Zimbabwean. Government Gazette

Total Page:16

File Type:pdf, Size:1020Kb

Zimbabwean. Government Gazette I ZIMBABWEAN. GOVERNMENT GAZETTE Published by Authority Vol. LXXII, No. 12 4th MARCH, 1994 Price $3,00 Genera! Notice 133 of! 994. (g) depart Makaure School Sunday 2.35 p.m., arrive Harare 5.20 p.m.; ROAD MOTOR TRANSPORTATION ACT [CHAPTER 262\ (h) depart Chegutu Thursday 1 p.m., arrive Oora School 4.40 p.m. Applications in Connexion with Road Service Permits (i) depart Gora School Thursday 4.45 p.m., arrive Makaure IN terms of subsection (4) of section 7 of the Road Motor School 5.35 p.m.; Transportation Act [Chapter 262\, notice is hereby given that the (i) depart Makaure School Wednesday 4.20 p.m., arrive Gora applications detailed in the Schedule, for the issue or amendment of School 5.10 p.m. road service permits, have been received for the consideration of the The service to operate as follows— m Controller of Road Motor Transportation. “As and when required.”. ^ Any person wishing to object to any such application must lodge j| with the Controller of Road Motor Transportation, P.O. Box 8332, 0/1144/93. Permit; 27407. Passenger-capacity; 75. K Causeway— Route: Harare - Mazowe - Concession - M’sonedi - Mvurwi - 5 (a) a notice, in writing, of his intention to object, so as to reach Mpinge Turn-off - Kazilo Turn-off - Nyamhondoro School - » the Controller’s office not later than the 25th March, 1994; I Mudindo Township - Mpinyuri School - Magwenya School - (b) his objecdon and the grounds therefor, on form R.M.T. 24, Shinje Council - Guruve - Chimfombo - Nyakapupu Turn-off - together with two copies thereof, so as to reach the Controller's Chamachinda - Gornbarashama. office not later than the 15th April, 1994. By: Alteration to times. Any person objecting to an application for the issue or amendment The service operates as follows— of a road service permit must confine his grounds of objection to (a) depart Harare Monday 1 p.m., arrive Gornbarashama 6 p.m.; matters directly bearing on the considerations referred to in para­ graph (a), (b), (c), (d), (e) or (f) of section 8 of the said Act. (b) depart Harare Tuesday and Wednesday 2 p.m., arrive Gornbarashama 7 p.m.; V. M. MUPAWOSE (MRS.), (c) depart Harare Friday 5.30 p.m., arrive Gornbarashama 4-3-94. Controller of Road Motor Transportation. 10.30 p.m.; Schedule (d) depart Harare Saturday 1.30 p.m., arrive Gornbarashama 6.30 p.m.; MOTOR-OMNIBUSES (e) depart Gornbarashama Tuesday to Wednesday 8.15 a.m., arrive Harare 1.45 p.m.; Amendments ■ ' (f) depart Gornbarashama Saturday 6 a.m., arrive Harare Mondoro Express (Pvt) Ltd. 11 a.m.; 0/1142/93. Permit: 26183. Passenger-capacity: 76. (g) depart Gornbarashama Sunday 12.15 p.m., arrive Harare 5.15 p.m. Route: Harare - Beatrice - Watyoka - Gora School - Nyamashesha - ChikaraTownship - Makaure School - Munema Kraal - Ny atsanga The service to operate as follows- - - Katava - Pickstone - Chegutu. (a) depart Harare Monday to Thursday 1 p.m., arrive By: Deletion of the times of operation and operating as and when Gornbarashama 6 p.m.; required. (b) depart Harare Friday 3 p.m., arrive Gornbarashama 8 p.m.; The service operates as follows— (c) depart Harare Saturday 1.30 p.m., arrive Gornbarashama (a) depart Harare Monday to Wednesday 1 p.m., arrive Makaure 6.30 p.m.; School 3.55 p.m,; (d) depart Gornbarashama Tuesday to Friday 5 a.m., arrive (b) depart Gora School Thursday 6 a.m., arrive Chegutu Harare 10 a.m.; 9.40 p.m.; (e) depart Gornbarashama Saturday 6 a.m., arrive Harare (c) depart Harare Friday and Sunday 6 p.m,, arrive Makaure 11 a.m.; School 8.55 p.m.; (f) depart Gornbarashama Sunday 11 a.m., arrive Harare 4 p.m. (d) depart Harare Saturday 1.30 p.m., arrive Makaure School 4.25 p.m.; Additionals (e) depart Makaure School Monday 3.55 p.m., arrive Harare Tenda Transport (Pvt.) Ltd. 6.20 p.m.; 0/909/93. Motor-omnibus. Passenger-capacity: 76. (f) depart Makaure School Tuesday, Wednesday, Friday and Route: Harare - Marondera - Macheke - Headlands - Rusape - Gunda Saturday 5.35 p.m., arrive Harare 8.20 p.m.; - Matsika - Masvosva - Mukonomuwi. % 192 Zimbabwean Government Gazette, 4th March, 1994 The service to operate as follows— (b) depart Gwanda Thursday and Saturday 1 p.m., arrive Kafusi (a) departHarare Monday to Sunday 7 a.m., arrive Mukonomuwi Dam 3.25 p.m. 10.30 a.m.; Note.—^This application is made to reinstate permit 19569 whicf (b) depart Mukonomuwi Monday to Sunday 11 a.m., arrive expired on the 30th September, 1993. Harare 2.30 p.m. Magwizi Transport. 0/933/93. Motor-omnibus. Passenger-capacity: 76. 0/1175/93. Motor-omnibus. Passenger-capacity: 90. Route 1; Harare - Marondera - Macheke - Rusape - Riverside - Route; Harare - Kadoma - Gweru - Masvingo - Beitbridge. Mutare. The service to operate as follows— Route 2: Mutare - Odzi - Pounsely - Zvevanhu School - Mt. Zuma (a) depart Harare Monday, Wednesday and Friday 7 p.m., arrive School - Sabi Drift - Watekama Township - Nyashanu Mission - Beitbridge 2.50 a.m.; Ruti Dam. (b) depart Harare Sunday 7 a.m., arrive Masvingo 12.10 p.m.; The service to operate as follows— (c) depart Beitbridge Tuesday, Thursday and Saturday 5 p.m., Route 1: airive Harare 0.50 a.m.; (a) depart Harare Tuesday, Thursday and Sunday 7 a.m., (d) depart Masvingo Sunday 1.30 p.m., arrive Harare 7.40 p.m arrive Mutare 11 a.m.; (b) depart Harare Friday 3 p.m., arrive Mutare 7 p.m.; Afro-Ventures Safaris Zimbabwe (Pvt.) Ltd. (c) depart Mutare Monday, Wednesday, Friday and Saturday 0/1195-1197/93. Three motor-omnibus. Passenger-capacity: 9 7.55 a.m., arrive Harare 11.55 a.m.; each. Route 2: Route: Throughout Zimbabwe. (a) depart Mutare Tuesday, Thursday and Sunday 1 p.m., Condition: arrive Ruti Dam 4.05 p.m.; (a) For pre-booked, organized site-seeing tours and excursions (b) depart Mutare Friday 7.30 p.m., arrive Ruti Dam only. 10.35 p.m.; (b) All operations to commence from Victoria Falls. (c) depart Ruti dam Monday, Wednesday, Friday and Satur­ day 4.30 a.m., arrive Mutare 7.35 a.m. I. Ganyani, trading as Ganyani Motorways. 0/1208/93. Motor-omnibus. Passenger-capacity: 75. Power Coach Express. Route: Sanyati Arda - Nyimo Township - Kadoma - Kwekwe - 0/1050/93. Motor-omnibus. Passenger-capacity: 75. Gweru - Mvuma - Masvingo - Ngundu Halt - Rutenga - Bubi Rivei Route: Harare - Chinhoyi - Karoi - Makuti - Chirundu. • . - Beitbridge. The service to operate as follows— The service to operate as follows— (a) depart Harare Tuesday, Thursday and Saturday 7 a.m., arrive (a) depart Sanyati Arda Monday, Wednesday and Friday 4 a.m. Chirundu 11.40 a.m.; arrive Beitbridge 12.40 p.m.; (b) depart Harare Sunday 2 p.m., arrive Chirundu 6.40 p.m.; (b) depart Sanyati Arda Sunday 3 a.m., arrive Ngundu Hall 9.12 a.m.; (c) depart Chirundu Monday, Wednesday and Friday 12 noon, arrive Harare 4.40 p.m.; (c) depart Ngundu Halt Sunday 9.27 a.m., arrive Sanyati Ardt 4 p.m.; (d) depart Chirundu Sunday 9 a.m., arrive Harare 1.40 p.m. (d) depart Beitbridge Tuesday, Thursday and Saturday 9 a.m. Pelandaba Bus Service. t arrive Sanyati Arda 6 p.m. 0/1161/93. Motor-omnibus. Passenger-capacity: 76. 0/1209/93. Motor-omnibus. Passenger-capacity: 75. Route 1: Bulawayo - Matopos - Hovi - Kezi - Antelope Mine - Route: Sanyati Arda - Nyimo Township - Kadoma - Kwekwe • Mashumba - Sikaraasure - Mashongola - Tshongwe - Mawaza - Gweru - Mvuma - Masvingo - Ngundu Halt - Rutenga - Bubi Rivei Makokwe - Simbuka - Kafusi Dam. ' - Beitbridge. Route 2: Kafusi Dam - Mafuko School - Gungwe Dam - Marinoha The service to operate as follows— School - Mawaza School - Chibi - Ntalali - Sengezane School - Gwaranyemba Dam - Gwanda Town. (a) depart Beitbridge Monday, Wednesday and Friday 9 a.m arrive Sanyati Arda 6 p.m.; Route 3: To operate as and when required at the beginning and end of each school term and on public holidays for the conveyance of (b) depart Beitbridge Sunday 6 a.m., arrive Masvingo 9.35 a.m. persons, connected with school activities to and from Bulawayo (c) depart Masvingo Sunday 10.05 a.m., arrive Beitbridge and— 1.40 p.m.; (i) Mzingwani Mission; (d) depart Sanyati Arda Tuesday, Thursday and Saturday 4 a.m. (ii) Tennyson Hlabangani Mission; arrive Beitbridge 12.40 p.m. (iii) David Livingstone; GOODS-VEHICLES (iv) Matopo Mission; and (v) Usher Institute. .Amendments The service to operate as follows— Zimbabwe United Freight Co. Ltd.—Bulwark Division. Route 1: G/16 and 17/94. Permits: 28393 and 28392, Two goods-vehicles Load: 8 000 kilograms, each. (a) depart Bulawayo Monday and Wednesday 11 a.m., arrive Kafusi Dam 3.45 p.m.; Route: Within Manicaland Province. (b) depart Bulawayo Friday and Sunday 4 p.m., arrive Kafusi Nature of carriage: Products and requirements of the timber industry Dam 8.45 p.m.; under contract to the Wattle Company Ltd. (c) depart Kafusi Dam Monday, Tuesday and Sunday 4.30 a.m., By: Increase of load capacity to 16 000 kilograms. arrive Bulawayo 9 a.m.; Additional (d) depart Kafusi Dam Friday 7.30 a.m., arrive Bulawayo 12 noon. Mhlanga Transport Route 2: G/289/93. Goods-vehicle. Load: 30 000 kilograms. (a) depart Kafusi Dam Thursday and Saturday 6 a.m., arrive Route: Within Mashonaland Province, with access to Harare anc Gwanda 8.25 a.m.; Mutare. Zimbabwean Government Gazette, 4th March, 1994 193 Nature of carriage— K. M. Edwards. (1) Goods, wares and merchandise of all kinds. G/33 and 34/94. Goods-vehicle. Load: 30 000 kilograms, each.
Recommended publications
  • Zimbabwean \ Government Gazette
    c,-"' 'ik."4 V' A ZIMBABWEAN \ GOVERNMENT GAZETTE Published by Authority Vol. LXXI, 1^0. 60 24th SEPTEMBER, 1993 Fhice 2,50 General Notice 569 of 1993. Commencing At its junction with Majoni Road (33/171) and stands 85 and 81. ROADS ACT [CHAPTER 263] Passing through Application for Declaration of Branch Roads: Habane Township Stand Nos. 85,84, 83, 82,431 and 81. Terminating IT is hereby notified, in terms of subsection (3) of section 6 of the At its junction with Robert Mkandla Road (33/177) and stands Roads Act [Chapter 263], that application has been made for the 110 and 432. roads described hereunder, and shown on Provincial Plan RC 33/29/D to be branch roads. Reference Plan RC 23/29/D may be inspected, free of charge, at the offices 33/174 Ngubo Road. of the Secretary for Transport, Kaguvi Building, Fourth Street, Commencing Harare. At its junction with Majoni Moyo Road (33/171) and stands 92 Description of road and 117. Reference Passing through 33/170 Mtonzima Gwebu Road. Stand Nos. 93,94, 95, 115, 116, 118,119, 120, 121, 122 and 123. Commencing TermitMting 1 At its junction with Stella Coulson Road (33/104). On Stand No. 124. Passing through Reference Stand Nos. 2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18, 19, 20,483,484, 22,23, 24,25, 26, 27,28,29, 30,31,32, 33, 33/175 Mtshede Road. 34, 35 and 36. Commencing Terminating At its junction with Majoni Moyo Road (33/171) and stands 125 and 109.
    [Show full text]
  • Provisional Constitutional Referendum Polling Stations 16 March 2013 Matabeleland South Province
    Matabeleland South Provisional Constitutional Referendum Polling Stations 16 March 2013 Matabeleland South Province DISTRICT CONSTITUENCY LOCAL AUTHORITY WARD# POLLING STATIONS FACILITY Beitbridge Beitbridge East Beitbridge RDC 1 Chikwalakwala Primary School Beitbridge Beitbridge East Beitbridge RDC 1 Chipise Primary School Beitbridge Beitbridge East Beitbridge RDC 1 Chitulipasi Primary School Beitbridge Beitbridge East Beitbridge RDC 1 Lungowe Primary School Beitbridge Beitbridge East Beitbridge RDC 1 Malabe Primary School Beitbridge Beitbridge East Beitbridge RDC 2 Chabili Primary School Beitbridge Beitbridge East Beitbridge RDC 2 Chapongwe Primary School Beitbridge Beitbridge East Beitbridge RDC 2 Dite Primary School Beitbridge Beitbridge East Beitbridge RDC 2 Lukumbwe Dip Tank Tent Beitbridge Beitbridge East Beitbridge RDC 2 Panda Mine Tent Beitbridge Beitbridge East Beitbridge RDC 2 Lukange Primary School Beitbridge Beitbridge East Beitbridge RDC 3 Chaswingo Primary School Beitbridge Beitbridge East Beitbridge RDC 3 Fula Primary School Beitbridge Beitbridge East Beitbridge RDC 3 Madaulo Primary School Beitbridge Beitbridge East Beitbridge RDC 3 Makombe Primary School Beitbridge Beitbridge East Beitbridge RDC 3 Mandate Primary School Primary School Beitbridge Beitbridge West Beitbridge RDC 4 Jopembe Primary School Beitbridge Beitbridge West Beitbridge RDC 4 Mgaladivha Primary School Beitbridge Beitbridge West Beitbridge RDC 4 Manazwe Area Tent Beitbridge Beitbridge West Beitbridge RDC 4 Matshiloni Primary School Beitbridge Beitbridge
    [Show full text]
  • Zimbabwe Electricity Transmission & Distribution Company Important Notice to Customers 2012 Winter Load Shedding Programmes
    ZIMBABWE ELECTRICITY TRANSMISSION & DISTRIBUTION COMPANY IMPORTANT NOTICE TO CUSTOMERS 2012 WINTER LOAD SHEDDING PROGRAMMES INTRODUCTION The Zimbabwe Electricity Transmission & Distribution Company is experiencing a power shortfall due to generation constraints at Hwange Power Station, the low dispatch at the small thermal power stations and power import constraints. The power shortfall is being managed through load shedding in order to balance the power supply and demand. Power demand peaks to about 2100MW in Zimbabwe during the winter period. The load shedding programmes are only a guide for planning purposes. The power supply situation is DYNAMIC and load shedding on a day will depend on the power available and power demanded on the day. In the event of the supply shortfalls falling below anticipated averages on a particular day, then the additional areas indicated on the schedules will be load shed. ZETDC is doing everything possible to improve the available capacity. Customers are asked to use the limited power sparingly. All non-essential loads should be switched off. Domestic geysers and water heaters should be switched off manually between 5pm and 8pm to enable more residential areas to have power. All commercial customers are required to switch off all lights, office equipment and appliances that will not be in use over night. All customers are being called upon not to use lights during the day where possible. Essential services loads in the categories listed below are exempted from load shedding. • Major Referral Hospitals • Major Water & Sewer installations • National Security Establishments • Major Airports and Broadcasting Stations • Major Central Business Districts The major winter wheat clusters will receive priority supplies.
    [Show full text]
  • Literature Review
    UNIVERSITY OF ZIMBABWE Impact and sustainability of drip irrigation kits, in the semi-arid Lower Mzingwane Catchment, Limpopo Basin, Zimbabwe By Richard Moyo A thesis submitted to the University of Zimbabwe (Faculty of Engineering, Department of Civil Engineering) in partial fulfilment of requirements of Master of Science in Water Resources Engineering and Management ABSTRACT Smallholder farmers in the Mzingwane Catchment are confronted with low food productivity due to erratic rainfall and limitations to appropriate technologies. Several drip kit distribution programs were carried out in Zimbabwe as part of a global initiative aimed at 2 million poor households a year to take major step on the path out of poverty. Stakeholders have raised concerns of limitations to conditions necessary for sustainable usage of drip kits, such as continuing availability of minimum water requirement. Accordingly, a study was carried out to assess the impacts and sustainability of the drip kit program in relation to water availability, access to water and the targeting of beneficiaries. Representatives of the NGOs, local government, traditional leadership and agricultural extension officers were interviewed. Drip kit beneficiaries took part in focus group discussions that were organised on a village basis. A survey was then undertaken over 114 households in two districts, using a questionnaire developed from output of the participatory work. Data were analysed using SPSS. The results from the study show us that not only poor members of the community (defined for the purpose of the study as those not owning cattle), accounting for 54 % of the beneficiaries. This could have been a result of the condition set by some implementing NGOs that beneficiaries must have an assured water source - which is less common for poorer households.
    [Show full text]
  • The Role of Photovoltaic Solar Energy in Enhancing Food Security
    THE ROLE OF PHOTOVOLTAIC SOLAR ENERGY IN ENHANCING FOOD SECURITY. THE CASE OF PELELE SOLAR POWERED IRRIGATION SCHEME IN WARD 12 OF GWANDA DISTRICT. BY TELLMORE NDLOVU R121944A FACULTY OF SOCIAL SCIENCES DEPARTMENT OF GEOGRAPHY AND ENVIRONMENTAL STUDIES A DISSERTATION SUBMITTED TO THE FACULTY OF SOCIAL SCIENCES IN PARTIAL FULFILMENT OF THE REQUIREMENTS OF THE BACHELOR OF SCIENCE HONOURS DEGREE IN GEOGRAPHY AND ENVIRONMENTAL STUDIES AT MIDLANDS STATE UNIVERSITY, GWERU, ZIMBABWE. OCTOBER 2015 i APPROVAL FORM MIDLANDS STATE UNIVERSITY The undersigned certify that they have read and recommended to the Midlands State University for acceptance as a dissertation entitled: the role of Photovoltaic solar energy in enhancing food security. A case of Pelele solar powered irrigation scheme in ward 12 of Gwanda District. STUDENT……………………………………………………….DATE……/……/…… SUPERVISOR…………………………………………………..DATE……/……/…… CHAIRPERSON………………………………………………...DATE……/……/…… EXTERNAL EXAMINER……………………………………...DATE……/……/…… Submitted in partial fulfilment of the Bachelor of social sciences Honours Degree in Geography and Environmental Studies. i DECLARATION I declare that this is my own work and material used from other sources to compile this dissertation has been fully acknowledged. ii DEDICATION This dissertation is dedicated to my beloved parents, Mr and Mrs M. J. Ndlovu as well as my brothers and sisters whose concerted efforts, support and encouragement has brought this work to fruition. May Heavens light shine on you always. iii ACKNOWLEDGEMENTS Firstly I would like to thank God Almighty for his love, wisdom and for guiding me throughout this academic journey. Profound gratitude goes to my academic supervisor Mr K. Shoko for guiding me through in undertaking this entire project. I am highly indebted to him for his patience, enthusiasm and academic support.
    [Show full text]
  • 2019 Load Shedding Programmes
    ZIMBABWE ELECTRICITY TRANSMISSION & DISTRIBUTION COMPANY 2019 LOAD SHEDDING PROGRAMMES INTRODUCTION and other related equipment should be switched Stage 2; Please be advised that the power supply The Zimbabwe Electricity Transmission & Distribution off at peak times for more areas to have power. situation is dynamic, in the event that the power Company (ZETDC) is experiencing increased power shortfall increases beyond the planned limits, load shortfalls i.e. demand and supply mismatch, due to Please be advised that ordinarily, load shedding will shedding will move into stage 2. These are additional low water levels at Kariba Power Station, generation be within the morning and evening peak periods areas that will be switched off as per schedule constraints at Hwange Power Station and limited of 5am to 10am and 5pm to 10pm respectively. when the shortfall is higher for the particular time. imports. The power shortfall is being managed However, the durations may be longer in the event through load shedding in order to balance the of increased power shortfall to avoid the collapse Customers will be informed as soon as the situation power supply available and the demand. of the National Electric grid. requires stage two implementation. Every effort is being directed at improving the The load shedding cycles will be in two stages as Large power users are being requested to reduce generation capacity to ensure that supply follows; their power demand during the morning and disruptions are kept at minimum levels. In order to evening peak periods of 5am to 10am and 5pm to Stage 1; the first group of customers as listed on the assist in reducing the power demand, customers 10pm respectively.
    [Show full text]
  • Practical Experiences of Community Based Disaster Risk Management Planning in Matabeleland South, Zimbabwe
    Practical experiences of Community Based Disaster Risk Management Planning in Matabeleland South, Zimbabwe Community VCA meeting Marula Ward 1 Practical experiences of CBDRM planning in Matabeleland South, Zimbabwe Preamble Growth, development and progress towards the Millennium Development Goals (MDGs) is increasingly being undermined by the impact of a variety of hazards, both natural and man- made. The rising cost of disasters in both developed and emerging countries has moved disaster risk reduction to centre stage in the battle against poverty. One hundred and sixty eight countries (168) have signed up to the ISDR sponsored Hyogo Framework for Action which commits signatories to a strategy for building the resilience of nations and communities to disasters. The strategy builds on three strategic goals which ultimate aim to mainstream disaster risk reduction into all development processes. The evidence is clear, disasters are not natural phenomena, but rather problems of poor development planning, exacerbated by rising populations, increasing poverty, environmental degradation and the impacts of climate change. While increasing frequency and intensity of meteorological events is partly to blame, the vulnerability and lack of preparedness of many sectors of society determine the outcome of hazardous events. It has been clearly demonstrated that awareness, preparedness and resilience determine the outcome of the impact of any hazard, be it drought or flood, earthquake or cyclone. Changes in patterns of human behaviour and decision-making at all levels of government and society can lead to substantial reductions in disaster risk. Public awareness of natural hazards and disaster risk reduction education are pre-requisites for effective catastrophic risk management at country and regional levels.
    [Show full text]
  • Community Foundations in Zimbabwe
    COMMUNITY FOUNDATIONS IN ZIMBABWE Analysis of Eleven Case Studies Surveyed by SIVIO Institute October 2020 sivioinstitute.org Introduction Philanthropy or simply giving is a component and contributions to local organisations which, in turn, use way of life across society. Across sub-Saharan Africa the funds to support projects that improve the quality and indeed in Zimbabwe we have started to see of life. The emphasis of community philanthropy is on the growth of philanthropy. Studies by Moyo (2013), human reciprocity and solidarity. Murisa (2017) and Mohamed (2013) have identified various forms or types of philanthropy but the This form of philanthropy is important in that main focus and the easiest to often track has been community members are at the centre of mobilising, the philanthropy undertaken by High Net Worth sustain, and growing resources (internal and external). Individuals (HNWIs). HNWIs such as Strive Masiyiwa, In doing so communities get to decide for themselves Aliko Dangote, Mo Ibrahim and Patrice Motsepe have how to use the resources and therefore community been identified as among the growing number of philanthropy has the potential to influence and African elites who have also become philanthropists address the current limitations of conventional through their the setting up of various charitable developmental approaches. Community giving is not initiatives and foundations that channel mostly a modern concept or practice. money resources to the poor or needy. As a result, The emphasis of community most people associate philanthropy with wealthy philanthropy is on human individuals, organizations/foundations, and even reciprocity and solidarity. governments – giving from their abundance to those in need and the less fortunate (see Wilkinson-Maposa, As communities grow in their giving, a new layer of Fowler, Olivr-Evans and Mulenga, 2009)1.
    [Show full text]
  • Government Gazette ©
    Be ZIMBABWEAN - © GOVERNMENT GAZETTE Published by Authority ‘Vol. LXVI, No.68 9th DECEMBER,1988 Price 40c_ ~ General Notice 762 of 1988. Route2i | “ROAD MOTOR TRANSPORTATION ACT {CHAPTER 262] | (a) depart Plumtree Monday and Wednesday 1 p.m., _. arrive Mahole 4.10 p.m.; - SO _ (b) ‘depart Plumtree Friday 10 am., arrive Madlambuzi. _ Applications in Connexion with Road Service Permits 11.55 a.m.; . - | _ ) depart Mahole Tuesday and Thursday 6 a.m., arrive — IN ferms of subsection (4) of section 7of the Road Motor | _ Plumtree 9.10 a.m.; So o Transportation Act [Chapter 262}, notice is hereby given that. (d) depart Madlambuzi Friday 4.15 p.m., arrive Bulawayo “the applications detailed in the Schedule, for the issue or 7.55 p.m. = . ‘amendment of road service permits, have been: received for the ‘consideration of the Controller of Road Motor Transpotation. ‘J. R. Zvinoira. | Any person wishing to object to any such application must lodge with the Controller of Road. Motor Transportation, P.O. Q/665/87. Motor-omnibus. Passenger-capacity: 76. Box 8332, Causeway—: oe a — Route: Mutare.- Birchenough Bridge - Zaka - Maware Turn- (a) a notice, in writing, of his intention to object, | so as | '. off Branch - Triangle. ’ to reach the Controller’s office not later than the | 30th December, 1988; . —_ Theservice to operate as follows—— ce _ (b) his objection. and the grounds therefor, on form R.M.T, (a) depart. Mutare Monday, Wednesday and Saturday 24, together with two copies thereof, so as to reach | 6 a.m., atrive Triangle 1.25 p.m; _ - the Controller’s office not later than the 20th January, .
    [Show full text]
  • MIDLANDS PROVINCE - Basemap
    MIDLANDS PROVINCE - Basemap Mashonaland West Chipango Charara Dunga Kazangarare Charara Hewiyai 8 18 Bvochora 19 9 Ketsanga Gota Lynx Lynx Mtoranhanga Chibara 2 29 Locations A Chitenje 16 21 R I B 4 K A CHARARA 7 Mpofu 23 K E 1 Kachuta 4 L A 12 SAFARI Kapiri DOMA 1 Kemutamba Mwami Kapiri Chingurunguru SAFARI Kosana Guruve AREA Mwami Kapiri Green Matsvitsi Province Capital Mwami Mwami Bakwa AREA Valley 5 Guruve 6 KARIBA 26 Kachiva 1 Doro Shinje Nyaodza Dora Kachiva Shinje Ruyamuro B A R I Masanga Nyamupfukudza 22 Nyama A Nyamupfukudza C e c i l m o u r 22 Town E K Kachekanje Chiwore 18 Nyakapupu K Masanga Doma 2 7 L A Gache- Kachekanje Masanga 23 Lan Doma 3 Gatse Gache lorry 5 Doma Gatse Masanga B l o c k l e y Chipuriro 2 Maumbe Maumbe Rydings GURUVE Bumi 16 Maumbe Hills Gachegache Chikanziwe 8 Kahonde Garangwe Karoi 15 Place of Local Importance Magwizhu Charles Lucky Chalala Tashinga Kareshi Crown 5 Mauya 10 11 Clarke 7 10 3 Mauya Chalala Charles Nyangoma 11 1 Karambanzungu Chitimbe Clarke Magunje 8 Nyamhondoro Hesketh Bepura Chalala Kabvunde KAROI URBAN Mugarakamwe Karambanzungu Magunje Magunje Hesketh Nyangoma Mhangura 9 Kudzanai Army Government Ridziwi Mudindo Nyamhunga Sikona ARDA 9 Mission Nyamhunga Mahororo Charles Chisape HURUNGWE Mhangura Sisi MATUSADONA Murapa Sengwe Dombo Madadzi Nyangoma Mhangura 12 Clack Karoi Katenhe Arda Kanyati Nyamhunga Enterprise Tategura Mhangura NATIONAL 17 Kapare Katenhe Karoi Mine Mhangura Sisi Mola Makande Nyadara Muitubu Mola Nyamhunga 10 Enterprise 14 Mola PARK Makande 11 Mhangura Ramwechete 11
    [Show full text]
  • Clifford Mabhena
    ‘Visible Hectares, Vanishing Livelihoods’: A case of the Fast Track Land Reform and Resettlement Programme in southern Matabeleland - Zimbabwe Clifford Mabhena Thesis submitted in fulfilment of the requirement for the Degree of Doctor of Social Sciences (Development Studies) Faculty of Social Science and Humanities University of Fort Hare 2010 i Declaration This work has not been previously submitted in whole, or in part, for the award of any other degree. It is my work. Each significant contribution to, and quotation in, this dissertation from the work of other people has been attributed, and has been cited and referenced. Signature Date ii Abstract: Land reform has been going on in Zimbabwe since the state attained independence from Britain in 1980 as a way of enhancing agrarian livelihoods for the formerly marginalized people. This study argues that, the Land Reform Programme in Southern Matabeleland rather than enhancing agrarian livelihoods, well established livelihoods have actually been drastically reduced. This has been exacerbated by the state programme of land re-distribution that prescribes a „one size fits all‟ model. Yet this is contrary to the thinking in development discourse that equitable land distribution increases rural livelihoods. As a way of gathering data this study utilized ethnography and case study methodologies. I spent two years interacting and interviewing purposively selected new resettles, communal residents, migrant workers and gold panners in this region. Results from this study confirm that, land reform has greatly reduced livelihoods, particularly agrarian livelihoods. Also, this research has found out that, the majority of residents now depend on off-farm livelihoods such as gold panning and migration to neighbouring South Africa.
    [Show full text]
  • Governsient Gazette
    & GOVERNSIENT GAZETTE Publed by Authority Vol, LIX, No, 73. 27th NOVEMBER, 1981 Price 30c _ General Notice 1096 of 1981, RESERVE BANK OF ZIMBABWE ACT (CHAPTER 173] Statement of Assets and Liabilities of tho Reserve Bank of Zimbabwe IN terms of sootlon 20 of the’ Reserve Bank of Zimbabwo Act (Chapter 173), 0 statomont of the assels and linbiltties of the Reserve ‘Bank of Zimbabwo as at the 13th Novembor, 198!, Is published In the | chedule, B. WALTERS, -27—=11=81, Sc . Secretary to the Treasury, HEDU STATEMENT OF ASSETS AND LIABILITIES AS AT THE arn NOVEMBER, [981 . Liabilittes 5 Assets 5 Capital , . Cone ee ote 2.000 000 Gold and foreign assets... «,. + 150761570 General Reserve Fund Pe ee * 6000 000 Loans and advanees , to : 62 102 000 Currency {n circulation. i, . 193039 344 Internal investments— . 286 177 474 Deposits and other liabilities to the publi . § 308 405 307 Government stock . — 86 826 600 Other liabilities 2... 40, , 106 784 785 Other . an 199 350 871 . Otherassets .. ew et we ew a) 47188395 $616229436 | 8616229436 | ‘General Notice 1097. of 1981. _ (b) his objection and the grounds therefor, on Form R.M.T. ROAD MOTOR TRANSPORTATION ACT [CHAPTER 262] - 24, together with two copies thereof, so as to reach the © ‘Controller’s office not later than the 8th January, 1982. Renewalof Road Service Permits _ e Any person objecting to an application for the issue or amendment of a road service permit must confine his grounds of objection to matters directly bearing on the considerations HOLDERSof road service permits which‘are due to expire referred to in paragraph (a), (b), (c), (d), (e), or (f) of section on the 31st January, 1982, are reminded that applications for 8 of the said Act.
    [Show full text]