Questions & Answers

Total Page:16

File Type:pdf, Size:1020Kb

Questions & Answers The Baird Family Hospital and The ANCHOR Centre Questions & Answers Aberdeen Maternity Hospital (AMH) is no longer fit for purpose. Gynaecology and Breast services are provided from elsewhere on Why do we need a new hospital? the Foresterhill Health Campus and the new hospital provides an opportunity to bring these clinical services into one location. Where will The Baird Family Hospital be On the site currently occupied by the Breast Screening Centre and the located? Foresterhill Health Centre. This location will allow for physical connections to be made with both Why has this location been chosen? Aberdeen Royal Infirmary (ARI) and Royal Aberdeen Children’s Hospital (RACH) which will benefit patients and clinical services. All of the clinical services currently within AMH will relocate to The Baird What will happen to the existing AMH? Family Hospital. It is anticipated that AMH will then be demolished. Breast screening services will be part of The Baird Family Hospital. In the What will happen to the Breast Screening interim construction period, these services will be temporarily located Centre? within ARI and the existing building will be demolished. What will happen to the Foresterhill This will be relocated to the west part of the Foresterhill Health Campus. Health Centre? This will then allow the existing Health Centre to be demolished. Oncology and Haematology out-patient and day-patient services are currently provided from various locations across ARI, often in Why do we need The ANCHOR Centre? accommodation which is not fit for purpose. This new centre will allow for purpose-built clinical space to be provided to better meet the needs of patients and their families. The centre will be built on the Foresterhill Health Campus on the site Where will the centre be located? adjacent to the Eye Clinic. This will allow for a physical connection to the existing Radiotherapy Why has this location been chosen? Centre which will be of benefit to patients who can then receive the majority of their care and treatment in the one location. The Eye Clinic services will be relocated to accommodation within ARI. What will happen to the Eye Clinic? This will then allow the existing building to be demolished. Will the new buildings mean more patients All of the clinical services are currently provided on the site so the new attending Foresterhill Health Campus? buildings will not increase the number of patients visiting the site. There is currently a review of staff parking underway. A full site survey Will there be more car parking spaces and around traffic and traffic management will be carried out and this will how will disabled parking be addressed? include parking facilities for patients and visitors. NHS Grampian has already well established working relationships with How will NHS Grampian ensure adequate public transport providers and also works with Nestrans, the Transport public transport access? Partnership for Aberdeen City and Aberdeenshire. How will these new buildings impact on Both buildings will include enhanced research and teaching facilities. University of Aberdeen facilities? caring • listening • improving.
Recommended publications
  • Moray Transformation Programme Board: Frequently Asked Questions
    Moray Transformation Programme Board: Frequently Asked Questions 1) What is the scope of the Moray Transformation Programme Board? The Moray Transformation Programme Board (MTPB) has been set up with representation from all stakeholders to develop two local transformation programmes in health and social care: I. Dr Gray’s Hospital Transformation Programme (NHS Grampian) II. Home First (Health & Social Care Moray) In addition, during COVID-19, the MTPB will support key decision-making required to develop and maintain service delivery. The MTPB is not a statutory body and does not replace the current governance and accountability structures of NHS Grampian and the Moray Integration Joint Board. The MTPB meets monthly and the agenda, papers and minutes will be available on the websites of NHS Grampian and Health & Social Care Moray. Here is a short overview of each programme. I. Dr Gray’s Hospital Transformation Programme has been set up to ensure the hospital can meet current and future challenges with the right profile and approach to service delivery. Dr Gray’s has an important future role serving the people of Moray, Grampian and North of Scotland. The programme will set out the range of sustainable services that can, and should, be delivered at Dr Gray’s as a District General Hospital. Dr Gray’s will provide care locally as well as regionally and develop new relationships with NHS Highland in order to transform and continue current service delivery. It will also build on its strong links with Aberdeen Royal Infirmary, Aberdeen Maternity Hospital and Royal Aberdeen Children’s Hospital. It will continue to provide a range of planned specialist care and treatment, using appropriate technology- enabled solutions which are delivered by both local and visiting teams.
    [Show full text]
  • Where to Give Birth?
    Where to give birth? baby, you will want to be in a place where you feel relaxed, comfortable and secure. Where you have your baby will be an individual choice for you. This leaflet is designed to support discussions between you and your midwife/obstetrician. Remember, it is your choice and you can Choosing where change your mind at anytime during to have your baby your pregnancy. In Grampian women have a number of different birthplaces What are the options? to choose from. 9 Home Birth. Whether this is your first or 9 Community Maternity Unit. subsequent pregnancy, when the time comes for you to have your 9 Consultant-led Unit. 3 Home Birth Recent evidence suggests that homebirth is as safe as birthing in a Consultant-led Unit for women who are healthy, who have had a previous uncomplicated birth and whose pregnancy is straightforward. For these women giving birth at home reduces the chances of having a caesarean section, forceps or ventouse and an episiotomy (cut to the perineum). You can still choose to have a homebirth if you are having your first baby, but the risk of having a baby born in poor condition is higher compared to giving birth in a Community Maternity Unit or Consultant-led Unit. 4 Community Maternity Units Consultant Units Aberdeen and Peterhead have a Community Consultant-led Units are based in Aberdeen Maternity Unit (CMU). These units provide and Elgin and are primarily for women 24 hour care for women who are pregnant, who have medical, pregnancy or birth in labour and after birth.
    [Show full text]
  • NHS Grampian Dr Gray's Hospital – Phase 2 Plan for Obstetric And
    NHS Grampian Dr Gray’s Hospital – Phase 2 Plan for Obstetric and Paediatric Services Recommendations 1. The System Leadership Team (SLT) of NHS Grampian has considered the phase 2 plan for the future delivery of obstetric and paediatric services for the women and children of Moray. This is being taken forward in the context of the wider development of Dr Gray’s Hospital as a modern District General Hospital (DGH) placed within a wider network of services across Grampian and the North of Scotland. It is recommended that the NHS Grampian Board: • Notes the obstetric and paediatric service proposals which have been formulated through engagement with public representatives and staff • Acknowledges the benefits and risks associated with delivering and sustaining the proposed services and supports ongoing assessment to ensure that the proposals can be delivered in a safe and sustainable way • Supports progression of the paediatric service plan, including further assessment of the requirements of the emergency department, with engagement and phased recruitment progressing in parallel. An update will be provided to the Board seminar on 5 September 2019 • Requests an update on the risk mitigations which need to be addressed before further progress of the obstetric service at the Board meeting on 1 August 2019. • Requests an outline description of the future profile of Dr Gray’s Hospital as a modern DGH at the Board meeting on 1 August 2019. Strategic Context 2. Dr Gray’s Hospital plays an essential role in the delivery of services for the population of Moray and west Aberdeenshire. Like other hospitals, its role has responded to changes in clinical practice and technology and this will continue as the hospital develops as part of wider networked pathways of care within the North of Scotland.
    [Show full text]
  • Health and Social Care Integration Scheme for Moray December March 20158
    Consultative Draft January 2018 Formatted: Centered Health and Social Care Integration Scheme for Moray December March 20158 This document is also available in large print and other formats and languages, upon request. Please call NHS Grampian Corporate Communications on (01224) 551116 or (01224) 552245. 1 Consultative Draft January 2018 Formatted: Centered Introduction This document outlines the future governance framework revised arrangements for how adult and older people care services will be integrated and delivered by The Moray Council and NHS Grampian and is prepared in line with the requirements of the Public Bodies (Joint Working) (Scotland) Act 2014. In developing revising theis2015 Integration Scheme we have engaged with carers, people who currently use health and social care services in Moray, and our joint workforce. We have also subjected the draft revised Scheme to an extensive consultation exercise and have made further changes to the original document based on the views and comments expressed by people and the organisations who took the opportunity to respond. During the consultation exercise we also informed people that the contents of this revised Integration Scheme will be final and it shall not be possible to make any modifications to the revised Integration Scheme without a further consultation and approval by Scottish Ministers. We also explained that the revised Integration Scheme will set out the parameters of our Strategic Plan which will present in more detail the changes to the way we propose to deliver integrated care services in Moray in the future. At a time when the health and social care system is facing significant demographic and financial challenges, we consider that this Integration Scheme will provide a strong foundation to how we can best improve the quality of care we deliver to the people of Moray.
    [Show full text]
  • NHS Grampian Consultant Anaesthetist (Interest in General Anaesthesia)
    NHS Grampian CONSULTANT ANAESTHETIST (Interest in General Anaesthesia) Aberdeen Royal Infirmary VACANCY Consultant Anaesthetist (Interest in General Anaesthesia) Aberdeen Royal Infirmary 40 hours per week £80,653 (GBP) to £107,170 (GBP) per annum Tenure: Permanent NHS Grampian Facilities NHS Grampian’s Acute Sector comprises, Aberdeen Royal Infirmary (ARI), Royal Aberdeen Children’s Hospital (RACH), Aberdeen Maternity Hospital (AMH), Woodend Hospital, Cornhill Hospital, and Roxburgh House, all in Aberdeen and Dr Gray’s Hospital, Elgin. Aberdeen Royal Infirmary (ARI) The ARI is the principal adult acute teaching hospital for the Grampian area. It has a complement of approximately 800 beds and houses all major surgical and medical specialties. Most surgical specialties along with the main theatre suite, surgical HDU, and ICU are located within the pink zone of the ARI. The new Emergency Care Centre (see below) is part of ARI and is located centrally within the site. Emergency Care Centre (ECC) The ECC building was opened in December 2012 and houses the Emergency Department (ED), Acute Medical Initial Assessment (AMIA) unit, primary care out-of- hours service (GMED), NHS24, and most medical specialties of the Foresterhill site. The medical HDU (10 beds), Coronary Care Unit, and the GI bleeding unit are also located in the same building. Intensive Care Medicine and Surgical HDU The adult Intensive Care Unit has 16 beds and caters for approximately 700 admissions a year of which, less than 10 per cent are elective and 14 per cent are transfers from other hospitals. The new 18 bedded surgical HDU together with ICU and medical HDU have recently merged under one critical care directorate.
    [Show full text]
  • 'Our System Response'
    2020/21 Grampian Health and Social Care COVID-19 and Winter (Surge) Plan ‘OUR SYSTEM RESPONSE’ Executive Leads for Winter Planning Programme Grampian Health and Social Care 2020/21 COVID-19 and Winter (Surge) Plan Professor Nick Fluck NHS Grampian Executive Lead Medical Director ‘OUR SYSTEM RESPONSE’ 2020/21 Ms Fiona Francey Senior Responsible Chief Officer, NHS Grampian Executive Summary 4 Acute Sector Officer (SRO) Introduction 8 1.1 Aim of Plan 8 1.2 Rationale and Planning Assumptions 8 Aberdeenshire Health Mr Iain Ramsay Senior Responsible 1.3 Approach 10 Partnership Manager and and Social Care 1.4 Finance 14 Chief Social Work Officer Officer (SRO) Partnership 1.5 Approval of Plan 14 1.6 Governance Arrangements 15 Key Drivers and Changes from Previous Winters 16 Ms Susan Harrold 2.1 Striving To Deliver High Quality, Safe, Person-Centred Care 16 Planning Manager NHS Grampian Programme Manager 2.2 Trends in Data from Previous Years 16 2.3 Lessons Learned from 2019/20 Winter Debrief Meeting - 29/01/2020 17 2.4 New Developments and Service Changes Introduced Since Winter 2019/20 19 Action Plan for Winter 2020/21 22 3.1 System Response - Implementation of a Winter Tactical Operating Model (WR-TOM) 22 3.2 Data Modelling 33 3.3 Surge and Capacity Planning 34 3.4 Test and Protect 41 This publication is also available in other formats and 3.5 Vaccination 41 languages on request. Please call Equality and Diversity 3.6 Infection Prevention and Control 42 on 01224 551116 or 01224 552245 or email: 3.7 Whole System Resilience 43 [email protected]
    [Show full text]
  • Nhs Grampian, Nhs Orkney &
    NHS GRAMPIAN, NHS ORKNEY & NHS SHETLAND COLLABORATIVE ABDOMINAL AORTIC ANEURYSM (AAA) SCREENING PROGRAMME ANNUAL REPORT OCTOBER 2012 TO OCTOBER 2013 Prepared by: Mrs Alison Mundie AAA Screening Programme Manager, Aberdeen Royal Infirmary NHS Grampian Executive Summary A national ‘Abdominal Aortic Aneurysm (AAA) Screening Programme’ was launched in Scotland in 2012. In the northeast of Scotland AAA-screening involves collaboration across NHS Grampian, NHS Orkney and NHS Shetland. Rollout within the collaborative commenced as a phased process across 11 sites in October 2012, with NHS Grampian being the third Health Board to begin screening in Scotland. Across the Collaborative AAA-screening is undertaken in urban, rural and island communities. The screening sites include the major mainland hospitals, community hospitals and island hospitals. AAA screening is undertaken by trained NHS nurses in Grampian/Orkney and by a Trainee Sonographer/Radiographer and Advanced Practitioner (Reporting Sonographer) in Shetland. Within the AAA-screening programme all men aged 65 are invited by postal invitation for an abdominal ultrasound scan to identify the presence of an AAA. Men with a normal abdominal aortic diameter (<3.0 cms) are discharged from the programme; men with a diameter between 3.0 to 5.4 cms are offered surveillance within the programme: and men with a diameter >= 5.5 cms are referred to the Vascular Surgery Unit at Aberdeen Royal Infirmary (ARI) for assessment (with a view to undergoing open repair or endovascular aneurysm repair, EVAR). Men over the age of 65 years, who have not previously been screened, are also able to self-refer themselves for AAA-screening.
    [Show full text]
  • NHS Grampian Archives Special Collections Centre Sir Duncan Rice Library Bedford Road Aberdeen AB24 3AA  01224 274912  [email protected]
    NHS Grampian Archives Special Collections Centre Sir Duncan Rice Library Bedford Road Aberdeen AB24 3AA 01224 274912 [email protected] NHS Grampian Archives Collection Policy Introduction 1. NHS Grampian Archives forms part of NHS Grampian and holds records relating to the NHS and its predecessor bodies, along with local health related organisations, and of individuals actively concerned with health care. 2. NHS Grampian Archives aims to collect, preserve, and make available records which have long-term historical, administrative, legal and medical interest which relate directly to the National Health Service and its predecessors within the North East of Scotland. 3. NHS Grampian was previously the Northern Health Service Archive and had responsibility for records relating to the Highland region as well as the Grampian Region. Highland Council Archives now hold the NHS Highland records. The Northern Health Service Archives therefore became NHS Grampian Archives in 2013. 4. The records had been held at Woolmanhill Hospital until 2013, when the (generally) historic collection was moved to storage within the University of Aberdeen’s Special Collections Centre in the Sir Duncan Rice. The (generally) modern records are held in an NHS managed outstore. 5. A list of the records held is available on the University of Aberdeen’s Special Collections Centre Archives and Manuscripts Catalogue, and by contacting the NHS Grampian Archivist. Scope 6. This policy will apply to records collected in all formats by NHS Grampian Archives. It must be noted that NHS Grampian Archives does not normally accept museum objects. 7. The scope of the records which NHS Grampian Archives aims to collect, preserve and make available to the public (according to various legislation) is as follows: 7.1.
    [Show full text]
  • Evaluation of a New Service Model
    Evaluation of a new service model Forres Neighbourhood Care Team, Health & Social Care Moray The Evidence and Evaluation for Improvement team (EEvIT) April 2019 © Healthcare Improvement Scotland 2019 Published April 2019 This document is licensed under the Creative Commons Attribution- Noncommercial-NoDerivatives 4.0 International Licence. This allows for the copy and redistribution of this document as long as Healthcare Improvement Scotland is fully acknowledged and given credit. The material must not be remixed, transformed or built upon in any way. To view a copy of this licence, visit https://creativecommons.org/licenses/by-nc-nd/4.0/ www.healthcareimprovementscotland.org Contents Introduction ............................................................................................................... 2 Context ...................................................................................................................... 2 The new nursing model: Forres Neighbourhood Care Team .................................... 2 The Evidence and Evaluation for Improvement Team support with the evaluation............................................................................................................ 4 Findings...................................................................................................................... 4 In summary ................................................................................................................ 7 How were the evaluation findings used? .................................................................
    [Show full text]
  • Emergency Care Centre Guidebook
    Emergency Care Centre Guidebook This booklet provides information about our new hospital. Contents The Emergency Care Centre - designed by Introduction 2 clinicians, focussed on patients. Services in the Emergency Care Centre/Building plan 3/4/5 This booklet is for members of the Level 0 and Level 1 Layout 6/7 public, patients and visitors. Patient Benefits 8 It provides information on how services are provided in the Emergency Care Centre Staff Benefits 9 and how to access the new building. Which Service - Know Who To Turn To 10 Emergency Care Centre Patient Access 11/12/13 Travel and Parking 12 Catering 15 Smoking 15 Special Features of the Emergency Care Centre Building 16/17 Interesting Facts 17 Grampian Hospitals Art Trust and the ECC 18/19 Frequently Asked Questions 20/21 www.nhsgrampian.org/emergencycare Introduction Services in the ECC Welcome to NHS Grampian’s Emergency Care Centre (ECC). Emergency and urgent care has been carried out in a number The opening of this facility represents a major step forward in of various locations on the Foresterhill Health Campus: the modernisation of facilities and services on the Foresterhill • Primary care out-of-hours service (GMED) in the Health Campus as laid out in NHS Grampian’s Health Plan. David Anderson Building. (www.nhsgrampian.org/healthandcareframework) • Urgent minor injuries and emergency care in the The Emergency Care Centre brings together emergency and urgent A&E Department. care services into one building. Accident and Emergency (A&E), • Medical emergency admissions in the Acute Medical GMED (primary care out-of-hours service), NHS24 and services for Assessment Unit (Ward 49, Aberdeen Royal Infirmary).
    [Show full text]
  • NHS Grampian Announces £150 Million Foresterhill Redevelopment
    NHS Grampian - caring listening improving NHS news SPRING 2016 Welcome to the Spring 2016 edition of NHS News Keep up to date with Bringing you news, opportunities and information from NHS Grampian NHS Grampian... his newsletter is one of the ways in deliver, to be better informed about Twhich we try and share information what is happening in Grampian and, www.nhsgrampian.co.uk with you about health services and most importantly, to receive the best Receive the latest news from about how to be healthier. Our focus is possible care and treatment to meet NHS Grampian by following us very much on the people of Grampian your needs. on Facebook or Twitter and how you can, and do, influence We hope you enjoy reading this healthcare in your area. www.facebook.com/ newsletter, and we would like you to tell NHS.Grampian.Scotland We want the people of Grampian us your opinions about the content and to see themselves as partners in the if there are any articles you would like to @NHSGrampian | twitter.com/ delivery of services, rather than just see in future editions. You will find the NHSGrampian receivers of services. We want you to details of how to contact us on the back have a greater say in the services we page. ore than £150 million will be Minvested in building new facilities at NHS Grampian’s Foresterhill Campus in NHS Grampian announces Aberdeen over the next five years. Plans for the project have been lodged with Aberdeen City Council and could £150 million Foresterhill redevelopment result in 10 new facilities.
    [Show full text]
  • HTAP Steering Group I Am Pleased to Present the Health & Transport Action Plan (HTAP) Annual Report for the Financial Year 2016-17
    GRAMPIAN HEALTH & TRANSPORT ACTION PLAN Annual Report 2016-2017 NHS Grampian 1 Foreword from the Chair of the HTAP Steering Group I am pleased to present the Health & Transport Action Plan (HTAP) Annual Report for the financial year 2016-17. As Chair of the HTAP Steering Group, I would like to acknowledge the contributions made by partner organisations and individuals towards achieving the aims set out in the HTAP. In many ways health and transport are intertwined concepts, both as an access issue and a public health issue. The work of the HTAP reflects these issues and seeks to strategically influence successful delivery across the region. For some residents the issue may be whether it is possible to access affordable and suitable transport needed to attend health and social care appointments. Transport can also have a negative impact on health outcomes by contributing to air pollution, road traffic casualties and inactive lifestyles. These issues do not equally impact all communities and demographics within the region resulting in health inequalities. The long term nature of issues addressed by the HTAP are complex in nature. It is with these challenges in mind that organisations will, I hope, continue to increasingly work together and support the delivery of the HTAP. Gerry Donald, Chair of the HTAP Steering Group (NHS Grampian) 2 Introduction The vision for transport and public health is: • For people in Grampian to choose to This annual report details progress made by travel by active modes such as walking and partner organisations in relation to the aims of cycling whenever appropriate and to have the Health & Transport Action Plan during the the ability to do so conveniently and safely, financial year 2016-2017.
    [Show full text]