Accelerated Infrastructure Development | 157 158 | SOCCSKSARGEN Regional Development Plan 2017-2022 Chapter 19 Accelerated Infrastructure Development
Total Page:16
File Type:pdf, Size:1020Kb
Chapter 19 Accelerated Infrastructure Development | 157 158 | SOCCSKSARGEN Regional Development Plan 2017-2022 Chapter 19 Accelerated Infrastructure Development Infrastructure, by definition, undergirds a country’s socioeconomic development. The more strategically distributed it is – both sectorally and spatially – the better it is for inclusive growth and sustainable development. With a growing economy, the region requires more and better selected infrastructure investments, given its landscape, expanding population and rapid urbanization. To support a higher growth trajectory and improve the quality of life in both urban and rural communities, infrastructure development will remain among the top priorities of the region over the medium term. Spending on infrastructure has to be intensified while addressing persistent issues and challenges hampering implementation, so that the so-called “Golden Age of Infrastructure” will form part of a solid foundation for reaching the country’s Long-Term Vision 2040. INTEGRATED AND EFFECTIVE TRANSPORT SYSTEM Assessment Roads and Bridges schools, hospitals, and attracted investments to the region. The region recognizes the importance of improving the transportation sector to In terms of providing an integrated support its rapid and inclusive economic transport terminal in urban centers in the growth. Prudent strategies were pursued region, Koronadal City has an ongoing and strategic projects were implemented to construction of an Integrated Transport accelerate the development of the sector’s Terminal project. Other cities have yet to safe, reliable, cost-effective, and sustainable establish one. infrastructure facilities to ensure the efficient transport of people and products. Adhering to the policy of full transparency and accountability to its people, the region engaged the general public to participate in the governance, monitoring and feedback in the implementation of infrastructure projects. The implementation of strategic road projects has enhanced the accessibility to production areas, major tourism destinations and basic service facilities like Chapter 19 Accelerated Infrastructure Development | 159 Table 54: Roads and Bridges, 2011-2016 2011 2012 2013 2014 2015 2016 INDICATORS/UNITS ACTUAL ACTUAL ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL** TARGET National roads rehabilitated/ improved 17.369 33.15 39.445 39.160 23.285 27.314 19.425 17.641 - 11.420 (km) National roads concreted/ widened 5.51 10.54 151.053 116.71 80.949 101.801 128.732 177.433 27.713 164.82 (km) National bridges constructed/ 97.256 128.37 306 60 101 168 811 638 53 66 widened/completed (lm) National bridges rehabilitated/ replaced 1.8 104.73 735 784 1,062 1,122 1,309 2,029 - 1,695 (lm) Increased percentage of *89.98 permanent bridges (CY - 92.16 - 95.75 95.75 95.19 95.19 - 99.05 along national roads (%) 2010) Foreign assisted projects (FAPs) 22.96 - - 17.190 - 11.80 - - - - implemented (km) Increased road 90.48 72.38 71.86 71.91 75.79 76.80 79.44 82.56 83.76 90.27 pavement ratio (%) Increased road density (length of national 0.07763 0.07811 0.07812 - 0.07914 0.07763 0.07913 0.07763 0.07945 0.07763 roads/ land area) Note: ** Regional Office projects only Source of data: DPWH XII Table 55: Status of Kilos Abante Programs/Projects (KAPP), As of December 2016 NO. OF PROJECTS ROAD STATISTICS (IN KILOMETERS) IMPLEMENTED (2011- TOTAL ROAD NETWORK 2015) PROJECT COST (PHPM) ON- PAVED UNPAVED LENGTH COMPLETED GOING Marbel – Makar (Makar – 58.906 0 58.906 32 3 1,300,792.50 Marbel) Road Makilala – Allah Valley Road 34.238 0 34.238 26 1 847,939.00 Matalam – M’lang – 23.633 0 23.633 14 0 400,584.00 Bagontapay Road Sen. Ninoy Aquino (SNA) – 11.432 49.965 61.397 11 8 869,706.00 Lebak – Kalamansig Road Kalamansig – Palimbang – 131.782 109.738** 22.044** 67 5 3,405,768.10 Maitum Road ** Surallah – Lake Sebu – 33.701 60.053 93.754 16 10 1,857,912.00 Maitum Road Maitum – Lake Sebu Road 11.481 11.987 23.468 5 2 630,494.00 Banisilan – Guiling – Alamada 61.175 9.531 70.706 37 3 1,638,270.00 – Libungan Road General Santos City 19.633 0 19.633 *** *** 979,520.00 Circumferential Road Cotabato City Circumferential 15.570 0 15.570 27 1 824,520.00 Road **** Note: * Status as of November 30, 2016 ** Road length statistics for the entire Awang-Upi-Lebak-Kalamansig-Palimbang-Maitum Road. The road section from Awang-Upi-Lebak-Kalamansig is already paved. *** The northern portion of the circumferential road is now open to trafiic, while the construc tion of Banawalan Bridge 2 in the western section is still on-going and targeted to be completed in CY 2017. Once, completed, the western section can now be open to traffic. **** The total cost already includes the Construction of Access Road leading to Timako Seaport with New Bridge (Miwaroy Bridge) amounting to PhP 115.63 million but the project has not yet started. Source of data: DPWH XII 160 | SOCCSKSARGEN Regional Development Plan 2017-2022 Figure 24: Kilos Abante Programs/Projects (KAPP), Roads Chapter 19 Accelerated Infrastructure Development | 161 Port development under the umbrella of SOCSKSARGEN Area Development Board was created to Seaports provide alternate amenities for regularly monitor the progress of project the transport of people and products of the implementation. region. As of December 2015, various projects were undertaken for the improvement The extension of Glan Port wharf and the of major ports in the region. The Port of widening of its causeway were completed. General Santos City, one of the leading The Construction of the Passenger modern ports in the country, is considered Terminal Building is on-going with a total the gateway of SOCCSKSARGEN Region. cost of PhP 7,780,170.58. About PhP90 It is a certified International Ship and Port Million from the Philippine Ports Authority Facility (ISPS) and it takes pride of an (PPA) corporate funds was made available ISO-compliant cargo handling operator for the implementation of Timako Port (ISO 901 and ISO 14001). Among the Development Project Phase 1. The project initiatives undertaken in response to the involves the construction of rock causeway recommendations emanating from the 1st and a Roll On – Roll Off (RoRo) ramp. Makar Port Development Summit include the repair and replacement of Fendering Cargo throughput at the General Santos and Mooring System at the Eastern Wharf Port reached 2.630 million metric tons in which was completed at an amount of 2016 lower than the 2011 figure of 2.842 PhP 26,647,225.78. The rehabilitation and metric tons. This is due the reduction of the upgrading of the Western Wharf is on-going number of vessels in 2016 at 959 compared with a total cost of PhP 102,155,082.00. The to 2011 at 1,648. Task Force on Makar Port Development Figure 25: Existing Seaport Project in Region XII, 2016 162 | SOCCSKSARGEN Regional Development Plan 2017-2022 Airport development Muslim Mindanao (ARMM). Passengers from Cotabato Province would either The General Santos City International access the services of the airports of Airport, which is classified by the Civil General Santos and Cotabato or the Davao Aviation Authority of the Philippines International Airport in Davao City. The (CAAP) as an alternate international airport, annual domestic passenger traffic at mainly serves the air transport requirements Cotabato Airport reached 243,771 in 2015 of the city and nearby provinces of South higher compared the 191,780 in 2011. Cotabato, Sultan Kudarat, and Sarangani. Annual domestic cargo traffic in million The annual domestic passengers in General kilograms was 2.178 in 2015 as against the Santos Airport posted an increasing trend 1.516 in 2011. The annual domestic flights which reached 363,527 incoming and in thousand also increased from 2.828 in 378,560 outgoing in 2015 compared to the 2011 to 3.314 in 2015. There is an ongoing 243, 512 incoming and 245,721 outgoing construction of Cargo Terminal Building in 2011. The annual domestic cargo traffic under the Cotabato (Awang) Airport in million kilograms was 7.74 incoming Improvement Project amounting to PhP and 13.67 outgoing in 2015 higher the 5.0 million. The Civil Aviation Security 2011 figure of 4.01 incoming and 7.02 Service – Office for Transportation Security outgoing. The annual domestic flights in (CAS-OTS) provided the Cotabato Airport thousands reached 6,994.6 incoming and with the state-of-the-art security screening 10,436.8 in the third quarter of 2016. On equipment composed of the following: x-ray updates on the General Santos City Airport machine, walk-through metal detector, Improvement Project, the following projects handheld metal detector and closed-circuit were completed: Expansion of passenger television. terminal building amounting to PhP 25 million; Installation of a new carousel at The development of the Central Mindanao PhP 20 million; and Expansion of vehicle Airport (known as M’lang Airport) will parking area for PhP 10 million. Projects be among the major support facilities in not yet started but already awarded to the region that will provide efficient access winning contractor are the: Rehabilitation for various agricultural commodities to and Expansion of GSC Airport Terminal domestic and international market. The Building amounting to PhP 434.292 million; Airport is projected to be an alternate and Expansion of Apron and Construction airport for Awang Airport and will also of Drainage System for PhP 54.371 million. cater to the entire province of Cotabato and Projects not yet started and funds to be nearby municipalities of Sultan Kudarat, downloaded by DOTr to CAAP-CO thru Maguindanao and South Cotabato. MOA are the following: Construction Under the Central Mindanao (M’lang) of Water Supply Facilities; Upgrading Airport Development Project, the expansion of Navigational Aids; Rehabilitation of of airport including the extension and Administration Building and Control widening of airport runway, concreting Tower; Construction of Satellite Fire Station of apron, installation of fire station and with Access Road; and, Upgrading of construction of perimeter fence was Power Plant and Rehabilitation of Airfield completed with a cost of PhP 160 million.