EST. ENERGY /UNUSED UNDELIVERED 87,491 20,924 CONS. AFFECTED EST. NO. OF PURPOSE

lowing date and time: es/actions NGCP POWER INTERRUPTION: - Facilitate closing of Load Break Switch (LBS) at Structure No. 56 of the La Trinidad-Sablan 69 kV Line. South Drive, City MELCHOR S. LICOBEN AREAS AFFECTED (Except the following areas Lualhati, Felipe, Moran, (Except the following areas Lamut, Marlboro Country, Manager, Network Services Department ELECTRIC COOPERATIVE, INC. NOTICE OF POWER INTERRUPTION APPROVED FOR PUBLIC ANNOUNCEMENT: which includes Acop Central and Caponga Except Camp 6, 4, , 3, Mangga, Whole of Baguio City Apostol, De Los Reyes, Europa, Modesta, Good Shepperd, Cuneta, areas, Gibraltar, Romulo Drive, Tuding road, Outlook Mary Hurst, Lucnab, Teachers Camp to Forbes Park DS, Balangabang, DENR Compound, Villamor St., Portion of Outlook Drive, Innsbruck, South Portion of Paterno St., DPS Compound, Lower Cabinet Hill, Green Water, Wagner Road, Military Cut-off, Sta. Scholastica Village, Dagsian, Hillside, Gabriela Silang, Woodsgate, Camp 8, BWD Dedicated Line, Puliwes, San Vicente, Lower Balsigan, Agpaoa Drive, Milo Subdivision, Woodsville Subdivision, Sarok, Kennon road, Kalinga Pelota Court, Petersville, Amparo Heights, Lexber Heights Phase I, Amistad, Montecello, Richgate Square Phase II, Crest Wood, Eagle I & Ciudad Grande Lexber Heights Phase II, Gumamela, Bakakeng road, New Site SLU-SVP, Forest Gold, Ramsey Pumping, Sto. Nino Subdivision, Camp 7, Kennon road, Pias, Youngland, Mangga, Pongian, Soyuc, Ongasan, Lion's Head, BWD Stage 1. Tavera St., Kneedler Poblete Extension, Johnhay, BCC, Country Club Village, Happy Hallow. Upper Ambiong, Ambuklao Road portion, APTS, Sim-sim Compound, Regidor st., Maria Basa, Liteng, Pacdal Circle, Sispno Road, Botanical Garden) Whole of La Trinidad DZWT, GMA, RPN, DZBS). Whole of Sablan Whole of Tuba ( Twin Peaks, Tabaan Sur). Parts of Tublay AREA and Irisan Substations DE-ENERGIZED EQUIP'T REF. OF North Sanitary Camp Feeder 03 Feeder 04 Feeder 05 Feeder 06 Feeder 07 Feeder 08 Feeder 09 Feeder 10 For more information please contact the following nos.: 637-4400 local 605 to 607/09088657202/09175921698 5:00 PM 4:30 PM to 1. This also serves as notice to all concerned Cable & Communication Companies inspect and institute necessary safety measur on their cables/lines attached the affected BENECO poles. 2. Always consider all lines energized. Power maybe restored earlier than the scheduled time. 2018 DATE TIME FEEDER January 31, Wednesday,

Please be informed that the BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) is scheduling Electric Service Interruption on fol NOTES: cc: all local Radio & TV stations, Telephone Cable Companies, affected big loaders radio room/isd/nnrsd/file/Corplan-wesm/comrel/NGCP