Cordillera Administrative Region 12,193,419,000 429 Projects

Total Page:16

File Type:pdf, Size:1020Kb

Cordillera Administrative Region 12,193,419,000 429 Projects Annual Infrastructure Program Revisions Flag: (D)elisted; (M)odified; (R)ealigned; (T)erminated Operating Unit/ Revisions UACS PAP Project Component Decsription Project Component ID Type of Work Target Unit Target Allocation Implementing Office Flag Cordillera Administrative Region 12,193,419,000 429 projects GAA 2016 MFO-1 8,707,522,000 192 projects Abra District Engineering Office 1,054,561,000 41 projects ABRA (LONE DISTRICT) Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary 165003014600009 Abra-Ilocos Norte Rd - K0437+-105 - K0437+-055, K0437+146 - P00005882LZ-CW1 Construction of Road Square meters 1,342 45,911,000 Abra District Engineering K0437+181, K0438+252 - K0438+330, K0426+086 - K0426+112, Slope Protection Office / Abra District K0427+520 - K0427+561, K0434+347 - K0434+408 - Construction of Structure Engineering Office Road Slope Protection Structure Network Development - Improvement/Widening of National Roads - Secondary 165003015100019 Abra-Kalinga Rd - K0415+345 - K0416+422 - Road Widening P00005396LZ-CW1 Road Widening Lane Km 1.066 16,006,000 Abra District Engineering Office / Abra District Engineering Office Network Development - Improvement/Widening of National Roads - Tertiary 165003015200013 Abra-Ilocos Norte Rd - K0424+000 - K0425+688, K0427+343 - K0427 P00005599LZ-CW1 Road Widening Lane Km 4.359 49,000,000 Abra District Engineering +483, K0429+000 - K0429+169, K0429+348 - K0429+408, K0429+ Office / Abra District 585 - K0429+716, K0424+320 - K0424+882, K0425+030 - K0425+ Engineering Office 225, K0425+300 - K0425+688, K0426+400 - K0426+690, K0429+ 000 - K0429+760 - Road Widening Construction and Maintenance of Bridges along National Roads - Replacement of Permanent Weak Bridges 165003016000025 Baay Br. (B02231LZ) along Abra-Cervantes Rd - Replacement of P00017069LZ-CW1 Replacement of Bridge Square meters 954 100,000,000 Cordillera Administrative Bridge Region / Cordillera Administrative Region Construction and Maintenance of Bridges along National Roads - Rehabilitation/ Major Repair of Permanent Bridges 165003016200040 Don Mariano Marcos Br. (B02229LZ) along Abra-Kalinga Rd - P00001721LZ-CW1 Rehabilitation / Major Number of 1 15,000,000 Abra District Engineering Rehabilitation / Major Repair of Bridge Repair of Bridge Bridges Office / Abra District Engineering Office Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Tertiary 165003014300033 Abra - Cervantes Road - K0439+300 - K0441+000 - Construction of P00009225LZ-CW1 Construction of Lane Km 1.400 20,000,000 Abra District Engineering Concrete Road Concrete Road Office / Abra District Engineering Office 3/29/2017 9:38:30 AM Page 1 of 49 Operating Unit/ Revisions UACS PAP Project Component Decsription Project Component ID Type of Work Target Unit Target Allocation Implementing Office Flag Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/ Highway Development and Management-4 (HDM-4) - Secondary 165003013900028 Abra-Ilocos Sur Rd - K0390+169 - K0390+662, K0392+-053.4 - K0393 P00000339LZ-CW1 Preventive Lane Km 3.265 17,308,000 Abra District Engineering +000, K0408+114 - K0408+190 - Preventive Maintenance of Road: Maintenance of Road: Office / Abra District Asphalt Overlay Asphalt Overlay Engineering Office 165003013900029 Abra-Kalinga Rd - K0419+264 - K0420+278 - Preventive Maintenance P00008001LZ-CW1 Preventive Lane Km 2.030 10,755,000 Abra District Engineering of Road: Asphalt Overlay Maintenance of Road: Office / Abra District Asphalt Overlay Engineering Office Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary 165003015800014 Abra-Ilocos Norte Rd - Chainage 7058 - Chainage 9088 - P00004146LZ-CW1 Construction of Lane Km 4.060 81,200,000 Cordillera Administrative Construction of Concrete Road Concrete Road Region / Cordillera Administrative Region Apayao 1st District Engineering Office 587,873,000 17 projects APAYAO (LONE DISTRICT) Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary 165003014500005 Abbut-Conner Rd - K0565+241 - K0565+291 - Construction of Road P00005916LZ-CW1 Construction of Road Square meters 1,250 4,000,000 Apayao 1st District Slope Protection Structure Slope Protection Engineering Office / Structure Apayao 1st District Engineering Office 165003014500006 Conner-Kabugao Rd - K0598+267 - K0598+287, K0601+396 - K0601+ P00005917LZ-CW1 Construction of Road Square meters 3,204 49,500,000 Apayao 1st District 616, K0603+723 - K0603+786 - Construction of Road Slope Slope Protection Engineering Office / Protection Structure Structure Apayao 1st District Engineering Office Network Development - Off-Carriageway Improvement including drainage 165003015600040 Abbut-Conner Rd - K0549+183 - K0550+532 - Off-Carriageway P00003249LZ-CW1 Off-Carriageway Square meters 4,275 14,000,000 Apayao 1st District Improvement: Shoulder Paving / Construction Improvement: Shoulder Engineering Office / Paving / Construction Apayao 1st District Engineering Office 165003015600041 Conner-Kabugao Rd - K0571+576 - K0575+775 - Off-Carriageway P00003250LZ-CW1 Off-Carriageway Square meters 12,456 40,800,000 Apayao 1st District Improvement: Shoulder Paving / Construction Improvement: Shoulder Engineering Office / Paving / Construction Apayao 1st District Engineering Office Network Development - Construction of Missing Gaps connecting National Roads, including ROW 165003015400051 Apayao-Ilocos Norte Road (Kabugao, Apayao-Solsona, Ilocos Norte P00003179LZ-CW1 Construction of Gravel Lane Km 3.520 49,000,000 Apayao 1st District Road), Apayao 1st DEO, LD - Construction of Gravel Road Road Engineering Office / Apayao 1st District Engineering Office 3/29/2017 9:38:30 AM Page 2 of 49 Operating Unit/ Revisions UACS PAP Project Component Decsription Project Component ID Type of Work Target Unit Target Allocation Implementing Office Flag Construction and Maintenance of Bridges along National Roads - Replacement of Bridges (Temporary to Permanent) 165003015900002 Matalag Br. (B02242LZ) along Conner-Kabugao Rd - Replacement of P00001379LZ-CW1 Replacement of Bridge Square meters 1,424 155,660,000 Central Office / Cordillera Bridge Administrative Region 165003015900004 Buyukan Br. (B02232LZ) along Kabugao-Pudtol-Luna-Cagayan Bdry P00001722LZ-CW1 Replacement of Bridge Square meters 110 12,000,000 Apayao 1st District Rd - Replacement of Bridge Engineering Office / Apayao 1st District Engineering Office 165003015900005 Nagyadan Br. 1 (B04240LZ) along Kabugao-Pudtol-Luna-Cagayan P00001380LZ-CW1 Replacement of Bridge Square meters 110 12,000,000 Apayao 1st District Bdry Rd - Replacement of Bridge Engineering Office / Apayao 1st District Engineering Office 165003015900006 Nagyadan Br. 2 (B04241LZ) along Kabugao-Pudtol-Luna-Cagayan P00001381LZ-CW1 Replacement of Bridge Square meters 110 12,000,000 Apayao 1st District Bdry Rd - Replacement of Bridge Engineering Office / Apayao 1st District Engineering Office 165003015900007 Sibayan Br. (B04243LZ) along Kabugao-Pudtol-Luna-Cagayan Bdry P00001382LZ-CW1 Replacement of Bridge Square meters 256 28,000,000 Apayao 1st District Rd - Replacement of Bridge Engineering Office / Apayao 1st District Engineering Office Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary 165003015700016 Conner-Kabugao Rd - K0584+783 - K0585+177 - Construction of P00003686LZ-CW1 Construction of Lane Km 0.864 17,280,000 Apayao 1st District Concrete Road Concrete Road Engineering Office / Apayao 1st District Engineering Office Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary 165003015800023 Apayao-Ilocos Norte Rd - K0611+186 - K0614+476 - Construction of P00004147LZ-CW1 Construction of Lane Km 6.582 131,640,000 Cordillera Administrative Concrete Road Concrete Road Region / Cordillera Administrative Region 165003015800062 Apayao-Ilocos Norte Rd - K0614+476 - K0614+901 - Road Upgrading P00016002LZ-CW1 Road Upgrading Gravel Lane Km 0.850 17,000,000 Apayao 1st District Gravel to Paved to Paved Engineering Office / Apayao 1st District Engineering Office 3/29/2017 9:38:30 AM Page 3 of 49 Operating Unit/ Revisions UACS PAP Project Component Decsription Project Component ID Type of Work Target Unit Target Allocation Implementing Office Flag Apayao 2nd District Engineering Office 1,636,002,000 23 projects APAYAO (LONE DISTRICT) Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary 165003014600008 Claveria-Calanasan-Kabugao Rd - K0672+567 - K0672+632, K0672+ P00005994LZ-CW1 Construction of Road Square meters 2,200 60,000,000 Cordillera Administrative 1100 - K0672+1260, K0673+260 - K0673+360 - Construction of Road Slope Protection Region / Cordillera Slope Protection Structure Structure Administrative Region 165003014600010 Claveria-Calanasan-Kabugao Rd - K0707+516 - K0707+778 - P00010008LZ-CW1 Construction of Road Square meters 1,520 40,000,000 Apayao 2nd District Construction of Road Slope Protection
Recommended publications
  • Indigenous Peoples/Ethnic Minorities and Poverty Reduction: Regional Report
    INDIGENOUS PEOPLES/ETHNIC MINORITIES AND POVERTY REDUCTION REGIONAL REPORT Roger Plant Environment and Social Safeguard Division Regional and Sustainable Development Department Asian Development Bank, Manila, Philippines June 2002 © Asian Development Bank 2002 All rights reserved Published June 2002 The views and interpretations in this report are those of the author and do not necessarily reflect those of the Asian Development Bank. ISBN No. 971-561-438-8 Publication Stock No. 030702 Published by the Asian Development Bank P.O. Box 789, 0980, Manila, Philippines FOREWORD his publication was prepared in conjunction with an Asian Development Bank (ADB) regional technical assistance (RETA) project on Capacity Building for Indigenous Peoples/ T Ethnic Minority Issues and Poverty Reduction (RETA 5953), covering four developing member countries (DMCs) in the region, namely, Cambodia, Indonesia, Philippines, and Viet Nam. The project is aimed at strengthening national capacities to combat poverty and at improving the quality of ADB’s interventions as they affect indigenous peoples. The project was coordinated and supervised by Dr. Indira Simbolon, Social Development Specialist and Focal Point for Indigenous Peoples, ADB. The project was undertaken by a team headed by the author, Mr. Roger Plant, and composed of consultants from the four participating DMCs. Provincial and national workshops, as well as extensive fieldwork and consultations with high-level government representatives, nongovernment organizations (NGOs), and indigenous peoples themselves, provided the basis for poverty assessment as well as an examination of the law and policy framework and other issues relating to indigenous peoples. Country reports containing the principal findings of the project were presented at a regional workshop held in Manila on 25–26 October 2001, which was attended by representatives from the four participating DMCs, NGOs, ADB, and other finance institutions.
    [Show full text]
  • Inclusion and Cultural Preservation for the Ifugao People
    421 Journal of Southeast Asian Human Rights, Vol.2 No. 2 December 2018. pp. 421-447 doi: 10.19184/jseahr.v2i2.8232 © University of Jember & Indonesian Consortium for Human Rights Lecturers Inclusion and Cultural Preservation for the Ifugao People Ellisiah U. Jocson Managing Director, OneLife Foundation Inc. (OLFI), M.A.Ed Candidate, University of the Philippines, Diliman Abstract This study seeks to offer insight into the paradox between two ideologies that are currently being promoted in Philippine society and identify the relationship of both towards the indigenous community of the Ifugao in the country. Inclusion is a growing trend in many areas, such as education, business, and development. However, there is ambiguity in terms of educating and promoting inclusion for indigenous groups, particularly in the Philippines. Mandates to promote cultural preservation also present limits to the ability of indigenous people to partake in the cultures of mainstream society. The Ifugao, together with other indigenous tribes in the Philippines, are at a state of disadvantage due to the discrepancies between the rights that they receive relative to the more urbanized areas of the country. The desire to preserve the Ifugao culture and to become inclusive in delivering equal rights and services create divided vantages that seem to present a rift and dilemma deciding which ideology to promulgate. Apart from these imbalances, the stance of the Ifugao regarding this matter is unclear, particularly if they observe and follow a central principle. Given that the notion of inclusion is to accommodate everyone regardless of “race, gender, disability, ethnicity, social class, and religion,” it is highly imperative to provide clarity to this issue and identify what actions to take.
    [Show full text]
  • Estimation of Local Poverty in the Philippines
    Estimation of Local Poverty in the Philippines November 2005 Republika ng Pilipinas PAMBANSANG LUPON SA UGNAYANG PANG-ESTADISTIKA (NATIONAL STATISTICAL COORDINATION BOARD) http://www.nscb.gov.ph in cooperation with The WORLD BANK Estimation of Local Poverty in the Philippines FOREWORD This report is part of the output of the Poverty Mapping Project implemented by the National Statistical Coordination Board (NSCB) with funding assistance from the World Bank ASEM Trust Fund. The methodology employed in the project combined the 2000 Family Income and Expenditure Survey (FIES), 2000 Labor Force Survey (LFS) and 2000 Census of Population and Housing (CPH) to estimate poverty incidence, poverty gap, and poverty severity for the provincial and municipal levels. We acknowledge with thanks the valuable assistance provided by the Project Consultants, Dr. Stephen Haslett and Dr. Geoffrey Jones of the Statistics Research and Consulting Centre, Massey University, New Zealand. Ms. Caridad Araujo, for the assistance in the preliminary preparations for the project; and Dr. Peter Lanjouw of the World Bank for the continued support. The Project Consultants prepared Chapters 1 to 8 of the report with Mr. Joseph M. Addawe, Rey Angelo Millendez, and Amando Patio, Jr. of the NSCB Poverty Team, assisting in the data preparation and modeling. Chapters 9 to 11 were prepared mainly by the NSCB Project Staff after conducting validation workshops in selected provinces of the country and the project’s national dissemination forum. It is hoped that the results of this project will help local communities and policy makers in the formulation of appropriate programs and improvements in the targeting schemes aimed at reducing poverty.
    [Show full text]
  • The White Apos: American Governors on the Cordillera Central Frank L
    Cedarville University DigitalCommons@Cedarville Alumni Book Gallery 1987 The White Apos: American Governors on the Cordillera Central Frank L. Jenista Cedarville University, [email protected] Follow this and additional works at: https://digitalcommons.cedarville.edu/alum_books Part of the Other History Commons, and the United States History Commons Recommended Citation Jenista, Frank L., "The White Apos: American Governors on the Cordillera Central" (1987). Alumni Book Gallery. 334. https://digitalcommons.cedarville.edu/alum_books/334 This Book is brought to you for free and open access by DigitalCommons@Cedarville, a service of the Centennial Library. It has been accepted for inclusion in Alumni Book Gallery by an authorized administrator of DigitalCommons@Cedarville. For more information, please contact [email protected]. The White Apos: American Governors on the Cordillera Central Disciplines History | Other History | United States History Publisher New Day Publishers Publisher's Note Excerpt provided by kind permission of New Day Publishers. There will be no selling of the book outside of New Day. ISBN 971100318X This book is available at DigitalCommons@Cedarville: https://digitalcommons.cedarville.edu/alum_books/334 ,. • • AMERICAN GOVERNORS ON 1HE CORDILLERA CENTRAL FRANKL. JENISTA New Day- Publishers Quezon City 1987 PREFACE For at least the last five centuries of recorded' history, Southeast Asians have been conspicuously divided into peoples of the hills and of the plains. Hjghlanders have tended to be independent animists living in small communities isolated by war or terrain, ·without developed systems of either kinship or peonage and order­ ing their lives according to custom and oral tradition. .Their lowland . neighbors, exposed to the greater traditions of Buddhism, Islam or Christianity, lived in more complex worlds with courts and chroni­ cles, plazas and cathedrals.
    [Show full text]
  • Chapter III POPULATION and SOCIAL PROFILE
    Baguio City Ecological Profile 2018 Chapter III POPULATION AND SOCIAL PROFILE POPULATION SIZE The 2018 projected population of Baguio City is 361,569 based on the 2015 Census of Population (POPCEN 2015), with a growth rate of 1.54. Fig 1: Projected Population, Baguio City, Table 5: Censal years Population/ 2016- 2020 projected population 375,000 Censal Years Year 370,000 Population 1995 365,000 226,883 2000 252,386 360,000 2007 301,926 355,000 2010 318,676 350,000 2015 345,366 Projected Population 345,000 2016 350,685 340,000 2017 356,085 335,000 2018 361,569 2016 2017 2018 2019 2020 2019 367,137 2020 372,791 The increase in the city’s population translated into an average population growth rate (PGR) is 1.54 percent annually during the period 2010 to 2015. This means that there were about 15 persons added per year for every 1,000 persons in the population. The average household size in 2015 was 3.8 persons. In the same period, total household population was 342,200 persons, higher by 26,400 persons from the household population of 315,800 persons in 2010. Table 6 :Top Ten Most Populated Barangays, 2015 BARANGAYS POPULATION BARANGAYS POPULATION 1. Irisan 30,507 6. Bakakeng Norte/Sur 8,780 2. Asin Road 13,145 7. Fairview Village 8,429 3. Camp 7 10,969 8. Gibraltar 7,613 4. Loakan Proper 10,189 9. San Luis Village 7,529 5. Bakakeng Central 9,216 10. Sto. Tomas Proper 7,058 Baguio City, considered as one of the highly urbanized cities of the country, composed of 129 barangays.
    [Show full text]
  • Municipality of La Trinidad BARANGAY LUBAS
    Republic of the Philippines Province of Benguet Municipality of La Trinidad BARANGAY LUBAS PHYSICAL AND SOCIO-ECONOMIC PROFILE I. PHYSICAL PROFILE Geographic Location Barangay Lubas is located on the southern part of the municipality of La Trinidad. It is bounded on the north by Barangay Tawang and Shilan, to the south by Barangay Ambiong and Balili, to the east by Barangay Shilan, Beckel and Ambiong and to the west by Barangay Tawang and Balili. With the rest of the municipality of La Trinidad, it lies at 16°46’ north latitude and 120° 59 east longitudes. Cordillera Administrative Region MANKAYAN Apayao BAKUN BUGUIAS KIBUNGAN LA TRINIDAD Abra Kalinga KAPANGAN KABAYAN ATOK TUBLAY Mt. Province BOKOD Ifugao BAGUIO CITY Benguet ITOGON TUBA Philippines Benguet Province 1 Sally Republic of the Philippines Province of Benguet Municipality of La Trinidad BARANGAY LUBAS POLITICAL MAP OF BARANGAY LUBAS Not to Scale 2 Sally Republic of the Philippines Province of Benguet Municipality of La Trinidad BARANGAY LUBAS Barangay Tawang Barangay Shilan Barangay Beckel Barangay Balili Barangay Ambiong Prepared by: MPDO La Trinidad under CBMS project, 2013 Land Area The Department of Environment and Natural Resources (DENR) Cadastral survey reveals that the land area of Lubas is 240.5940 hectares. It is the 5th to the smallest barangays in the municipality occupying three percent (3%) of the total land area of La Trinidad. Political Subdivisions The barangay is composed of six sitios namely Rocky Side 1, Rocky Side 2, Inselbeg, Lubas Proper, Pipingew and Guitley. Guitley is the farthest and the highest part of Lubas, connected with the boundaries of Beckel and Ambiong.
    [Show full text]
  • Directory of Participants 11Th CBMS National Conference
    Directory of Participants 11th CBMS National Conference "Transforming Communities through More Responsive National and Local Budgets" 2-4 February 2015 Crowne Plaza Manila Galleria Academe Dr. Tereso Tullao, Jr. Director-DLSU-AKI Dr. Marideth Bravo De La Salle University-AKI Associate Professor University of the Philippines-SURP Tel No: (632) 920-6854 Fax: (632) 920-1637 Ms. Nelca Leila Villarin E-Mail: [email protected] Social Action Minister for Adult Formation and Advocacy De La Salle Zobel School Mr. Gladstone Cuarteros Tel No: (02) 771-3579 LJPC National Coordinator E-Mail: [email protected] De La Salle Philippines Tel No: 7212000 local 608 Fax: 7248411 E-Mail: [email protected] Batangas Ms. Reanrose Dragon Mr. Warren Joseph Dollente CIO National Programs Coordinator De La Salle- Lipa De La Salle Philippines Tel No: 756-5555 loc 317 Fax: 757-3083 Tel No: 7212000 loc. 611 Fax: 7260946 E-Mail: [email protected] E-Mail: [email protected] Camarines Sur Brother Jose Mari Jimenez President and Sector Leader Mr. Albino Morino De La Salle Philippines DEPED DISTRICT SUPERVISOR DEPED-Caramoan, Camarines Sur E-Mail: [email protected] Dr. Dina Magnaye Assistant Professor University of the Philippines-SURP Cavite Tel No: (632) 920-6854 Fax: (632) 920-1637 E-Mail: [email protected] Page 1 of 78 Directory of Participants 11th CBMS National Conference "Transforming Communities through More Responsive National and Local Budgets" 2-4 February 2015 Crowne Plaza Manila Galleria Ms. Rosario Pareja Mr. Edward Balinario Faculty De La Salle University-Dasmarinas Tel No: 046-481-1900 Fax: 046-481-1939 E-Mail: [email protected] Mr.
    [Show full text]
  • List of KALAHI-CIDSS Subprojects - MAKILAHOK As of February 01, 2019
    List of KALAHI-CIDSS Subprojects - MAKILAHOK as of February 01, 2019 Estimated Physical Date of Region Province Municipality Barangay Sub-Project Name Project Type KC Grant LCC Amount Total Project No. Of HHsDate Started Accomplishme Status Completion Cost nt (%) CAR [Cordillera Administrative Region]MOUNTAIN PROVINCE SADANGA ANABEL Construction of One Unit One School Building 1,181,886.33 347,000.00 1,528,886.33 / / Not yet started Storey Elementary School Building CAR [Cordillera Administrative Region]MOUNTAIN PROVINCE SADANGA BEKIGAN Construction of Sumang-Paitan Water System 1,061,424.62 300,044.00 1,361,468.62 / / Not yet started Village Water System CAR [Cordillera Administrative Region]MOUNTAIN PROVINCE SADANGA BELWANG Construction of Pikchat- Water System 471,920.92 353,000.00 824,920.92 / / Not yet started Pattiging Village Water System CAR [Cordillera Administrative Region]MOUNTAIN PROVINCE SADANGA SACASACAN Rehabilitation of Penged Maballi- Water System 312,366.54 845,480.31 1,157,846.85 / / Not yet started Sacasshak Village Water Supply System CAR [Cordillera Administrative Region]MOUNTAIN PROVINCE SADANGA SACLIT Improvement of Wetig- Footpath / Foot Trail / Access Trail 931,951.59 931,951.59 / / Not yet started Takchangan Footpath (may include box culvert/drainage as a component for Footpath) CAR [Cordillera Administrative Region]IFUGAO TINOC AHIN Construction of 5m x 1000m Road (may include box 251,432.73 981,708.84 1,233,141.57 / / Not yet started FMR Along Telep-Awa-Buo culvert/drainage as a component for Section road)
    [Show full text]
  • 2278-6236 the Migrants of Kalinga
    International Journal of Advanced Research in ISSN: 2278-6236 Management and Social Sciences Impact Factor: 6.284 THE MIGRANTS OF KALINGA: FOCUS ON THEIR LIFE AND EXPERIENCES Janette P. Calimag, Kalinga-Apayao State College, Bulanao Tabuk City, Kalinga Abstract: This study is a descriptive-historical research on the life and experiences of migrants in Kalinga. This was conducted to understand the life migrants and the challenges they faced as they transferred residence. The participants of the study are the migrants of Kalinga aged 55 and above. Interview was the primary method used in gathering data for the study. An interview guide was used as a basis for questioning while note-taking was done by the researcher to document the information supplied by the participants. All conversations were also recorded through a tape recorder. Secondary resources such as researches, books and articles were used to further explain the results of the study. Results of the study revealed that the life of migrants is not just as easy, they faced a lot of challenges after migrating. They experienced financial difficulties, problems in relation to bodong, fear of Kalingas due to political conflicts, land grabbing, health problems, tribal wars, and differences in beliefs and religion. In view of the aforementioned findings and conclusions, the following topics are hereby recommended that this research will be a basis of the government of Kalinga as they create programs that involve migrants and as they review the implementation of bodong in their locale. Keywords: Migrants, focus, life, experiences, Kalinga INTRODUCTION One of the most difficult decisions a person can make is to leave the place where he used to live and transfer to a new community with more opportunities than the former.
    [Show full text]
  • Republic of the Philippines Department of Public Works and Highways
    Republic of the Philippines Department of Public Works and Highways ANNUAL PROCUREMENT PLAN (APP) FOR CY 2014 CORDILLERA ADMINISTRATIVE REGION (CAR) Procurement Project Cost/ Pre- Posting Pre-Bid Submission Post Award No. Contract Package Description Method ABC (Php) Procurement Advertisement Conference and Receipt Bid Evaluation Qualification of Conference of Bids Evaluation Contract CORDILLERA ADMINISTRATIVE REGION (CAR) 001 Mt Province-Ilocos Sur via Tue Rd., Section 1: Public Bidding P 54,930,000.00 Nov. 08, 2013 Nov. 11, 2013 Nov. 20, 2013 Dec. 02, 2013 Dec. 04, 2013 Dec. 09, 2013 Jan. 14, 2014 K0388+900 - K0389+500, K0393+500 - K0393+856; Section 2: K0398+000 - K0398+ 578, K0399+728 - K0399+811; Section 3 K0412+165 - K0412+942, K0413+327 - K0413+354, K0413+368 - K0413+400 002 Gurel-Bokod-Kabayan-Buguias-Abatan Rd., Public Bidding P 60,110,000.00 Nov. 08, 2013 Nov. 11, 2013 Nov. 20, 2013 Dec. 02, 2013 Dec. 04, 2013 Dec. 09, 2013 Jan. 14, 2014 K0352+560-K0353+180, K0353+397-K0354+875 003 Balili-Suyo-Sagada Road Leading to Sagada Caves, Public Bidding P 96,210,000.00 Nov. 08, 2013 Nov. 11, 2013 Nov. 20, 2013 Dec. 02, 2013 Dec. 04, 2013 Dec. 09, 2013 Jan. 14, 2014 Rice Terraces and Water Falls, Bontoc and Sagada, Mt.Province(DSTD) 004 Jct Talubin-Barlig-Natonin-Paracelis-Callacad Public Bidding P 53,780,000.00 Nov. 18, 2013 Nov. 21, 2013 Nov. 28, 2013 Dec. 10, 2013 Dec. 13, 2013 Dec. 17,2013 Jan. 14, 2014 Rd., K0406+922 - K0408+556 005 Maba-ay-Abatan,Bauko road leading to various Public Bidding P 94,560,000.00 Nov.
    [Show full text]
  • NDCC Update Sitrep No. 19 Re TY Pepeng As of 10 Oct 12:00NN
    2 Pinili 1 139 695 Ilocos Sur 2 16 65 1 Marcos 2 16 65 La Union 35 1,902 9,164 1 Aringay 7 570 3,276 2 Bagullin 1 400 2,000 3 Bangar 3 226 1,249 4 Bauang 10 481 1,630 5 Caba 2 55 193 6 Luna 1 4 20 7 Pugo 3 49 212 8 Rosario 2 30 189 San 9 Fernand 2 10 43 o City San 10 1 14 48 Gabriel 11 San Juan 1 19 111 12 Sudipen 1 43 187 13 Tubao 1 1 6 Pangasinan 12 835 3,439 1 Asingan 5 114 458 2 Dagupan 1 96 356 3 Rosales 2 125 625 4 Tayug 4 500 2,000 • The figures above may continue to go up as reports are still coming from Regions I, II and III • There are now 299 reported casualties (Tab A) with the following breakdown: 184 Dead – 6 in Pangasinan, 1 in Ilocos Sur (drowned), 1 in Ilocos Norte (hypothermia), 34 in La Union, 133 in Benguet (landslide, suffocated secondary to encavement), 2 in Ifugao (landslide), 2 in Nueva Ecija, 1 in Quezon Province, and 4 in Camarines Sur 75 Injured - 1 in Kalinga, 73 in Benguet, and 1 in Ilocos Norte 40 Missing - 34 in Benguet, 1 in Ilocos Norte, and 5 in Pangasinan • A total of 20,263 houses were damaged with 1,794 totally and 18,469 partially damaged (Tab B) • There were reports of power outages/interruptions in Regions I, II, III and CAR. Government offices in Region I continue to be operational using generator sets.
    [Show full text]
  • Income Classification Per DOF Order No. 23-08, Dated July 29, 2008 MUNICIPALITIES Classification NCR 1
    Income Classification Per DOF Order No. 23-08, dated July 29, 2008 MUNICIPALITIES Classification NCR 1. Pateros 1st CAR ABRA 1 Baay-Licuan 5th 2 Bangued 1st 3 Boliney 5th 4 Bucay 5th 5 Bucloc 6th 6 Daguioman 5th 7 Danglas 5th 8 Dolores 5th 9 La Paz 5th 10 Lacub 5th 11 Lagangilang 5th 12 Lagayan 5th 13 Langiden 5th 14 Luba 5th 15 Malibcong 5th 16 Manabo 5th 17 Penarrubia 6th 18 Pidigan 5th 19 Pilar 5th 20 Sallapadan 5th 21 San Isidro 5th 22 San Juan 5th 23 San Quintin 5th 24 Tayum 5th 25 Tineg 2nd 26 Tubo 4th 27 Villaviciosa 5th APAYAO 1 Calanasan 1st 2 Conner 2nd 3 Flora 3rd 4 Kabugao 1st 5 Luna 2nd 6 Pudtol 4th 7 Sta. Marcela 4th BENGUET 1. Atok 4th 2. Bakun 3rd 3. Bokod 4th 4. Buguias 3rd 5. Itogon 1st 6. Kabayan 4th 7. Kapangan 4th 8. Kibungan 4th 9. La Trinidad 1st 10. Mankayan 1st 11. Sablan 5th 12. Tuba 1st blgf/ltod/updated 1 of 30 updated 4-27-16 Income Classification Per DOF Order No. 23-08, dated July 29, 2008 13. Tublay 5th IFUGAO 1 Aguinaldo 2nd 2 Alfonso Lista 3rd 3 Asipulo 5th 4 Banaue 4th 5 Hingyon 5th 6 Hungduan 4th 7 Kiangan 4th 8 Lagawe 4th 9 Lamut 4th 10 Mayoyao 4th 11 Tinoc 4th KALINGA 1. Balbalan 3rd 2. Lubuagan 4th 3. Pasil 5th 4. Pinukpuk 1st 5. Rizal 4th 6. Tanudan 4th 7. Tinglayan 4th MOUNTAIN PROVINCE 1. Barlig 5th 2. Bauko 4th 3. Besao 5th 4.
    [Show full text]