such as Cyberjaya and Putrajaya, the North-South and the proposed Senawang-KLIA Expressways offer from smoother and faster alternatives to major destinations. KUALA LUMPUR / PUTRAJAYA New Seremban Toll ( Approved New Alignment ) DESTINATION 1 KUALA LUMPUR 70 KM MALACCA 75 KM KLIA 22 KM GEORGETOWN, PENANG 369 KM PUTRAJAYA / CYBERJAYA 60 KM ISKANDAR M’SIA, JOHOR 261 KM PORT KLANG 95 KM WOODLANDS, SINGAPORE 270 KM PORT DICKSON 20 KM 21km 22km 23km SEREMBAN North South Hig 2 from NILAI KPJ LANG VALLEY Specialist Hospital hway UALA LUMPUR Seremban Toll CONURBATION & BANDAR SRI SENDAYAN Taman S2 Heights
    [Show full text]
  • Prinsip Toleransi, Kesederhanaan Dan Keharmonian
    www.selangorkini.my Media_Selangor selangortv.my MediaSelangor PERCUMA 20 - 27 Oktober 2017, 29 Muharam - 7 Safar 1439 Kekal destinasi utama pelabur PERPADUAN 10 Dasar bantu rakyat KUNCI miliki rumah KEHARMONIAN 15 Misi pendidikan Prinsip toleransi, kesederhanaan serantau dan keharmonian disegarkan dan ditegaskan semula Raja-Raja Melayu terus menjadi tiang seri Kerajaan Selangor Dato’ Seri Mohamed Azmin Ali Dato’ Menteri Besar 20 BERITA PENUH MUKA 3 Informasi MUAT TURUN Terkini PERCUMA Utama di jari anda APLIKASI 2 SelangorKini 20 - 27 Oktober 2017 Vanakkam, En Iniya Deepavali Nal Vaalthukkal aya bagi pihak Kerajaan Negeri si unsur kejahatan. Kebaikan itu digam- hidupan kepada mereka yang kurang berkenaan sedang melatih 160 anak ingin mengucapkan Selamat barkan menerusi cahaya mengalahkan bernasib baik supaya tiada anggota ma- muda India Selangor dan bakal dikem- Hari Deepavali kepada semua kejahatan yang dikaitkan dengan ke- syarakat terpinggir di Negeri Selangor. bangkan kepada 240 peserta India rakyat Selangor yang beragama gelapan. Bagi mencapai hasrat itu, pada Be- negeri ini. HinduS dan Sikh. Sejajar dengan semangat perayaan lanjawan Negeri 2017, Kerajaan Negeri Usaha murni memperkasa kaum In- Sesungguhnya, sambutan Deepavali ini, adalah menjadi harapan agar sinar tekad mengangkat martabat masyara- dia sedang meniti kejayaan dan saya adalah peluang terbaik untuk berkum- cahaya muncul daripada kegelapan dan kat India Selangor dengan Program menyeru semua pihak untuk bersama pul bersama keluarga dan sahabat yang mengubah negara yang tercinta ini. Pe- Pembinaan Upaya Usahawan India Se- Kerajaan Negeri, menggandakan usa- pasti memberikan kenangan manis. Ke- rubahan melahirkan semangat meng- langor menerusi peruntukkan seba- ha melahirkan rakyat Selangor yang nangan manis itulah semangat penting hadapi cabaran dengan keyakinan dan nyak RM1 juta.
    [Show full text]
  • Flood Risk Pattern Recognition by Using Environmetric Technique- a Case
    Jurnal Full Paper Teknologi FLOOD RISK PATTERN RECOGNITION BY USING Article history Received ENVIRONMETRIC TECHNIQUE: A CASE STUDY IN 25 February 2015 Received in revised form LANGAT RIVER BASIN 24 March 2015 Accepted Ahmad Shakir Mohd Saudia, Hafizan Juahirb*, Azman Azida, 1 October 2015 Mohd Ekhwan Torimana,c, Mohd Khairul Amri Kamarudina, Madihah Mohd Saudia,Ahmad Dasuki Mustafaa, Mohammad *Corresponding author Azizi Amrana [email protected] aEast Coast Environmental Research Institute, Universiti Sultan Zainal Abidin, Gong Badak Campus, 21300,Kuala Terengganu, Terengganu, Malaysia bFaculty Science and Technology, University Science Islam Malaysia, 71800, Nilai, Negeri Sembilan, Malaysia cSchool of Social, Development and Environmental Studies, Faculty of Social Sciences and Humanities, National University of Malaysia, 43600 Bangi, Selangor, Malaysia Graphical abstract Abstract This study looks into the downscaling of statistical model to produce and predict hydrological modelling in the study area based on secondary data derived from the Department of Drainage and Irrigation (DID) since 1982-2012. The combination of chemometric method and time series analysis in this study showed that the monsoon season and rainfall did not affect the water level, but the suspended solid, stream flow and water level that revealed high correlation in correlation test with p-value < 0.0001, which affected the water level. The Factor analysis for the variables of the stream flow, suspended solid and water level showed strong factor pattern with coefficient more than 0.7, and 0.987, 1.000 and 1.000, respectively. Based on the Statistical Process Control (SPC), the Upper Control Limit for water level, suspended solid and stream flow were 21.110 m3/s, 4624.553 tonnes/day, and 8.224 m/s, while the Lower Control Limit were 20.711 m, 2538.92 tonnes/day and 2.040 m/s.
    [Show full text]