Introduction of Company Introduction of Company
Total Page:16
File Type:pdf, Size:1020Kb
Introduction of Company Contents 1 Greetings 4 Certification and Intellectual property 2 ManagementManagement Philosophy Philosophy 5 Business Field 3 Organization 6 Major Performance 7 Major Products Delivery 8 Copy of Licensing, Certification and Intellectual property 9 Location 1. Greetings Welcome to ERT Engineering Co., Ltd. Since now we are in the 21st century of Information Age with infinite competition, the self-innovation and effort to adapt to changes are absolutely required for either businesses or individuals. We, ERT Engineering Co., Ltd. are strengthening our competitiveness with increasing specialization in Rolling Stock Field. In domestic railroad industry, it is deemed urgent for each company which is specialized in each field such as civil construction, track, architecture, electric power, signaling, communication, rolling stock, driving · operating, inspection & test-facility etc. to be competitive in the global market by preparing comparative advantages in design, supervision, construction, or related installation supply field based on independent experience and technology. All of our executives and employees of ERT Engineering Co., Ltd. promise you not only that we will do our best to develop the company into the top in railroad, transportation, and 21st-century intellectual installation areas, playing an essential part in railroad and other related industries, but also that we will put you first, and grow up with you. We sincerely thank you for visiting ERT Engineering Co., Ltd. and ask for your continuous care and concerns. Thank you very much. January 1, 2014 ERT Engineering Co., Ltd. 2. Management Philosophy Chartered : December 13, 2011 Capital : 400 million Korean won (US$ 4 Mil) Address : B-501, Pangyo Innovally, CHALLENGE 621, Sampyeong-dong, Bundang-gu, Seongnam-si, Gyeonggi-do, Republic of Korea Tel/Fax : +82-31-8018-8988 / +82-31-8018-8985 E-mail : [email protected] CREATMTY LEADERSHIP PASSION An individual with a passion of “I can do it”. A creative talent who views problems in new angle CREATIVITY perspective and applies creative thinking & behavior to the actual work. Someone who never fears failure having proactive CHALLENGE attitudes and indomitable challenge s pirit s . PASSION COOPERATION An individual who can respond to rapid market LEADERSHIP changes with great drive and multiplayer leadership that can cope with hardships. COOPERATION A person with mutual cooperation spirits 3. 조직도Organization BOD President V. President Technical Advisor New Business Engineering 1 Engineering 2 Machine/ Facility Business Support R & D Sales Div. Development Div. Div. Div. Div. Div. Institute •Rolling Stocks •International •Sys. Eng. •Promotion/Plan Parts Project •Machine/Facility •Business Support •Operation Plan •R&D of TPS •Sales •E&M •Design/Analysis •Fire Fighting Fac. •Asset Managing •Design of Depot •R&D of DMS •Contract •System Eng. •Master Operation •Supervision •Financial/HR/ •Production of •Other R&D Management •Project Plan Service of M&F Accounting Maint. equipment Management •Design of Plant 4. Certification and intellectual property 4-1. Certification and licensing Certification Certified at Certified by Remarks Business Registration Oct. 05, 2012 Bundang District Tax Office R & D Center Apr. 20, 2012 Korea Industrial Technology Association Venture Business Certificate Mar. 05, 2012 Korea Technology Finance Corporation Overseas Construction Mar. 22, 2012 International Contractors Association of Korea General Industrial Machinery , The subject of engineering activities Mar. 09, 2012 Korea Engineering & Consulting Association Mechanical Equipment/Facilities General Industrial Machinery , The handbook of engineering companies Oct. 10, 2012 Korea Engineering & Consulting Association Mechanical Equipment/Facilities Research and Development Services Oct. 26, 2012 Minister of Education, Science and Technology Factory Registration May. 16 2012 Korea Industrial Complex Corp. 4-2. Intellectual properties Designation Certified at Certified by Remarks TPS 3.0 Pro (SW registration) August 1, 2012 Korea Copyright Commission Trains operation simulation S/W Measurement of conical spring displacement of the Loaded Rail Under Examination (Application Korean Intellectual Property The facilities of regular inspection for rolling Vehicle, Measuring the height of the axle box & their Measuring No.:1-1-2013-0338220-62) Office stocks Equipments Contact force measurement system of the electromagnetic Under Examination (Application Korean Intellectual Property The facilities of regular inspection for rolling contactor No.:1-1-2013-0295216-36) Office stocks 5. Business Field Design Engineering & Construction Operational Planning Design Engineering & Construction of Rail Vehicles Depots of Rail Car Fleets of Machinery & Facilities · Engineering Services & Case Study of Inspection and · Investigation and Planning of the train formation. Maintenance System for Domestic & International · Simulation of the Train Operation & Performance · Design Engineering & Construction of Machinery railroad. (TPS Simulation). and Facilities for Civil Architectures. · Planning and Layout of the In-Line & Parking track in · Planning of Train Operation as Operating · Design & Construction of HVAC System & Fire depot for Rail car fleets Timetable, and Numbers of Required Vehicles Fighting System for Railroad and Road incl. Tunnel · Consultation & Reporting on specification fleets · Investigation and consultation on Energy Utilization requirements of Rail Car for RFP or Tender. · Operating System Planning incl. Organization, and its Planning. · Operational Planning of Fleets on main line & in depot . Process, Required Personnel, Operating Cost plan. · Investigation/Consultation of Alternative energy · Design Engineering of Depot s for light rail, heavy rail, · Maintenance System planning of Wayside facilities resource and Energy Saving and its planning. monorail, maglev train s, including turnkey conditions. · O&M Operation including Train, Depot and facilities. Maintenance & Inspection System Engineering Service for Domestic Products of Facilities & Equipments Engineering & Planning and International Markets · Design and Supervision of the Light & Heavy · Introduction from International Market & Inspection & Maintenance Shop/System including Development of New Types of equipments. · Feasibility Study and Basic Planning of Train Optimization. · Planning and building of automation equipment. Operation. · Test & Commissioning Plan of Trains. · Fabrication and installation of railway maintenance · Working Planning of the Train Operation. from · Establishment of Maintenance System and equipments. Feasibility to Operation stage. Investigation of Inspection/Maintenance facilities size. · Production and commissioning of inspection & test · Basic and Working design Engineering of · Maintenance Philosophy and Maintenance process. equipments. inspection , repair and Maintenance System. · Planning and Specification of Inspection/Maintenance · Production and Delivery of facilities and Installation Work. Testing/Inspection/Repair /Maintenance quipments · Planning on Facilities maintenance and its training. and Facilities. · System Engineering incl. Interface Management and RAMSE, and Project Management for E&M and O&M. 6. Major Performance 6-1. Design Engineering Services Period Field Contractor DAEWOO Basic Design of the KTX Gwangju depot. 2009.10 ~ 2010.10 Inspection Engineering &ConstructionCo., Ltd. Basic Design Service of the turnkey bidding for Honam High Speed Railway DAEWOO 2010.03 ~ 2010.05 Inspection Depot design & construction. Engineering &ConstructionCo., Ltd Basic Design Service of the connection-line construction between Kyungbu Driving & Operating 2010.08 ~ 2010.11 SunKoo Engineering Co., Ltd. High Speed Railway and Donghae Nambu Line. planning Basic Design Service in Shinbundang Line Northern Extension Subway. 2010.11 ~ 2010.12 Inspection Yooshin Engineering Co., Ltd. Basic Planning and Feasibility Study of the Joong-ang Line (Dodam- Driving & Operating 3companies involving 2011.02 ~ 2011.12 Yeongcheon) Double Track. planning Saman Co., Ltd. Basic Design Service of the West Line(Hongseong-Songsan) Double Track in Driving & Operating Dong-Myeong Engineering 2011.03 ~ 2011.10 the Section 4 Construction. Planning Consultant & Architecture Inspection Basic Design Service of the Myeonmok Line Light Railway(LRT) in the private 2011.11 ~ 2011.11 Driving & Operating Yooshin Engineering Co., Ltd. investment project. planning Basic Design Service of the Donghae south Line (Doekha) rolling stock in the 2011.10 ~ 2012.02 Inspection SeohyunEngineering Co., Ltd. depot construction. (T/K) Basic Design Service of the Shinansan Line (Songsan) Double Track in the DAEWOO Inspection depot construction. (T/K) Engineering &ConstructionCo., Ltd. KORAIL AIRPORT RAILROAD Co., Performing service of the Airport Express Train Performance Simulation .(TPS) 2012.09 ~ 2012.10 Driving & Operating Ltd. Basic Design Service of connected railway at Incheon International Airport Driving & Operating 2012.11 ~ 2012.12 Yooshin Engineering Co., Ltd. Terminal 2 (T/K) planning Basic Design Service of the Jung-ang Line(Dodam-Yeongcheon) Double Track Driving & Operating DAEWOO 2012.10 ~ 2012.12 in the Section 2 Construction. (T/K) planning Engineering &ConstructionCo., Ltd. Basic Design Service of the Jungang Line(Dodam-Yeongcheon) Double Track Driving & Operating Halla Engineering & Construction 2012.10 ~ 2012.12 in the Section 11 Construction. planning Corp. Feasibility