Been Found by Them; and and Central Coalfields

Total Page:16

File Type:pdf, Size:1020Kb

Been Found by Them; and and Central Coalfields 51 Written Answers SRAVANA 29, 1913 (SAKA) Written Answers 38 ~ranslarion] THE DEPUTY MINISTER IN THE Upgmddm at Sujn Station MINISTRY OF COAL (SHRI S.B. NYAMAGOUDA): (a) and (b) The Ei SHRI RAMASHRAY PRASAD 3422. Five Year Plan (1992-97) for the develop SINGH: Will the Minister of RAILWAYS ment of coal industry is under preparation. be pleased t0 -8: [Trmslattion] (e) wfmUmr the Government propose to upgrade the Sujra Station on Delhi- Amount spent on ON and Gas Drilling Baghpat-Shyamli section to '0' dass dur- in Rajasthan . ing 1991-92; 3425. SHRI DAU DAYAL JOSHI: Will (b) H so, the details thereof; and the Minister of PETROLEUM AND NATURAL GAS be pleased to state: (c) if not, the reasons therefor? (a) since when the exploration work for THE MINISTER OF STATE IN THE oil and natural gas has been going on in MINISTRY OF RAILWAYS (SHRI MAL- Rajasthan; and UKARJUN): (a) No, Sir. (b) the amount spent thereon so far? (b) Does not arise. THE MINISTER OF PETROLEUM (c) The proposal has not been found AND NATURAL GAS (SHRI 8. SHANK- financially justified. ARANAND): la\ Since 1958. LPG agencbs in Rajsthan (b) Till 31.3.1991. a total amount of 3423. PROF. RASA SINGH RAWAT: Rs. 260.96 crores has been spent. Will the Minister of PETROLEUM AND Walting List for LPG Connection In NATURAL GAS be pleased to state: Kamataka (a) the district-wise number of LPG 3426. SHRI RAMCHANDRA VEERAP- agencies at present in Rajasthan; PA: Will the Minister of PETROLEUM (b) whether the Govemment have re- AND NATURAL GAS be pleased to ceived bmplaints from consumers of state: vatious gas agencies in Ajmer district (a) the district-wise waiting list for LPG regarding irregularities being committed connections in Kamataka and the pre- by them; and sent monthly demand of LPG in the (c) if so. the action taken thereon? State; and THE MINISTER OF PETROLEUM (b) the steps taken to provide LPG AND NATURAL GAS (SHRI B. SHANK- connections to all the applicants on the ARANAND): (a) As on 1.4.1991 there waiting lists? were 158 LPG distributorships in Rajas- THE MINISTER OF PETROLEUM than. AND NATURAL GAS (SHRI B. SHANK- @) and (c) Whenever complaints are ARANAND): (a) As on 1.4.91, 2.62 labs received they are Wed into and ap- persons are on the waiting list. The propriate action is taken. average monthly consumption during IEngIiqw 1990-91 was 9.1 TMT. Rodudkn In Cemtml Coalfkldr (b) Efforts are on to give LPG connec- Umlted In Elghu~Plan tions to as many applicants as possible 3424. SHRI GOPl NATH GAJAPATHI: in Kamataka. Will the Minister,of COAL be pleased to Coal Maria stab: 3427. SHRI UPENDRA NATH VERMA: (a) whether the Government have ta- Will the Minister of COAL be pleased to lcenanysteptoincreasecoalproducm state: dWQ the Eighth Five Year Plan; and (a) whether the deposited money of (b) if so, the tam proposed to be set the coal mafia has been forfeited after UP kr Coal production in the Eghth plan, the investigation conducted by the C.B.I.; parlrcularly by the Central coalfields (b) if so, the amount forfeited since Umited? 1980, till now; 39 Written Answers AUGUST 20, 1991 Written Answers 40 (c) whether the Government are incur- complaints have been received during ring heavy losses on account of the the last two years and have been in- activities of coal mafia; quired into. LPG supply is subject to . (d) if so, the details thereof; availability in the country, the availability of which varies from year to year. (e) whether the Government propose to constitute a committee of Members of Harnessing of Bio-Gas in Kerala Parliament to investigate the large scale 3429. SHRI P.C. THOMAS: Will the bungling and irregularities in the coal Minister of POWER AND NON-CON- distribution; and VENTIONAL ENERGY SOURCES be (f) if not, the reasons therefor? pleased to state: WE DEPUTY MINISTER IN THE (a) whether the Government propose MINISTRY OF COAL (SHRI S.B. NYA- to hamess bio-gas energy in Kerala; MA GOUDA): (a) and (b) According to (b) if so, the details thereof; information furnished by Central Bureau (c) whether subsidy is provided to of Investigation (CBI), during the course small bio-gas plants in that State and is of investigation of 7 cases registered by likely to continue to be given; them in 1989 the payments of benami fixed deposit receipts involving an (d) whether bio-gas -slurry is a good amount of Rs. 3.77 crores were stopped. fertilizer; and Later on, an amount of Rs. 2.70 crores (e) if so, the steps proposed to be was released on the basis of the order taken to promote its use? dated 22.4.91 of Calcutta High Court. All THE MINISTER OF STATE IN THE the 7 cases are reportedly under investi- MINISTRY OF POWER AND NON-CON- gation of the CBI. VENTIONAL ENERGY SOURCES (SHRI (c) and (d) The activities of anti-social KALP NATH RAI): (a) Yes, Sir. elements do affect the efficient and (b) A target of setting up of 2500 family smooth functioning of the Coal Com- type biogas plants have been fixed for panies, but it is difficult to quantify the the nodal department of the State Gov- losses. ernment of Kerala for 1991-92. Besides, (e) and (f) There is at present no Khadi and Village Industries Commission proposal to constitute such a committee. is also setting up biogas plants in the However, Coal Distribution policy of Coal State. India Ltd. (CIL) is being reviewed by the (c) Yes, Sir. The Central subsidy for Government. small size biogas plants is likely to be [~n~lishj continued subject to availability of finan- Complaints of LPG Consumers of cial resources and periodic review. Hindustan Petroleum Corporation (d) & (e) Yes, Sir. The steps taken for 3428. SHRI SUSHIL CHANDRA VER- promotion of the use of slurry for manu- MA: Will the Minister of PETROLEUM rial purposes include organisation of de- AND NATURAL GAS be pleased to monstrations in farmers' fields, training of state: beneficiaries, bringing out literature high- (a) whether the LPG consumers of lighting its benefits in regional languages, Hindustan Petroleum Corporation have to etc. wait for long periods for supply; Air Service to Rajahmundry (b) whether numerous complaints have 3430. SHRI K.V.R. CHOWDARY: Will been received in this regard in recent the Minister of CIVIL AVIATION AND years; and TOURISM be pleased to state: (c) the action taken or proposed -to be (a) whether the Government propose taken by the Government in this regard? to improve the Air sewices to Rajahmun- THE MINISTER OF PETROLEUM dry in view of heavy demand from the AND NATURAL GAS (SHRI B. SHANK- ONGC for oil exploration and for gas ARANAND): (a) to (c) 549 individual based industries located there; and .
Recommended publications
  • Ngo Documents 2013-08-14 00:00:00 Coal India Investor Brief High Risk
    High risk, low return COAL INDIA LTD’s shareholder value is threatened by poor corporate governance, faulty reserve estimations, regulatory risk and macro-economic issues. Introduction Coal India Limited is the world’s largest coal miner, with a production of 435 million metric tons (MT) in 2011 -201 2. There is significant pressure on CIL to deliver annual production growth rates in excess of 7%. The company has a 201 7 production target of 61 5 MT.[1 ] Coal India’s track record raises questions over its ability to deliver this rate of growth. In addition, serious governance issues are likely to impact CIL’s financial performance. These pose a financial and reputational risk to CIL, its shareholders and lenders, while macro- economic issues in the Indian energy economy pose a long term threat to Coal India. • CIL’s attempts to access new mining areas are facing widespread opposition from local communities and environmental groups. With its reliance on open-pit mining, access to new mines are essential for CIL to achieve production targets. G • CIL has grown reliant on shallow, open pit mining for 90% of its production, and has lost in-house expertise on deep mining techniques. N I • CIL has a record of poor corporate governance, manifested in rampant corruption, poor worker safety and repeated legal violations. This has, in the last year alone, led to penalties and F closure notices for over 50 mines, threatening both its financial performance and reputation. E I • CIL’s financial performance has been affected by directives from majority shareholder Government of India to keep coal prices artifically low.[2] According to one estimate, this cost R CIL $1 .75 billion in the 201 2-1 3 financial year alone.[3] The government has also taken away coal blocks allocated to CIL and given them to private players.[4] B • Changing economics of coal power in India; renewable energies are becoming cost- competitive even as coal faces increased regulatory scrutiny and public opposition.
    [Show full text]
  • Download the File
    J ~. List of Status of Pending Cases in PMA (as on 01.04.2017) SI. Number of case Name of Parties No. 1. PMAlDr.GR/43/2011 UCO Bank & 1. Cycle Corporation of India limited 2. Department of Heavy Industries 2. PMA/Dr.GR/46/2011 National Textile Corporation Limited (WBABO) & Central Bank of India 3. PMA/Dr.GR/60/2011 UCO Bank & 1. Rehabilitation Industries Corporation Limited 2. Department of Heavy Industries 4. PMAlDr.GR/72/2011 Steel Authority of India Limited (Rourkela Steel Plan) & Braithwaite & Co. Limited 5. PMA/Dr. GR/49/20 12 Gujarat State Electricity Corporation Limited & South Eastern Coalfield Limited 6. PMA/KD/06/2013 HSCC (India) Limited & Oil India Limited 7. PMAlKD/07/2013 National Project Construction Corporation Limited (NPCC) & National Thermal Power Corporation Limited (NTPC) 8. PMAlSKM/01/2014 Mazagon Dock Limited & Dredqinq Corporation of India Limited 9. PMAlRY/07/2014 Telecommunication Consultants India Limited (TCll) & Bharat Sanchar Nigam Limited (BSNl)- 10. PMA/RY/09/2014 National Projects Construction Corporation & Farakka Barrage Project 11. PMA/RY/10/2014 National Fertilizers Limited (NFl) & Central Coalfields Limited (CCl) 12. PMA/RY/12/2014 National Projects Construction Corporation Limited R National Aluminium Company Limited 13. PMAlRY/15/2014 Rashtriya Ispat Nigam Limited (Visakhapatnam Steel Plant) & National Projects Construction Corporation Limited 14. PMA/RY/16/2014 Telecommunication Consultants India Limited (TCll) & Gujarat Police, Government of Gujarat 15. PMA/RY/01/2015 Dredging Corporation of India Limited & Kolkata Port Trust 16. PMAlRY/02/2015 National Projects Construction Corporation Limited (NPCC) & Central Coalfields Limited (CCl) 17. PMA/RY/03/2015 Hindustan Steelworks Construction Limited & Central Coalfields Limited (CCl) 18.
    [Show full text]
  • Result of Star Rating Base Year 2018-19
    STAR RATING OF UNDERGROUND MINES FOR THE YEAR 2018-19 Annexure-A Type STAR RATING Name of the Coal India FINAL MARKS % Sl. Name of the Coal Mine of AWARDED BY Subsidiary / Company STAR RATING. Mine CCO 1 Shyamsunderpur Colliery UG Eastern Coalfield Limited 94 FIVE STAR EASTERN COAL FIELDS 2 JHANJRA PROJECT COLLIERY UG 92 FIVE STAR LIMITED 3 Sreerampur-1 Incline UG SCCL 92 FIVE STAR South Eastern Coalfields 4 Churcha Mine RO UG 91 FIVE STAR Limited Coal India Limited 5 Adriyala Shaft Project(ALP) UG SCCL 87 FOUR STAR 6 BAHERABANDH UG MINE UG SECL 87 FOUR STAR 7 Katkona 1&2 UG SECL 87 FOUR STAR EASTERN COALFIELD 8 SHANKARPUR COLLIERY UG 87 FOUR STAR LIMITED EASTERN COALFIELDS 9 KUMARDHUBI COLLIERY UG 86 FOUR STAR LIMITED 10 Badjna Colliery UG Eastern coal limited 85 FOUR STAR 11 KAPILDHARA UGP UG SECL 85 FOUR STAR 12 Khandra Colliery UG E.C.L 85 FOUR STAR WESTERN COALFIELDS 13 SHOBHAPUR UG 85 FOUR STAR LIMITED Eastern Coalfields 14 Dhemomain pit colliery UG 84 FOUR STAR Limited 15 Godavarikhani - 7 LEP UG SCCL 84 FOUR STAR 16 SHEETALDHARA-KURJA UGP UG SECL 84 FOUR STAR 17 SODEPUR (R) COLLIERY UG Eastern coalfields Limited 84 FOUR STAR Eastern Coalfields 18 Bahula Colliery UG 83 FOUR STAR Limited 19 BANKOLA UG ECL 83 FOUR STAR WESTERN COALFIELDS 20 SAONER MINE NO 1 UG 83 FOUR STAR LIMITED WESTERN COALFIELDS 21 SARNI MINE UG 83 FOUR STAR LIMITED Western coalfields 22 Silewara Colliery UG 83 FOUR STAR Limited 23 Singhal under ground mine UG Secl 83 FOUR STAR 24 Sreerampur-3 & 3A Incline UG SCCL 83 FOUR STAR 25 Tawa UG WCL 83 FOUR STAR 26 Tilaboni Colliery UG ECL 83 FOUR STAR Western Coalfields 27 Adasa mine UG 82 FOUR STAR limited Eastern Coalfields 28 Chinakuri Mine No.
    [Show full text]
  • Central Coalfields Ltd. Sales & Marketing Department
    CENTRAL COALFIELDS LTD. SALES & MARKETING DEPARTMENT DARBHANGA HOUSE : RANCHI JHARKHAND – 834 001 NOTICE All the customers seeking to purchase coal from CCL are hereby informed that from 1 st April 2011 , CCL will be accepting the coal value through RTGS/NEFT only . For this purpose all the customers are required to declare the details of maximum two of their bank accounts in the prescribed format ( available at CCL’s website as well as at CSC,Ranchi ).All the customers have to remit the coal value through the declared bank accounts only failing which their transaction will fail. Pre-registration of Bank details is a must before remitting to CCL . All new customers are advised to get themselves registered with CCL (at CSC,Ranchi) before proceeding with RTGS/NEFT transfer. Following are the details of CCL’s Bank account into which the remittance through RTGS/NEFT is to be made :- Beneficiary Bank Name- Punjab National Bank Beneficiary Branch IFSC Code- PUNB0040400 Beneficiary Name - CCL Sales Realization Account Beneficiary Branch - SN Ganguly Road Branch , Ranchi Beneficiary Account Number- CCLR0001XXXXXX , Here xxxxxx refers to the 6 digit registration number allotted by CCL (CSC,Ranchi ). All customers to please note the above which will be needed to fill up the RTGS/NEFT form available at their respective Banks On processing the RTGS/NEFT request , the Bank will provide a 16 digit UTR Number to the depositor. This number will have to be quoted by the customers in their application for submission of coal value in the space provided earlier for Draft Number. Any clarification in this context can be had from CSC,Ranchi.
    [Show full text]
  • Organisational Structure and Functions
    CHAPTER 1 44th Foundation Day of CIL ORGANISATIONAL STRUCTURE AND FUNCTIONS ANNUAL REPORT 2018-19 Ministry OF Coal ORGANISATIONAL STRUCTURE AND FUNCTIONS Introduction Allocating coal blocks in a transparent manner. The Ministry of Coal has the overall responsibility of determining Functions of the Ministry of Coal policies and strategies in respect of exploration and development The Ministry of Coal is concerned with exploration, development of coal and lignite reserves, sanctioning of important projects of and exploitation of coal and lignite reserves in India. The subjects high value and for deciding all related issues. These key functions allocated to the Ministry of Coal (includes Subordinate or other are exercised through its public sector undertakings, namely Coal organizations including PSUs concerned with their subjects) India Limited (CIL) and NLC India Limited (NLCIL) and Singareni under the Government of India (Allocation of Business) Rules, Collieries Company Limited (SCCL), a joint sector undertaking of 1961, as amended from time to time as follows :- Government of Telangana and Government of India with equity capital in the ratio of 51:49. (i) Exploration and development of coking and non-coking coal and lignite deposits in India. Vision (ii) All matters relating to production, supply, distribution The core objectives of MoC are linked to its vision of securing and prices of coal. the availability of coal to meet the demand of different sector of the economy in an eco-friendly and sustainable manner and the (iii) Development and operation of coal washeries other than overall mission of augmenting production through Government those for which the Department of Steel is responsible.
    [Show full text]
  • Top Public Sector Companies
    Top Public Sector Companies Air India Bharat Coking Coal Limited Bharat Dynamics Limited Bharat Earth Movers Limited Bharat Electronics Limited Bharat Heavy Electricals Ltd. Bharat Petroleum Corporation Bharat Refractories Limited Bharat Sanchar Nigam Ltd. Bongaigaon Refinery & Petrochemicals Ltd. Broadcast Engineering Consultants India Ltd Cement Corporation of India Limited Central Warehousing Corporation Chennai Petroleum Corporation Limited Coal India Limited Cochin Shipyard Ltd. Container Corporation Of India Ltd. Cotton Corporation of India Ltd. Dredging Corporation of India Limited Engineers India Limited Ferro Scrap Nigam Limited Food Corporation of India GAIL (India) Limited Garden Reach Shipbuilders & Engineers Limited Goa Shipyard Ltd. Gujarat Narmada Valley Fertilizers Company Limited Haldia Petrochemicals Ltd Handicrafts & Handloom Exports Corporation of India Ltd. Heavy Engineering Corp. Ltd Heavy Water Board Hindustan Aeronautics Limited Hindustan Antibiotics Limited Hindustan Copper Limited Hindustan Insecticides Ltd Hindustan Latex Ltd. Hindustan Petroleum Corporation Ltd. Hindustan Prefab Limited HMT Limited Housing and Urban Development Corporation Ltd. (HUDCO) IBP Co. Limited India Trade Promotion Organisation Indian Airlines Indian Oil Corporation Ltd Indian Rare Earths Limited Indian Renewable Energy Development Agency Ltd. Instrumentation Limited, Kota Ircon Internationl Ltd. ITI Limited Kochi Refineries Ltd. Konkan Railway Corporation Ltd. Krishna Bhagya Jala Nigam Ltd Kudremukh Iron Ore Company Limited Mahanadi
    [Show full text]
  • ANNUAL REPORT 2018 an OVERVIEW L Central Vigilance Commission Is the Apex Integrity Institution of India, Created in 1964 to Address Governmental Corruption
    ANNUAL REPORT 01.01.2018 to 31.12.2018 CENTRAL VIGILANCE COMMISSION Annual Report 2018 i Shri K.V. Chowdary Central Vigilance Commissioner Dr. T.M. Bhasin Shri Sharad Kumar Vigilance Commissioner Vigilance Commissioner ii Annual Report 2018 The 55th Annual Report of the Central Vigilance Commission is prepared under Section 14 of the CVC Act, 2003 for submission to the President of India. The report highlights the work done by the Central Vigilance Commission during the year ending 31st December, 2018 in fulfilling its mandate under the CVC Act, 2003. (K.V. CHOWDARY) CENTRAL VIGILANCE COMMISSIONER (Dr. T.M. BHASIN) (SHARAD KUMAR) VIGILANCE COMMISSIONER VIGILANCE COMMISSIONER New Delhi Dated: the 6th June, 2019 Annual Report 2018 iii ACKNOWLEDGEMENT The Central Vigilance Commission thanks the Government of India, its Ministries/Departments, Public Sector Undertakings, Public Sector Banks and other organizations, the team of Chief Vigilance Officers, Central Bureau of Investigation, Law Officers, the Whistle Blowers and all others connected with the Commission for their cooperation and assistance. iv Annual Report 2018 CONTENTS Chapter Description Pages 1 Mandate of the Commission 1-9 2 Commission’s Activities during 2018 11-29 3 Superintendence over Vigilance Administration 31-45 4 Non-Compliance of Commission’s advice and other Areas of Concern 47-92 5 Chief Technical Examiners’ Organisation 95-98 6 Superintendence over Central Bureau of Investigation 101-113 7 Preventive Vigilance and Systemic Improvements 115-141 8 Participative Vigilance
    [Show full text]
  • Coal Mining in India
    Welcomes H.E. Milan Hovorka, Ambassador, The Czech Republic to India & Czech Business Delegation 09th Nov 2017 CIL HQ, Kolkata A Presentation on “Coal India Limited & Business Opportunities” Coal Industry In India Total resources as on 01.04.2017 :- 315 Bt Proved: 143 Bt Indicated: 139 Bt Inferred: 33 Bt 93% of production from opencast mines; 7% from underground mines Indian coal is generally high ash, ~ 4400 GCV, low sulphur All India Coal production in 2016-17: 659Mt Types of Coal Produced in India 593 Mt 613 Mt (90 %) 66Mt Mt (93%) 46 Mt (10%) Mt (7%) Major Indian Public Sector Coal Producing Companies A. CIL - Coal Producing Subsidiaries Eastern Coalfields Ltd.(ECL) (1975) (1) Bharat Coking Coal Ltd.(BCCL) (1972) (2) 1 NEC Central Coalfields Ltd.(CCL) (1975) (3) 5 4 3 Northern Coalfields Ltd.(NCL) (1985) (4) Western Coalfields Ltd.(WCL) (1975) (5) South Eastern Coalfields Ltd(SECL) (1985) (6) Mahanadi Coalfields Ltd.(MCL) (1992) (7) 2 * A Small Unit Under CIL(HQ) - COAL North Eastern Coalfields (NEC) 7 LIGNITE 6 * Planning & Design Institute of CIL- 8 Central Mine Planning & Design Institute (CMPDIL) (1975) 9 B. Singareni Collieries Co. LTD. (SCCL) (8) C. Neyveli Lignite Corporation. (NLC) (9) Coal India Ltd - Key highlights Coal Resources of about 88 Bt as on 01.04.2016 Raw coal production (2016-17): 554.13 Mt: (84% share) Largest coal company in Operates 394 mines across 8 states the world Operates 15 coal beneficiation facilities with capacity 36.80 Mtpa Coal meets 54% of the total primary energy requirement of India Capitalize on With abundance of resources, coal to remain the most economic growth in the source of fuel for power generation and dominant contributors at least for next 20 years, in spite of Paris Protocol.
    [Show full text]
  • Brief Profile of Shri P.M. Prasad, CMD, BCCL
    Brief Profile of Shri P.M. Prasad, CMD, BCCL Shri P. M. Prasad took over the additional charge of Chairman-cum-Managing Director(CMD) of Bharat Coking Coal Limited(BCCL) w.e.f. 1st Feb 2021. Presently, he is serving Central Coalfields Ltd.(CCL) as Chairman-cum-Managing Director from 01.09.2020. Shri Prasad started his professional career by joining CIL in August 1984 after graduating in BE(Mining) from Osmania University in the year 1984 and since then has performed his duties at Western Coalfields Limited and Mahanadi Coalfields Limited in various capacities ranging from Executive Trainee to General Manager upto April 2015. Shri Prasad acquired M.Tech in Open Cast Mining from Indian School of Mines, Dhanbad in 1991. He also graduated in Law from Nagpur University in 1997. His various accolades of those times include reopening of underground fire area in 1994-95 at DRC mine in WCL in five stages. For this outstanding job, he was awarded Meritorious certificate as Best Mines Manager from Secretary to Govt. of India, MoC and Chairman, CIL in 1995. As GM, Lingaraj Area, MCL, he was responsible for successful opening & operation of Kaniha Opencast Coal Project from March’2010. Diversion of nallah at Hingula Opencast Area to unlock coal reverse of 26.00 MTe in the year 2014-15 and starting New Railway Siding No. 9 at Talcher Coalfield was highlight of his achievements as GM, Hingula Area, MCL. In May’2015, he joined NTPC as Executive Director (Coal Mining). He has been credited with expediting the process of award of MDO projects and awarded Pakribarwadih coal block (NTPC’s first project) and floated NITs for remaining coal blocks.
    [Show full text]
  • Central Coalfields Limited ( June - 2021 )
    STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL/Government. FORM - I For PATRATU A/B/C UNDERGROUND Capacity Area Name of Project (in MTPA) ( in Ha) Patratu ABC 5.0 (Nominal) Project Area : 2067.82 Underground 7.51 Leasehold Area: 1912.53 Project (Peak) ( Barka - Sayal Area) Central Coalfields Limited ( June - 2021 ) Form - 1 for Patratu A/B/C Underground ( 5 .0 MTPA) Barka - Sayal Area, Central Coalfields Limited ============================================================================ FORM - I (I) Basic Information 1 Name of the project Patratu A/B/C Underground of Central Coalfields Limited 2 S. No. in the schedule A Coal Mine 1(a) 3 Proposed capacity / area / length / Proposed Capacity – 5.0 MTPA (Nominal) 7.51 MTPA tonnage to be handled / command (Peak) area / lease area / number of Land Requirement – wells to be drilled Project Area : 2067.82 Leasehold Area: 1912.53 Ha 4 New / s / Modernization New 5 Existing Capacity/Area etc Nil 6 Category of Project. i.e .'A' or 'B' A 7 Does it attract the general No condition? If yes, Please specify 8 Does it attract the specific No condition? If yes, Please specify 9 Location Plot / Survey / Khasra No 1,2,3,4,5 etc. Village Binja, Terpa, K i rigara, Tokis u d, Sankul, Palu, Rochap P alu and Daridih Tehsil Patratu District Ranchi and Ramgarh State Jharkhand 10 Nearest railway station / airport Patratu Railway Station at a distance of 7 .0 km from the along with distance in kms.
    [Show full text]
  • ANSWERED ON:23.07.2015 Allotment of Funds Under CSR Bharathi Mohan Shri R.K.;Pathak Smt
    GOVERNMENT OF INDIA COAL LOK SABHA UNSTARRED QUESTION NO:483 ANSWERED ON:23.07.2015 Allotment of Funds under CSR Bharathi Mohan Shri R.K.;Pathak Smt. Riti;Singh Shri Sushil Kumar Will the Minister of COAL be pleased to state: (a) the guidelines for allotment of funds by Neyveli Lignite Corporation (NLC) Limited and Coal India Limited (CIL) under Corporate Social Responsibility; (b) the funds allotted by CIL and its subsidiary companies and NLC Limited for Corporate Social Responsibility (CSR) activities during each of the last three years and the current year along with the development works done, company-wise; and (c) the details of funds not utilized/lying unutilized under CSR during 2013-14 and 2014-15 along with the reasons therefor and the action taken by the Government in this regard? Answer MINISTER OF STATE (IC) IN THE MINISTRY OF COAL, POWER AND NEW & RENEWABLE ENERGY (SHRI PIYUSH GOYAL) (a) As per modified CSR policy based on New Companies Act 2013, CSR budget of CIL is allocated based on 2% of the average net profit of the Company made during three immediate preceding financial years or Rs. 2.00 per tonnes of coal production of previous year whichever is higher. In respect of NLC, it is at least two per cent of the average net profits of the company made during the three immediately preceding financial years. (b) The funds allocated by CIL and its subsidiaries under CSR activities and the development works done during last three years and current years is given at annexure-I and that of NLC at annexure-II.
    [Show full text]
  • ANSWERED ON:10.12.2013 OPEN CAST COAL MINES ALLOCATION Naranbhai Shri Kachhadia;Venugopal Shri P
    GOVERNMENT OF INDIA COAL LOK SABHA UNSTARRED QUESTION NO:890 ANSWERED ON:10.12.2013 OPEN CAST COAL MINES ALLOCATION Naranbhai Shri Kachhadia;Venugopal Shri P. Will the Minister of COAL be pleased to state: (a) the number of underground and opencast coal mines functional in the country as on date, company-wise and State-wise; (b) the details of the new coal mines opened during each of the last three years and the current year. State-wise including the State of Gujarat, Madhya Pradesh and Jharkhand; (c) whether the Government proposes to open new coal mines to increase coal production in the country; (d) if so, the detail thereof along with the time by which they are likely to be allocated and made operational, location wise and State- wise; and (e) the total investment likely to be made for the purpose and the sources from where funds are likely to be mobilized in this regard? Answer MINISTER OF THE STATE IN THE MINISTRY OF COAL (SHRI PRATIK PRAKASHBAPU PATIL) (a) The number of functional underground and opencast coal and lignite mines as on 01st April, 2013 are as given below: Company State Under Ground Opencast Eastern Coalfields Ltd (ECL) West Bengal 77 12 Jharkhand 10 5 Bharat Coking Coal Ltd. (BCCL) West Bengal 2 1 Jharkhand 38 18 Central Coalfields Ltd. (CCL) Jharkhand 25 42 Northern Coalfields Ltd. Madhya Pradesh - 6 Uttar Pradesh - 4 Western Coalfields Ltd. (WCL) Madhya Pradesh 20 7 Maharashtra 22 32 South Eastern Coalfields Ltd. (SECL) Madhya Pradesh 28 7 Chhattisgarh 36 16 North Eastern Coalfields Ltd.
    [Show full text]