Angat Water Transmission Improvement Project
Total Page:16
File Type:pdf, Size:1020Kb
Introduction About Halcrow / CH2M HILL • We are an industry leader in consulting, design, design-build, operations and program management. • Headquartered in Englewood, Colorado, USA • More than 26,000 employees • US$6.6 billion in revenue • Employee-owned • Broadly diversified across multiple business sectors • Actively working in 60+ countries worldwide • Acquired Halcrow in 2011. • Industry leading company in the water market 2012 GLOBAL WATER COMPANY OF THE YEAR Presentation Outline • Project Background • Project Rationale • Angat Water Transmission System • Technical Scope • Bidding Process • Timeline Project Background Transmission System Capacity Date Constructed / Commissioned Tunnel 1 760 mld 1939 Tunnel 2 1,890 mld 1969 Tunnel 3 2,000 mld 1992 Aqueduct 1 &2 380 mld 1939, 1948 Aqueduct 3 830 mld 1969 Aqueduct 5 2,000 mld 1992 Aqueduct 6 2,000 mld 2012 Decades-old transmission system needs rehabilitation and upgrade to ensure water security. Project Rationale • Aims to improve reliability, operation, IPO DAM flexibility and security BIGTE of raw water from Ipo BASIN Dam to La Mesa Dam • Will introduce water safety, risk and asset management plans LA MESA DAM Angat Water Transmission System Sierra Madre Mountains Angat Reservoir Angat River UMIRAY-ANGAT TRANSBASIN TUNNEL ANGAT DAM IPO DAM Proposed AWTIP TUNNEL-4 1 2 3 BIGTE, NORZAGARAY TRANSITION STRUCTURES LA MESA 1 TREATMENT PLANT 2 3 NOVALICHES- LA MESA MAYNILAD WATER PORTAL STRUCTURES SERVICE AREA MANILA WATER SERVICE AREA LA MESA RESERVOIR BALARA TREATMENT PLANT Construction of Tunnel - 4 Estimated Project Cost : US$ 133.99 Million IPO DAM TUNNEL-1 TUNNEL-2 TUNNEL-3 TUNNEL DESIGN : 19 CMS Flow Capacity BIGTE SETTLING Supply Aqueduct No. 5 BASIN Allow rehabilitation of existing Tunnels No. 1, 2 & 3 and Aqueducts 3 & 4 Geologic Profile Indicative Tunnel Support Length Segment Type I 10% 639 II 65% 4,151 III 10% 639 IV 5% 319 V 3% 192 VI 3% 192 P 4% 255 100% 6,386 Tunnel Inlet Alignment Concept 10 Tunnel Outlet Alignment Concept 11 11/06/2014 Typical Tunnel Cross-Section • Drill and blast excavation • Tunnel Boring Machine construction, if feasible • Concrete-lined • 100-year design life Bidding Information • Requirement: Design Build Contractor • ADB Procurement Guidelines • 2-Stage Competitive Bidding Process Bidding Procedure International Competitive Bidding FIRST STAGE BIDDING SECOND STAGE BIDDING STOP STOP ADB ADB Deadline Approval Deadline Approval Technical Technical Revised Revised Proposal Proposal Technical Proposal Technical Proposal Financial Financial Proposal Proposal Revised Technical Technical Financial With “CHANGES PURSUANT TO FIRST STAGE EVALUATION” Preparation 1 Evaluation 1 Preparation 2 Evaluation 2 Timeline Tasks Duration NEDA Board Approval May 29, 2014 ADB Loan Approval July, 2014 Approval of Bidding Documents (D&B) August 04, 2014 Publication of Invitation Aug 07 - Aug 13, 2014 Issuance of Documents Aug 07 - Sept. 03, 2014 Conduct of Pre-Bid Conference September 04, 2014 First Stage Bid Submission Dec. 05, 2014 Bid Evaluation (TWG/BAC Recommendation/ Board Approval Dec 06 - Jan 09, 2015 Information to Technically Qualified Jan 14, 2015 Second Stage Bid - Issuance Addendum/Submission Financial & Technical Proposals/ TWG/BAC Evaluation and Recommendation/ Board Approval Jan 15 - Mar 26, 2015 Notice of Award (NOA) March 31, 2015 Contract Finalization and Signing (Legal/OGCC/BOT) April 01 - 14, 2015 Issuance of Notice to Proceed (NTP) April 21, 2015 THANK YOU. .