Summer 2014 Campus North Projects Last update: June 16, 2014

Project List D-3 B-1 1) Adaptive Reuse of 5757 S. University Ave. D-3 18) Ratner Center - Pool Work B-1 Phase 2 and Phase 4 PM: Daniel Albo PM: Jose Lopez Schedule: 6/2/14 - 9/12/14 C-2 Schedule: Summer 2014 - Spring 2015 19) Regenstein - Basement C-2 A B C D E F C-1 2) Campus North Residence Hall C-1 PM: Denise Davis 1 East 55th Street East 55th Street PM: Eric Eichler/John Barlow Schedule: 4/11/14 - 7/25/14 Schedule: 6/16/14 - Summer 2016 D-2 Regenstein - Mech. Improvements 3) Campus and Student Life - Multiple Locations D-2 PM: C. Lee Ratner Parking Structure Athletic Max Palevsky East Masters Renovation, Schedule: TBD Center Hitchcock Masters Apt Renovation, 7 Regenstein - Chiller Motor Repair Bartlett Commons Eco Digester Installation

South Ellis Avenue 5514 Blackstone PM: Camilo Garza 2 PM: Richard Wrigley

18 South Kimbark Avenue C-1 Schedule: D-4 South Kenwood Avenue South University Avenue South Avenue Woodlawn Schedule: Summer 2014 Court Cochrane-Woods Sylvan Arms 24 Theatre Art Center 20) - Space Renovations D-4 4) Cochran Wood5533-35s - Rest rBlackstoneoom and Room 157 C-1 4 PM: Roxsand King PM: James Garcia B-3 South Dorchester Avenue Schedule: TBD Schedule: Henry Crown Smart Rockefeller Chapel - Mech. Improvement Storage Young Museum Field House 5) Crerar - Lighting Upgrades B-3 Stagg Field Alumni House PM: C. Lee Memorial PM: C. Lee Building 6 Schedule: TBD Schedule: 6/16/14 - 8/15/14

East 56th Street West Vault East 56th Street Rockefeller Chapel - Pulpit Enclosure Work Crerar - Roof Repairs Campus Max Palevsky Max Palevsky PM: Janine Wilkosz 2 Max Palevsky Commons PM: Desiree DiLucente C-1 Utility Plant High Commons (Central) Commons 27 Schedule: TBD LASR Energy (West) (East) Schedule: 6/1/14 - 9/30/14 Physics 3 Rockefeller Chapel - Multiple Projects UChicago Child AAC 6) Crown Field House - Mech. Improvements C-1 Development C-1 Temp Accelerator (1) Drive Repaving, (2) Water Main, (3) Sidewalk Replacement Center- Drexel PM: C. Lee PM: (1) Barry O'Quinn, (2) and (3) TBD Schedule: 8/9/14 - 9/16/14 17 Vault Schedule: (1) 8/18/14 - 8/27/14, (2) and (3) TBD Knapp Work Medical 7) Ellis Garage - Office Renovations C-1 Research 21) Rosenwald - Chilled Water Connection 27 PM: Angela Knoble C-4 Building Mansueto PM: Angela Knoble C-4 Knapp 15 Vault Schedule: 6/16/14 - 9/30/14 Library 19 Work Schedule: 7/1/14 - 8/31/14 Center for Bslc William Eckhardt Bartlett 27 Psi Biomedical Green House Research Center Commons Upsilon Ellis Garage - Structural ImproveC-4ments Discovery 22) Ryerson Lab- Dome Replacement and Room Waterproofing PM: Richard Wrigley 28 17 PM: Barry O'Quinn C-3 BSDLC Biopsychology Schedule: 6/17/14 - 9/30/14 Research Building 3 Divinity Schedule: Summer 2014 House 8) Electrical Upgrades C-4 17 23) Social Sciences Dean’s Suite C-3 C-3

South Maryland Avenue SSRD, Stuart, Foster, Green Hall Mitchell PM: C. Lee East 57th Street East 57th Street PM: Jim Garcia Cobb Gate Tower 5701 S. Woodlawn SouthBlackstone Avenue Kersten 1323 5700 Schedule: 7/14/14 - 8/8/14 Center for Gordon Center Hitchcock Hall Anatomy Zoology Hutchinson Quadrangle Schedule: 6/16/14 - 11/15/14 Physics 5701 Care and For Integrative Science Hall Club 29 B-2, C-2 24) Stagg Field - Lighting Repair A-1 Snell 1413-15 57th Street Discovery 9 Reynolds 5710 5707 9) Fire Alarm Device Testing / Fire Pump Testing - Multiple Locations C-4 9 Hall PM: Pete Hickling 3 10 Club Snell-Hitchcock Hall, Kersten Physics B-2, C-2 Culver Erman Biology Vault 5706-10 Blackstone Schedule: 6/17/14 - 7/1/14 Hall Center Work PM: 5720 27 25) Swift and Bond - Cloister Walkway C-4 Crerar Mandel Schedule: B-2 A-1 Hall Comer Library 5727 PM: Desiree DiLucente Searle South Kenwood Avenue 10) GCIS - Multiple Projects B-2 Center For Human Dev. Chemistry 5733 Schedule: Late June - 11/30/14 Children Hinds Building Envelope Remediation Phase II Duchossis 5 Lab Comer Geophysics Kent Student Chemistry Cold Rooms, Cheng Chin Lab, 26) Ida Noyes/Harper Center - Trash Enclosures E-4 Center Ryerson Eckhart 14 Wilder House C-4 Childrens Hall Counseling For Advanced Jones Lab Hall McGiffert Dickinson Lab Fit-out, Krishnan Lab Fit-out, PM: Richard Bumstead Hospital Service Medicine 27 Hall Hall Cummings Vault 22 Operational Improvements, Low Temp Water System, Schedule: TBD Work 1 Kovler Life Sciences Vault BlackstoneMoellerin Hallg Lab Fit-out American Work 5757 27) Vault Renovations - Multiple Locations D-2, D-3E-4, B-3 CVRL Center PMs: Tom Deal / Dan De Young School Bookstore 27 PM: C. Lee / Daniel Albo 30 Schedule: Summer 2014 30 Levi Schedule: 6/16 - 9/15/14 South Drexel Boulevard 30 Hall East 58th Street 11) Harper Library - Renovations C-4 C-4 D-2, D-3, B-3 East 58th Street 30 28) William Eckhardt Research Center B-2 PM: Denise Davis 13 PMs: John Ekholm / David Rift / Jen Fifield Mitchell Hospital Schedule: 7/13/14 - 1/31/15 Surgery Brain Re- Schedule: Completion November 2015 search Institute Parking Peck Booth School Cloisters B-2 Oriental Harper Library - North ADA Entrance Structure Pavilion MRI of 29) 5701 S. Woodlawn D-2 Cobb Walker Pick Institute Business PM: C. Lee Swift Rosenwald PM: Angela Knoble Rubloff Hall Museum Hall Wyler Children’s Hall Hall Schedule: TBD ICU Armour Belfield Hall Sunny Schedule: Completion Spring 2015 4 Hospital E-4 D-2 Billings Hospital Hospital 16 Gymnasium 12) Lab Schools Phase 2 E-4 Blake Bond Chapel 21 Beecher 12 30) 58th St. Streetscape West B-3 Franklin Hall 25 Hall Rockefeller Stein House PM: David Culcasi Middle PM: Patrick Wilson Mclean Chapel Judd Hall University School Schedule: Completion 2015 Gilman Institute Gates Stuart Green Schedule: Completion July 2014 Parking Struc- Haskell High School B-3 Smith Hall Hall Hall Kolver ture Goldblatt Hall Lab Schools - Outdoor Classroom Hospital 17 8 20 Gymnasium Not Shown on Map (Management Pavilion Goldblatt Hospital Harper Ida PM: David Culcasi Goodspeed 8 Kelly Addition Memorial Social Sci- Noyes Compressed Air Lines Replacement Mat’ls) Lying-in Hospital Hall Hall Schedule: Completion 2015 Bobs Roberts Hicks Memorial Wieboldt Library ence Hall C-3 From Woodlawn to Main Quad (Underground Work) Hall International House Hospital Hospital Classics Research Foster 13) Levi Hall - 4 North C-3 PM: Daniel Albo 11 17, 26 Blane Hall Breckenridge 12 PM: Patrick Wilson House Schedule: Summer 2014 South Cottage Grove Avenue South Cottage Grove 8 8 South University Avenue South Ellis Avenue South Avenue Woodlawn South Kimbark Avenue South Dorchester Avenue Schedule: SummSouth Blackstone Avenue er 2014 East 59th Street East 59th Street 23 East 59th Street D-3 Main Quad Water Distribution - Phase 4 14) McGiffert House - Parking Lot D-3 PM: Jim Garcia PM: Sara Matesevac Schedule: Summer 2014, Dates TBD Schedule: TBD B-2 Backfills: Legend 15) North Science Quad - Landscape B-2 Classics - ESTIMATED 8/1/14 - 9/15/14 PMs: John Ekholm / David Rift / Jen Fifield Rosenwald - ESTIMATED 7/1/14 - 9/15/14 D-4 Interior Building Exterior Interior and Exterior Schedule: Completion November 2015 PM: C. Lee Schedule: see above Project Project Project 16) Pick Hall - Facade and Roof D-4 Campus Accessibility Notice PM: Desiree DiLucente B-2, D-2, C-4, E-4 Ongoing construction projects or street repairs may temporarily limit accessibility. The Schedule: 6/1/14 - 9/30/14 University encourages you to review the status of University construction projects at the 17) Primary Steam Regulating Valve Replacement - Multiple Locations Facilities Services Campus Plan and Construction site. (http://facilities.uchicago.edu/construction/) Accelerator Building, Gates Hall, , Psi Upsilon, House Disciples Divinity House B-2, D-2, C-4, E-4 Should you have any questions, concerns, or suggestions for improving accessibility on any of the route, please contact Facilities Services at (773) 834-1414. PMs: C. Lee / Daniel Albo Schedule: 7/15/14 - 9/15/14