1 apan ways J il n a i R Construction
d of HSR in India ways
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan pee a il S a
di General Manager h n R I g n an i Hi
Shinkansen Construction b f s r Network in Japan t U uarters, , ec q j Co.,Ltd ro P Head enges o
ll gy q & HSR U b R il i J a HSR P j t i I di Shinkansen Network in Japan Ch llProcedure of Shinkansen f Hi h S d R il The Present Situation of HSR in India ・ ・ ・ ・ Technolo Harutoshi HAYASAKA Japan International Consultants for Co.,Ltd Transportation Technolo 2
in
- Corridor Pre
Leader: Railway
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan Team Leader: Pre Speed
–
an. ) High cum p
–
ysore M ect in Ja o Expert j jp t
ne Ahmedabad, High Speed Railway Corridor in li : -
s h b Railway o
J ranc b or
j Mumbai
a Chief Railway Expert ith b h li t M ) MjM Jb India. • Leader : The Study Team of Countermeasures against Snow for Mumbai Damage and Demonstration of Railway Technology in Sweden • Study for HSR Line-6 in India (Chennai – Feasibility Bengaluru – Coimbatore – – Ernakulam Thiruvananthapuram w • Chief Project Manager : Planning on MAGLEV Construction Pro • Adviser : The Eurotunnel Project Financing by Technical the Banking Syndicate in UK and France. • HSR Construction/Acting Leader: Joint Feasibility Study Brief about the speaker’s major jobs Brief about Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan Introduction of JIC 4 2020
til ways un il a R
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan an di n I
integration
f on o i s i national
erm v t i i f I di R il til 2020 ong- L Inclusive Development, both Indian Railways Vision 2020 Strengthening national integration Large-scale generation of productive Environmental sustainability geographically and socially employment 4 Items ・ ・ ・ ・ High-Speed Railways 250~350km/h high speed railway planning study of 7 lines Preliminary Public-private partnership 5 680km 480km 140km 780km 530km Length 1060km 1,000km e l yso M Amritsar o - Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan t ne ulam-Thiruvanantapuram li
h Corridor ranc Howrah-Haldia Chandigarh - b
Delhi-Jaipur-Jodhpur ith b h li t M l Projects in India w Pune-Mumbai-Ahmedabad Dehli Delhi-Agra-Lucknow-Varanasi-Patna Hydrabad-Dornakal-Vijayawada-Chennai HSR in India Projects Chennai-Bengaluru-Ernak 1 4 6 2 3 5 7 No. Alignment of No.6 Corridor
Bengaluru Chennai Krishnagiri
Mysore Krishnagiri
Coimbatore :Section (a) - total length 334 km :Sti()Section (c) - tot al l ength 1060 km :Station of major cities
:Other stations Ernakulam
Thiruvananthapuram
PrePre--feasibilityfeasibility Study for HiHighgh Speed Rail Corridor (Chennai – Bengaluru – Coimbatore – Ernakulam – Thiruvananthapuram) 7 Agency
Construction the from Administrative
,
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan Independent independent
+ an ↓
was as
Construction
that CATT.
2003,
and
1963 projects.
in JRCC Railway October
in of
works
founded Japan Railway Construction Public Corporation Japan Transport and Technology Agency Technology and Transport public
founded : : Corporation for Advanced Transport and Technology and Transport Advanced Corporation for :
: Japan Railway Construction integration
was with was
the
JRCC Headquarters of Japanese Nationallines Railways (JNR) in order to construct new JRTT by CATT JRCC JRTT Foundation of JRTT 8 ) lev Test Line lev Test g (Tokyo Monorail) (Tokyo Maglev Test Line Maglev Test Yamanashi Ma Yamanashi ( (g) Airport access railway ) ress Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan p Subway Tsukuba Ex (Minatomirai Line) ( Urban Railway ) Tunnel Shinkansen Hokuriku Shinkansen ( Seikan Undersea Various Types of Railway Construction 9 Tohoku Tohoku Sapporo Shinkansen Joetsu Shinkansen 2016 2010 Akita Tokyo Yamagata Hokkaido Shinkansen
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan 2015 Tokaido Shinkansen (780km) (175km) Hokuriku Shinkansen (2,388km)
) Shin-Osaka
Network JRTT y ansen b
k d n e t Kyushu [ ] Route Kagoshima Shi k ruc t Sanyo Hakata 2011 ons Shinkansen CttdbJRTT C Under construction Planning stage In operation (2,388km) oshima-Chuo g
() ( Ka [ Route ] Nagasaki Shinkansen Network 10 time
y 1 min delay bilit
a Per day li e 930,000 passengers less than R li bilit Average delay time Mass Transit
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan Approx. Shinkansen years
per hour 50
in 50 years Density
Safety No passenger High Density fatalities Up to 15trains Main Features of the Shinkansen Annual Averaggye Delay Time in Tokaido Shinkansen Year
Annual Average Delay Time (minute/train) 12
t c a bli e pu th ?
rom f
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan ng projects di
un f HSR s,
t ec the j
for
pro HSR or large is desirable. How can public funding be What should be the organizational structure What should be the organizational for executing the projects and subsequently operations ? What difficulties are likely in the completion of HSR projects ? HSR projects suffer from time and cost overruns. What steps are required to prevent ? matter in the HSR projects above-mentioned F HSRattracted for the j HSR projects ? t f di f th bli t Challenges of High Speed Railways • • • • 13 ) %
Project 1 33 % works)
Shinkansen operation financing
( JR (Private Companies) Local Governments bear
(Public
Shinkansen Project
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan f governments Lease fees
facilities Lease o infrastructure.
(1/3)
) Transport and Technology Agency and Technology Transport %
local 2
67 % Shinkansen and
the
(2/3)
for
National Government National burden Separation of infrastructure andSeparation of infrastructure operation Financing Infrastructure construction Infrastructure and ownership Framework for Implementation of Shinkansen JRTT (Government Agency) JRTT (Government ( □ □ JRTT: Japan Railway Construction, Japan Railway JRTT: 14 (JR) or t (JR) Operator Operates pera Ot(JR) O assessment Environmental impact Lease Agreement Consultation a work Construction
up
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan JRTT Start of (JRTT) (JRTT) Completion Draws up a Conducts study construction work construction plan Construction body based on the plan Nomination Construction order Order lication Approval pp App Tourism
Shinkansen Construction and t
Transport
governmen l Infrastructure,
ona ti Submits study report a Decision of basic plan Land, Directs to conduct study Directs to conduct
NtiN l t Decision of provisional plan of
Approves the construction plan Nomination of operator Nomination of construction body Procedure of Shinkansen Minister 15
, t
pmen it i guidance
bridges, equ
c i r t expertise ec JRTT’s
El t i El tunnels,
of
s, k under rac
tk t fields
il il etc.
ra roadbeds,
f f works of o Operator (JR)
equipment on
i s on specific i ii
ti buildings, in Design consulting firm
ruc t Private Companies superv ons
Construction Ctti C station Mechanical d Land survey Land survey / geological research firms General contractors: Specialized contractors: Implementing Involved an
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan Lease
Contracts Contracts Contracts project
construction
all construction plan technologies
railway
J R T whole
specialized
the
various
Construction management Consultations with local governments Completion Land acquisition Briefing to local communities Order for construction works Location and geological surveys Completion inspection Structure designing Formulation of the over using Organizing A case of Shinkansen line construction Flow of Railway Construction and Roles of JRTT Projects 16 ) ) Bridge Tohoku Shinkansen Tohoku Kyushu Shinkansen Earth Structure ( (
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan ) )( ) )( Tunnel Viaduct Earth Structure Kyushu Shinkansen Hokuriku Shinkansen ( ( Structures on Shinkansen 17 l
unne Bridge Viaduct Structure Earth Tl T NEW OLD
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan 0% 20% 40% 60% 80% 100% - (Omiya-Niigata) Yatsushiro
(Tokyo-Morioka) Kagoshima Chuo) Kagoshima (Takasaki-Nagano) (Shin Osaka-Hakata) (Tokyo-Shin Osaka) (Tokyo-Shin (Morioka-Hachinohe) (Shin Yatsushiro Tohoku Shinkansen Tohoku Joetsu Shinkansen Sanyo Shinkansen Tokaido Shinkansen Tokaido Tohoku Shinkansen Tohoku Kyushu Shinkansen Hokuriku Shinkansen Percentage of Structures on Shinkansen 18 2007 1988 1994 2005 Construction
Under Construction Italy UK ,
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan rance, Switzerland France Italy FUK F Nagano, Niigata 2007 m km k
00 45 . . 57 00 km 50 45 k ) Ambin
uro (E
l Montd’
) anne Basis Montd’ Ambin Ch l (E ) ril 2009 1 Gotthard Base 57.07 km Switzerland 2010 7 Koralm 32.80 km Austria Contemplation Under 2 34 Brenner Basis 5 Seikan6 Lotschberg Basis 55.00 km8 Austria, Italy9 Guadarrama 34.58 km Taihang 53.85 km Contemplation Under Aomori Hokkaido, 28.38 km Spain 27.85 km China Contemplation Under 2007 p 11 Iwate Ichinohekm 25.81 Iwate 2002 14 Iiyama 22.23 km 15 Oshimizu 22.22 km Gunma, Niigata 1982 1213 Base Pajares Lainzer-Wienerwald 23.94 km 24.67 km Austria Spain Contemplation Under Contemplation Under 10 Hakkouda 26.46 km Aomori No. Tunnel Length location Open A ( (p ) The Longest Railway Tunnel in the World 19 ) Bridge Kyushu Shinkansen ( )
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan Slab Track ( ) Tunnel Kyushu Shinkansen ( Track Structure 20
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan Ballast track Slab track Resiliently supported track ansen Nagano) k - n Shi (Omiya-Niigata) (Tokyo-Morioka) (Okayama-Hakata) (Takasaki (Tokyo-Shin Osaka) (Tokyo-Shin (Morioka-Hachinohe) (Shin Osaka-Okayama) anyo S Shi k Joetsu Shinkansen Sanyo Shinkansen Percentage of Tracks on Shinkansen Tohoku Shinkansen Tohoku Tohoku Shinkansen Tohoku Tokaido Shinkansen Tokaido Hokuriku Shinkansen 21
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan area
o y Urban Railways Tok metropolitan 22
rate
es: tax
iliti ac f f iliti
exempt
on Exception ti Tax system Tax Reduced Tax a Tunnel: St ti ) )
value value
1/3 etc. Loan
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan rental
equivalent equivalent
)
Profit Profit
Body Facilities (
1/3 Local Public
( Public Body ) Government Railway Operator Railway Constructor ( Existing Railway Enterpriser ) 1/3 National For the Enhancement of Urban Railway Convenience Scheme of Subsidies Government 23
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan Sendai Subways 24
and aid,
‐ in ‐ Grant Stake construction
35% spending
Local Government for
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan government.
raised
30% local
bond
the
by
municipal
a
Subsidy Enterprise bond, Loan payable Enterprise bond, subways is
of
35% bond
National Government Public, Para-public Organizations, Tokyo Metro Co., Ltd. Public, Para-public Organizations, Tokyo improvement Enterprise For Subway Construction Scheme of Subsidies ort p : 51Min. : 51Min. Narita Airport Terminal 1Sta. Ibaraki Narita Airport 2 Sta. Terminal Airport Chiba
Narita Air
Narita Airport Railway Rapid 8.4km –Narita Air –Narita ) o – y Tsuchiya Route NRA (
JR
① ①JR JR Route Keisei Main Line Route JR Narita Line Center of Tok Center of Tok ① ② JR Sobu Line Chiba Sta.
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan Line Hokuso 32.3km Imba Nihon-idai Sta. Keisei Main Line JR Uchibo Line Keisei Main Line Route
②
e Keisei-Takasago Sta. Haneda Airport Sta.
Keisei Main Lin Main Keisei 12.7km a. St Shinagawa Sta. Shinagawa eno eno USt U - i Saitama se i Tokyo Kanagawa e KiK i Route Map Narita Rapid Rail Access opening of Before Nippori Sta. Tokyo Sta. Tokyo JR Yamanote Line JR Yamanote Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan
g ) Kon O'Hare Narita g gg Incheon / Frankfurt
Heathrow / /
/ / Hon
/ USA UK Korea Japan Charles de Gaulle China / Germany the center of Tokyo and the airport was an urgent issue. before opening of NRA Reduction in journey time between
( France Journey between times major airports and city centers of the world Journey Time t Ltd
Narita Airpor Narita Railway Rapid 8.4km o., Narita Airport Terminal 2 Sta. C
) Narita Airport 1 Sta. Terminal ccess A
il a R
】 id ap 19.1km R Use existing structures a One track is One used by JR it ( Narita Rapid Rail Access Rail Rapid Narita 10.7km Max. speed 160km/h Max. ar Tsuchiya iRiRl C Ltd idRilA NitR N : Newly constructed section dy o b Keisei Electric Railway Co., Ltd
) on : ti ruc t JR Sobu Line ons 130km/h Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan Cttibd C Operator Newly constructed section was to Newly section entrusted JRTT constructed Narita Rapid Rail Access Rail Narita Rapid → Imba Nihon-idai Sta. Imba Nihon-idai 【
Hokuso Line Hokuso 32.3km Keisei Main Line improved section ( 32.3km
Narita Rapid Rail AccessNarita Rapid Rail 51.4km Access
Hokuso Line a. Max. speed 110km/h Max. St Rail
asago Rapid
k a TkT St - i Narita Rapid Rail Access se
i : Haneda Airport Sta. e 110km/h KiK i Max. speed Max. Tokyo Sta. body
】 a. Shinagawa Sta. Shinagawa St Nippori Sta. eno USt U - i Keisei Main Line Main Keisei 12.7km se Construction body i Improvement work was entrusted to Improvement work was entrusted Hokuso-Railway Co.,Ltd Co.,Ltd e Planning Hokuso Line
KiK i 【 . 51Min.
: : 51Min. : 51Min. Narita Airport Terminal 1Sta. 36 Min : ) Narita Airport 2 Sta. Terminal Airport Chiba
Narita Airport Railway Rapid 8.4km NRA Narita Airport ( – Narita Airport
Rapid
JR Narita Line
Narita Rapid Access Rail 10.7km Route
New Keisei Route JR Route Keisei Main Line Route Keisei Main Line ③ ① ② Befor opening After opening Center of Tokyo – Center of Tokyo JR Sobu Line
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan Ibaraki Line Hokuso 32.3km Imba Nihon-idai Sta. Keisei Main Line e time JR Uchibo Line Chiba Sta. y Main Line Route Route Kisei Main Line Route
ourne JR ② New Keisei Rout j jy ① ①JR e ③
e Keisei-Takasago Sta. Haneda Airport Sta.
Keisei Main Lin Main Keisei 12.7km a. After St Before opening of Narita Rapid Rail Access Sta. Shinagawa eno eno USt U Reduction in Reduction in - i Saitama se i Tokyo Kanagawa e KiK i Effects of Opening of Narita Rapid Rail Access ① Nippori Sta. Tokyo Sta. Tokyo JR Yamanote Line JR Yamanote reduction 15 min.
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan time y
) ) ourne j jy O'Hare Narita Narita Incheon / Frankfurt
Heathrow / / /
/ / Hong Kong
/ USA UK Korea Japan Japan Charles de Gaulle China / Germany e after opening of NRA after opening
( before opening of NRA
( Franc Reduction in Reduction in Journey times between major airports and city centers of the world Effects of Opening Narita Rapid Rail Access Effects ① trains trains trains trains
After Narita Airport Terminal 2 Sta. t opening 105 116 Narita Airport 1 Sta. Terminal Stopping major stations trains 221 trains trains
- Before
】 opening 150 Narita Yukawa Sta. Narita Yukawa Narita Airpor Imba Nihon-idai Sta. Route Route – Narita Airpor
trains/day
Line Line 51 trains/day
Route
:
) Ueno – Main Main - Haneda Airport Sta.
Keisei
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan ֞ Chiba-NT-Chuo Sta. charge
Keisei New Shin-Keisei Line Total 150 ① ② Keisei Shin-Kamagaya Sta. Shin-Kamagaya extra 41 trains/day
Tobu-Noda Line Tobu-Noda : no extra charge (
Skyliner 54 trains/day )
: express
Keisei Main Line Before Higashi-Matsudo Sta. Higashi-Matsudo ① ( Aoto Sta. Limited express Daytime : Narita Airport Sta. Airport Daytime : Narita Skyliner ) ) 【 Haneda Airport Sta. New Keisei Route Keisei-Takasago Sta. New New a.
rovement of Convenience ② ( ( St p Tokyo Sta. Nippori Sta. JR Musasino Line eno USt U Im - i se i e Effects of Opening of Narita Rapid Rail Access ② KiK i Narita Airport Terminal 2 Sta. Narita Airport 1 Sta. Terminal Narita Yukawa Sta. Narita Yukawa 】 . Sta Imba Nihon-idai Sta.
Airport
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan
Chiba-NT-Chuo Sta. ): Haneda Airport Sta Shin-Keisei Line
֞ network . Shin-Kamagaya Sta. Shin-Kamagaya Sta. Shin-Kamagaya y Tobu-Noda Line Tobu-Noda Sta
of Chiba pref. Northwest part a. no extra charge Airport
St ( o d su t Narita a
:
MtM d St - Higashi-Matsudo Sta. Higashi-Matsudo hi Aoto Sta. gas Haneda Airport Sta. Hi hi Keisei-Takasago Sta. To Kanagawa pref. To Daytime : Narita Airport Sta
Limited express 【 a. South part of Saitama pref. ansion of railwa St p py Tokyo Sta. Nippori Sta. JR Musasino Line eno USt U Ex Ex - i se i e Effects of Opening of Narita Rapid Rail Access ③ KiK i )
1 4 . . 51 5 54 5 2010
5 5 . . 13 5 March 14 5
in
passengers
one
air
Others previous
7 . departing 5 and
36 7 .
4.8% 41 5 by -
Car 2010
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan selected
September
Bus in
modes
survey
access
4 . this of
9 . 44 4 Railway 5.5% 38 9 + shares
between
of
The share of railway among access modes has increased The share of railway ・ 0% 20% 40% 60% 80% 100% 3 9 . . Comparison Transition Transition of access to the airport ( Effects of Opening Narita Rapid Rail Access ④ • 2010 3 2010 9 33
Japan International Consultants for Transportation Co., Ltd. for Transportation Co., International Consultants Japan Thank you for your attention.