Anel Business Center (Istanbul, Turkey)
Total Page:16
File Type:pdf, Size:1020Kb
Anel Group 2017 Operation Areas Renewable Energy Medium and Low Voltage MEP (Mechanical Electrical Panel Production Plumbing) Operation & Maintenance Marine Electric & Recycling Electronic Systems Milestones 1986 Foundation of Anel Elektrik Darlık Dam: The First Project 1988 KAV Factory: First Industrial Facility Project 1990 Foundation of AnelSis 1991 Hürriyet Headquarters: A Passage to Business Centers with Technological Infrastructure 1998 Foundation of Operation & Maintenance Unit 1999 First International Airport Project in Turkey: Istanbul Atatürk International Airport First International Project: Russia Tverskaya Hotel Foundation of Russia Office 1986 Turkcell Maltepe Operation Center Milestones 2010 Foundation of AnelDoğa 2000 Ford Otosan Gölcük Factory: One of the Anel Elektrik’s Public Offering Biggest Automotive Factory Cyprus Solar Power Plant Foundation 2004 First Overseas International Airport 2011 Marmaray BC1: World’s Deepest Project: Cairo International Airport Submerged Tube Project 2005 Foundation of AnelMarin 2012 BP Head Office: First Project in Baku Ankara Esenboğa International Airport 2006 MİLGEM Project 2013 Abu Dhabi Midfield Terminal Project: The Star Project of Abu Dhabi 2030 Foundation of Qatar Office Projection 010 2007 Hamad International Airport: The Baku Olympic Stadium: The First Stadium Biggest Airport In Qatar Project 2009 Transition to Electromechanical Contracting 2014 Ganjlik Mall: The Biggest Mall In Baku Structure 2 2000 2015 DP World Yarımca Container Terminal Foundation of AnelEnerji Qatar Rail Redline South Underground – Metro: One Of The Most Important Transportation and Infrastructure Projects of The Gulf Area MEP (Mechanical Electrical Plumbing) Profile ▪ Specialized in electrical and mechanical contracting ▪ Provided service for more than 200 projects with 117,5 million man/hours since 1986 ▪ Diversified business experience (16 different Engineering types of projects) ▪ Effective design and site management with BIM company (Building Information Modelling) for more than 30 years Profile 4.000+ employees from 15 different nations Domestic; 3% Overseas; 97% Profile th ▪ 200 in ‘’The Top 250 2017 Q2 Revenue: International Contractors List 2017’’ of ENR (Engineering News 127.5 mn USD* Record) * The revenue belongs to Anel Elektrik Proje Taahhüt ve Ticaret Inc. th ▪ 254 largest Company in 'Fortune 500 Turkey List of 2016 th ▪ 5 company in "Contracting th Services" and 36 in the "First 500 Service Exporters" List of TIM Geographic Settlement ▪ Ongoing Projects Turkey, Qatar, United Arab Emirates (Abu Dhabi, Dubai) ▪ Completed Projects Egypt, Jordan, Bulgaria, Ukraine, Russia, Georgia, Azerbaijan, Turkey, Qatar Regions Of Focus ▪ Turkey ▪ Middle East and North Africa ▪ Qatar, United Arab Emirates, Bahrain, Kuwait, Umman, Iran, Algeria, Morocco, Egypt ▪ Africa ▪ Botswana, Ethiopia, Gabon, Ghana, South Africa, Kenya, Mauritius, Namibia, Tanzania ▪ Central Asia ▪ Russia, Azerbaijan, Kazakhstan ▪ South Asia: ▪ Sri Lanka, Vietnam, Indonesia, Philippines, Malaysia, Thailand, Myanmar ▪ Western Europe ▪ England ▪ Eastern Europe ▪ Bulgaria, Croatia, Hungary, Poland, Romania Project Types Of Focus ▪ Airports ▪ Roads ▪ Data Centers ▪ Tunnels and Railway Systems ▪ Ports ▪ Hospitals ▪ Laboratories ▪ Pharmaceutical Industries ▪ Technological Buildings ▪ Business Centers ▪ Commercial Buildings ▪ Cultural Facilities ▪ Sport Facilities ▪ Hotels ▪ Shopping Malls ▪ Industrial Buildings Occupational Health & Safety In Abu Dhabi: In Qatar: 15 million 37 million man-hours 15 37 man-hours without LTI million million without LTI (2013 April – 2016 (since 2006) December) According to the statistics; 0,66 7,46 incidents in Turkey incidents 0,66 incidents in Anel happen in every 1.000.000 man-hours work HSE and Other Awards Management Systems ▪ IS0 9001 Quality Management System ▪ ISO 14001 Environment Management System ▪ OHSAS 18001 Occupational Health & Safety Management System Revenues Revenues – $ Anel 30.06.2017 31.12.2016 31.12.2015 31.12.2014 31.12.2013 31.12.2012 31.12.2011 127.528.180 219.169.829 200.298.259 285.187.099 236.542.961 165.411.001 185.916.053 285.187.099 236.542.961 219.169.829 200.298.259 185.916.053 165.411.001 127.528.180 30.06.2017 31.12.2016 31.12.2015 31.12.2014 31.12.2013 31.12.2012 31.12.2011 * The revenue belongs to Anel Elektrik Proje Taahhüt ve Ticaret Inc. Backlog 2017 Q2 Current Backlog 565 530 mn USD 515 371 488 138 373 15 85 12 276 371 203 476 3 225 66 445 99 427 500 62 163 307 368 177 163 5 2010 2011 2012 2013 2014 2015 2016 2Q2017 2017 2018 2019 International Domestic Backlog mn USD Backlog Distribution Estimates mn USD Backlog Domestic Projects Project Client Location Total Amount Backlog İşmer İş Merkezleri İş Towers Tower 3 Renovation İstanbul 1.242.857 169.057 Yönetim ve İletişim A.Ş. Kosifler Kavacık Showroom Kosifler İnşaat İstanbul 2.921.587 784.860 Bay İnşaat İthalat ve Maslak 42 İstanbul 1.314.962 223.096 Ticaret A.Ş. Sinerji İnşaat Mimarlık Kaplankaya Aydın 4.145.384 598.782 Müşavirlik A.Ş. Oğuz Bayazıt Mühendislik Türkiye Finans Participation Bank Head Office İstanbul 2.916.279 383.002 İnşaat Sanayi Ltd. Şti. Others 2.000.789 1.090.048 TOTAL ($) 14.541.858 3.248.845 Backlog Overseas Projects Project Client Location Total Amount Backlog TAV/CCC/ArabTec Joint Abu Dhabi Midfield Terminal Building UAE 418.349.286 152.217.221 Venture Qatar Rail Redline South Underground Metro QDVC-GS E&C-Al Darwish Eng. Qatar 249.494.959 122.241.277 JV Hamad Bin Khalifa Medical City Hyundai Eng. & Const. Qatar 42.178.082 2.937.002 Al Rayyan Road Doğuş Onur JV Qatar 46.470.939 26.702.883 Midmac-CCC JV (Contractor: Sidra Medical & Research Center Qatar 12.787.541 -720.559 Qatar KENTZ WLL) FCC-Yüksel-Archirodon- Qatar Qatar Rail Redline South Elevated and At Grade Metro 67.486.150 39.242.364 Petroserv JV Hyundai Engineering and Dubai–I (Bluewaters) Teminal UAE 20.708.447 20.708.447 Construction Co. Ltd. Other Overseas Projects 6.984.546 4.409.603 TOTAL($) 864.459.950 367.738.238 GRAND TOTAL (Domestic + Overseas) 879.001.808 370.987.083 Backlog Hospitals; Business 1% Centers & Malls; 1% Airports; 57% UAE; 47 % Qatar; 52% Roads & Railway Systems & Others; 41% Turkey; 1% Backlog Breakdown by Country Backlog Breakdown by Project Type Project completion period; 2-3 years average Scope Of Works: Electrical ▪ MV Cabling ▪ MV Cubicles ▪ Power Transformers ▪ SCADA System ▪ Busduct ▪ LV Cabling ▪ LV Panel Boards ▪ Cable Containment ▪ Power Management Systems ▪ Diesel Generators ▪ Uninterruptable Power Supply (UPS) ▪ Lighting Fixtures Scope Of Works: Electrical ▪ Lighting Control Systems ▪ LV Panelboards ▪ Earthing ▪ Lightning Protection ▪ Public Address and Announcement Systems ▪ Fire Alarm Systems ▪ Master Clock Systems ▪ IT Systems ▪ CCTV Systems ▪ MATV Systems ▪ Card Access Systems ▪ Building Management System Scope Of Works: Mechanical ▪ Plumbing ▪ Domestic Cold Water ▪ Domestic Hot Water ▪ Water Treatment ▪ Sewage Water ▪ Drain Water ▪ Grey Water ▪ Storm Water ▪ Gravity System ▪ Siphonic System ▪ Heating System ▪ Individual Heating ▪ Central Heating ▪ District Heating ▪ Air Conditioning and Ventilation System Scope Of Works: Mechanical ▪ Individual Cooling (Split Units) ▪ Central Cooling ▪ All Air Systems ▪ All Water Systems ▪ Air and Water Combined Systems ▪ Variable Refrigerant Flow Systems ▪ Fire Fighting Systems ▪ Fire Suppression Systems ▪ Water Suppression Systems ▪ Gas Suppression Systems ▪ Individual Suppression Systems (FM200) ▪ Central Suppression Systems (Inert Gas) ▪ Smoke Control Systems ▪ Stair and Lift Pressurization System ▪ Building Management System ▪ Natural Gas System ▪ Superheated Water System ▪ Compressed Air System ▪ Steam System ▪ LPG System Contracting Process PLANNING & COST ENGINEERING WORKS PROCUREMENT & Design Review LOGISTICS CONTROL Time Schedule Calculations Material Take-off Labor Time Keeping BIM Modelling & Clash Resolution Purchase Orders Progress Monitoring Material Submissions Material Delivery Cost Monitoring Method Statements Storage & On Site Transport Change Management CONSTRUCTION QA/QC & HSE TESTING, COMMISSIONING Mounting MONITORING & HANDOVER Site Mobilization Factory Inspection Tests Material Inspections Installation Supervision Site Acceptance Tests Installation Inspection Resource Distribution As Built Drawings Progress Documentation Interfacing with others Operation & Main Manuals Safety Inspection & Records Protection Of The Works Project Handover Document Technological Tools Design ▪ Etap 12.5 Power System Design&Analysis ▪ Amtech Electrical Software ▪ Caneco BT-International Electrical Design Software 5.3 ▪ Siemens-Simaris Design Professional 9.0 ▪ Schneider Electric-Ecodial Advance Calculation 4.6 Int ▪ Dialux Lighting Building Calculation ▪ Carrier E20-II H.A.P-Trace 700 ▪ Pipe Stress Analyse – Ceaser II Drawing ▪ AutoCAD LT / AutoCAD-MEP / Revit / Navisworks Manage Planning: Primavera ERP: SAP Active Risk Management: ARM 7 BIM for Construction Design Construction Build Operations 3D Design 4D Scheduling 5D Estimating 6D Facility Management Architectural & Engineering Design 3D + Time Element Quantity Extraction for Cost Estimation Value Engineering Life Cycle BIM Strategies Documentation Project Phasing Simulations Modular Solutions BIM As-Builts MEP Engineering Calculations Construction Sequencing & Scheduling BIM Maintenance Plans&Tech Support Life Safety & Logistic Modelling Just in Time Equipment Delivery BIM embedded O&M Manuals Energy Analysis Detailed Simulation Installation COBie Data Populations & Extraction Clash Analysis