Last Updated: 3 January 2019 Railway-Related Facilities Under Settlement

Total Page:16

File Type:pdf, Size:1020Kb

Last Updated: 3 January 2019 Railway-Related Facilities Under Settlement Last updated: 3 January 2019 Railway-related Facilities under Settlement Monitoring within Railway Protection Areas The MTR Corporation will upload latest information when there are changes in the railway-related facilities under settlement monitoring, updates in the settlement limit for suspension or when the latest settlement level exceeds the limit for suspension. Total number of facilities currently under settlement monitoring: 50 Number of facilities where settlement monitoring has ceased because of the completion of relevant works: 19 Number of newly-added facilities under settlement monitoring (additional facilities since last announcement on 6 August 2018): 5 (Code: 65 – 69) Number of facilities under settlement monitoring with relevant works currently suspended: 3 Settlement Latest Project Responsible Nearby MTR Limit for Code Project Project Type Settlement Nature Party Station/Railway Facilities Suspension # Level (mm) (mm) Kwun Tong Line Universal access facilities at Between Kowloon Bay Public Highways 1 footbridge, elevated walkway Civil works and Ngau Tau Kok 20 +5 works Department and subway stations Architectural Building Public 2 East Kowloon Cultural Centre Services Kowloon Bay Station 20 +4 project works Department Kowloon Bay Station Barrier-free access facilities at Public Highways Relevant works have 3 Civil works 20 -3 highway structure works Department been completed thus settlement monitoring has ceased Settlement Latest Project Responsible Nearby MTR Limit for Code Project Project Type Settlement Nature Party Station/Railway Facilities Suspension # Level (mm) (mm) Civil Engineering Public 4 Tseung Kwan O – Lam Tin Tunnel Civil works and Development Near Lam Tin Station 20 +3 works Department Barrier-free access facilities at Public Highways 5 Civil works Kowloon Bay Station 20 -3 highway structure works Department Private Ho Man Tin Station Package 1 Building 6 project (Note 1) Ho Man Tin Station 20 -3 property development project works Private Property development project at Building 7 project (Note 1) Near Choi Hung Station 20 -2 No.35 Clear Water Bay Road project works Tsuen Wan Line Tsim Sha Tsui Station Private Tsim Sha Tsui Carnarvon Road Building 8 project (Note 1) Relevant works have 20 -1 Subway project been completed thus works settlement monitoring has ceased Private Property development project Building Between Kwai Hing and 9 project (Note 1) 20 +6 on Kin Chuen Street, Kwai Chung project Tai Wo Hau stations works Redevelopment project at No. Private Building Between Mong Kok and 10 742 – 744 Nathan Road, Mong project (Note 1) 20 +2 project Prince Edward stations Kok works Lift and connecting footbridge Public Highways 11 Civil works Tsuen Wan Depot 20 -2 on Sai Lau Kok Road, Tsuen Wan works Department Island Line Property development project Building Private Fortress Hill Station 12 project (Note 1) 20 -2 on Oil Street project works Settlement Latest Project Responsible Nearby MTR Limit for Code Project Project Type Settlement Nature Party Station/Railway Facilities Suspension # Level (mm) (mm) Relevant works have been completed thus settlement monitoring has ceased Near North Point Station Private Property development project Building Relevant works have 13 project (Note 1) 20 -8 on Java Road project been completed thus works settlement monitoring has ceased Private Redevelopment project at No. Building 14 project (Note 1) Near HKU Station 20 -4 450 – 456G Queen’s Road West project works Private Redevelopment project at No. 1 Building 15 project (Note 1) Sai Ying Pun Station 20 0 – 19 Chung Ching Street project works Between Sai Ying Pun and Sheung Wan stations Private Redevelopment project at No.48 Building 16 project (Note 1) Relevant works have 20 -2 – 51 Connaught Road West project works been completed thus settlement monitoring has ceased Private Redevelopment project at No. 87 Building Between Sheung Wan 17 project (Note 1) 20 -4 – 89 Des Voeux Road West project and Sai Ying Pun stations works Private Redevelopment project at No.2 Building Between Central and 18 project (Note 1) 20 -1 Murray Road project Admiralty stations works Private Redevelopment project at No.2 Building Between Central and 19 project (Note 1) 20 0 Murray Road project Admiralty stations works Settlement Latest Project Responsible Nearby MTR Limit for Code Project Project Type Settlement Nature Party Station/Railway Facilities Suspension # Level (mm) (mm) North Point Station Private Redevelopment project at No.1A Building Relevant works have 20 project (Note 1) 20 -6 – 1P Marble Road project been completed thus works settlement monitoring has ceased South Island Line Private Property development project Building Ventilation building near 21 project (Note 1) 20 0 on Lee Nam Road, Ap Lei Chau project Lee Wing Street works Private Wong Chuk Hang Station Building 66 project (Note 1) Wong Chuk Hang Depot 20 -3 Package 1 property development project works Private Wong Chuk Hang Station Building 67 project (Note 1) Wong Chuk Hang Depot 20 0 Package 2 property development project works Tseung Kwan O Line Private LOHAS Park Package 7 property Building Near Tseung Kwan O 22 project (Note 1) 20 +2 development project Depot works Private LOHAS Park Package 9 property Building Near Tseung Kwan O 23 project (Note 1) 20 -2 development project Depot works Private LOHAS Park Package 10 property Building Near Tseung Kwan O 24 project (Note 1) 20 +2 development project Depot works Settlement Latest Project Responsible Nearby MTR Limit for Code Project Project Type Settlement Nature Party Station/Railway Facilities Suspension # Level (mm) (mm) Tung Chung Line, Airport Express and Disneyland Resort Line Section in Kwai Chung Park Environmental Environmental protection works Public 25 Civil works Protection 20 -10 in Kwai Chung Park works Relevant works have Department been completed thus settlement monitoring has ceased Near Kowloon Station Private West Kowloon Cultural District – Building Relevant works have 26 project (Note 1) 20 -17 M+ Project project works been completed thus settlement monitoring has ceased Between Kowloon and Hong Kong stations Private West Kowloon Cultural District – Building 27 project (Note 1) 20 -6 M+ Project project Relevant works have works been completed thus settlement monitoring has ceased Private West Kowloon Cultural District – Building 28 project (Note 1) Near Kowloon Station 20 -8 Lyric Theatre Complex project works Private Hong Kong International Airport Building Between Airport and 29 project (Note 1) 20 -11 Three-runway System project AsiaWorld-Expo stations works Civil Engineering Tung Chung New Town Public Between Siu Ho Wan and 30 Civil works and Development 20 -4 Extension works Tung Chung Station Department Settlement Latest Project Responsible Nearby MTR Limit for Code Project Project Type Settlement Nature Party Station/Railway Facilities Suspension # Level (mm) (mm) East Rail Line and Ma On Shan Line Near Mong Kok East Station Universal access facilities at Public Highways 31 footbridge, elevated walkway Civil works 15 +3 works Department Relevant works have and subway been completed thus settlement monitoring has ceased Civil Engineering Widening of footbridge of Public 32 Civil works and Development Fanling Station 15 -2 Fanling Station works Department Barrier-free access facilities at Public Highways 33 Civil works Near Fanling Station 20 -4 footbridge works Department Between Tai Wo and Fanling stations Cable laying at Liantang/Heung Public Highways 34 Yuen Wai Boundary Control Civil works 20 -3 works Department Relevant works have Point been completed thus settlement monitoring has ceased Widening of Fanling Highway – Public Highways Between Tai Wo and 35 reinstatement of Tai Wo Civil works 20 -1 works Department Fanling stations Footbridge Barrier-free access facilities at Public Highways Between Tai Wo and 36 Civil works 20 -5 footbridge works Department Fanling stations Private Lo Wu Station improvement Building 37 project (Note 1) Lo Wu Station 20 -3 works project works^ Settlement Latest Project Responsible Nearby MTR Limit for Code Project Project Type Settlement Nature Party Station/Railway Facilities Suspension # Level (mm) (mm) 38* Private Tai Wai Station property Building (Note project (Note 1) Tai Wai Station 40 -24 development project 2) works Public housing development Hong Kong Building Public 39 project at Choi Yuen Road Sites 3 Housing Sheung Shui Station 15 -1 project works and 4, Sheung Shui Authority Property development project Private Building Between Shek Mun and 40 on On Yiu Street in Shek Mun, project (Note 1) 20 0 project Tai Shui Hang stations Sha Tin works Between Tai Shui Hang and Hang On stations Subsidised housing Hong Kong Building Public 41 development project on Hang Housing 15 -1 project works Relevant works have Kin Street, Ma On Shan Authority been completed thus settlement monitoring has ceased West Rail Line East Tsim Sha Tsui Station Redevelopment project at No. 18 Private Building 42 – 24 Salisbury Road, Tsim Sha project (Note 1) Relevant works have 20 +2 project Tsui works been completed thus settlement monitoring has ceased Between East Tsim Sha Tsui and Austin stations Private Redevelopment project at No. 12 Building 43 project (Note 1) 20 +1 Salisbury Road, Tsim Sha Tsui project Relevant works have works been completed thus settlement monitoring has ceased Settlement Latest Project Responsible Nearby MTR Limit for Code Project Project Type Settlement Nature Party Station/Railway Facilities Suspension # Level (mm) (mm) Between
Recommended publications
  • Proposed Road Improvement Works in West Kowloon Reclamation Development Phase I
    Proposed Road Improvement Works in West Kowloon Reclamation Development Phase I Project Profile (Report No. 276799/11.01/B) August 2011 Highways Department, HKSAR Government Proposed Road Improvement Works in West Kowloon276799 ReclamationTNI Development BRI 096/03 B P:\Hong Kong\ENL\PROJECTS\276799(BRI) West Kowloon Road Phase I Impr\reports\PP\Project Profile RevA doc 01 December 2009 Schemes H, I, J, Q (Interim Option) and Improvement Works at the Junction of Canton Road/ Ferry Street/ Jordan Road Project Profile August 2011 Highways Department 6/F., Homantin Government Offices, 88 Chung Hau Street, Homantin, Kowloon Mott MacDonald, 20/F, Two Landmark East, 100 How Ming Street, Kwun Tong, Kowloon, Hong Kong T +852 2828 5757 F +852 2827 1823 W www.mottmac.com.hk Phase I Project Profile Issue and revision record Revision Date Originator Checker Approver Description A June 2011 Various Eric Ching H. T. Cheng First Issue B August 2011 Various Eric Ching H. T. Cheng Second Issue This document is issued for the party which commissioned it We accept no responsibility for the consequences of this and for specific purposes connected with the above-captioned document being relied upon by any other party, or being used project only. It should not be relied upon by any other party or for any other purpose, or containing any error or omission used for any other purpose. which is due to an error or omission in data supplied to us by other parties This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it.
    [Show full text]
  • LC Paper No. CB(1)608/20-21(03) for Discussion on 1 March 2021
    LC Paper No. CB(1)608/20-21(03) For discussion on 1 March 2021 Legislative Council Panel on Development and Panel on Home Affairs Joint Subcommittee to Monitor the Implementation of the West Kowloon Cultural District Project Improvement of Connectivity of West Kowloon Cultural District with its neighbouring district and Implementation of the Infrastructure Works for the West Kowloon Cultural District, Phase 1 Fourth Construction Package PURPOSE This paper updates Members on the implementation progress of projects that would improve connectivity of the West Kowloon Cultural District (WKCD or the District) with its neighbouring districts, and seeks Members’ support for the funding proposal to deliver the Public Infrastructure Works (PIW), Phase 1 Fourth Construction Package for the WKCD, details of which are at Annex A. BACKGROUND 2. Integration and connectivity are the two key planning design principles that guided the formulation of the Development Plan for WKCD. Pursuant to the Foster + Partners design concept, traffic and related servicing facilities within WKCD are located below ground in the Integrated Basement (IB), thus allowing the District above ground to be developed in an organic and flexible way. At present, the public can visit WKCD via a series of footbridge and subway systems from the eastern and western sides of the District as well as Museum Drive. In the not-too-distant future, when further pedestrian and road linkages to WKCD are opened, WKCD can be accessed via multiple ways, covering road, rail and water transport conveniently and without hassle. The guiding principle is that WKCD should be connected to the lives of people beyond the District, complement the neighbouring old and cultural areas, and become part of a larger network of green spaces connecting the southern tip of the Kowloon Peninsula, with the potential for the waterfront promenade to be extended to Yau Ma Tei in the north and Tsim Sha Tsui in the south.
    [Show full text]
  • Designated 7-11 Convenience Stores
    Store # Area Region in Eng Address in Eng 0001 HK Happy Valley G/F., Winner House,15 Wong Nei Chung Road, Happy Valley, HK 0009 HK Quarry Bay Shop 12-13, G/F., Blk C, Model Housing Est., 774 King's Road, HK 0028 KLN Mongkok G/F., Comfort Court, 19 Playing Field Rd., Kln 0036 KLN Jordan Shop A, G/F, TAL Building, 45-53 Austin Road, Kln 0077 KLN Kowloon City Shop A-D, G/F., Leung Ling House, 96 Nga Tsin Wai Rd, Kowloon City, Kln 0084 HK Wan Chai G6, G/F, Harbour Centre, 25 Harbour Rd., Wanchai, HK 0085 HK Sheung Wan G/F., Blk B, Hiller Comm Bldg., 89-91 Wing Lok St., HK 0094 HK Causeway Bay Shop 3, G/F, Professional Bldg., 19-23 Tung Lo Wan Road, HK 0102 KLN Jordan G/F, 11 Nanking Street, Kln 0119 KLN Jordan G/F, 48-50 Bowring Street, Kln 0132 KLN Mongkok Shop 16, G/F., 60-104 Soy Street, Concord Bldg., Kln 0150 HK Sheung Wan G01 Shun Tak Centre, 200 Connaught Rd C, HK-Macau Ferry Terminal, HK 0151 HK Wan Chai Shop 2, 20 Luard Road, Wanchai, HK 0153 HK Sheung Wan G/F., 88 High Street, HK 0226 KLN Jordan Shop A, G/F, Cheung King Mansion, 144 Austin Road, Kln 0253 KLN Tsim Sha Tsui East Shop 1, Lower G/F, Hilton Tower, 96 Granville Road, Tsimshatsui East, Kln 0273 HK Central G/F, 89 Caine Road, HK 0281 HK Wan Chai Shop A, G/F, 151 Lockhart Road, Wanchai, HK 0308 KLN Tsim Sha Tsui Shop 1 & 2, G/F, Hart Avenue Plaza, 5-9A Hart Avenue, TST, Kln 0323 HK Wan Chai Portion of shop A, B & C, G/F Sun Tao Bldg, 12-18 Morrison Hill Rd, HK 0325 HK Causeway Bay Shop C, G/F Pak Shing Bldg, 168-174 Tung Lo Wan Rd, Causeway Bay, HK 0327 KLN Tsim Sha Tsui Shop 7, G/F Star House, 3 Salisbury Road, TST, Kln 0328 HK Wan Chai Shop C, G/F, Siu Fung Building, 9-17 Tin Lok Lane, Wanchai, HK 0339 KLN Kowloon Bay G/F, Shop No.205-207, Phase II Amoy Plaza, 77 Ngau Tau Kok Road, Kln 0351 KLN Kwun Tong Shop 22, 23 & 23A, G/F, Laguna Plaza, Cha Kwo Ling Rd., Kwun Tong, Kln.
    [Show full text]
  • Minutes of 995 Meeting of the Town
    Minutes of 995th Meeting of the Town Planning Board held on 28.10.2011 Present Permanent Secretary for Development Chairman (Planning and Lands) Mr. Thomas Chow Mr. K.Y. Leung Mr. Walter K.L. Chan Mr. B.W. Chan Ms. Maggie M.K. Chan Mr. Raymond Y.M. Chan Mr. Rock C.N. Chen Mr. Y.K. Cheng Professor Eddie C.M. Hui Ms. Anna S.Y. Kwong Professor Paul K.S. Lam Dr. James C.W. Lau Ms. Julia M.K. Lau Mr. Maurice W.M. Lee Mr. Laurence L.J. Li Mr. Roger K.H. Luk - 2 - Mr. Timothy K.W. Ma Ms. Anita W.T. Ma Professor S.C. Wong Dr. W.K. Yau Principal Assistant Secretary (Transport) Transport and Housing Bureau Miss Elsa Cheuk Deputy Director of Environmental Protection Mr. Benny Wong Assistant Director (2), Home Affairs Department Mr. Frankie Chou Director of Lands Miss Annie Tam Director of Planning Mr. Jimmy Leung Deputy Director of Planning/District Secretary Miss Ophelia Wong Absent with Apologies Mr. Stanley Y.F. Wong Vice-chairman Professor Edwin H.W. Chan Mr. Felix W. Fong Professor P.P. Ho Dr. C.P. Lau Mr. Clarence W.C. Leung Dr. W.K. Lo Dr. Winnie S.M. Tang Ms. Pansy L.P. Yau Mr. Stephen M.W. Yip - 3 - In Attendance Assistant Director of Planning/Board Miss H.Y. Chu Chief Town Planner/Town Planning Board Mr. J.J. Austin Senior Town Planner/Town Planning Board Ms. Caroline T.Y. Tang - 4 - Agenda Item 1 [Open Meeting] Confirmation of Minutes of the 994th Meeting held on 14.10.2011 [The meeting was conducted in Cantonese.] 1.
    [Show full text]
  • An Construction Update of the Express Rail West Kowloon Terminus Part 1
    An construction update of the Express Rail West Kowloon Terminus Part 1 A visual record/summary prepared by Raymond Wong as part of his study of the ERL project since 2011 Presentation prepared in March 2016 Brief Introduction The 26-km long Hong Kong Section of the Guangzhou- Shenzhen-Hong Kong Express Rail Link (Express Rail Link, or XRL) runs from West Kowloon in Hong Kong to the boundary of Hong Kong and Shenzhen. The Express Rail Link will connect with the 16,000-km National High- speed Railway Network and will enhance Hong Kong's role as the southern gateway to the Mainland. Construction of the Express Rail Link commenced in January 2010, with completion targeted for 2018. The rail consists only with a Terminus located at the north of the West Kowloon Cultural District and will be linked to Austin Station and Kowloon Station by footbridges and subways. There will be no intermediate station in the Hong Kong Section before it reaches Shenzhen. Alignment of the Express Rail within Hong Kong section This presentation tries to provide an visual update of the work status for the Terminus construction including the associated works up to February 2016. Highlights of some of the features and working difficulties involved in the construction of the Terminus and its associated facilities 1. The area of the involved sites is extremely large (overall about 30 hectares). 2. Complicated phases of traffic diversion required both for vehicular and pedestrian. 3. Involving deep and large volume of excavation to accommodate the station facilities. 4. Working in close proximity to two existing mass transit system, that is, the Kowloon Southern Link and the Tung Chung/Airport Express Lines.
    [Show full text]
  • Kowloon P P P
    Branch ATM District Branch / ATM Address Voice Navigation ATM Prince Edward Branch 774 Nathan Road, Kowloon P P P Fuk Tsun Street Branch 32-40 Fuk Tsun Street, Tai Kok Tsui, Kowloon P P P P 4-4A Humphrey's Avenue, Tsim Sha Tsui, Humphrey's Avenue Branch P P Kowloon Mong Kok (Silvercorp Int'l Tower) Shop B, 707-713 Nathan Road, Mong Kok, P P P P Branch Kowloon 1/F, Sino Cheer Plaza, 23-29 Jordan Road, Jordan Road Branch P P Kowloon Mong Kok Branch 589 Nathan Road, Mong Kok, Kowloon P P Prince Edward Road West (Mong Kok) 116-118 Prince Edward Road West, Mong P P Branch Kok, Kowloon 24-28 Carnarvon Road, Tsim Sha Tsui, Tsim Sha Tsui Branch P P Kowloon Shanghai Street (Prince Edward) 689-693 Shanghai Street, Mong Kok, Kowloon P P Branch 73-77 Tai Kok Tsui Road, Tai Kok Tsui, Tai Kok Tsui Branch P P P P Kowloon Shop 19-20, 2/F, China Hong Kong City, 33 China Hong Kong City Branch P P Canton Road, Tsim Sha Tsui , Kowloon Mong Kok Road Branch 50-52 Mong Kok Road, Mong Kok, Kowloon P P P Shop 133, 1/F, Olympian City 2, 18 Hoi Ting Olympian City Branch P P Road, Kowloon Apartments A-B on G/F & 1/F, Holly Mansion, Kimberley Road Branch P P P P 37 Kimberley Road, Tsim Sha Tsui, Kowloon. Shop 1003-1004, 1/F, Elements, 1 Austin Road Elements Branch P P P West, Kowloon Mong Kok (President Commercial 608 Nathan Road, Mong Kok, Kowloon P P P Centre) Branch Yau Ma Tei Branch 471 Nathan Road, Yau Ma Tei, Kowloon P P P Shop 3,LG/F,Hilton Towers,96 Granville Tsim Sha Tsui East Branch P P Road,Tsim Sha Tsui East, Kowloon Cameron Road Wealth Management 30
    [Show full text]
  • LCQ15-Annex2 (2010)
    Annex 2 Record of Train Service Delays of 8 Minutes or More from 01/01/2010 to 31/12/2010 Incident Railway Line Delay Incident Time Cause of Incidents / Findings of Investigation Remedial Action Taken Date Affected (min.) 3-Jan-10 8:25 PM Light Rail A Light Rail Vehicle (LRV) was withdrawn from service after it was hit by a New Territories taxi at the No injuries were reported. Light Rail service resumed at 8:59 p.m. after the site was cleared. 35 junction between Tai Fong Street and Tai Hing Bus Terminus egress. The left-hand-side of the LRV car body was damaged. 4-Jan-10 6:30 PM Light Rail A LRV was withdrawn from service after a pair of doors failed to close after platform duties at Tin Shui Investigation found a faulty door component which was immediately replaced. 12 Wai Stop. The concerned LRV was pushed away from the site. 8-Jan-10 7:32 AM Tsuen Wan Line A Central-bound train was withdrawn from service at Tsuen Wan Station because the left-hand-side Investigation found a coin was jammed in the doors. It was immediately removed. 8 driving cab door failed to close after platform duties. 8-Jan-10 8:42 AM Tung Chung Line A Tung Chung- bound train was delayed at Tsing Yi Station because a points failed to detect its position. Investigation found faulty components of points equipment which were immediately replaced. 20 The train had to work in Restricted Manual Mode at a speed not more than 22 kph to pass the affected area.
    [Show full text]
  • Minutes of the Third Meeting of Yuen Long District Council in 2018 Date
    The minutes were confirmed on 4 September 2018 without amendment. Minutes of the Third Meeting of Yuen Long District Council in 2018 Date : 26 June 2018 (Tuesday) Time : 9:30 a.m. – 6:30 p.m. Venue : Conference Room, Yuen Long District Council, 13/F., Yuen Long Government Offices, 2 Kiu Lok Square, Yuen Long Present Time of Arrival Time of Withdrawal Chairman: Mr SHUM Ho-kit (Beginning of the meeting) (End of the meeting) Vice-chairman: Mr WONG Wai-shun, MH (Beginning of the meeting) (End of the meeting) Members: Mr CHAM Ka-hung, Daniel, (Beginning of the meeting) (End of the meeting) BBS, MH, JP Ms CHAN Mei-lin (Beginning of the meeting) (4:50 p.m.) Mr CHEUNG Muk-lam (Beginning of the meeting) (3:30 p.m.) Mr CHING Chan-ming (Beginning of the meeting) (End of the meeting) Ms CHIU Sau-han, MH (Beginning of the meeting) (End of the meeting) Mr CHOW Wing-kan (Beginning of the meeting) (End of the meeting) Mr KWOK Hing-ping (Beginning of the meeting) (2:55 p.m.) Mr KWOK Keung, MH (Beginning of the meeting) (End of the meeting) The Hon KWONG Chun-yu (Beginning of the meeting) (End of the meeting) Mr LAI Wai-hung (Beginning of the meeting) (11:15 a.m.) Ms LAU Kwai-yung (Beginning of the meeting) (End of the meeting) Mr LEE Yuet-man, MH (Beginning of the meeting) (End of the meeting) The Hon LEUNG Che-cheung, (Beginning of the meeting) (12:15 p.m.) SBS, MH, JP Mr LEUNG Fuk-yuen (Beginning of the meeting) (End of the meeting) Mr LEUNG Ming-kin (Beginning of the meeting) (End of the meeting) Mr LUI Kin, MH (9:45 a.m.) (6:10 p.m.) The Hon LUK Chung-hung
    [Show full text]
  • Our Network Hong Kong Operating Network with Future Extensions
    OUR NETWORK HONG KONG OPERATING NETWORK WITH FUTURE EXTENSIONS Shenzhen Lo Wu Intercity Through Train Route Map Beijing hau i C Lok Ma Shanghai Sheung Shu g Beijing Line Guangzhou Fanlin Shanghai Line Kwu Tung Guangdong Line n HONG KONG SAR Dongguan San Ti Tai Wo Long Yuen Long t Ping 48 41 47 Ngau a am Tam i Sh i K Mei a On Shan a Tai Po Marke 36 K Sheungd 33 M u u ui Wa W Roa Au Tau Tin Sh 49 Heng On y ui Hung Shui Ki g ng 50 New Territories Tai Sh Universit Han Siu Ho 30 39 n n 27 35 Shek Mu 29 Tuen Mu cecourse* e South Ra o Tan Area 16 F 31 City On Tuen Mun n 28 a n u Sha Ti Sh n Ti 38 Wai Tsuen Wan West 45 Tsuen05 Wa Tai Wo Ha Che Kung 40 Temple Kwai Hing 07 i 37 Tai Wa Hin Keng 06 l Kwai Fong o n 18 Mei Fo k n g Yi Diamond Hil Kowloon Choi Wa Tsin Tong n i King Wong 25 Shun Ti La Lai Chi Ko Lok Fu d Tai Si Choi Cheung Sha Wan Hung Sau Mau Ping ylan n ay e Sham Shui Po ei Kowloon ak u AsiaWorld-Expo B 46 ShekM T oo Po Tat y Disn Resort m Po Lam Na Kip Kai k 24 Kowl y Sunn eong g Hang Ha Prince n Ba Ch o Sungong 01 53 Airport M Mong W Edward ok ok East 20 K K Toi ong 04 To T Ho Kwa Ngau Tau Ko Cable Car n 23 Olympic Yau Mai Man Wan 44 n a Kwun Ti Ngong Ping 360 19 52 42 n Te Ti 26 Tung Chung East am O 21 L Tung Austi Yau Tong Tseung Chung on Whampo Kwan Tung o n Jordan Tiu g Kowl loo Tsima Hung 51 Ken Chung w Sh Hom Leng West Hong Kong Tsui 32 t Tsim Tsui West Ko Eas 34 22 ha Fortress10 Hill Hong r S ay LOHAS Park ition ew 09 Lantau Island ai Ying Pun Kong b S Tama xhi aus North h 17 11 n E C y o y Centre Ba Nort int 12 16 Po 02 Tai
    [Show full text]
  • 2 Hong Kong Operating Network with Future
    Shenzhen Lo Wu HONG KONG OPERATING NETWORK WITH FUTURE EXTENSIONS Intercity Through Beijing Train Route Map Lok Ma Chau Sheung Shui LEGEND EXISTING NETWORK PROJECTS IN PROGRESS POTENTIAL FUTURE EXTENSIONS Shanghai Station Airport Express Guangzhou-Shenzhen- North Island Link Kwu Tung Hong Kong Express Rail Link Fanling Beijing Line Interchange Station Disneyland Resort Line Northern Link Zhaoqing Guangzhou Proposed Station East Rail Line Kwun Tong Line Extension South Island Line (West) Shanghai Line South Island Line (East) Proposed Island Line Extension to Central South Guangdong Line Foshan Interchange Station Kwun Tong Line West Island Line Dongguan HONG KONG SAR Shenzhen Metro Light Rail Shatin to Central Link Network Ma On Shan Line * Racing days only Tseung Kwan O Line Tai Wo Tsuen Wan Line Yuen Long Long Tung Chung Line Ping 44 West Rail Line 40 47 33 Kam Tai Po Market PROPERTIES OWNED / PROPERTY DEVELOPMENTS UNDER Sheung 48 Road DEVELOPED / MANAGED BY CONSTRUCTION / PLANNING 49 THE CORPORATION 34 LOHAS Park Package 2C-10 Tin Shui Wai Ma On Shan 36 50 01 Telford Gardens / Telford Plaza I and II 38 Che Kung Temple Station Wu Kai Sha 02 World-wide House 39 Tai Wai Station New Territories Heng On 03 Admiralty Centre 40 Tin Shui Wai Light Rail University 04 Argyle Centre 41 Austin Station Site C Siu Hong Tai Shui 05 Luk Yeung Sun Chuen / Luk Yeung 42 Austin Station Site D Hang Galleria 52 Wong Chuk Hang Station 06 New Kwai Fong Gardens 53 Ho Man Tin Station 27 07 Sun Kwai Hing Gardens 35 29 Tuen Mun Racecourse* 08 Fairmont House 30
    [Show full text]
  • Minutes of the Fourth Meeting of Yuen Long District Council in 2018 Date
    The minutes were confirmed on 30 October 2018 without amendment. Minutes of the Fourth Meeting of Yuen Long District Council in 2018 Date : 4 September 2018 (Tuesday) Time : 9:30 a.m. – 2:25 p.m. Venue : Conference Room, Yuen Long District Council, 13/F., Yuen Long Government Offices, 2 Kiu Lok Square, Yuen Long Present Time of Arrival Time of Withdrawal Chairman: Mr SHUM Ho-kit, JP (Beginning of the meeting) (End of the meeting) Vice-chairman: Mr WONG Wai-shun, MH (Beginning of the meeting) (End of the meeting) Members: Mr CHAM Ka-hung, Daniel, (Beginning of the meeting) (End of the meeting) BBS, MH, JP Ms CHAN Mei-lin (Beginning of the meeting) (End of the meeting) Mr CHAN Sze-ching (Beginning of the meeting) (End of the meeting) Mr CHING Chan-ming (Beginning of the meeting) (End of the meeting) Ms CHIU Sau-han, MH (Beginning of the meeting) (End of the meeting) Mr CHOW Wing-kan (Beginning of the meeting) (1:30 p.m.) Mr KWOK Hing-ping (Beginning of the meeting) (End of the meeting) Mr KWOK Keung, MH (Beginning of the meeting) (End of the meeting) The Hon KWONG Chun-yu (9:35 a.m.) (10:30 a.m.) Ms LAU Kwai-yung (Beginning of the meeting) (End of the meeting) Mr LEE Yuet-man, MH (Beginning of the meeting) (End of the meeting) Mr LEUNG Fuk-yuen (Beginning of the meeting) (End of the meeting) Mr LEUNG Ming-kin (Beginning of the meeting) (End of the meeting) The Hon LUK Chung-hung, JP (Beginning of the meeting) (12:30 p.m.) Ms MA Shuk-yin (Beginning of the meeting) (End of the meeting) Mr MAK Ip-sing (Beginning of the meeting) (1:55 p.m.)
    [Show full text]
  • Proposed Development Plan 擬議發展圖則
    Proposed Development Plan 擬議發展圖則 圖例 建築物高度管制區界線 NOTATION BUILDING HEIGHT CONTROL ZONE BOUNDARY ZONES 地帶 OPEN SPACE O 休憩用地 OTHER SPECIFIED USES OU 其他指定用途 25 MISCELLANEOUS 其他 新油麻地避風塘 50 NEW YAU MA TEI TYPHOON SHELTER 區(A) 70 BOUNDARY OF DEVELOPMENT 發展範圍界線 ZONE(A) 區(C) BUILDING HEIGHT CONTROL 建築物高度管制區界線 ZONE BOUNDARY ZONE(C) 佐敦道 MAXIMUM BUILDING HEIGHT 最高建築物高度 (IN METERS ABOVE PRINCIPAL DATUM) 100 (主水平基準上若干米) 100 區(B) JORDAN ROAD ZONE(B) 40 30 WEST KOWLOON HIGHWAY 廣東道 連翔道 土地用途及面積一覽表 SCHEDULE OF USES AND AREAS 大約面積及百分率 匯翔道 APPROXIMATE AREA & % WUI CHEUNG ROAD 用途 USES 公頃 % 百分率 西九龍公路 HECTARES OPEN SPACE 16.13 39.26 休憩用地 LIN CHEUNG ROAD CHEUNG LIN OTHER SPECIFIED USES 24.96 60.74 其他指定用途 CANTON ROAD 西區海底隧道輪候繳費廣場 AUSTIN ROAD WEST WESTERN HARBOUR CROSSING 柯士甸道西 TOLL PLAZA 25 TOTAL DEVELOPMENT AREA 41.09 100.00 發展區總面積 電力支站 藝術、文化、娛樂 ELECTRICITY 藝術、文化、娛樂 SUB-STATION 混合用途(2) 及商業用途(1) 混合用途(4) 及商業用途(6) ARTS, CULTURAL, ENTERTAINMENT MIXED USES (2) MIXED USES (4) ARTS, CULTURAL, ENTERTAINMENT AND COMMERCIAL (1) OU 混合用途(5) AND COMMERCIAL (6) 藝術、文化、娛樂及商業用途(4) 夾附的 註釋 屬這份圖則的一部分 MIXED USES (5) 混合用途(3) ARTS, CULTURAL, ENTERTAINMENT AND COMMERCIAL (4) OU OU MIXED USES (3) OU THE ATTACHED NOTES ALSO FORM PART OF THIS PLAN 藝術、文化、娛樂 OU 及商業用途(2) OU ARTS, CULTURAL, ENTERTAINMENT AND COMMERCIAL (2) OU OU OU O(2) 混合用途(10) 混合用途(9) 混合用途(6) MIXED USES (10) MIXED USES (9) 藝術、文化、娛樂 及商業用途(5) MIXED USES (6) ARTS, CULTURAL, ENTERTAINMENT OU Area (c) 混合用途(7) AND COMMERCIAL (5) OU MIXED USES (7) OU Area (b) OU OU Area (a) OU 藝術、文化、娛樂 OU 混合用途(1) 及商業用途(2) OU MIXED USES (1) ARTS, CULTURAL, ENTERTAINMENT AND COMMERCIAL (2) OU OU OU 藝術、文化、娛樂及商業用途(3) ARTS, CULTURAL, ENTERTAINMENT AND COMMERCIAL (3) 混合用途(8) MIXED USES (8) 西區海底隧道通風大樓 WESTERN HARBOUR CROSSING VENTILATION BUILDING O(1) 尖沙咀 40 TSIM SHA TSUI OU 30 “After taken into account the opinions gathered from the public engagement exercise as well as other OU technical and material considerations, further changes to this draft Development Plan might be required before submission to the Town Planning Board.
    [Show full text]