Warehouse for Rent in Lazar Logistic Center 117045 Pitești, Str

Total Page:16

File Type:pdf, Size:1020Kb

Warehouse for Rent in Lazar Logistic Center 117045 Pitești, Str Homepage / A category warehouses / Lazar Logistic Center Lazar Logistic Center 117045 Pitești, Str. Paisesti DN, Nr. 5 Warehouse Rental Fee (m2 / month) Available Warehouse Space : - 3.200 m2 Service Charge: - Min. Warehouse Space for Rent: 100 m2 117045 Pitești, Str. Paisesti DN, Nr. 5 Available Warehouse Space: 3.200 m2 Min. Warehouse Space for Rent: 100 m2 From Owner Alina Ghinea Alina Ghinea Description S.C. INTERNATIONAL S.C. INTERNATIONAL LAZAR COMPANY LAZAR COMPANY ▪ STORAGE S.R.L S.R.L ▪ HANDLING (including heavy goods up to 32 tons) +40 72 070 0100 +40 72 070 0100 ▪ DELIVERY ▪ STOCKS ADMINISTRATION Mail me Caracteristics of the Project : • Modern center of logistics and distribution A class • Railway connection ● Complex Informational flows via EDI(electronic data interchange) • Functional office spaces Spatial Data • Confference and videoconfference halls Warehouse Category: A category warehouses • Large parking for cars and trucks • Flexibility for satisfaction of customers Building Status: Exist • Profesionnal property management services: (security 24h/24h, cleaning, exterior lighting etc) Warehouse Space in Total : 6200 m2 Available Warehouse Space : 3.200 m2 Description of Location Rentable Warehouses : - Lazar Logistics one of the most modern and well equipped logistics Min. Warehouse Space for 100 m2 parks in Romania benefits from direct access to the A1 motorway and is Rent : located just 5 minutes from Pitesti the capital and the largest city of Arges county. Add-on Factor: - Pitesti is the capital of Arges County, one of the most developped industrial area of Romania. The city of Pitesti is situated in the central- Occupancy Rate: - south side of the country, reprezenting an important road nidle, conected by Bucharest through A1 highway and sustained by a good acces for infrastructure. Closest cities: • Bucharest (120 km SE) - A1 • Craiova (103 km SV) - Financial Information DN65 • Sibiu (118 km NV) - DN7 • Brasov (109 km NE) - DN73 • Arad Warehouse Rental Fee: - (425 km NV) - DN7+DN1 • Constanta (350 km SE) - A1+A2 • Curtea de Arges (40 km NV) – DN7C • Ramnicu Valcea (65 km NV) – DN7 Service Charge: - Lazar Logistic Center is located on the A1 highway Bucharest - Pitesti at Min. Rental Period: 1 month km 120, with DN 7 Pitesti - Rm. Valcea, thus Logistic center is connected to the major transport routes and to the main economic and Financial Guarantee: - logistic hotspots. Lazar Logistic Center is located 120 km far from Bucharest, 103 km far from Craiova, 109 km far from Brasov and 350 km far from Constanta. Rent Calculator » Parking Type of Parking Spaces Parking Fee Surface Parking - - Underground - - Additional Info Year of Construction: December 1, 2010 Year of Renovation: - Tenants: LAZAR LOGISTICS – References and Cetifications ➢ HOEDLMAYR INTERNATIONAL AG SCHWERTBERG ➢ AGRO CS SLOVACIA ➢ UNITED STATES STEEL EUROPA, SLOVACIA ➢ AUTOMOBILE DACIA SA ➢ CEVA LOGISTICS ROMANIA ➢ SC ABB SRL, a part of ABB HOLDINGS BV ➢ SC ROMELECTRO SA ➢ KAERCHER ROMANIA ➢ SC EURO AUTO PLASTIC SYSTEM SRL ➢ SC DELTA INVEST SRL ➢ COCA-COLA HBC ROMANIA SRL Services Fuel station Offices Parking for cars Separate access for office staff Parking for trucks Meeting room Public transport on site Direct highway access Rest facility Shower, locker room Climate controlled Cross dock Bulk space Online visibility Vehicle wash Properties Building name: 1 Column grid size: 25.3 Clear height: 10,15 m Floor loading: 40 t/m2 Dock doors (nr): 2 Drive in doors (nr): 2 Warehouse space Total space: 6200 m2 Available space: 3000 m2 Office space Total space: 200 m2 Available space: 200 m2 Attributes Offices Parking for cars Separate access for office staff Parking for trucks Public transport on site Direct highway access Shower, locker room Cross dock Bulk space Online visibility Commercial area Technical parameters Water availability Ventillation Fire protection Security Heating system CCTV.
Recommended publications
  • AGENDA LACEY PLANNING COMMISSION MEETING Tuesday, July 21, 2020 – 4:00 P.M
    AGENDA LACEY PLANNING COMMISSION MEETING Tuesday, July 21, 2020 – 4:00 p.m. MEETING WILL BE CONDUCTED REMOTELY, NOT IN-PERSON. TO ATTEND THE MEETING REGISTER AT: https://us02web.zoom.us/j/88061444555 (*see below for further info) Call to Order: 4:00 p.m. A. Roll Call B. Approval of Agenda & Consent Agenda Items Approval of July 7 Meeting Minutes Public Comments: 4:01 p.m. Commission Members Reports: 4:03 p.m. Director’s Report: 4:05 p.m. New Business: 4:10 p.m. Shoreline Master Program Periodic Update: Jessica Brandt, Associate Planner; Dan Nickel, The Watershed Company. The Planning Commission will be briefed by staff and the City’s consultant on proposed amendments to the City’s Shoreline Master Program to comply with the periodic update requirements of the Washington State Shoreline Management Act. Stormwater Comprehensive Plan Update: Doug Christenson, Stormwater Engineer. The Planning Commission will be briefed on the draft Stormwater Comprehensive Plan which will provide a multi-year plan to guide the programs, activities, and projects of Lacey’s Storm and Surface Water Utility. Communications and Announcements: 4:55 p.m. Next Meeting: August 4, 2020. Adjournment: 5:00 p.m. *Or iPhone one-tap: US: +13017158592,,88061444555# or +19292056099,,88061444555# Or Telephone: Dial (for higher quality, dial a number based on your current location): US: +1 301 715 8592 or +1 929 205 6099 or +1 312 626 6799 or +1 346 248 7799 or +1 669 900 6833 or +1 253 215 8782 or 888 788 0099 (Toll Free) or 877 853 5247 (Toll Free) Webinar ID: 880 6144 4555 International numbers available: https://us02web.zoom.us/u/kDYk6DP5 Page 1 of 1 MINUTES Lacey Planning Commission Meeting Tuesday, July 7, 2020 – 4:00 p.m.
    [Show full text]
  • Driving Restrictions, Goods Transport Germany 2019 Vehicles Concerned Trucks with a Total Permissible Weight of Over 7.5T, As We
    Driving Restrictions, Goods Transport Germany 2019 Vehicles concerned trucks with a total permissible weight of over 7.5t, as well as trucks with trailers in case of business-like/commercial or paid transportation of goods including related empty runs. Area throughout the road and motorway network Prohibition Sundays and public holidays from 00h00 to 22h00 Exceptions (applies also to the additional summer driving restrictions) 1. Combined rail/road goods transport from the shipper to the nearest loading railway station or from the nearest designated unloading railway station to the consignee up to a distance of 200km (no limitation on distance during the additional summer restrictions); also combined sea/road goods transport between the place of loading or unloading and a port situated within a radius of 150km maximum (delivery or loading). 2. Deliveries of fresh milk and other dairy produce, fresh meat and its fresh derivatives, fresh fish, live fish and their fresh derivatives, perishable foodstuffs (fruit and vegetables). 3. Transportation of animal by-products according to category 1, Art. 8 as well as category 2, Art. 9f of regulation (EG) No. 1069/2009. 4. Use of vehicles of recovery, towing and breakdown services in case of an accident or other emergencies. 5. Transport of living bees. 6. Empty vehicles, in connection with the transport operations mentioned under point 2-5. 7. Transport operations using vehicles subject to the Federal Law on the obligations of service; the relevant authorisation must be carried on board and produced for inspection on request. Also exempted from the prohibition are vehicles belonging to the police and federal border guard, fire brigades and emergency services, the federal armed services and allied troops.
    [Show full text]
  • (EDI) Claim & Reporting Compliance Handbook
    Iowa EDI Claim and Reporting Compliance Handbook IOWA DIVISION OF WORKERS’ COMPENSATION July 2001 Iowa Division of Workers' Compensation EDI Release 2 Handbook This publication is the sole property of the International Association of Industrial Accident Boards and Commissions and the Iowa Division of Workers’ Compensation © International Association of Industrial Accident Boards and Commissions, 1998 © Iowa Division of Workers’ Compensation, 2000 I. TABLE OF CONTENTS II. INTRODUCTION .............................................................................................................4 General Overview .................................................................................................................................................................4 Iowa EDI Claim and Reporting Compliance Handbook ...............................................................................................4 Iowa EDI Objectives .....................................................................................................................................................4 Letter from the Commissioner ............................................................................................................................................5 Contact List.............................................................................................................................................................................6 Iowa Division of Workers’ Compensation.................................................................................................6
    [Show full text]
  • Driving Restrictions, Goods Transport, 2020 Austria
    Driving Restrictions, Goods Transport, 2020 Austria 1. GENERAL DRIVING RESTRICTIONS Vehicles concerned Trucks with trailers, if the maximum authorised total weight of the motor vehicle or the trailer exceeds 3.5t; trucks, articulated vehicles and self- propelled industrial machines with an authorised total weight of more than 7.5t. Area Nationwide, with the exception of journeys made exclusively as part of a combined transport operation within a radius of 65km of the following transloading stations: Brennersee; Graz-Ostbahnhof; Salzburg- Hauptbahnhof; Wels-Verschiebebahnhof; Villach-Fürnitz; Wien- Südbahnhof; Wien-Nordwestbahnhof; Wörg; Hall in Tirol CCT; Bludenz CCT; Wolfurt CCT. Prohibition Saturdays from 15h00 to 24h00; Sundays and public holidays from 00h00 to 22h00 Public holidays 2020 1 Jan New Year's Day 6 Jan Epiphany 13 Apr Easter Monday 1 May Labour Day 21 May Ascension Day 1 Jun Whit Monday 11 Jun Corpus Christi 15 Aug Assumption of the Virgin Mary 26 Oct National Day 1 Nov All Saints' Day 8 Dec Immaculate Conception 25 Dec Christmas Day 26 Dec St Stephen's Day Exceptions concerning trucks with trailers exceeding 3.5t · vehicles transporting milk; concerning vehicles with an authorised total weight of more than 7.5t · vehicles carrying meat or livestock for slaughter (but not the transport of heavy livestock on motorways); · perishable foodstuffs (but not deep frozen goods) which are as follows: fresh fruits and fresh vegetables, fresh milk and fresh dairy products, fresh meat and fresh meat products, fresh fish and fresh fish products, live fish, eggs, fresh mushrooms, fresh bakery products and fresh cakes and pastry, fresh herbs as potted plant or cut and ready-to-eat food preparations, as well as empty transports linked to the transports of the above mentioned goods or return journeys for carriage of transport facilities and wrapping of the above mentioned goods (a CMR (a consignment note) needs to be carried onboard and presented in case of inspection).
    [Show full text]
  • Braukšanas Ierobežojumi Kravas Transportlīdzekļiem Rumānijā 2020. Gadā
    Braukšanas ierobežojumi kravas transportlīdzekļiem Rumānijā 2020. gadā 1. Vispārējie braukšanas ierobežojumi: Transportlīdzekļi: Kravas transportlīdzekļi ar pilnu masu virs 7.5t; Ierobežojumu darbības zona: DN1 (E60), Bucharest – Ploiesti – Brasov (skatīt tabulā) Ierobežojumi spēkā: No 2020. gada 1. janvāra līdz 31. decembrim; Ierobežojumi spēkā Nr. Ceļš Virziens Pirmdiena - Piektdiena un Svētdiena ceturtdiena sestdiena DN1, km 17 + 900 (Otopeni 1. pilsētas robeža) – Ploiesti 6.00 – 22.00 00.00 – 24.00 00.00 – 24.00 (krustojums DN1 –DN1A) DN1 DN1, km 67 + 400 Ploiesti 00.00 – 01.00 2. (krustojums DN1 –DJ1236) – 6.00 – 22.00 00.00 – 24.00 05.00 – 24.00 Brasov (DN1 – DN1 A); Izņēmumi: Civilās aizsardzības transportlīdzekļi, bēru transports, pirmās palīdzības un humanitārās palīdzības dienestu transportlīdzekļi, pasta pārvadājumi, degvielas pārvadājumi, specializētie avārijas transportlīdzekļi, sanitāro dienestu transportlīdzekļi. Alternatīvi maršruti: DN1A: Bucharest – Ploiesti – Brasov; A3: Bucharest – Ploiesti; DN1A: Ploiesti – Brasov; DN7: Bucharest – krustojums DN7 – DN71; DN71: krustojums DN7 – DN71 – Targoviste; DN72A: Targoviste – Stoenesti – krustojums DN72A – DN73; DN73: krustojums DN72A – DN73 – Rasnov – Brasov. 2. Citi braukšanas ierobežojumi Ierobežojumu periods, dienas un laiks Ierobežojumu periods, dienas un laiks Ierobežojumu periods, dienas un laiks Valsts svētku Dienu pirms Periods Valsts dienas, kas Periods Piektdiena Sestdiena Svētdiena valsts svētku Ceļa svētku noteiktas dienas Ceļš Darbības zona virziens diena atbilstoši valdības lēmumam* Bucharest Bucharest (krustojums A2 - - Constanta 06.00 06.00 Bucharest - - - apvedceļš) – 22.00 22.00 Fundulea – 1. jūlijs 1. aprīlis 16.00 06.00 06.00 Lehliu– Fetesti – - A2 - 30. - - - Cernavoda 31. septembris 22.00 22.00 22.00 – augusts Constanta (A2 Constanta 06.00 krustojums ar - - - - A4) Bucharest 22.00 Pitesti (krustojums DN7 ar DN 7C) – 16.00 06.00 06.00 Abos DN7 Ramnicu Visu gadu - - - - - - - virzienos Valcea – 22.00 22.00 22.00 Vestem (krustojums DN7 - DN1) Agigea – 1.
    [Show full text]
  • Driving Restrictions, Goods Transport, 2019 Austria 1. GENERAL
    Driving Restrictions, Goods Transport, 2019 Austria 1. GENERAL DRIVING RESTRICTIONS Vehicles concerned Trucks with trailers, if the maximum authorised total weight of the motor vehicle or the trailer exceeds 3.5t; trucks, articulated vehicles and self- propelled industrial machines with an authorised total weight of more than 7.5t. Area Nationwide, with the exception of journeys made exclusively as part of a combined transport operation within a radius of 65km of the following transloading stations: Brennersee; Graz-Ostbahnhof; Salzburg- Hauptbahnhof; Wels-Verschiebebahnhof; Villach-Fürnitz; Wien- Südbahnhof; Wien-Nordwestbahnhof; Wörg; Hall in Tirol CCT; Bludenz CCT; Wolfurt CCT. Prohibition Saturdays from 15h00 to 24h00; Sundays and public holidays from 00h00 to 22h00 Public holidays 2019 1 Jan New Year's Day 6 Jan Epiphany 22 Apr Easter Monday 1 May Labor Day 30 May Ascension Day 10 Jun Whit Monday 20 Jun Corpus Christi 15 Aug Assumption of the Virgin Mary 26 Oct National Day 1 Nov All Saints' Day 8 Dec Immaculate Conception 25 Dec Christmas Day 26 Dec St Stephen's Day Exceptions concerning trucks with trailers exceeding 3.5t · vehicles transporting milk; concerning vehicles with an authorised total weight of more than 7.5t · vehicles carrying meat or livestock for slaughter (but not the transport of heavy livestock on motorways); · perishable foodstuffs (but not deep frozen goods) which are as follows: fresh fruits and fresh vegetables, fresh milk and fresh dairy products, fresh meat and fresh meat products, fresh fish and fresh fish products, live fish, eggs, fresh mushrooms, fresh bakery products and fresh cakes and pastry, fresh herbs as potted plant or cut and ready-to-eat food preparations, as well as empty transports linked to the transports of the above mentioned goods or return journeys for carriage of transport facilities and wrapping of the above mentioned goods (a CMR (a consignment note) needs to be carried onboard and presented in case of inspection).
    [Show full text]
  • Romania National Reform Programme 2020
    NATIONAL REFORM PROGRAMME 2020 BUCHAREST APRIL 2020 TABLE OF CONTENTS ABBREVIATION INDEX .................................................................................. 3 1. INTRODUCTION .................................................................................. 7 2. MACROECONOMIC CONTEXT AND SCENARIO ................................................... 9 3. POLICY RESPONSE TO ECONOMIC CHALLENGES .................................. 13 3.1. Fiscal and budgetary policy ................................................... 13 3.2. Business environment and competitiveness ............................ 29 3.3. Strenghtening administrative capacity and other governmental measures ................................................................................. 53 4. NATIONAL EUROPE 2020 OBJECTIVES ......................................................... 73 4.1. Employment ........................................................................... 73 4.2. Research, Development and Innovation (RDI) ......................... 82 4.3. Environment and climate change ............................................ 90 4.4. Renewable energy sources ..................................................... 98 4.5. Energy efficiency .................................................................. 101 4.6. Early school leaving ............................................................. 106 4.7. Tertiary education ............................................................... 116 4.8. Social inclusion and combating poverty ...............................
    [Show full text]
  • Prohibiciones De Circulacion Para Vehiculos En Rumanía
    PROHIBICIONES DE CIRCULACION PARA VEHICULOS EN RUMANÍA Prohibición Para camiones y conjuntos con más de 7,5 t de PMA. - Período: Todo el año. Días y horas restringidas Artículo Carretera Ruta Lunes-Jueves Viernes Sábado-Domingo DN1 - KM 17.900 - Otopeni - Ploiesti 1 DN1 (interjección DN1 con DN1 A) 06:00h - 22:00h 00:00h - 24:00h 00:00h - 24:00h Poiesti (interjección DN1 con DN1 B) - 2 Brasov (interjección DN1 con DN1 A) Excepciones: vehículos de protección civil, transporte funerario, primeros auxilios y transporte humanitario, correo, distribución de carburante, vehículos para averías de coches, vehículos sanitarios. Rutas alternativas: - DN1A: Bucharest – Ploiesti – Brasov - A3: Bucharest – Ploiesti; DN1A: Ploiesti – Brasov - DN7: Bucharest – intersección DN7 – DN71; DN71: intersección DN7 – DN71 – Targoviste; DN72A: Targoviste – Stoenesti – intersección DN72A – DN73; DN73: intersección DN72A – DN73 – Rasnov – Brasov. PROHIBICIONES LOCALES EN BUCAREST Pro hibición Para camiones de más de 5 t. de PMA. - Localización: Zona “A” de Bucarest, delimitada por las siguientes zonas: Bulevar Dacia – Calle Traian – Calle Nerva Traian – Bulevar Octavian Goga – Pasaje Marasesti – Bulevar Marasesti – Calle Mitropolit Nifon – Bulevar Libertatii – Calle 13 Septembrie – Calle Pandurilor – Calle Grozavesti – Calle Orhideelor – Bulevar Dinicu Golescu – Plaza Gara de Nord – Calle Grivitei – Calle Nicolae Titulescu – Bulevar Banu Manta – Bulevar Ion Mihalache – Bulevar Maresal Averescu – Bulevar Constantin Prezan – Bulevar Aviatorilor – Bulevar Mircea Eliade – Bulevar P.I. Ceaikovski – Calle Barbu Vacarescu – Calle Tunari – Bulevar Dacia. Prohibición Para camiones de más de 7.5 t de PMA. - Localización: Zona “B” de Bucarest, delimitada por las siguientes zonas: Bulevar Aerogarii – Calle Cpt Alex Serbanescu – Calle Barbu Vacarescu – Calle Fabrica de Glucoza – Carretera principal Petricani – Calle Doamna Ghica – Carretera principal Colentina – Carretera principal Fundeni – Calle Morarilor – Bulevar Basarabia – Bulevar 1 Decembrie 1918 – Bulevar Th.
    [Show full text]
  • Driving Restrictions, Goods Transport Romania 2019 GENERAL RESTRICTIONS Vehicles Concerned Goods Vehicles of Over 7.5T MPW Area
    Driving Restrictions, Goods Transport Romania 2019 GENERAL RESTRICTIONS Vehicles concerned goods vehicles of over 7.5t MPW Area DN1, km 17 + 900 (limit of Otopeni city) - Ploiesti (junction DN1 - DN1 A); Ploiesti (junction DN1 - DN1B) - Brasov (junction DN1 – DN1 A) Period from 1 January to 31 December Restricted days and hours Road Route Monday- Saturday - Sunday Friday Thursday DN1, km 17 + 900 (limit of Otopeni city) - 00h00 – Ploiesti (junction DN1 - 00h00 – 24h00 DN1 DN1 A) 06h00-22h00 24h00 Ploiesti (junction DN1 - DN1B) - Brasov (junction DN1 – DN1 A) Exceptions vehicles of the civil protection service, funeral transport, first-aid and humanitarian transport, mail transport, fuel distribution, breakdown vehicles, vehicles belonging to sanitation services. Alternative routes DN1A: Bucharest – Ploiesti – Brasov A3: Bucharest – Ploiesti; DN1A: Ploiesti – Brasov DN7: Bucharest – junction DN7 – DN71; DN71: junction DN7 – DN71 – Targoviste; DN72A: Targoviste – Stoenesti – junction DN72A – DN73; DN73: junction DN72A – DN73 – Rasnov – Brasov. PUBLIC HOLIDAYS DRIVING RESTRICTIONS Vehicles concerned goods vehicles of over 7.5t MPW Area See the table below Road Area Direction The day before The day of Public the public public holiday holiday holiday A2 Bucharest (junction A2 - Bucharest – 26 April, Bucharest ringroad) – Constanta 28 April, Fundulea – Lehliu– Fetesti 06.00 – 29 April, Constanta - 16.00 – 22.00 – Cernavoda – Constanta 22.00 1 May, Bucharest (junction A2 with A4) 1 June, 16 June, 17 June, 15 August DN 7 Pitesti (junction DN7
    [Show full text]
  • European Investment Bank Annual Report 2018 on JASPERS
    ANNUAL REPORT 2018 JASPERS JOINT ASSISTANCE TO SUPPORT PROJECTS IN EUROPEAN REGIONS JASPERS ANNUAL REPORT 20 ANNUAL JASPERS 1 8 EUROPEAN INVESTMENT BANK ANNUAL REPORT 2018 JASPERS JOINT ASSISTANCE TO SUPPORT PROJECTS IN EUROPEAN REGIONS European Investment Bank Annual Report 2018 on JASPERS © European Investment Bank, 2019 98 -100, boulevard Konrad Adenauer – L-2950 Luxembourg 3 +352 4379-1 U [email protected] www.eib.org twitter.com/eib facebook.com/europeaninvestmentbank youtube.com/eibtheeubank For more information about Jaspers: U [email protected] www.jaspers.eib.org All rights reserved. All questions on rights and licensing should be addressed to [email protected] Flowers from around the world decorate the covers of the European Investment Bank’s main publications in 2019. Flowers remind us of life’s diversity and beauty, and reinforce the importance of protecting our natural environment. This report has been written with the active assistance of many individuals in operational and internal divisions of the EIB. Our cordial thanks go to all of them for their support. The EIB wishes to thank the following promoters and suppliers for the photographs illustrating this report: ©EIB, Shutterstock, Gettyimages, LDz, Kristian Duus, ADMIE, Transelectrica, James Hunt, Croatian Ministry of regional development and EU funds, Zygimantas Vaitkus, Jean Valsesia, Alan O' Brien, NDSAS, Petar Yordanov, Malta Water Services Corporation, Daphne Voss, Lukasz Wyra, IGSU. All rights reserved. Authorisation to reproduce or use these photos must be requested directly from the copyright holder. Published by the European Investment Bank. Editor: Daniela Sacchi Layout: EIB GraphicTeam Printed on FSC Paper. Cover and interior: Munken Polar, FSC Mix pdf: QH-AN-19-001-EN-N ISBN 978-92-861-4233-8 ISSN 2443-7085 doi:10.2867/598033 The Joint Assistance to Support Projects in European Regions (JASPERS) initiative helps regions and cities improve the quality of investment supported by EU funds.
    [Show full text]
  • Lista Proiectelor Contractate 31.01.2021
    MINISTERUL FONDURILOR EUROPENE-ROMANIA LISTA PROIECTELOR CONTRACTATE - PROGRAMUL OPERATIONAL DIRECȚIA GENERALĂ PROGRAME EUROPENE INFRASTRUCTURĂ MARE INFRASTRUCTURA MARE 31.01.2021 4.8681 LEI Valoarea eligibilă a proiectului (lei)/Eligible project value Stadiu proiect Plăţi către beneficiari (lei)/Payments to the beneficiaries (în implementare/ Axă prioritară/Prioritate de Rata de Nr si data Contract de Data de incepere a Data de finalizare a Categorie de Valoarea veniturilor nete reziliat/ investiţii/Obiectiv specific/Priority cod SMIS/SMIS cofinanțare Valoarea eligibilă a proiectului Cheltuieli neeligibile/ Non Total valoare proiect/Total nr Titlu proiect/Project Title Finantare/No and date of Nume beneficiar/Beneficiary Rezumat proiect//Project Summary proiectului/ Start date of the proiectului/End date Regiune/Region Judet/County Tip Beneficiar/Beneficiary intervenție/Category of generate (NFG)/Net Generated finalizat)/Project Axis/Investment Priority/Specific Code UE/EU co- (lei)/Eligible project value eligible expenditure project value the Financing Agreement project of the project intervention Contributia proprie a income stage (in Objective financing rate Contribuția națională/National Fonduri UE/EU Funds beneficiarului/Contribution of the implementation/ter Contribution beneficiary minated/completed Contribuția națională Fonduri UE/EU Funds /National Contribution AP 1 Obiectivul principal al proiectului consta in proiectarea,supervizarea si constructia a Constructia autostrazii Timisoara 71.88 de km de autostrada (2x2) între sectorul
    [Show full text]
  • Stadiul Proiectelor
    SITUAȚIA PROIECTELOR DE INFRASTRUCTURĂ - SEPTEMBRIE 2021 1.AUTOSTRĂZI 1.1. AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI - SEPTEMBRIE 2021 PANA LA DETALII NR. CRT. CATEGORIE DRUM RANG DRUM INDICATIV DRUM DE LA (km) ANTREPRENOR SECTORUL LOTUL LUNGIME (km) STADIUL FIZIC ACTUAL STADIUL FINANCIAR ACTUAL DATA ÎNCEPERII DATA FINALIZĂRII AN DESCHIDERE VALOARE PROIECT OBSERVAȚII (km) PROCEDURĂ CONTRACT PROIECTARE SI EXECUTIE SEMNAT IN DATA DE 11.08. 2020. 14.09.2020 - EMITERE ORDIN MARTIE 2022 (CONFORM ANUL 2022 6 LUNI - ETAPA DE A FOST TRANSMISA CATRE ANTREPRENOR ADRESA CU ORDINUL DE INCEPERE PENTRU DATA DE 14.09.2020. A FOST ACORDAT DREPTUL DE ACCES IN SANTIER ANTREPRENORULUI. ASOCIEREA TRAMECO SA – VAHOSTAV -SK A.S. – SECTIUNEA 3C, AUTOSTRADA BRASOV - TARGU MURES - SUBSECTIUNEA 3C2: DE INCEPERE PENTRU ETAPA CONTRACT) PROIECTARE; 18 LUNI - ETAPA DE 326.51 MIL. LEI FARA DURATA CONTRACTULUI ESTE DE 144 DE LUNI DIN CARE: 1 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI AUTOSTRADA 30+550 59+100 DRUMURI BIHOR SA – DRUM ASFALT SRL – EAST SUBSECTIUNEA 3C2 CHIRIBIS - 28.55 0.50% 0% CLUJ - ORADEA CHIRIBIS - BIHARIA DE PROIECTARE (PROIECT IUNIE 2022 (CONFORM EXECUTIE LUCRARI; 120 LUNI - TVA 6 LUNI - ETAPA DE PROIECTARE; FINALIZARE PUNCT DE REFERINTA NR. 1 IN 09.11.2020. WATER DRILLINGS SRL BIHARIA TEHNIC) PROGRAM) PERIOADA DE GARANTIE 18 LUNI - ETAPA DE EXECUTIE LUCRARI 120 LUNI - PERIOADA DE GARANTIE SEMNARE CONTRACT PROIECTARE SI EXECUTIE IN DATA DE 28.12.2020. PRETUL PE KM DE AUTOSTRADA ESTE DE CCA. 46,261,293.92 LEI FARA TVA, REPREZENTAND CCA. 9,383,629 EURO FARA TVA. DURATA CONTRACTULUI ESTE DE 96 DE LUNI, DIN CARE: SUBSECTIUNEA 3A2 • 12 LUNI PERIOADA DE PROIECTARE, SECTIUNEA 3A SI SECTIUNEA NADASELU - MIHAIESTI • 24 LUNI PERIOADA DE EXECUTIE A LUCRARILOR, AUTOSTRADA BRASOV - TARGU MURES - ASOCIEREA S.C.
    [Show full text]