450-460 Weber St. N

Total Page:16

File Type:pdf, Size:1020Kb

450-460 Weber St. N March 29, 2017 Reference No. 11139589 Mr. Scott Patterson Labreche Patterson & Associates Inc. Professional Planners, Development Consultants, Project Managers 330-F Trillium Drive Kitchener, Ontario N2E 3J2 Dear Mr. Patterson: Re: Environmental Noise Impact Study 460 Weber Street North, Waterloo, Ontario 1. Introduction GHD was retained to complete an Environmental Noise Impact Study (Study) in support of the approval for a proposed child care centre at 460 Weber Street North in Waterloo, Ontario (Site). The proposed child care centre is part of a 6-storey commercial development at the site. GHD evaluated the overall acoustic comfort and the minimum acoustic design requirements to ensure that the day care meets the Ontario Ministry of the Environment and Climate Change (MOECC) and Region of Waterloo (Region) requirements. The Study is required in support of a Zoning By-Law Amendment Application to the City of Waterloo.The Study characterizes the existing noise impact exposure due to adjacent commercial developments as well as road traffic and compares the noise exposure with the noise limits defined by the Ontario Ministry of the Environment and Climate Change's (MOECC) land use planning policies and guidelines detailed in Publication NPC 300 "Stationary and Transportation Sources – Approval and Planning", August 2013 (NPC-300). This Study has determined that the stationary noise impact from the adjacent commercial developments meets the NPC-300 requirements at the site but that the potential environmental impact exposure from road traffic is significant. The proposed Child Care Facility will require a provision for central air-conditioning and a Type C noise warning clause that is specific to the Development concept to meet the applicable noise criteria. Noise control requirements for the Site were based on road traffic volumes forecast for 2026 by the Region. GHD has reviewed the proposed development plan for 460 Weber Street North received by email on February 16, 2017. Any changes made to the plan may require further analysis and a Study update. The study was prepared consistent with the following guidance: • NPC-300, "Stationary and Transportation Sources – Approval and Planning" August 2013 GHD 651 Colby Drive Waterloo Ontario N2V 1C2 Canada T 519 884 0510 F 519 884 0525 W www.ghd.com The following attachments were included in support of this Study: • Attachment A – Site Plan • Attachment B –Traffic Data & STAMSON Traffic Model Outputs • Attachment C – Noise Modelling Results • Attachment D – Stationary Noise Impact Source Table • Attachment E – Consultant's Declaration • Attachment F – Owner's Statement 2. Land Development and Site Conditions The site will be developed for a 6-storey office building with the child care centre occupying the East portion of the main floor. There are various commercial developments to the North, East, and South of the site and a residential neighbourhood to the West. FaithLife Financial is the closest adjacent commercial building directly to the North followed by Parkway Ford Sales and Intelligent Mechatronic Systems Inc. to the North-East. The site is located in an Acoustical Class 1 area defined by NPC-300 as an area with an acoustical environment typical of a major population centre, where background sound level is dominated by the activities of people, usually road traffic. Self-contamination noise impact was also evaluated from rooftop mechanical equipment and discussed separately. 3. Sound Level Criteria The Class 1 criteria for stationary noise sources are defined by NPC-300 in Tables C-5 and C-6 as follows: Table C-5 – Exclusion Limit Values of One-Hour Equivalent Sound Level (Leq, dBA) Outdoor Points of Reception Time of Day Sound Level Limit (dBA) 07:00 - 19:00 50 19:00 - 23:00 50 11139589Patterson-2 2 Table C-6 – Exclusion Limit Values of One-Hour Equivalent Sound Level (Leq, dBA) Plane of Window of Noise Sensitive Spaces Time of Day Sound Level Limit (dBA) 07:00 - 19:00 50 19:00 - 23:00 50 23:00 - 07:00 45 The MOECC also defines noise levels for transportation noise originating from road traffic sources as follows: Receiver Category Time Period Road Traffic Criteria Outdoor Living Area (OLA) Day = 7:00 to 23:00 Leq = 55 dBA Indoor Living Area Day = 7:00 to 23:00 Leq = 45 dBA Indoor Living Area – Sleeping Quarters Night = 23:00 to 7:00 Leq = 40 dBA 4. Road Traffic Analysis 4.1 Road Traffic Noise Modeling Methodology The road traffic noise impact was conducted using STAMSON, the MOECC's computerized model of ORNAMENT. The Application of the model for the site was consistent with the ORNAMENT technical documents. The computer model input parameters include, among other data, the number of road segments, number of house rows, the positional relationship of the receptor to a noise source or barrier in terms of distance, elevation and angle, the basic site topography, the ground surface type, traffic volumes, traffic composition and speed limit. The predicted sound level is based on the 1-hour equivalent sound level, designated as Leq, and is adjusted by the STAMSON program to the 16-hour daytime and the 8-hour nighttime equivalent sound level. The applicable noise criteria for noise sensitive spaces are specified in terms of the 16-hour daytime period (7:00 a.m. to 11:00 p.m.) and 8-hour nighttime period (11:00 p.m. to 7:00 a.m.) enabling a direct comparison between the STAMSON model output and the noise criteria. 4.2 Road Traffic Model Input Parameters This section describes the STAMSON model input parameters used to predict road traffic noise impact for the Site. Based on traffic data obtained from the Regional Municipality of Waterloo the information below was used to calculate the noise impact for Weber Street North. The forecasted values were generated by the Region and they are valid until December 31, 2018. 11139589Patterson-2 3 Weber Street North • Current AADT (2016) 15,300 • Forecast AADT (2026) 18,200 • Commercial vehicle rates: 1.5 percent medium trucks and 1.3 percent heavy trucks • Posted Speed Limit: 60 kilometres per hour (km/h) • Day and Night Splits: 90 percent day and 10 percent night These values are the foundation of this analysis and if changes or adjustments are made, recalculation of the noise impact exposure for the Site will be necessary. The Region of Waterloo AADT Forecast for Noise Studies reports have been supplied in Attachment B. 4.3 Road Traffic Noise Modeling Results GHD calculated the Plane of Window ("POW") noise exposure for each façade and storey of the proposed office building, for the separate daytime and nighttime periods. The summary of the road traffic noise modelling results is presented below and in Table B.1. The STAMSON road traffic model outputs are provided in Attachment C. Point of Reception Modelled Impact Day/Night (dBA) Development – West Façade 63/57 Development – South Façade 59/52 Development – East Façade 42/36 Development – Outdoor Living Area 52 4.4 Noise Control Requirements Daytime Outdoor Living Area Assessment (NPC-300, Section C7.1.1) NPC-300 section A5 Page 13-14 defines an Outdoor Living Area (OLA). This definition includes front/rear yards and terraces as well as unenclosed balconies and elevated terraces with a minimum depth of 4 meters. NPC-300 states that if the 16-hour equivalent Sound Level (Leq) is greater than 55 dBA and less than or equal to 60 dBA then noise control measures may be required. The Site plan provided in Attachment A includes the construction of a 2-meter tall L-shaped acoustic barrier wall around the OLA area which blocks the direct line-of-sight of the OLA to Weber Street. The modelled impact to the OLA is 52 dBA and therefore no additional noise control measures are required. 11139589Patterson-2 4 Plane of a Window – Ventilation Requirements (NPC-300, Section C7.1.2) The daytime and night-time POW noise impact assumes a worst-case and direct line of sight noise exposure to Weber Street North. The following summarizes NPC-300 POW noise impact requirements: Daytime Level Nighttime Level Ventilation Requirements and Special Building (dBA) (dBA) Warning Clauses Components 55 50 Not Required Not Required 55 – 65 50 – 60 Yes with Type C Warning Clause Not Required 66 or more 60 or more Yes with Type D Warning Clause Yes NPC-300 states that if the night-time sound level outside a living area exceeds 51 dBA or if the daytime sound level outside a living area window exceeds 56 dBA the building should be designed with a provision for the installation of central air conditioning in the future, at an occupant's discretion. The modelled daytime impact is 63 dBA therefore the following Type C Warning Clause is recommended by NPC-300: Warning Clause Type C: "This unit has been designed with the provision for adding central air conditioning at the occupant's discretion. Installation of central air conditioning by the occupant will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the sound level limits of the Municipality and the Ministry of the Environment and Climate Change." Table B.1 summarizes the predicted worst-case day/night sound levels and the requirements for the units that require warning clauses and provisions for air conditioning. Indoor Living Areas – Building Components (NPC-300, Section C7.1.3) The building must be constructed to standard Ontario Building Code requirements. Improved building components are not required as summarized in Table B.1. 5. Stationary Noise Impact Analysis The stationary noise impact modeling results are summarized in Attachment C. Figure C.1 documents the on-site equipment as well as the evaluated sensitive points-of-reception (POR) receiver locations.
Recommended publications
  • EMMANUEL VILLAGE RESIDENCE INC. Applicant
    Court File No.: CV-16-11424-00CL ONTARIO SUPERIOR COURT OF JUSTICE B E T W E E N: EMMANUEL VILLAGE RESIDENCE INC. Applicant - and - ATTORNEY GENERAL OF ONTARIO Applicant - and - 1250 WEBER STREET EAST, KITCHENER, ONTARIO OR THE PROCEEDS OF THE SALE THEREOF (IN REM) Respondent MOTION RECORD OF EMMANUEL VILLAGE RESIDENCE INC. August 17, 2016 DLA PIPER (CANADA) LLP Barristers & Solicitors 1 First Canadian Place 100 King Street West, Suite 6000 P.O. Box 367 Toronto ON M5X 1E2 Bruce Darlington (LSUC# 25310K) [email protected] Tel: 416-365-3529 Fax: 416-369-5210 Jennifer A. Whincup (LSUC# 60326W) [email protected] Tel: 416-365-3425 Fax: 416-369-5240 Lawyers for Emmanuel Village Residence Inc. CAN: 22443870.1 - 2 - TO: THORNTON GROUT FINNIGAN LLP Suite 3200, 100 Wellington Street West P.O. Box 329, Toronto-Dominion Centre Toronto, ON M5K 1K7 Leanne M. Williams [email protected] Tel: 416-304-0060 Fax: 416-304-1313 Asim Iqbal [email protected] Tel: 416-304-0595 Fax: 416-304-1313 Lawyers for BDO Canada Limited AND TO: TORKIN MANES Barristers and Solicitors 151 Yonge Street, Suite 1500 Toronto ON M5C 2W7 Jeff Simpson [email protected] Tel: 416-777-5413 Fax: 1-888-587-9143 Lawyers for HMT Holdings Inc. AND TO: GOLDMAN SLOAN NASH & HABER LLP Barristers and Solicitors 480 University Avenue, Suite 1600 Toronto ON M5G 1V2 Brendan Bissell [email protected] Tel: 416-597-6489 Fax: 416-597-9922 Lawyers For Sure Mortgage Capital Inc. CAN: 22443870.1 - 3 - AND TO: BENNETT JONES LLP 3400 One First Canadian Place P.O.
    [Show full text]
  • 450-460 Weber St. N
    PLANNING JUSTIFICATION REPORT 450 – 460 WEBER STREET NORTH, CITY OF WATERLOO PREPARED FOR: 2439672 ONTARIO INC. PREPARED BY: LABRECHE PATTERSON & ASSOCIATES INC. SCOTT PATTERSON, BA, CPT, MCIP, RPP PRINCIPAL, SENIOR PLANNER ALICIA MONTEITH, BES PLANNER 330 – F TRILLIUM DRIVE KITCHENER, ONTARIO N2E 3J2 PHONE: 519-896-5955 FAX: 519-896-5355 DATE: APRIL 7, 2017 PROJECT NO.: P-732-14 450 – 460 WEBER STREET NORTH, WATERLOO ZONING BY-LAW AMENDMENT APPLICATION TABLE OF CONTENTS 1. INTRODUCTION 1 2. AREA DESCRIPTION 1 3. PROPOSED DEVELOPMENT 7 4. PROVINCIAL POLICY STATEMENT (2014) 9 5. PLACES TO GROW–GROWTH PLAN FOR THE GREATER GOLDEN HORSESHOE (2006) 11 6. CITY OF WATERLOO OFFICIAL PLAN (2012) 12 7. CITY OF WATERLOO ZONING BY-LAW 1418 17 8. CITY OF WATERLOO COMPREHENSIVE REVIEW OF THE ZONING BY-LAW 19 9. PROPOSED AMENDMENT 21 10. SUPPORTING MATERIALS 23 11. CONCLUSION 25 PLANNING JUSTIFICATION REPORT Labreche Patterson & Associates Inc. OUR FILE: P- 732-14 450 – 460 WEBER STREET NORTH, WATERLOO ZONING BY-LAW AMENDMENT APPLICATION 1. INTRODUCTION Labreche Patterson & Associates Inc. has been retained by 2439672 Ontario Inc. to provide this Justification Report in support of the proposed development of the lands municipally known as 450 Weber Street North and 460 Weber Street North, in the City of Waterloo. As part of a comprehensive Master Plan development of the subject properties and an abutting property at 435 King Street North, the landowners are proposing to construct a mixed-use development consisting of multiple buildings and residential, commercial and employment uses. At this time, the landowners wish to seek additional permitted uses above and beyond those currently permitted in the “I-6” zone as found in Zoning By-law No.
    [Show full text]
  • Court File No. CV-19-614593-00CL
    Court File No. CV-19-614593-00CL ONTARIO SUPERIOR COURT OF JUSTICE (COMMERCIAL LIST) B E T W E E N: CORNER FLAG LLC Applicant – and – ERWIN HYMER GROUP NORTH AMERICA, INC. Respondent APPLICATION UNDER section 243 of the Bankruptcy and Insolvency Act, R.S.C. 1985, c. B-3, as amended, and under section 101 of the Courts of Justice Act, R.S.O. 1990, c. C.43 MOTION RECORD OF ALVAREZ & MARSAL CANADA INC., IN ITS CAPACITY AS COURT-APPOINTED RECEIVER AND MANAGER OF ERWIN HYMER GROUP NORTH AMERICA, INC. (Motion for Approval of Sales Process) March 20, 2019 OSLER, HOSKIN & HARCOURT LLP 100 King Street West 1 First Canadian Place Suite 6200, P.O. Box 50 Toronto, ON M5X 1B8 Tracy C. Sandler (LSO# 32443N) Tel: 416.862.5890 Jeremy Dacks (LSO# 41851R) Tel: 416.862.4923 Fax: 416.862.6666 Counsel for the Receiver – 2 – TO: THE SERVICE LIST AND TO: THE SUPPLEMENTAL SERVICE LIST Court File No. CV-19-614593-00CL ONTARIO SUPERIOR COURT OF JUSTICE COMMERCIAL LIST BETWEEN: CORNER FLAG LLC Applicant – and – ERWIN HYMER GROUP NORTH AMERICA, INC. Respondents SERVICE LIST (as at March 20, 2019) PARTY CONTACT BLAKE, CASSELS & GRAYDON LLP Pamela L.J. Huff Commerce Court West Tel: 416.863.2958 199 Bay Street, Suite 4600 Email: [email protected] Toronto, ON M5L 1A9 Linc Rogers Tel: 416.863.4168 Fax: 416.863.2653 Email: [email protected] Counsel to the Applicant Aryo Shalviri Tel: 416.863.2962 Email: [email protected] Vanja Ginic Tel: 416.863.3278 Email: [email protected] Caitlin McIntyre Tel: 416.863.4174 Email: [email protected] [2] ALVAREZ & MARSAL CANADA INC.
    [Show full text]
  • Waterloo Region Resource Booklet for Young Adults 2017
    1 WATERLOO REGION RESOURCE BOOKLET FOR YOUNG ADULTS 2017 INDEX page Introduction 3 Advocacy & Support 4 Health & Wellness 10 Brain Injury Rehabilitation and Services 14 Mental Health & Counselling Services 15 Therapy Services 21 Social & Recreation 23 School 28 Employment and Volunteer Supports 32 Money Matters 34 Transportation 38 Living on Your Own 43 2 INTRODUCTION This booklet contains information about community agencies in Waterloo Region that provide services to adults with physical disabilities. It is intended to aid the transition from pediatric services to adult services. This booklet was compiled by the Transition Network Committee of Waterloo Region (TNCWR) and was last updated May 2017. The Transition Network Committee of Waterloo Region is comprised of community agencies that provide support to children, youth and adults with physical disabilities, and family members. The committee builds community capacity through communication, education, and a shared community vision to facilitate the transition of youth with physical disabilities to adult living. For more information about this committee, or to have your agency included in the next version of this booklet, contact Joanne Duddy at [email protected] or at (519) 886- 8886 x1325. In addition to the information found in this booklet, the following websites are great resources; www.wrfn.info https://canchild.ca/en/research-in-practice/transitions 3 ADVOCACY AND SUPPORT Various local and provincial agencies and organizations offer assistance and information to individuals with disabilities, their families and service providers. Advocacy often focuses on raising public awareness regarding disability-related issues. CAMBRIDGE ACCESSIBILITY ADVISORY COMMITTEE (CAAC) This committee advises Cambridge City Council, about the preparation, implementation, and effectiveness of its accessibility plan each year.
    [Show full text]
  • Fl-Cal of the REGIONAL MUNICIPALITY of WATERLOO a By-Law
    BY-LAW NUMBER ;fl-cal OF THE REGIONAL MUNICIPALITY OF WATERLOO A By-law to Amend By-law Number 33-77 entitled The Traffic By-law. The Council of The Regional Municipality of Waterloo enacts as follows: 1. Schedule "A", Part 1, page 20 of By-law Number 33-77 is hereby repealed and the attached Schedule "A", Part 1, page 20 is substituted therefor. 2. Schedule "K", page 114 of By-law Number 33-77 is hereby repealed and the attached Schedule "K", page 114 is substituted therefor. By-law read a first and second time this 9th day of April, A.D. 1981. Read a third time and finally passed in the Council Chambers of The Regional Municipality of Waterloo this 9th day of April, A .D. 1981. Page 20 SCHEDULE "A" PART 1 REFERENCE HIGHWAY SIDE FROM TO 1. Wilmot Regional Road 9 North Regional Road 12 90 m westerly 2. Wilmot Regional Road 9 South Regional Road 12 120 m westerly 3. Waterloo Regional Road 9 (Erb Street) North Hallman Road 30 m westerly 4. waterloo Regional Road 9 (Erb Street) North 30 m west of Churchill Avenue 30 m east of Churchill Ave 5. Waterloo Regional Road 9 (Erb Street) North 30 m west of Amos Avenue Bridgeport Road East 6. Waterloo Regional Road 9 (Erb Street) South Hallman Road 90 m east of Weber Street 7. Waterloo Regional Road 9 (Erb Street) South 34 m west of Ellis Crescent 30 m east of Margaret Ave. 8. Waterloo Regional Road 9 (Erb Street) South 60 m west of Terrystone Walk Bridgeport Road East 9.
    [Show full text]
  • Integrated Transportation Master Plan TRANSPORTATION’S ROLE in a COMPLETE and HEALTHY KITCHENER
    Final Report Kitchener Integrated Transportation Master Plan TRANSPORTATION’S ROLE IN A COMPLETE AND HEALTHY KITCHENER June 2013 Table of Contents Executive Summary: Implementation Measures ........................................ 1 1. Travel Safety .............................................................................................................. 1 2. Active Transportation ............................................................................................... 1 3. Transportation Demand Management .................................................................... 3 4. Neighbourhood Traffic Management ...................................................................... 4 5. Parking Supply and Management ........................................................................... 4 5.2 Zoning Bylaw Parking Provisions ......................................................................... 5 6. Goods Movement ...................................................................................................... 5 7. Traffic Control ........................................................................................................... 6 8. Master Plan Implementation .................................................................................... 6 1. Planning Context .................................................................................. 1 1.1 Report Organization ............................................................................................ 1 1.2 Purpose & Scope of the Integrated Transportation
    [Show full text]
  • Rapid Transit Initiative
    Rapid Transit Initiative Phase 2 Summary Report – Environmental Assessment Study September 24, 2009 in association with Region of Waterloo Rapid Transit Initiative Phase 2 Summary Report – Environmental Assessment Study September 24, 2009 Document Control Version History Version Date Change 0.1-Draft May 8, 2009 Preliminary Draft 1.0 September 24, 2009 Final Revision and Approval Control of Last Version Task Responsibility Position Date Preparation Doug Willoughby AECOM September 24, 2009 Project Manager Katie Harvey AECOM Designer - Transportation Revision Darshpreet Singh Region of Waterloo July 14, 2009 Bhatti Senior Project Manager Rapid Transit Initiative David Durant Region of Waterloo Senior Project Manager Rapid Transit Initiative Approval in association with Page i Region of Waterloo Rapid Transit Initiative Phase 2 Summary Report – Environmental Assessment Study September 24, 2009 TABLE OF CONTENTS 6.2.5. OTTAWA STREET (CHARLES STREET EAST TO MILL STREET) .................................................. 83 6.2.6. CNR HURON PARK SUBDIVISION (OTTAWA STREET SOUTH TO HAYWARD AVENUE) ........... 83 1.0 INTRODUCTION ................................................................................................................................................. 1 6.2.7. COURTLAND AVENUE ....................................................................................................................... 83 1.1. ONTARIO ENVIRONMENTAL ASSESSMENT PROCESS FOLLOWED .................................................... 1 6.2.8. HYDRO CORRIDOR
    [Show full text]
  • Fifth Edition
    Issue No. 5 - Wednesday, May 6, 2020 FIFTH EDITION This is our Fifth Edition of the WCR Press. We have continued planning for when our trains begin to operate again by developing a plan to ensure our passengers and visitors feel safe travelling with us. Through the WCR Press we hope to stay in touch with our volunteers, neighbours and partners during the temporary shut down and showcase the initiatives being undertaken that are required to keep the WCR operating in a safe fashion. We enjoy providing a history of our heritage operating rail collection as well as other railway operations that have served the area over the years. We would be remiss if we did not thank those who have been so helpful to us during this unprecedented time by providing information and answers to our questions and concerns. They themselves are either in shutdown and working from home, on lay-off or with reduced staff but have continued to be there for us. Among them have been the Waterloo Region Tourism Marketing Corporation, The Greater KW Chamber of Commerce, the Village of St. Jacobs BIA, the Township of Woolwich, the City of Waterloo, Regional Municipality of Waterloo, MP Tim Louis, MPP Mike Harris and Transport Canada. No. 9 takes its train south between Elmira and St. Jacobs in August of 2019. Photo by Greg McDonnell Although primarily a volunteer not-for-profit organization, we are also a provincially licensed shortline railway operating with oversight provided by Transport Canada – that never stops. We are also a small business facing the same challenges as every other small business trying to maintain a payroll, meeting on-going expenses – all while attempting to determine whether we will be able to operate or not with little or no revenue.
    [Show full text]
  • Stage 1 Archaeological Assessment Proposed
    Stage 1 Archaeological Assessment Proposed Multi-Residential Development 22 Weber Street West Part of Lot 5, Registered Plan 360 City of Kitchener Regional Municipality of Waterloo Part of Lot 3, German Company Tract Geographic Township of Waterloo Waterloo County, Ontario Prepared for Denny Cybalski c/o MHBC Planning, Urban Design & Landscape Architecture 540 Bingemans Centre Drive, Suite 200 Kitchener, ON N2B 3X9 Tel: (519) 576–3650 Licensed under P.J. Racher MHSTCI Licence #P007 PIF #P007-1100-2020 ARA File #2020-0051 10/07/2020 Original Report Stage 1 Archaeological Assessment Proposed Multi-Residential Development, 22 Weber Street West, City of Kitchener i EXECUTIVE SUMMARY Under a contract awarded in April 2020, Archaeological Research Associates Ltd. carried out a Stage 1 assessment of lands with the potential to be impacted by a multi-residential development at 22 Weber Street West in the City of Kitchener, Regional Municipality of Waterloo, Ontario. The proposed development consists of a 15-storey structure (including a ground floor and 14 floors with 9 units each for a total of 126 units) and 29 parking spaces. The assessment was carried out in support of an Official Plan Amendment and Zoning By-law Amendment application and was triggered by the requirements set out in Section 2.6 of the Provincial Policy Statement, 2020 issued under Section 3 of the Planning Act. This report documents the background research and potential modelling involved in the assessment, and presents conclusions and recommendations pertaining to archaeological concerns within the property. The Stage 1 assessment was conducted in June 2020 under Project Information Form #P007-1100- 2020.
    [Show full text]
  • Georgetown to Kitchener Rail Expansion Environmental Study Report
    Georgetown to Kitchener Rail Expansion Environmental Study Report GO Transit Prepared by R.J. Burnside & Associates Limited 170 Steelwell Road, Suite 200 Brampton ON L6T 5T3 Canada July 13, 2009 File No: MTB 14877.0 The material in this report reflects best judgement in light of the information available at the time of preparation. Any use which a third party makes of this report, or any reliance on or decisions made based on it, are the responsibilities of such third parties. R.J. Burnside and Associates Limited accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this report. GO Transit i Environmental Study Report Georgetown to Kitchener Rail Expansion July 2009 Executive Summary New or Expanded Bus Service: This alternative would involve the expansion of bus service on This Executive Summary highlights the study findings contained in the Environmental Study existing major arterial roadways and highways. The expanded service would be primarily an express Report (ESR) with particular emphasis on the preferred alternative design concept and the service to enable the most efficient travel time for inter-regional commuter traffic. In order to main issues identified during the study process. improve the frequency and reliability of bus services, transit signal priority, rush-hour reserved bus lanes or dedicated bus-only roadways / transit-ways may be considered. Additional infrastructure E.1 Why Undertake this Study? would be required to support the increased number of buses such as new bus terminals and maintenance and storage facilities. GO Transit currently operates the Georgetown peak period train service between Union Station and the Town of Georgetown.
    [Show full text]
  • GSR Vertical File Index General Subjects
    GSR Vertical File Index General Subjects Compiled by the staff of Information Services, Kitchener Public Library Revised 1 January 2017 - 1 - GSR General Subjects Abbreviations: CB-KW = Collective Biography – Kitchener Waterloo CB–Watco = Collective Biography – Waterloo County (Region) – excluding Kitchener –Waterloo RMW = Regional Municipality of Waterloo Note: Coverage starts from various dates to 31 December 2004. For articles from the Waterloo Region Record (formerly K-W Record), dated 1 January 2005 to the present, please see staff at the Information Level 2 desk (outside the Grace Schmidt Room). Thank you. Updated 1 January 2017 Page 2 of 638 GSR General Subjects GSR General Subject Headings Index General A AASMAN, SUSAN see CB WATCO ABATE, LAURA ABBAS, ALI see IRAQ – WAR 2003 ABBEY, JOHN see CB WATCO ABBOTT, BRUCE see CB KW ABBOTT, KATHLEEN (WIFE OF WILLIAM) NEE LOTH see CB KW ABERNATHY, RUTH see ARTISTS-RMW ABERLE, MURRAY see CB WATCO ABERLE, ROY see CB WATCO ABILITY CENTRE ABORIGINAL PEOPLES – ARCHAEOLOGY see also ARCHAEOLOGY ABORIGINAL PEOPLES – GENERAL ABORIGINAL PEOPLES – MISSISSAUGAS OF THE NEW CREDIT FIRST NATION ABORIGINAL PEOPLES – POWWOWS ABORIGINAL PEOPLES – SIX NATIONS OF THE GRAND RIVER ABORIGINAL PEOPLES – WEEJEENDIMIN NATIVE RESOURCE CENTRE ABORTION - K-W see also PLANNED PARENTHOOD - WATERLOO REGION; K-W RIGHT TO LIFE ABWUNZA YMCA CHILD CARE CENTRE see DAY CARE (A-Z) ACADEMY OF DANCE see BUS ENT WAT ACCIDENTS - KITCHENER, ONTARIO - 1995 - 1999, 2000 - see also scrapbooks in GSR (MGSR 363.100971345 ACCID for (Volume
    [Show full text]
  • BY-LAW NUMBER Insert By-Law Number
    BY-LAW NUMBER 12-028 OF THE REGIONAL MUNICIPALITY OF WATERLOO A By-law to Confirm the Proceedings of the Council of the Regional Municipality of Waterloo at this Meeting Held on June 27, 2012 WHEREAS by Section 5(1) of the Municipal Act, 2001, c.25, the powers of a municipality shall be exercised by its Council; AND WHEREAS by Section 5 (3), the powers of Regional Council are to be exercised by by- law; AND WHEREAS it is deemed expedient that proceedings of the Council of the Regional Municipality of Waterloo as herein set forth be confirmed and adopted by by-law; NOW THEREFORE THE COUNCIL OF THE REGIONAL MUNICIPALITY OF WATERLOO ENACTS AS FOLLOWS: 1. The actions of the Council of the Regional Municipality of Waterloo at this meeting held on the 27th day of June, 2012 in respect of each recommendation contained in the Reports of Standing and Special Committees as adopted or amended and adopted and each motion and resolution passed or other action taken by the Council of the Regional Municipality of Waterloo at this meeting are hereby adopted and confirmed as if all such proceedings were expressly embodied in this By-law. The foregoing includes but is not limited to the reports enumerated in Schedule "A" to this By-law. 2. The Regional Chair and proper officials of the Regional Municipality of Waterloo are hereby authorized and directed to do all things necessary to give effect to the actions of the Council of the Regional Municipality of Waterloo referred to in the preceding section hereof.
    [Show full text]