Quarterly Infrastructure Program (February 2020 – April 2020)
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Healthy Waterways-2015 Social Science Research Report
This may be the author’s version of a work that was submitted/accepted for publication in the following source: Johnston, Kim& Beatson, Amanda (2015) Healthy waterways - 2015 Social Science Research Report. Queensland University of Technology, Business School, Australia. This file was downloaded from: https://eprints.qut.edu.au/93606/ c Consult author(s) regarding copyright matters This work is covered by copyright. Unless the document is being made available under a Creative Commons Licence, you must assume that re-use is limited to personal use and that permission from the copyright owner must be obtained for all other uses. If the docu- ment is available under a Creative Commons License (or other specified license) then refer to the Licence for details of permitted re-use. It is a condition of access that users recog- nise and abide by the legal requirements associated with these rights. If you believe that this work infringes copyright please provide details by email to [email protected] License: Creative Commons: Attribution-Noncommercial 2.5 Notice: Please note that this document may not be the Version of Record (i.e. published version) of the work. Author manuscript versions (as Sub- mitted for peer review or as Accepted for publication after peer review) can be identified by an absence of publisher branding and/or typeset appear- ance. If there is any doubt, please refer to the published source. https://doi.org/10.5204/rep.eprints.93606 1 SOCIAL SCIENCE RESEARCH FINAL REPORT AUGUST 2015 Prepared by Dr Kim Johnston and Dr Amanda Beatson QUT Business School Queensland University of Technology doi: 10.5204/rep.eprints.93606 © The Author(s). -
Roads & Drainage Portfolio Report 17 April 2019
Roads & Drainage Portfolio Report 17 April 2019 Works in Progress & Future Works Summary for April/May The following are current/planned works Construction: • Blackbutt Drainage Improvements – Stormwater crossing Hart Street complete. Remaining pipes currently being installed, Kerb and Channel yet to commence. • Bitumen reseal programme –Resealing works have commenced. • Broad Creek Floodway – Contractors have completed the reconstruction work. • Home Street, Nanango – Adjustments to design required, construction planned for May. • Rodney Street, Proston – Kerb and Channel Replacement - Design complete, construction planned for May. Gravel Resheeting/Heavy Formation Grade Name Description Expected Expected Start Date Completion Date Shellytop Road Gravel Resheeting & Heavy Feb19 Apr19 Formation Grade Booie Road Gravel Resheeting & Heavy Mar19 Apr19 Formation Grade Dangore Mountain Road Gravel Resheeting Mar19 Apr19 Saddle Tree Creek Road Gravel Resheeting & Heavy Mar19 Apr19 Formation Grade Jacksons Road Gravel Resheeting & Heavy Apr19 Apr19 Formation Grade Haly Creek Road Shoulder Resheeting Apr19 Apr19 Maidenwell Bunya Mountains Gravel Resheeting & Heavy Apr19 Apr19 Road Formation Grade Byee Road Shoulder Resheeting Apr19 Apr19 Woltmanns Road Gravel Resheeting & Heavy Apr19 May19 Formation Grade Kingaroy Burrandowan Road Shoulder Resheeting & Apr19 May19 Heavy Formation Grade Page 1 of 9 Paines Road Gravel Resheeting / May19 May19 Clearing Deep Creek Road Gravel Resheeting & Heavy May19 May19 Formation Grade Kearneys Road Shoulder Resheeting -
Queensland Teachers' Union Submission to the Senate Inquiry
Queensland Teachers’ Union Submission to the Senate Inquiry into the Development and Implementation of National School Funding Arrangements and School Reform March 2014 2 Contents Introduction ................................................................................................... 4 Background .................................................................................................... 5 Section 1: Précis of previous submissions ...................................................... 6 A. Queensland state schools in rural and remote settings ............................. 6 B. Queensland state schools in regional centres ............................................ 9 C. Queensland state schools in metropolitan areas ..................................... 11 Section 2: National Partnerships schools on the road to success .................. 14 A. Harris Fields State School ....................................................................... 14 B. Redbank Plains State High School ........................................................... 16 C. Glenala State High School ....................................................................... 17 D. Cairns West State School ........................................................................ 18 E. Urangan Point State School .................................................................... 20 Section 3: The “Great Results Guarantee” .................................................... 21 Distribution of federal funds in Queensland: The “Great Results Guarantee” .... -
Darling Downs 79,530 Km2 Area Covered by Location1
Darling Downs 79,530 km2 Area covered by location1 5.72% Population of Queensland1 3,846 km Other state-controlled road network 687 km National Land Transport Network2 See references section (notes for map pages) for further details on footnotes. Toowoomba Office 1-5 Phillip Street | Toowoomba | Qld 4350 Locked Bag 1 | Warwick | Qld 4370 (07) 4639 0777 | [email protected] Warwick Office 306 Wood Street | Warwick | Qld 4370 Locked Bag 1 | Warwick | Qld 4370 (07) 4661 6333| [email protected] • continue pavement rehabilitation on the Gore Highway • continue planning for bikeways in Central Toowoomba Darling Downs between Toowoomba and Millmerran, jointly funded and the Warwick principal cycle network by the Australian Government and Queensland Government • commence planning to improve Toowoomba In 2020–21 we completed: Connection Road and Hursley Road intersection • continue bridge replacement on the Rocky Creek • upgrading of the Emu Creek bridge on the New England Bridge on Murphy’s Creek Road, as part of the • continue planning to identify a Toowoomba North Highway, jointly funded by the Australian Government Queensland Government’s COVID-19 economic South Transport Corridor. and Queensland Government recovery response Link for TMR Project Page: • construction of Stage 1 of the New England Highway • continue pavement strengthening and widening on https://www.tmr.qld.gov.au/Projects Cycleway between Highfields and Toowoomba CBD the New England Highway between Yarraman and Toowoomba, as part of the Queensland Government’s -
Font: Times New Roman, 12Pt
Question on Notice No. 1854 Asked on 22 November 2005 MRS PRATT asked the Premier and Treasurer (MR BEATTIE)— QUESTION: Will he provide details of all Government grants for the Nanango Electorate by category for 2003, 2004 and 2005? ANSWER: To provide information on all Government grants within the Nanango Electorate would be an onerous process drawing resources from essential services. However, I have provided the following details on grants that have been made to assist the people of your electorate under my portfolio. Funding is allocated by financial year and the data has been provided in this format. 2002-03 (Rounded to nearest thousand) Minor Facilities Program 2002 Upgrade of four tennis courts from antbed to synthetic grass surface at Kingaroy - Kingaroy And District Tennis Association Inc - $56,000. Club Development Program 2002 Wide Bay Branch come and try days - Queensland Netball Association Wide Bay Branch Inc. - $3,000; Chicks claim their cattle - South Burnett Branch - The Australian Stock Horse Society Inc. - $3,000; Cricket coaching clinics - Kumbia Cricket Association Incorporated - $3,000; Intro to soccer comp - South Burnett Soccer Association Inc. - $3,000; South Burnett rugby recruit - South Burnett Rugby Union Club Incorporated - $3,000; Nanango netball junior development camp -Nanango And District Netball Association (Inc)- $3,000; Come 'n try fun days - South Burnett Branch Little Athletics Centre Inc. - $2,000; and Cactus program - Kingaroy Touch Association Inc - $1,000. Gambling Community Benefit Fund Purchase -
Darling Downs - DD1
Priority Agricultural Areas - Darling Downs - DD1 Legend Railway Regional Plans boundary Parcel boundary C o g o Lake and dam o n R i Priority Agricultural Area ver DD4 DD7 DD1 DD5 DD8 M a r a n o a DD2 DD3 DD6 DD9 R iv e r r ive e R onn Bal 02.25 4.5 9 13.5 18 Ej Beardmore Dam kilometres B a l o n To the extent permitted by law, The Department of State Development, n e Infrastructure and Planning gives no warranty in relation to the material or R i information contained in this data (including accuracy, reliability, v e r completeness or suitability) and accepts no liability (including without limitation, liability in negligence) for any loss, damage or costs (including indirect or consequential damage) relating to any use of the material or information contained in this Data; and responsibility or liability for any loss or damage arising from its use. Priority Agricultural Areas - Darling Downs - DD2 Legend Bollon St George Railway Regional Plans boundary Parcel boundary Lake and dam Priority Agricultural Area DD4 DD7 Ba DD1 DD5 DD8 lo n n e R i v DD2 DD3 DD6 DD9 e r r e iv R n a rr Na Dirranbandi ive r lgo a R Cu r e v i R a 02.25 4.5 9 13.5 18 ar k h kilometres Bo To the extent permitted by law, The Department of State Development, Infrastructure and Planning gives no warranty in relation to the material or information contained in this data (including accuracy, reliability, Lake Bokhara completeness or suitability) and accepts no liability (including without limitation, Hebel liability in negligence) for any loss, damage or costs (including indirect or consequential damage) relating to any use of the material or information contained in this Data; and responsibility or liability for any loss or damage New South Wales arising from its use. -
DIVISION FINDER 2019 Division Finder
2019 COMMONWEALTH OF AUSTRALIA 2019 DIVISION FINDER Division Finder Queensland QLD EF54 EF54 i © Commonwealth of Australia 2019 This work is copyright. All rights reserved. No part of this publication may be reproduced by any means, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, scanning, recording or otherwise, without the written consent of the Australian Electoral Commission. All enquiries should be directed to the Australian Electoral Commission, Locked Bag 4007, Canberra ACT 2601. ii iii Contents Instructions For Use And Other Information Pages v-xiii INTRODUCTION Detailed instructions on how to use the various sections of the Division Finder. DIVISIONAL OFFICES A list of all divisional offices within the State showing physical and postal addresses, and telephone and facsimile numbers. INSTITUTIONS AND ESTABLISHMENTS A list of places of residence such as Universities, Hospitals, Defence Bases and Caravan Parks. This list may be of assistance in identifying institutions or establishments that cannot be found using the Locality and Street Sections. Locality Section Pages 1-43 This section lists all of the suburbs, towns and localities within the State of Queensland and the name of the corresponding electoral division the locality is contained in, or the reference ... See Street Section. Street Section Pages 47-135 This section lists all the streets for those localities in the Locality Section which have the reference ... See Street Section. Each street listing shows the electoral division the street is contained in. iv v Introduction The Division Finder is the official list used to Electors often do not know the correct identify the federal electoral division of the federal division in which they are enrolled, place an elector claims to be enrolled at. -
Agenda of Infrastructure Standing Committee Meeting
AGENDA Infrastructure Standing Committee Meeting Wednesday, 4 November 2020 I hereby give notice that a Meeting of the Infrastructure Standing Committee will be held on: Date: Wednesday, 4 November 2020 Time: 9.00am Location: Warren Truss Chamber 45 Glendon Street Kingaroy Mark Pitt PSM Chief Executive Officer Infrastructure Standing Committee Meeting Agenda 4 November 2020 Order Of Business 1 Opening ................................................................................................................................ 4 2 Leave of Absence / Apologies ............................................................................................ 4 3 Recognition of Traditional Owners ..................................................................................... 4 4 Declaration of Interest ......................................................................................................... 4 5 Portfolio – Roads & Drainage.............................................................................................. 5 5.1 Infrastructure Standing Committee Terms of Reference ........................................... 5 5.2 Roads & Drainage Portfolio Report ........................................................................ 12 6 Portfolio – Local Disaster Management, Water & Wastewater, Waste Management .... 19 6.1 Local Disaster Management, Water and Wastewater Portfolio Report ................... 19 7 Confidential Section ......................................................................................................... -
Strategic Framework
FRASER COAST REGIONAL COUNCIL SOUTH BURNETT REGIONAL COUNCIL PLANNING SCHEME STRATEGIC PLAN MAP NORTH BURNETT REGIONAL COUNCIL Legend Principal Centre Local Centre Airport Extractive Mining GYMPIE REGIONAL COUNCIL Major Infrastructure B oon doo ma Dam Roa d Tourism M u n Infrastructure Corridor d u b b e r a Wonda d - i a - Pro D ston o u Ro a R Proston r o d s n r g e t Cycling/Walking Route R s o a a c d n a Hivesville L Silv erleaf Road Interregional Links W ondai - P roston Ro ad d State Controlled Road a o R e e y B ay hw Hig unya ay B Nature Conservation/Open Space hw ig H Murgon a y n u ad B a Ro doom oon Proston - B Rural Residential Murgon R Kilcoy - oad B u r n e t Urban t H i CHERBOURG ABORIGINAL SHIRE COUNCIL g h w a y d a o R g Rural n o r u D - y a Wondai a r w e h b ig b H u t d t Major Watercourses y n a e u w n h r M ig u H B a y n u B Important Agricultural Areas Tingoora Mining Tenements Durong d Declared Catchment a o R i a d n o Wooroolin W - a l l i Local Government Area Boundary h c n i h C y a Note: This map is of a strategic nature and does not detail individual w h g i H property zoning. -
General Council Meeting
Minutes Of The General Council Meeting Held in the Warren Truss Chamber, 45 Glendon Street Kingaroy On Wednesday 15 May 2019 Chief Executive Officer: Mark Pitt Our Vision “South Burnett Region, working together building a strong, vibrant and safe community” Our Values A Accountability: We accept responsibility for our actions and decisions in managing the regions resources. C Community: Building partnerships and delivering quality customer service. H Harmony: Our people working cooperatively to achieve common goals in a supportive and safe environment. I Innovation: Encouraging an innovative and resourceful workplace. E Ethical Behaviour: We behave fairly with open, honest and accountable behaviour and consistent decision- making. V Vision: This is the driving force behind our actions and responsibilities. E Excellence: Striving to deliver excellent environmental, social and economic outcomes. Cr K M Campbell (Mayor) ……... SOUTH BURNETT REGIONAL COUNCIL GENERAL MEETING – MINUTES – 15 MAY 2019 SOUTH BURNETT REGIONAL COUNCIL MINUTES Wednesday 15 May 2019 ORDER OF BUSINESS: 1. LEAVE OF ABSENCE....................................................................................................... 1 2. PRAYERS ....................................................................................................................... 1 3. CONFIRMATION OF MINUTES OF PREVIOUS MEETING ........................................................ 1 3.1 South Burnett Regional Council Minutes ...................................................................... -
Roads & Drainage Portfolio Report 12 June 2019
Roads & Drainage Portfolio Report 12 June 2019 Works in Progress & Future Works Summary for June/July The following are current/planned works Construction: • Blackbutt Drainage Improvements – Stormwater crossing Hart Street and John Street is complete. Kerb and channel works are to be completed in June. • Rodney Street, Proston – Kerb and channel replacement. • Home Street, Nanango – Drainage Improvements, to commence in June. • Premier Drive, Kingaroy – Drainage Improvements have commenced. • Niagara Road, Boyneside – Project construction is to recommence following completion of Byee Road upgrade work. • Murgon CBD - Footpath replacement – Stage 1 near Mitre 10. • Siefert Street, Crawford - Footpath and drainage upgrade. Gravel Resheeting/Heavy Formation Grade Name Description Expected Expected Start Completion Date Date Haly Creek Road, Haly Shoulder Resheeting & Formation May19 Jun19 Creek Grade Woltmanns Road, Durong Gravel Resheeting & Heavy May19 Jun19 Formation Grade Jacksons Road, Durong Gravel Resheeting & Heavy May19 Jun19 Formation Grade Byee Road, Wheatlands Road Widening May19 Aug19 Paines Road, Durong Gravel Resheeting/Clearing May19 Jun19 Nukku Road, Nukku Gravel Resheeting & Heavy May19 Jun19 Formation Grade Mitchells Road, Silverleaf Gravel Resheeting Jun19 Jun19 Althause Road, Cloyna Gravel Resheeting Jun19 Jun19 Middle Road, Proston Gravel Resheeting Jun19 Jun19 Deep Creek Road, Benair Gravel Resheeting Jun19 Jun19 Dip Road, Keysland Gravel Resheeting Jun19 Jun19 Freshwater Road, Heavy Formation Grade Jul19 Jul19 Chahpingah -
BURNETT BASIN !! Dalby# !!( #!
!! !! !! !! !! !! !!!! !! ! !! I ve r!!a gh C !! re #!! Smoky Creek ek Middle Creek !! CRAIGLANDS IVERAGH !( Goovigen !! !! SEVENTEEN ek AL !! e #AL/TM ! Basin Locality r UPPER !SPRINGS Legend SEVENTY Y # !( C MARLUA BOROREN-IVERAGH p JAMBIN BELL CK AL Seventeen Seventy ! ! W !! AL/TM RAIL TM ! m ! ! ! ( Qld border, a AL H k k #! ! Townsville # C !! Automatic rainfall station (RN) FERNDALE C UPPER!! C MT MONGREL ! coastline C N (! a O RAINBOW AL C er AL !! Bowen ll S A tt Manual/Daily rainfall station (DN) Basin i LL u Bororen!( k d W IO F boundary e A CALLIDE DAM C P MT SEAVIEW m THREE MILE CK (! D lu !!! MILTON Automatic river height station (RV) k # INFLOW AL/TM E ! g * CAPTAIN CK Mackay !AL i TM !! e # # D AL/TM ! EDEN e Callide MALAKOFF R ! AL/TM D r ! MIRIAM VALE !! WESTWOOD e ! JUNCTION AL/TM A AL # Manual river height station (RV)ep e C ! # ! TM! /MAN RANGE AL w Dam # ! l N # l KROOMBIT !( a i # m G Nagoorin !! t i v LINKES C REPEATER AL NAGOORIN B e k ! ! ! Miriam Vale r e ! ! e CALLIDE DAM ! E BOOLAROO D !(!! # a Forecast site (quantitative) h ! N CAUSEWAY AL/TM ! eg #AL/TM f RAPLEYS ! KROOMBIT f l a # ! ( DA MOUNT lg k ! l ! C ! ! il l W HW AL/TM TOPS AL/TM ALLIGAT+OR ( Biloela ! # C e k Emerald Rockhampton e S KROOMBIT TOPS AL/TM !! #AL/TM # FLATS AL S it O Y !. Kr b ! KROOMBIT DAM AL, B C MFAoKrOeWcaATsAt CsKit e (qualitaE tive) !! !! oo m ! ! S R o !! N W !BILOELA ! !!! ! A !! y o ! u H ! !LOVANDEE HW/TW TM k ! CEDAR + TM E N n l # o l ! HILLVIEW QLD C s # e ! ! G e RED HILL Kroombit# k VALE AL !RseC!.uk !( MAKOWATA i (