City Corporation

Tiruchirappalli Corporation Draft Smart City Proposal Smart City Consultants

In association with Tiruchirappalli – City Profile › Parameters Description City Tiruchirapalli District Tiruchirapalli Total area (sq km) 167.23 10°48'38"N 78°40'52"E Geographic Location Elevation : 85 m above MSL Population (2011 Census) 916,857 Administrative Status City Corporation Climate Tropical Climate Temperature in ( Celsius Max. Min. Winter 31.3c 20.6c Summer 37.1c 26.4c Annual Precipitation 835 mm DEMOGRAPHIC INDICATOR Major economic activities : Trade & 9.16 Lakh (2011) – 1.27% of Population commerce, tourism related activities and total population of TN industrial activities Decadal Growth Rate Industries: BHEL, OFT, HAPP, Golden 22.86 % (2001-2011) Rock Railway Workshop, three industrial of Population City Economy estates (SIDCO), one industrial complex Population Density 5,482 people/ Sq Km (2011) (SIPCOT) and other industries include cotton and textile, milling, tanning, Literacy Level 83.6% (2011) Sex Ratio (Females cement, tobacco etc 1025 (2011) for 1000 males) Smart City Approach ›

Citizen Disseminate Engagement Decide Detail

Online Engagement Direct Engagement

MyGov – Discussion, Poll, Competition Citizen Consultation – General Public, Women (Suggestions and Essays) SHG, Disabled people and Senior Citizens

Social Media -, LinkedIn, Facebook, Seminars and Conferences : Department of Civil Supplies Twitter, EMail, Whatsup, Mass SMS and Consumer Protection Council, Indian Institute of Architects, NGOs, CII, Sastra University . etc

Citizen’s Perspective 1. Issues of the City Offline Suggestion and Polling Booths at important 2. Need of the City locations Summary of Consultation ›

Decide Detail Disseminate

Stake Holder Consultation – MyGov - Social Media - Seminar and Conferences – Competitions - Suggestion and Polling Booths – Mass SMS – Mass Emails

Area Preference Pan City Solutions Retrofitting Online • , Rockfort – 55% • Physical Infrastructure – 33% Rockfort, Suggestions • NSB Road, Puthur – 20% • Urban Mobility and Public Thillainagar, • Urayur, Ammamandabam– 20% Transportation– 32% • Other Areas – 05% • Waste Reduction – 15% • Other Sectors – 20% Urayur, Area Preference Pan City Solutions Ammamandapam Direct . Urban Mobility and Public Pan City Solutions Engagement . Gandhi Market – 45% . Thillai Nagar, Rockfort – 30% Transportation– 40% Urban Mobility and . Waste Reduction – 25% Public • Urayur, Ammamandabam 15% . Physical Infrastructure – 25% . Other Areas – 10% . Other Sectors – 10% Transportation

4 Print Media Exposure›

Keeping people updated about all levels of Smart City proposal preparation Vision › TIRUCHIRAPPALLI ப ொலிவொன 鏂ய நகர믍 “Transforming Tiruchirappalli, the heart of the state’s transportation network into ‘Transportation Hub of ’ with state-of-art infrastructure, enhanced inter and intra city connectivity and excellent quality of life with clean, green, safe and pedestrian friendly environment, taking inspiration from its cultural and historic heritage to create a strong economy based on Tourism, education and industries”” Vision › Smart Transit Hub

City to Commute with Comfort - BRTS Digitized City - E Bus stops Disabled Friendly City Clean & Green City – Green ways

Regional Heart of Transit Network - Integrated Bus Stand Enhanced Last Mile Connectivity – Smart Non Motorised Transport - Pedestrian with Sky Walk from Railway Junction to Bus stand Feeder System Friendly Roads with Cycle Tracks Vision › Putting People First

IT Connectivity – WIFI Hot Spots at Digital Signages Safety & Secure City - 24X7 CCTV Surveillance at all Public Places all Bus Stops & Public Places

Healthy city – Health monitoring Apps especially for Pregnant ladies, Tele medicine, 2 wheeler Ambulance Employment Opportunity for Economically Weaker Section Education - E Library at Public Places Area Based Development – Retrofitting

Rockfort Gandhi Market Cauvery Thillai Nagar Puthur

NSB Road Uraiyur Amma Mandapam Rockfort

Parks (existing) Thillai Nagar Water bodies (existing)

Gandhi Market Train Station (existing) Tennur

Bus Station (existing) Puthur

Area Based Development

Issues in Rockfort Area Issues in Thillai Nagar Solutions

1. Public Space 2. Wide Side Walks 3. Limited Vehicular Access 4. No On Street Parking 5. MLCP 6. Sustainable Public Transport Large Crowds, Hawkers, Loading Parking Issues, Increased Traffic  BRTS  Smart Bus Feeder System  Emergency and Loading Vehicle Use  Smart Card Access 7. Smart Use of FSI

Vehicle and Pedestrian Conflicts Lack of Open Space Gandhi Market - Wholesale Market to Organised Retail

Issues Solutions Future

1. Wholesale market to be relocated to outside of central city

2. Organised Retail Destination for residents and as Tourist Attraction (8 acres) Traffic Jams, Congestion  Public Plazas  Parking  (s)eating areas above food stalls  Smart Sustainable Building  Architectural Icon

No room for expansion Area Based Development - Rock Fort Smart Tourism To retrofit, operate and maintain Rockforts main Public Spaces as Tourist and Visitor Attractions with Events and Facilities around Themes of “Heritage, Culture, Art & Food” with Open Air Exhibitions, Dance, Music, Events, Markets, Open Air Cinema, Street Artists, Street Art etc

Temple Tank Area Green Park Area Rock fort Ibrahim Park Area Based Development – Cauvery Riverfront Promenade • Promenade Development North side Cauvery Riverfront • Largest pedestrian only public space in Trichy | Safe and Accessible for all with Smart Features • Offering the best views across Cauvery River and the Rockfort Temple Mount • Integrated with famous Amma Mandapam Bathing Ghats

Promenade – Ghats - Boats Trees and Soft Landscaping Pavilions – Events – F&B Area Based Development – Retrofitting

Public Realm Retrofitting Cauvery

Thoroughfares: Wide sidewalk Uraiyur Neighborhood Streets: Extra Wide Sidewalks Limited Vehicular Access Rockfort Pedestrian Only Zone Thillai Nagar Parks (existing) Waterbodies (existing) Gandhi Market Tennur Multi Storey Car Parks (planned) Puthur

Train Station (existing)

Bus Station (existing)

Area Based Development – Retrofitting

Sustainable Public Transportation Network Cauvery

Uraiyur

Rockfort BRTS (planned)

Smart Bus Feeder Thillai Nagar

Bus Stop

Walking Radius Bus Stop Gandhi Market – 400 mtr Tennur Puthur Bus Station (existing)

Train Station (existing) Area Based Development – Retrofitting

Mitigate Congestion and Protect Heritage: Cauvery Smart Use of FSI • Building Density / Heights depending on Road Widths • Heritage Zone around Rockfort Temple Uraiyur Mountain with lower FSI Rockfort

Thillai Nagar

Gandhi Market Higher FSI Tennur Puthur Prevailing FSI

Area Based Development – Retrofitting (Water Supply) Water Supply 2015 2045 Water Supply Existing Proposed Reservoir Capacity 16.15 ML Design Population 172160 190000 Total Demand (MLD) 23.24 25.65 No Reservoir 7 Hours of Supply 2-3 24 PROPOSED SYSTEM Per capita Supply (LPCD) 135 135 Road Network 123.4 KM Water Network 92.54 KM 123.40 KM Pipe Materials PVC 19.33 KM HDPE 10.73 KM 113 KM CI 39.40 KM

Pressure & water AC 23.08 KM Service Reservoir Quality Monitoring House Service Connections 70% 100% Features / Savings Bulk Flow Meter instruments • 24 x 7 water supply, increased service level, improved system Metered Connections 2% 100% efficiency , Reduced UFW to 10% Smart Features – Note: UFW reduction is a continuous process of identifying and plugging of leaks. In the DMA Zone 12 SCADA SYSTEM process the deteriorated pipes may have to be replaced as per requirements to achieve this UFW. GPRS enabled payment collection

Pressure and Flow Monitoring 24 AMR meters 20584 Bulk Flow Meters 12 Online Billing/ Volumetric Billing Area Based Development: Retrofitting (Sewerage System)

2015 2045 Component Existing Proposed Road Network 123.4 KM Design Population- 172,160 190,000 Total Sewerage Generation (MLD) 18.90 20.90 Sewerage Network 98.7 KM 30 KM STONEWARE 95.4 KM

PROPOSED SYSTEM PVC 3.3 KM EXISTING SYSTEM Zone 1 SPS Block 1 Collection efficiency of Sewerage 25% 100% Network SPS Block 1 Zone 2 Adequacy of STP 69% 100% SPS Block 4 Extent of Reuse & Recycling of sewerage - 100% SPS Block 4 Efficiency in redressal of customer - 95% To Existing MPS complaints Recycled Water Network - 91.7 KM Flow Level indication Sensor Sewage Pumping Station Smart Features Flow Level Indicators at Manholes - Yes Automatic operation of SPS - Yes SCADA System integration - Yes Note: Recycled water system needs to be implemented with Water Reuse for Flushing Tertiary treatment and Reuse - Yes direct pumping and DMA concept Area Based Development – Retrofitting (Storm Water Drainage)

Component Existing Proposed PROPOSED SYSTEM Road Network 123.4 KM Storm Water Network Coverage 243 KM 3 KM Incidence of Water Logging 6 Nil Outfall Location Smart Features Exiting Pond Sensors at Outfall to monitor - Yes water level Level Sensors at Strategic Locations Level sensor at strategic - Yes locations Rain water harvesting - Yes SCADA System integration - Yes Usage of Existing pond as Rain - Yes Water Harvesting structures EXISTING SYSTEM

Real time flooding locations to be displayed at all public places and important traffic junctions to avoid movement of Level Sensors traffic toward this area and the details to be flagged to central command center. Area Based Development – Retrofitting (Solid Waste Management) Component 2015 2045 Component Existing Proposed Design Population- 172160 190000 Household level coverage 100% 100% Total Solid Waste 109.50 120.00 Efficiency in collection of Solid 90% 100% Generation (TPD) Waste Note: 40T waste generated from Gandhi Market and balance 70T from Extent of Segregation of MSW - 100% residential areas. Extent of MSW Recovered - Yes Present per capita generation rate is about 421g which is much higher than CPHEEO standard for Tier 2 Cities (270g) Scientific disposal of MSW 30% Yes Efficiency in Redressal of Customer - Yes Complaints Smart Features Door to Door Collection Partly 100% Source Segregation - Yes 3 Bin Collection System - Yes Automatic Compactor Truck - Yes EXISTING SYSTEM PROPOSED SYSTEM Treatment Plant- Bio Methanation / Partly Yes Composting Aryamangalam Landfill site Provision of collection Provision of collection Provision of Sensor Bins - Yes Bins ( Manual Bins) Bins ( sensor Bins) Area Based Development – Retrofitting (Energy Supply & Efficiency) Power Supply – Area Based Development Entity Existing Status Proposed Smart Features Power generation possible through roof top solar PV system is 19.5MW, cost of installation to be borne by individual households

Power demand for area Energy -State government subsidy of based development is conversation Rs.20,000/- per kWp only for 105.43MW individual applicant with 1 kWp Solar panel and Net plant for residential purpose metering System Microgrid system at Substations -30% MNRE subsidy limited to 30% of MNRE bench mark cost or project cost, whichever is less Power SCADA system is there only Micro-grid management system at managemen till primary distribution primary distribution substations – 3 t voltage (33/11kV) only nos. Main Roads street lighting is still with sodium vapour Replace existing sodium vapour lamps and MH lamps - 7718 Street lamps with smart LED lighting sodium vapour lamps, 319 Lighting system – Bimonthly Savings of metal halide lamps, 198 FTL 212,616 units and INR 8.5 Lakhs Dedicated UG cable Power generation from lamps. corridor solid waste and Sewage Area Based Development – Retrofitting (Energy Supply & Efficiency) Power Supply – Area Based Development Entity Existing Status Proposed Smart Features Most of the electrical Conversion of entire electrical distribution is through Overhead network to underground Overhead Overhead lines and overhead cables and conversion length is lines line length is 299.30kM and 299.30 kM and dedicated UG no dedicated UG cable burred cable corridor with RFID corridor tagging along ROW of roads Waste to Introduction of biomass based Solar panel and Net Energy Not there power generation from municipal metering System Microgrid system at generation Solid waste Substations

Dedicated UG cable Power generation from corridor solid waste and Sewage Area Based Development - Retrofitting (IT Connectivity) ICT – Area Based Development Entity Status Smart Features City Command Integrated operation cum City Not present centre Command centre – 1no. Utility 24 x 7 Quality monitoring of Not there Monitoring Utilities •Intelligent Video Surveillance for real time monitoring Web based and mobile •GIS Integration of all Utilities, Integrated Operation apps for integrated •Citizen safety and security Smart City centre citizen service Not there systems Infrastructure •Web based and mobile apps based filling of Property Tax/ utility bills, Public grievance re- dressal system Wi-fi access at Install Wi-Fi zones and secure Intelligent Traffic Not there Digital Display and Signal system with Public Places data connectivity at Public places Signage boards, Wi-Fi at video surveillance All communication Conversion of all overhead cables are Overhead communication lines to public places Overhead lines and approximate underground and approximate length is 60kM proposed length is 60kM Improve the average Response/down response/down time of internet time of internet More than 3 hrs and telephonic lines by effective Passenger Information and telephonic System at Bus Stop & coordination with municipal GPS based Public Vehicle lines in Bus authorities Pan City Solution – BRTS and E Bus Stops› Components  Fast Travel  Improved Connectivity  Safe and secure travel  Citizens Comfort  Air Quality Present System at Bharathidasan Salai Existing  Inclusive  Technology

After Implementation of BRTS Proposed Pan City Solution – BRTS Alignment› ROUTE 1- to Central Bus Stand ROUTE 2 CBS – KK NAGAR

Airport BUS STATIONS : 6 (7.00 km)

Total BRTS Length: 24 km

Airport BRT LENGTH : 17.00 Km BRT TERMINAL : 3, BRT STATIONS : 30