World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document PROCUREMENT PLAN (Textual Part) Project information: Mali – Reconstruction and Economic Recovery Projet / P-144442 Project Implementation agency: Ministry of Economy and Finance Public Disclosure Authorized Date of the Procurement Plan: February 1, 2018 Period covered by this Procurement Plan: Up to November 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan Public Disclosure Authorized for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. Public Disclosure Authorized Public Disclosure Authorized PROCUREMENT Mali : Mali Reconstruction and Economic Recovery PLAN General Information Country: Mali Bank’s Approval Date of the Original Procurement Plan: 2018-02-23 Revised Plan Date(s): (comma delineated, leave blank if none)2020-02-03 Project ID: P144442 GPN Date: Project Name: Mali Reconstruction and Economic Recovery Loan / Credit No: IDA / H9010, IDA / D3730 Executing Agency(ies): Reconstruction and Economic Recovery WORKS Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Loan / Credit Market Procurement Prequalificatio Process Prequalification Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Signed Contract Contract Completion No. Approach Process n (Y/N) Status Evaluation Report as Issued / Opening / Minutes Recommendation for (US$) (US$) Documents Justification / Invitation Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CW-REF 29 / Realisation de 10 puits modernes (à grand diamètre) : Component 1: Amasrakad, Echel, Rehabilitation of local Demande de Single Stage - En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Open - National 240,000.00 0.00 Tintibaliten, Tamaimara, public infrastructure prix One Envelope d'exécution 20 14 13 Tin Ichmal, Doreye (2), (US$50 million equivalent) N’Tillit (3) dans la commune de N’Tillit CW-REF 30 / Réalisation de 14 forages dont 11 Component 1: Positifs et l’équipement de Rehabilitation of local Demande de Single Stage - En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Open - National 215,000.00 0.00 08 Forages en PMH dans public infrastructure prix One Envelope d'exécution 20 14 13 les Communes de Fatoma, (US$50 million equivalent) Socoura et Kona CW-REF 31 / Soufflage, Essai de Pompage, Réalisation de Component 1: Superstructure et Rehabilitation of local Demande de Single Stage - En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Open - National 110,000.00 0.00 Fourniture et Pose de public infrastructure prix One Envelope d'exécution 15 09 08 PMH de 17 anciens (US$50 million equivalent) forages dans les communes de Fatoma et Konna CW-REF 32 / Réalisation de 03 Puits Moderne dans Component 1: les villages de Koko, Rehabilitation of local Demande de Single Stage - En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Open - National 72,000.00 0.00 Grangomé et Timé dans public infrastructure prix One Envelope d'exécution 20 14 13 la commune de Konna (US$50 million equivalent) cercle de Mopti CW-REF 33 / Réalisation de quatorze (14) PMH dans les commune de Diafarabé Diaka de Component 1: Diondiori de Kareri, de Rehabilitation of local Demande de Single Stage - En attente 2017-12- 2018-02- 2018-08- Ouro Ardo 01 à Toko et IDA / H9010 A posteriori Open - National 354,000.00 0.00 public infrastructure prix One Envelope d'exécution 15 09 08 01 de Ouro Guiré de (US$50 million equivalent) deux (02) SHVA dont 01 à Barkédaga 01 à Koubi ,réhabilitation de l'AES de Dia cercle de Ténenkou CW-REF 34 / Réalisation (10) PMH à Soni Kaguidiourou Toguéré Coumbé Tanda Component 1: Kamaka Sebe Tomora Rehabilitation of local Demande de Single Stage - En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Open - National 690,000.00 0.00 Ouroguya Gueledie public infrastructure prix One Envelope d'exécution 15 09 08 Oualo et Sareamboubou (US$50 million equivalent) deux (02) SHVA Kona- Mali et Saremare de deux (02) AES Oualo et Sossobé CW-REF 35 / Réalisation de 17 PMH à Dogo à Yéré à Sarbéré à Baré Fétodjé Gandétama Component 1: Sarédin Karan à Rehabilitation of local Demande de Single Stage - En attente 2017-12- 2018-02- 2018-08- Diamkoko Kormou Bia IDA / H9010 A posteriori Open - National 309,000.00 0.00 public infrastructure prix One Envelope d'exécution 15 09 08 Owa Diou et Doukou (US$50 million equivalent) N'Garwoye Bougoudji et réhabilitation de l'AES de Guidio saré Youwarou - Région de Mopti CW-REF 36 / Réalisation (12) PMH Kerbé kouna Herao Lanadjer Toulet tob Kouroudourou Toromobiama Toulal Component 1: Toulal Sokodema Wario Rehabilitation of local Demande de Single Stage - En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Open - National 222,000.00 0.00 Nomade Almamor public infrastructure prix One Envelope d'exécution 15 09 08 Toupagal sonabé touki (US$50 million equivalent) modibo galil réhab de 03 PMH N'gniri Gnara Koubita Kora cercle de Youwarou CW-REF 37 / Realisation de trois puits pastoraux dont 01 à Sourango Component 1: commune de Farimaké Rehabilitation of local Demande de Single Stage - En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Open - National 60,000.00 0.00 01 à Kossombo et 01 à public infrastructure prix One Envelope d'exécution 15 09 08 Tilkal dans la commune (US$50 million equivalent) de Dirma cercle de Youwarou région de Mopt CW-REF 38 / Réalisation de 12 forages positifs avec PMH à Sogo-Ouro, Saka Inguéri, Ongom Sarré Component 1: Pathé, Biro, Guédia Faou Rehabilitation of local Demande de Single Stage - En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Open - National 364,000.00 0.00 et Margou et à Enguem public infrastructure prix One Envelope d'exécution 15 09 08 et Aourédans la Commune (US$50 million equivalent) de Youwarou et réalisation d’un AES à Sah dans la Commune de N'Dodjiga CW-REF 43 / Equipement de 03 Nouveaux forages en SHVA dans le village de Component 1: Boubakoré commune de Rehabilitation of local Demande de Single Stage - En attente 2018-02- 2018-04- 2018-09- Fatoma 01 dans le village IDA / H9010 A posteriori Open - National 108,000.00 0.00 public infrastructure prix One Envelope d'exécution 06 03 30 de Némindé et 01 dans (US$50 million equivalent) le village de Sina commune de Socoura et la réhabilitation de 01 SHVA dans le village de Koana commune de Konna CW-REF 49 / Réalisation Component 1: d'un ouvrage de Rehabilitation of local Demande de Single Stage - En attente 2018-02- 2018-04- 2018-09- IDA / H9010 A posteriori Open - National 600,000.00 0.00 franchissement (Pont) dans public infrastructure prix One Envelope d'exécution 04 01 28 la commune de Gossi (US$50 million equivalent) CW-REF 50 / Component 1: Construction de la gare Rehabilitation of local Demande de Single Stage - En attente 2018-02- 2018-04- 2018-10- IDA / H9010 A posteriori Open - National 900,000.00 0.00 routière à Tombouctou / C public infrastructure prix One Envelope d'exécution 20 17 14 de Tombouctou. (US$50 million equivalent) CW-REF 51 / Component 1: Construction d'un CSCOM Rehabilitation of local Demande de Single Stage - En attente 2018-01- 2018-03- 2018-09- IDA / H9010 A posteriori Open - National 240,000.00 0.00 à Tondidarou dans le public infrastructure prix One Envelope d'exécution 10 07 03 cercle de Niafunké (US$50 million equivalent) Component 1: CW-REF 55 / Realisation Rehabilitation of local Demande de Single Stage - En attente 2018-03- 2018-05- 2018-11- de 7 SHVA dans le cercle IDA / H9010 A posteriori Open - National 400,000.00 0.00 public infrastructure prix One Envelope d'exécution 20 15 11 de Menaka (US$50 million equivalent) Component 1: CW-REF 56 / Installation Rehabilitation of local Demande de Single Stage - En attente 2018-03- 2018-05- 2018-11- de 300 lampadaires dans IDA / H9010 A posteriori Open - National 600,000.00 0.00 public infrastructure prix One Envelope d'exécution 20 15 11 le cercle de Menaka (US$50 million equivalent) CW-REF 60 / Extension du CSCOM de Daka Fifo du CSCOM de Teherdjé t Component 1: réalisation de rampes Rehabilitation of local Demande de Single Stage - En attente 2017-12- 2018-02- 2018-08- d’accès sur les perrons de IDA / H9010 A posteriori Open - National 88,000.00 0.00 public infrastructure prix One Envelope d'exécution 20 14 13 bâtiments des CSCOM de (US$50 million equivalent) Bellafarandi Sankoré et Kabara commune de Tombouctou Page 1 CW-REF 61 / Réalisation de 25 Forages productifs équipés de PMH dans 25 écoles et réalisation de Component 1: Quatre forages productifs Rehabilitation of local Demande de Single Stage - En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Open - National 667,000.00 0.00 équipés de pompe solaires public infrastructure prix One Envelope d'exécution 20 14 13 avec fournitures et (US$50 million equivalent) installation de château métallique de 5 m3 dans la région de Tombouctou.
Recommended publications
  • Impact De La Mise E Chance Dans La Régio
    Ministère de l’Enseignement Supérieur et de République du Mali la Recherche Scientifique ------------- ----------------------- Un Peuple – Un But – Une Foi Universités des Sciences, des Techniques et des Te chnologies de Bamako (USTTB) --------------- Thèse N°…… Faculté de Médecine et d’Odonto -Stomatologie Année Universitaire 2011/2012 TITRE : Impact de la mise en œuvre de la stratégie chance dans la région de Mopti : résultat de l’enquête 2011 Thèse présentée et soutenue publiquement le………………………/2013 Devant la Faculté de Médecine et d’Odonto -Stomatologie Par : M. Boubou TRAORE Pour obtenir le grade de Docteur en Médecine (Diplôme d’Etat) JURY : Président : Pr Tiéman COULIBALY Membre : Dr Alberd BANOU Co-directeur : Dr Mamadou DEMBELE Directeur de thèse : Pr Sanoussi BAMANI Thèse de Médecine Boubou TRAORE 1 DEDICACES A MA MERE : Fanta FANE Je suis fier de t’avoir comme maman Tu m’as appris à accepter et aimer les autres avec leurs différences L’esprit de tolérance qui est en moi est le fruit de ta culture Tu m’as donné l’amour d’une mère et la sécurité d’un père. Tu as été une mère exemplaire et éducatrice pour moi. Aujourd’hui je te remercie d’avoir fait pour moi et mes frères qui nous sommes. Chère mère, reçois, à travers ce modeste travail, l’expression de toute mon affection. Q’ALLAH le Tout Puissant te garde longtemps auprès de nous. A MON PERE : Feu Tafara TRAORE Ton soutien moral et matériel ne m’as jamais fait défaut. Tu m’as toujours laissé dans la curiosité de te connaitre. Tu m’as inculqué le sens du courage et de la persévérance dans le travail A MON ONCLE : Feu Yoro TRAORE Ton soutien et tes conseils pleins de sagesse m’ont beaucoup aidé dans ma carrière scolaire.
    [Show full text]
  • Elephant Conservation in Mali: Engaging with a Socio-Ecological
    Empowering Communities to Conserve the Mali Elephants in Times of War and Peace Dr Susan Canney, Director of the Mali Elephant Project Research Associate, University of Oxford Lake Banzena by Carlton Ward Jr How have these elephants survived? •Internationally important elephant population •12% of all West African elephants •Most northerly in Africa •Undertake the longest &most unusual migration of all elephants Save the Elephants’ GPS collar data 3 elephants 2000-2001 9 elephants 2008-2009 Zone of Intervention The elephant migration route (in brown) in relation to West Africa. The area of project intervention comprises the elephant range and extends to the Niger river (in blue) Timbuktu 100km A typical small lake (with fishing nets in the foreground) Timbuktu 100km Photograph by Carlton Ward Jr Photograph by Carlton Ward Jr Increasing human occupation and activity accelerating through 1990s and 2000s Population density by commune 1997 census data Ouinerden #### Rharous #### ###### # # ## Bambara ## # Djaptodji Maounde N'Tillit Inadiatafane ###### #### # ## # ## #### ######################### # ###### ## ### ### ###################################################################################################################################################################################### # #### ############# ## Gossi #### ################################################# # # # ####### ################# ## ######## ########### ##### ######## # # ########### ##### ### ## #####################################################################################################################################################################################################
    [Show full text]
  • FALAISES DE BANDIAGARA (Pays Dogon)»
    MINISTERE DE LA CULTURE REPUBLIQUE DU MALI *********** Un Peuple - Un But - Une Foi DIRECTION NATIONALE DU ********** PATRIMOINE CULTUREL ********** RAPPORT SUR L’ETAT DE CONSERVATION DU SITE «FALAISES DE BANDIAGARA (Pays Dogon)» Janvier 2020 RAPPORT SUR L’ETAT ACTUEL DE CONSERVATION FALAISES DE BANDIAGARA (PAYS DOGON) (MALI) (C/N 516) Introduction Le site « Falaises de Bandiagara » (Pays dogon) est inscrit sur la Liste du Patrimoine Mondial de l’UNESCO en 1989 pour ses paysages exceptionnels intégrant de belles architectures, et ses nombreuses pratiques et traditions culturelles encore vivaces. Ce Bien Mixte du Pays dogon a été inscrit au double titre des critères V et VII relatif à l’inscription des biens: V pour la valeur culturelle et VII pour la valeur naturelle. La gestion du site est assurée par une structure déconcentrée de proximité créée en 1993, relevant de la Direction Nationale du Patrimoine Culturel (DNPC) du Département de la Culture. 1. Résumé analytique du rapport Le site « Falaises de Bandiagara » (Pays dogon) est soumis à une rude épreuve occasionnée par la crise sociopolitique et sécuritaire du Mali enclenchée depuis 2012. Cette crise a pris une ampleur particulière dans la Région de Mopti et sur ledit site marqué par des tensions et des conflits armés intercommunautaires entre les Dogons et les Peuls. Un des faits marquants de la crise au Pays dogon est l’attaque du village d’Ogossagou le 23 mars 2019, un village situé à environ 15 km de Bankass, qui a causé la mort de plus de 150 personnes et endommagé, voire détruit des biens mobiliers et immobiliers.
    [Show full text]
  • MALI - Cercle De Gao: Carte De Référence (Octobre 2013)
    MALI - Cercle de Gao: Carte de référence (Octobre 2013) KIDAL (KIDAL) Frontière internationale ALGERIE Limite de région Limite de cercle MAURITANIE Dabacar Chef-lieu de région Chef-lieu de cercle Kel amassine Kel takaraghate kalawate Icharamatane Chef-lieu de commune SENEGAL Kel taborack Village NIGER Kel sidalamine foulane Ilokane BURKINA FASO samit Cercle (autre région) Ifoghas GUINEE Kel bandaf 2 Cercle Gao Ibokalitane inouly Imrad divers MENAKA Forgeron Kel tafoulante Kel bandaf 1 Imilicha Ikefoutane COMMUNE Kel Imagrane talmen Inarwarene aboubakrine Ichadenharene Ikarbaganene Igawelene ANCHAWADI Kel Ighanagassane 1 tondibi GABERO Imagrane tikli Cheriffen haoussa BOUREM GAO Kel tanderbatene GOUNZOUREYE Ibohanane N'TILIT Kel ahad Imididaghane 2 SONI ALI BER Igorarene Ighanagassane 2 Imididaghane 1 TIILEMSI Kel Ikadeyane tadjalatt Cheriffen Fleuve Kel gourma TIILEMSI amdiliss Route principale Akodaka adinebangou Kareibandia Koygourou Badji Route tertiaire M'balde haoussa Kareibandia-ile Delega Goura Adineme Barissadji Meataha Aéroport international Kounsoum Barissadji Ile-goudelbaria Silwali Piste d'atterrissage Doumbaria SONI ALI BER Bagnadji Bossobon Gabame Lamboubero Hoyangaraba Djeboubero Kochakarei Kabanna DEMOGRAPHIE (2013) Baringouna AlizegameTondiagame Katia koima Seina ANCHAWADI Seyname Kel Total tanoukassane Taraykongo Berrahile Bella Ikalawatene cherifen kel doro GAO Ikayawane Chateau Kel razzaf Korogoussou Kosseye 8 472 157 8 472 157 16 806 999 Sidibe Mali Peulguelgobe Boulgoundie Bagoundie 2 Wabaria Norbene GOUNZOUREYE
    [Show full text]
  • Inventaire Des Aménagements Hydro-Agricoles Existants Et Du Potentiel Amenageable Au Pays Dogon
    INVENTAIRE DES AMÉNAGEMENTS HYDRO-AGRICOLES EXISTANTS ET DU POTENTIEL AMENAGEABLE AU PAYS DOGON Rapport de mission et capitalisation d’expérienCe Financement : Projet d’Appui de l’Irrigation de Proximité (PAIP) Réalisation : cellule SIG DNGR/PASSIP avec la DRGR et les SLGR de la région de Mopti Bamako, avril 2015 Table des matières I. Introduction .................................................................................................................................... 3 II. Méthodologie appliquée ................................................................................................................ 3 III. Inventaire des AHA existants et du potentiel aménageable dans le cercle de Bandiagara .......... 4 1. Déroulement des activités dans le cercle de Bandiagara ................................................................................... 7 2. Bilan de l’inventaire du cercle de Bandiagara .................................................................................................... 9 IV. Inventaire des AHA existants et du potentiel aménageable dans les cercles de Bankass et Koro 9 1. Déroulement des activités dans les deux cercles ............................................................................................... 9 2. Bilan de l’inventaire pour le cercle de Koro et Bankass ................................................................................... 11 Gelöscht: 10 V. Inventaire des AHA existants et du potentiel aménageable dans le cercle de Douentza ............. 12 VI. Récapitulatif de l’inventaire
    [Show full text]
  • M700kv1905mlia1l-Mliadm22305
    ! ! ! ! ! RÉGION DE MOPTI - MALI ! Map No: MLIADM22305 ! ! 5°0'W 4°0'W ! ! 3°0'W 2°0'W 1°0'W Kondi ! 7 Kirchamba L a c F a t i Diré ! ! Tienkour M O P T I ! Lac Oro Haib Tonka ! ! Tombouctou Tindirma ! ! Saréyamou ! ! Daka T O M B O U C T O U Adiora Sonima L ! M A U R I T A N I E ! a Salakoira Kidal c Banikane N N ' T ' 0 a Kidal 0 ° g P ° 6 6 a 1 1 d j i ! Tombouctou 7 P Mony Gao Gao Niafunké ! P ! ! Gologo ! Boli ! Soumpi Koulikouro ! Bambara-Maoude Kayes ! Saraferé P Gossi ! ! ! ! Kayes Diou Ségou ! Koumaïra Bouramagan Kel Zangoye P d a Koulikoro Segou Ta n P c ! Dianka-Daga a ! Rouna ^ ! L ! Dianké Douguel ! Bamako ! ougoundo Leré ! Lac A ! Biro Sikasso Kormou ! Goue ! Sikasso P ! N'Gorkou N'Gouma ! ! ! Horewendou Bia !Sah ! Inadiatafane Koundjoum Simassi ! ! Zoumoultane-N'Gouma ! ! Baraou Kel Tadack M'Bentie ! Kora ! Tiel-Baro ! N'Daba ! ! Ambiri-Habe Bouta ! ! Djo!ndo ! Aoure Faou D O U E N T Z A ! ! ! ! Hanguirde ! Gathi-Loumo ! Oualo Kersani ! Tambeni ! Deri Yogoro ! Handane ! Modioko Dari ! Herao ! Korientzé ! Kanfa Beria G A O Fraction Sormon Youwarou ! Ourou! hama ! ! ! ! ! Guidio-Saré Tiecourare ! Tondibango Kadigui ! Bore-Maures ! Tanal ! Diona Boumbanke Y O U W A R O U ! ! ! ! Kiri Bilanto ! ! Nampala ! Banguita ! bo Sendegué Degue -Dé Hombori Seydou Daka ! o Gamni! d ! la Fraction Sanango a Kikara Na! ki ! ! Ga!na W ! ! Kelma c Go!ui a Te!ye Kadi!oure L ! Kerengo Diambara-Mouda ! Gorol-N! okara Bangou ! ! ! Dogo Gnimignama Sare Kouye ! Gafiti ! ! ! Boré Bossosso ! Ouro-Mamou ! Koby Tioguel ! Kobou Kamarama Da!llah Pringa!
    [Show full text]
  • Rapport Mensuel De Monitoring De Protection Mali
    RAPPORT MENSUEL DE MONITORING DE PROTECTION MALI N° 11 - NOVEMBRE 2020 1 I - Aperçu de l’environnement de sécuritaire et de protection Nombre de violations en novembre: 286 Résumé des tendances en 2020 Sur un total de 3 714 violations enregistrées entre janvier et novembre 2020, les atteintes Nombre de violations en 2020: 3,714 au droit à la propriété et les atteintes à l’intégrité physique/psychique sont les deux catégories les plus élevées chaque mois sans exception. Au deuxième trimestre de 2020, les atteintes au droit à la vie ont nettement augmenté. Le nombre de mouvements forcés de 493 501 population est directement lié au nombre d'atteintes au droit à la vie. Les atteintes à la 402 363 388 351 liberté et à la sécurité de la personne ont connu un pic pendant la période électorale du 367 286 mois d’avril à Mopti et Tombouctou, et ont majoritairement été encore plus fréquemment 332 rapportées à Mopti et Ségou en juin et juillet. La saison des pluies et des intiatives de 144 88 réconciliation entre Dogon et Peulh au plateau Dogon dans la région de Mopti ont entrainé 57 57 49 49 57 57 57 57 57 57 une réduction des violations pendant le mois d'aout et de septembre. Suite à cette accalmie, 49 les attaques de villages dans le centre du pays ont encore augmenté. Depuis le mois d'octobre, un nombre accru d'atteintes à la sécurité de la personne (surtout des enlèvements) a été observé, majoritairement à Niono, région de Ségou où les affrontements Nombre de moniteurs inter-communautaires n'ont cessé de croître.
    [Show full text]
  • R E GION S C E R C L E COMMUNES No. Total De La Population En 2015
    PLANIFICATION DES DISTRIBUTIONS PENDANT LA PERIODE DE SOUDURE - Mise à jour au 26/05/2015 - % du CH No. total de la Nb de Nb de Nb de Phases 3 à 5 Cibles CH COMMUNES population en bénéficiaires TONNAGE CSA bénéficiaires Tonnages PAM bénéficiaires Tonnages CICR MODALITES (Avril-Aout (Phases 3 à 5) 2015 (SAP) du CSA du PAM du CICR CERCLE REGIONS 2015) TOMBOUCTOU 67 032 12% 8 044 8 044 217 10 055 699,8 CSA + PAM ALAFIA 15 844 12% 1 901 1 901 51 CSA BER 23 273 12% 2 793 2 793 76 6 982 387,5 CSA + CICR BOUREM-INALY 14 239 12% 1 709 1 709 46 2 438 169,7 CSA + PAM LAFIA 9 514 12% 1 142 1 142 31 1 427 99,3 CSA + PAM SALAM 26 335 12% 3 160 3 160 85 CSA TOMBOUCTOU TOMBOUCTOU TOTAL 156 237 18 748 18 749 506 13 920 969 6 982 388 DIRE 24 954 10% 2 495 2 495 67 CSA ARHAM 3 459 10% 346 346 9 1 660 92,1 CSA + CICR BINGA 6 276 10% 628 628 17 2 699 149,8 CSA + CICR BOUREM SIDI AMAR 10 497 10% 1 050 1 050 28 CSA DANGHA 15 835 10% 1 584 1 584 43 CSA GARBAKOIRA 6 934 10% 693 693 19 CSA HAIBONGO 17 494 10% 1 749 1 749 47 CSA DIRE KIRCHAMBA 5 055 10% 506 506 14 CSA KONDI 3 744 10% 374 374 10 CSA SAREYAMOU 20 794 10% 2 079 2 079 56 9 149 507,8 CSA + CICR TIENKOUR 8 009 10% 801 801 22 CSA TINDIRMA 7 948 10% 795 795 21 2 782 154,4 CSA + CICR TINGUEREGUIF 3 560 10% 356 356 10 CSA DIRE TOTAL 134 559 13 456 13 456 363 0 0 16 290 904 GOUNDAM 15 444 15% 2 317 9 002 243 3 907 271,9 CSA + PAM ALZOUNOUB 5 493 15% 824 3 202 87 CSA BINTAGOUNGOU 10 200 15% 1 530 5 946 161 4 080 226,4 CSA + CICR ADARMALANE 1 172 15% 176 683 18 469 26,0 CSA + CICR DOUEKIRE 22 203 15% 3 330
    [Show full text]
  • Relief Food Distribution in Mali
    WORLD VISION ISTEKNATIONAL WORLD VISION RELIEF ORGANIZATION END OF PROJECT REPORT 1985 DROUGHT -RELIEF FOOD DISTRIBUTION IN MALI (T.A. 688-XXX-000-5622) (T.A. 641-XXX-000-5603) (P.A. 899-950-XXX-5784) Report prepared £or The United State Agency for International Development Mali Mission and AIDjW Office of Food for Peace March 1986 TABLE 'OF CONTENTS Page no. I INTRODUCTION 11. SUMMARY OF ACHIEVEMENTS AND CONSTRAINTS 111. TRANSPORT# STORAGE, LOSS AND DAMAGE I IV. DISTRIBUTION IN- THE 7TH REGION A. Project Personnel B. Logistics C. Start Up and Inter-Agency Coordination D. Population Surveys E. Distribution ' P'.. Distribution in Gao Ville G. Menaka Feeding Centers V. DISTRIBUTION IN NIORO A. Project Personnel B. Logistics C. Population Surveys D. Distribution VI. CONCLUSIONS AND RECOMMENDATIONS VII. SUMMARY TABLES OF DISTRIBUTIONS ANNEX - ACCOUNTINGI CONTROL AND REPORTING FORMS USED BY WV. ' ANNEX I. INTRODUCTION . World Vision International is a Christian humanitarian organiza- tion with the world headquarters in Monrovia, California, and currently active in major relief activities in four African nations using US PL480 food commodities. USAID requested the . World Vision Relief Organization to assist with the international response to the Malian drought in 1985 by distributing 10,000 metric tonnes of grain under a Direct Grant from the AID ~oodfor Peace Office. World Vision was to take full responsibility for transport and management of commodities from transfer of title in Ghana, through distribution in the target areas of Nioro du Sahel (1st Region), Gao, Menaka and Ansongo (7th region), Republic of Mali. The goal ofthe project wastoprevent starvationandstem the massive migration toward urban centers in these areas which had been severely affected by 5 years of inadequate rainfall.
    [Show full text]
  • The Aid in Danger Monthly News Brief – April 2019 Page 1
    Aid in Danger Monthly News Brief April 2019 Safety, security and access incidents Insecurity affecting aid workers and aid delivery Africa This monthly digest comprises threats and Burkina Faso incidents of violence 10 April 2019: In Dagou town, Foutouri department, Komondjari affecting the delivery of province, militants presumed to be from JNIM and/or ISGS broke into aid. the home of a municipal councillor and abducted him along with an NGO worker presumed to have been at his home. The councillor’s son It is prepared by had also been abducted three days prior. Source: ACLED1 Insecurity Insight from information available in 15 April 2019 (DOA): Update: The Burkinabe Government announced open sources. that an Italian missionary, who was abducted in September 2018 in Niger, may have since been held in Burkina Faso. No further details All decisions made, on specified. Source: AFP the basis of, or with consideration to, such Cameroon information remains 19 April 2019: In Buea town, South-West region, a national staff the responsibility of member of a local NGO was kidnapped by unidentified armed their respective militants before being released a few days later. Source: UN-OCHA organisations. Central African Republic Subscribe here to 04 April 2019: In Ouham prefecture, on the road between Batangafo receive monthly reports and Bouca, an MSF staff member who worked at Batangafo Hospital on insecurity affecting was detained by an unidentified armed group before being held the delivery of aid. captive in the bush and killed. His motorcycle was also stolen by the perpetrators. Source: ACLED1, AWSD2, MSF, and UN-OCHA Visit our website to Democratic Republic of the Congo download previous Aid Throughout April 2019: In North Kivu and Ituri provinces, mistrust of in Danger Monthly first responders and widespread misinformation propagated by News Briefs.
    [Show full text]
  • Annuaire Statistique 2015 Du Secteur Développement Rural
    MINISTERE DE L’AGRICULTURE REPUBLIQUE DU MALI ----------------- Un Peuple - Un But – Une Foi SECRETARIAT GENERAL ----------------- ----------------- CELLULE DE PLANIFICATION ET DE STATISTIQUE / SECTEUR DEVELOPPEMENT RURAL Annuaire Statistique 2015 du Secteur Développement Rural Juin 2016 1 LISTE DES TABLEAUX Tableau 1 : Répartition de la population par région selon le genre en 2015 ............................................................ 10 Tableau 2 : Population agricole par région selon le genre en 2015 ........................................................................ 10 Tableau 3 : Répartition de la Population agricole selon la situation de résidence par région en 2015 .............. 10 Tableau 4 : Répartition de la population agricole par tranche d'âge et par sexe en 2015 ................................. 11 Tableau 5 : Répartition de la population agricole par tranche d'âge et par Région en 2015 ...................................... 11 Tableau 6 : Population agricole par tranche d'âge et selon la situation de résidence en 2015 ............. 12 Tableau 7 : Pluviométrie décadaire enregistrée par station et par mois en 2015 ..................................................... 15 Tableau 8 : Pluviométrie décadaire enregistrée par station et par mois en 2015 (suite) ................................... 16 Tableau 9 : Pluviométrie enregistrée par mois 2015 ........................................................................................ 17 Tableau 10 : Pluviométrie enregistrée par station en 2015 et sa comparaison à
    [Show full text]
  • COUNTRY Food Security Update
    MALI Food Security Outlook Update June 2013 Marketing conditions returning to normal in the north; decreased demand in the south KEY MESSAGES Figure 1 Current food security outcomes for June 2013 Cumulative rainfall totals for the period from May 1st through June 20th were generally normal to above- normal. Crop planting was slightly delayed by localized late June rains, particularly in structurally-deficit southern Kayes and western Koulikoro. Increased trade with normal supply areas in the south and accelerated humanitarian assistance have considerably improved staple food availability in northern markets, though import flows from Algeria are still limited. Exceptions include localized pastoral areas such as Ber (Timbuktu) and Anefif (Kidal), where persistent security problems continue to delay the recovery of market activities. Northern pastoral populations are still facing IPC Phase 3: Crisis levels of food insecurity. Source: FEWS NET Persistent weak demand in southern production markets This map shows relevant current acute food insecurity outcomes for triggered unusual price decreases between May and June, emergency decision-making. It does not necessary reflect chronic food ahead of the onset of the lean season in agropastoral insecurity. zones. The same trend is reported by rice-growing farmers in the Timbuktu region given the absence of Figure 2. Most likely estimated food security outcomes usual buyers and ongoing food assistance. for July through September 2013 The food security outlook for the southern part of the country is average to good and is starting to improve in the north with the various humanitarian programs underway, gradual economic recovery, and seasonal improvement in pastoral conditions.
    [Show full text]