REHABILITATION of BRIDGES • 75 Nos. Bridges at a Cost of Rs. 6.63 Crore Had Been Rehabilitated During the Year 2010- 11. •
Total Page:16
File Type:pdf, Size:1020Kb
REHABILITATION OF BRIDGES 75 Nos. Bridges at a cost of Rs. 6.63 Crore had been rehabilitated during the year 2010- 11. 96 Nos. Bridges at a cost of Rs. 14.00 Crore had been rehabilitated during the year 2011- 12. 102 Nos. Bridges at a cost of Rs. 33.00 Crore had been rehabilitated during the year 2012-13. 16 Nos. Bridges at a cost of Rs. 6.85 Crore had been rehabilitated during the year 2013- 14. 9 Nos. Bridges at a cost of Rs. 6.21 Crore had been rehabilitated during the year 2014-15 upto October, 2015. 7 Nos. Bridges at a cost of Rs. 13.00 Crore are in progress. 2 Nos. Bridges at a cost of Rs. 2.25 Crore to be taken up. F:\Back Up Pen drive\Assembly\Assembly March 2016\Annexure Feb, 2016\Rehabilitation 3054 of Bridges\Rehabilitation 3054 October, 2015.doc REHABILITATION OF BRIDGES COMPLETED DURING THE YEAR 2010-11 Sr. No. Name of circle ODR/ Name of the Bridge Admn. App. /division MDR (Rs. in Lacs) 1. Karnal/ P.D-I ODR Special repair estimate for rehabilitation of 7.57 Karnal bridge at RD 3.02 on Indri Garhi Birbal road to Islam Nagar in Karnal Distt. 2. Karnal/ P.D-I ODR Chirao Minor 5.00 Karnal 3. Karnal/ P.D-I ODR Jundla Minor 5.00 Karnal 4. Karnal/ P.D-I ODR Indri Drain 5.00 Karnal 5. Karnal/ P.D-I ODR Jundla Minor 5.00 Karnal 6. Karnal/ P.D-I ODR Dhanaura escape 4.00 Karnal 7. Karnal/ P.D-II ODR Yamuna Bridge 3.00 Karnal 8. Karnal/ P.D-II ODR Yamuna Bridge 5.00 Karnal 9. Chandigarh / ODR H.L. Bridge over Shampur Nala in Km. 1 13.5 CD Chandigarh crossing RT road to Khatauli. 10. Chandigarh / ODR H.L. Bridge 5 spans over Shampur nalla in 18.00 CD Chandigarh Km. 5 x-ing Link Road Raipur Rani Tirlokpur Road 11. Chandigarh / ODR Special repair to culvert on L/R to village 5.00 CD Chandigarh Turon. 12. Chandigarh / ODR Special repair to H.L. Bridge over Toka Nadi 4.50 CD Chandigarh crossing L/R to village Toka. 13. Chandigarh / ODR Restoration of damage to approaches of H.L. 6.00 CD Chandigarh Bridge over Ghaggar Nadi at RD 4200 crossing L/R Khartia to Barisher in Panchkula Distt 14. Chandigarh / ODR H.L. Bridge 3 spans in Km. 5 crossing L/R 14.00 CD Chandigarh Khartia to Badi Sher. 15. Chandigarh / ODR Replacement of existing culvert in Km. 9 to 4.00 CD Chandigarh Morni Tikkar Tal road. 16. Chandigarh / ODR Rehabilitation of H.L. Bridge over NADI 20.00 CD Chandigarh Crossing at RD 3550 of Panchkula Morni Road. 17. Chandigarh / ODR H.L. Bridge over Shampur Nala in Km. 1 7.00 CD Chandigarh crossing RT road to Khatauli. 18. Chandigarh / ODR H.L. Bridge over Sukhna choe crossing 65.00 CD Chandigarh K.P.K. road. 19. Chandigarh / ODR H.L. Bridge over Kalka Nadi crossing K.P.K. 60.00 CD Chandigarh road. 20. Chandigarh / ODR 20’ span culvert over Local Nala crossing 7.00 CD Chandigarh L/R Naggal to Dolan. 21. Chandigarh / ODR H.L. Bridge over Sarsa Nadi crossing 30.00 CD Chandigarh Barotiwala Siswan road. 22. Chandigarh / ODR H.L. Bridge over Kaushalya Nadi crossing 32.00 CD Chandigarh Pinjore Mallah Road. 23. Chandigarh / ODR H.L. Bridge over Bhorian Nadi crossing 15.00 CD Chandigarh Pinjore mallah road. 24. Chandigarh / ODR H.L culvert 3 metres span on link . Bridge 10.00 CD Chandigarh over local Nadi in Km. 2 crossing link road Toran Bhawana. 25. Chandigarh / ODR Slab type road Naulta 15.00 CD Chandigarh F:\Back Up Pen drive\Assembly\Assembly March 2016\Annexure Feb, 2016\Rehabilitation 3054 of Bridges\Rehabilitation 3054 October, 2015.doc 26. Chandigarh / ODR Slab type culvert 3 metres span on link 15.00 CD Chandigarh Diwan wala to Narainuwala 27. Chandigarh/P.D- ODR H.L. Bridge having 5 span 40 fit each over 5.00 Naraingarh Laha Nadi x-ing in Km. 50 (SH-1) 28. Chandigarh/P.D- ODR H.L. Bridge having 9 span 18.75 m each over 18.00 Naraingarh Markanda river x-ing in Km. 34 (SH-1) 29. Chandigarh/P.D- ODR H.L. Bridge having 3 span 9.80 m each over 5.00 Naraingarh Bagna Nadi x-ing in Km. 6 of Raipur Naraingarh road to Laha to Mandlai. ii) 2 Nos. Directional stud on U/S side & repair of 1 No existing stud. 30. Chandigarh/P.D- ODR H.L. Bridge 5 span 18.75 m each over Roon 50.00 Naraingarh Nadi on link road from Mianpur to Toka. 31. Chandigarh/P.D- ODR Link road from NH-72 to Mukandpur. 5.00 Naraingarh 32. Chandigarh/P.D- ODR NH-73 to Kakar Majra. 8.00 Naraingarh 33. Chandigarh/P.D- ODR NH-73 to Handi Khera Balmiki Basti. 8.00 Naraingarh 34. Chandigarh/P.D- ODR Link road from NH-73 to Paterheri to 10.00 Naraingarh Panjeton. 35. Chandigarh/P.D- ODR NH-73 to village Rajauli. 12.00 Naraingarh 36. Chandigarh/P.D- ODR Ambli Mehwa Kheri Road. 15.00 Naraingarh 37. Chandigarh/P.D- ODR L/R from Sadiqpur to Horbon. 15.00 Naraingarh 38. Chandigarh/P.D- ODR Link road from NH-73 to Mehmodpur Toba 12.00 Naraingarh 39. Chandigarh/P.D- ODR NH-73 to Kalal Majri. 14.00 Naraingarh 40. Chandigarh/P.D- ODR NH-73 to Laha Majri. 8.00 Naraingarh 41. Chandigarh/P.D- ODR Link road from Rajauli road to village Tanka 6.00 Naraingarh Majra. 42. Chandigarh/P.D- ODR Link road to village Kandaiwala. 5.00 Naraingarh 43. Chandigarh/P.D- ODR Link road from Kandaiwala to Zaferpur. 5.00 Naraingarh 44. Chandigarh/P.D- ODR Link road from Nanheri to Pammuwala. 5.00 Naraingarh 45. Chandigarh/P.D- ODR Link road from Nawagoan to Nanheri 5.00 Naraingarh 46. Chandigarh/ PD ODR Construction of 3 fit dia hume pipe culvert 4.00 Yamuna Nagar on Dadupur Khadri road in Km. 1.20 and 4.40 Km. 47. Rohtak /PD-I ODR Constructing 5m span type culvert on Pilana 5.10 Rohtak Ranila road at RD 0.800 in Rohtak Distt. 48. Rohtak /PD-I ODR D.H.S. (NH-10) to Gandhra to Atail Road. 2.00 Rohtak 49. Rohtak /PD-I ODR Kharawar to Nonand Road. 2.00 Rohtak 50. Gurgaon /PD-II ODR Gurgaon-Pataudi-Rewari Road (SH-26) 3.50 Gurgaon Section Km. 12.00 to 40.15. 51. Gurgaon /PD ODR Bridge over Gaunchi main drain (RD 82500) 1.31 Palwal on Lohina to Sarai Road RD 3500 mtr. in Palwal Distt. (ODR). 52. Gurgaon /PD ODR Bridge over Gaunchi main drain 1.52 Palwal (RD1344855) on Aherwan to Sapanki Road RD 1500 mtr. in Palwal Distt. (ODR) F:\Back Up Pen drive\Assembly\Assembly March 2016\Annexure Feb, 2016\Rehabilitation 3054 of Bridges\Rehabilitation 3054 October, 2015.doc 53. Gurgaon /PD ODR Bridge over Gaunchi main drain (RD 49900) 6.56 Palwal on Gaurauta to Jalalpur Maffi Road RD 2400mtr. in Palwal Distt. (ODR). 54. Gurgaon /PD ODR Bridge over Ujjina Diversion drain X-ing 6.56 Palwal (RD 5800) in Bhiduki to Ainch Road upto Border RD 2400mtr. in Palwal Distt. (ODR). 55. Gurgaon /PD ODR Bridge over Ujjina Diversion drain X-ing 6.56 Palwal (RD 3600) on Banswan to Shek Sai Mandir Road in Palwal Distt. (ODR). 56. Gurgaon /PD ODR Bridge over Ujjina Diversion drain X-ing 6.56 Palwal (RD 2300) on Hodal to Lalpur Road upto UP Border in Palwal Distt. (ODR). 57. Gurgaon /PD ODR Bridge over Gaunchi main drain (RD 1.42 Palwal 117500)on Hodal Gehlab Road RD 3500mtr. in Palwal Distt. (ODR). 58. Kaithal/ PD ODR Pipaitha to Padarth Khera road 0.08 Narwana 59. Kaithal/ PD ODR Bailerkha to Surjakhera road 0.05 Narwana 60. Kaithal/ PD ODR Batta to Brahmniwala road RD 3.35 0.15 Narwana 61. Kaithal/ PD ODR Batta to Sajuma road RD 2.02 0.35 Narwana 62. Kaithal/ PD ODR Batta to Sajuma road RD 5.10 0.15 Narwana 63. Kaithal/ PD ODR Kalayat Sajuma road RD 2.10 0.35 Narwana 64. Kaithal/ PD ODR Kalayat Sajuma road RD 6.00 0.10 Narwana 65. Kaithal/ PD ODR Kalayat link roaf RD 2.50 0.05 Narwana 66. Kaithal/ PD ODR Dhanauri to Nandsighwala RD 2.40 0.05 Narwana 67. Kaithal/ PD ODR Kurar to Sangan RD 5.00 0.1 Narwana 68. Kaithal/ PD ODR Badowal to Kakrod via Surburah RD 3.80 0.20 Narwana 69. Kaithal/ PD ODR Danoda Sainthli road RD 1.85 0.20 Narwana 70. Rewari /PD Nuh ODR Tauru Bhogipur road. 2.00 71. Rewari /PD Nuh ODR Tauru Sarai road upto Kota Khandewala 15.00 (V.T.) 72. Rewari /PD Nuh ODR Tauru Sarai road to Bhogipur road (V.T.) 2 0.70 Span 10’ slab type culvert 73. Rewari /PD Nuh ODR Punhana-jurhera road to Jalwant via Khera 1.50 (OVT) 2 Span 10’ slab type culvert. 74. Rewari /PD Nuh ODR Punhana-Kot road to Gubrari (OVT) 2 Span 1.5 10’ slab type culvert. 75. Rewari /PD Nuh ODR Punhana Shikrawa road (V.T.) 3 span 20, 2.50 slab type. Total 663.69 Say Rs. 6.63 crore F:\Back Up Pen drive\Assembly\Assembly March 2016\Annexure Feb, 2016\Rehabilitation 3054 of Bridges\Rehabilitation 3054 October, 2015.doc REHABILITATION OF BRIDGES COMPLETED DURING THE YEAR 2011-12 Sr.